This solicitation seeks sealed bids from certified Small Business Concerns for resurfacing the Natchez Trace Parkway in Mississippi. The project consists of asphalt overlay, sideslope repairs, wedge and leveling, spot patching, and other miscellaneous work across multiple schedules and contract options totaling between $10-20 million. Bid documents were issued on February 8, 2023 with bids due by the date specified in Block 13a of the solicitation. Interested vendors must register at www.sam.gov and complete annual Representations and Certifications at both www.sam.gov and http://www.dol.gov/vets/vets4212.htm. Questions regarding construction projects should be directed to eflhd.contracts@dot.gov. Bidders are encouraged to submit bids electronically per instructions in the solicitation. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO - NAP-NATR 3E16 3F25.pdf | ||
| Bridge As-Built Drawings.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| DRAFT SWPPP.docx | DOCX document | |
| IFB Solicitation - NP-NATR 3E16 3F25.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| VETS-4212 Form.pdf | ||
| FP14_Eng.pdf | ||
| NP NATR 3E16_3F25_FINAL Pavement Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Sheet
Symbols And Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Construction Plan
DESCRIPTION
INDEX TO SHEETS
PLANS FOR PROPOSED
PLANS PREPARED BY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
Project NP-NATR 3E16,3F25
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 26.71 Miles
ADT (2022)
ADT (2042)
DHV
%Truck
D
V (MPH)
55/45
1%
SPECIFICATIONS:
BRIDGE:
DESIGN DESIGNATION:
e(max) 8%
C/A None repairs, and other miscellaneous work.
wedge and leveling, spot patching, bridge joint work will include asphalt overlay, sideslope repairs, various access roads, and parking/pull-off areas. The
Parkway, including ramps, bridges, intersections, This project consists of resurfacing the Natchez Trace
3,060
4,547
0 2 5
SCALE IN MILES
N
PONTOTOC, CHICKASAW, HINDS, AND MADISON COUNTIES, MISSISSIPPI
BRIDGES, ACCESS ROADS, AND PARKING AREAS
TO MP 251.00 AND MP 86.08 TO 100.66 INCLUDING RAMPS,
PARKWAY PAVEMENT REHABILITATION FROM MP 239.23
Know what'sbelow.
before you dig.Call
R
Administration
Federal Highway
U.S. Department of Transportation
SHEET
NO
A01
A03-A04
A05-A06
B01-B07
C01-C04
D01-D11
LANE MILES:
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
NATCHEZ TRACE PARKWAY
PROJECT NP-NATR 3E16,3F25
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
ROAD: WIDTH SURFACE BASE
N/A
SUBGRADE
N/A
ROAD: WIDTH
22'
22'
SURFACE BASE
N/A N/A
SUBGRADE
5-9" ACP 6" ABC N/A
1.375" ACP
(10) MS Route 32 Bridge 5570-058P (03/22/2021)
(9) County Road Bridge at MP 240.90 5570-407P (11/18/2019)
(8) Chuquatonchee Creek Bridge 5570-057P (03/22/2021)
(7) Davis Lake Road Bridge 5570-056P (03/23/2021)
(6) County Road Bridge at MP 245.90 5570-409P (11/18/2019)
(5) MS Route 41 Bridge 5570-055P (03/23/2021)
(4) Tallabinnela Creek Bridge 5570-054P (03/23/2021)
(3) Farm Road Bridge at MP 248.01 5570-459P (11/18/2019)
(2) County Road Bridge at MP 249.10 5570-191P (03/23/2021)
(1) Field Road Bridge at MP 250.10 5570-331P (11/18/2019)
Natchez Trace Parkway (Proposed)
Natchez Trace Parkway (Existing)
NOVEMBER, 2022
Project Manager
Dan Weston
Lead Designer
Chris Burnell
Highway Design Manager
Bradley Proctor
54.14 Miles
PMIS #159666A & #159671A & #206843A
A02 Road Inventory Data
Project NP-NATR 3E16,3F25
SCALE IN MILES
0 60 120
KEY MAP
STATE OF MISSISSIPPI
HOLLY
SPRINGS TUPELO
P A
R K
W A
Y
T R
A C
E
DELTA
N
ATCH
EZ
NATCHEZ
JACKSON
MERIDIAN
GULFPORT
VICKSBURG
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
45N
E01-E07
M01
N01-N14
Ramp and Parking Area Plans
Erosion & Sediment Control Narrative
Traffic Control Detour Plan
1-800-227-6477
Summaries and SchedulesC05-C19
- MP 251
MP 239.23
- MP 100.66
MP 86.08
55/45
1%
8%
None
4,900
7,727
S01-S27 Standards And Details
:4
P
M
N o v e m b e r
T it le S h e e t
M o d e l
C
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \A
-N
A T
R
E
F tt l.
d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A01
NPS Drwg No. 604/182854 NPS PMIS Nos. 159666A and 159671A and 206843A
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
ROAD INVENTORY DATA
:4
S e p te m b e r
L o c a ti o n
M a p
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \A
-N
A T
R
E
F R
IP
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A02
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
NATCHEZ TRACE PARKWAY
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:2
A u g u s t
S
H E
E
P
R O
J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \A
-A
-N
A T
R
E
F s y m
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A03
N
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
SYMBOLS AND ABBREVIATIONS
AREA PATTERN
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Reconstruction
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
ABC Aggregate Base Course
Slope Fill/Regrade
RCP Reinforced Concrete Pipe
:2
A u g u s t
S
H E
E
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \A
-A
-N
A T
R E
F s y m
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A04
m il e s
T u p e lo
.5 m ile s
P o n to to c
NO SCALE
11 miles
Amory m il e s
M a b e n
(RIP MP 241.22)
MP 239.23
12+77
Begin Schedule C
Begin Project
(RIP MP 246.33)
MP 244.10
269+88
End Schedule C
Begin Schedule B
(RIP MP 247.24)
MP 245.00
316+72
End Schedule B
Begin Schedule A
(RIP MP 253.29)
MP 251.00
636+53
End Schedule A
End Project
107+57 to 109+57
Schedule D
592+47 to 593+48
474+32 to 475+12, 398+87 to 400+34, Schedule F
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
Sheet 1 of 2
NATCHEZ TRACE PARKWAY
:2
S e p te m b e r
L o c a ti o n
M p
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v
\C A
D D
\A
-N
A T
R
E
F lo c .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A05
NO SCALE
Pa rk w ay
Natc hez
Tra ce
To Jackson
To Canton
MP 86.08
BEGIN SCHEDULE E
MP 100.66
END SCHEDULE E
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
Sheet 2 of 2
NATCHEZ TRACE PARKWAY
:1
J u ly
L o c a ti o n
M a p
S h e e t
M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \A
-N
A T
R E
,3
F S c h E
L o c a ti o n .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 A06
CL
<½" elevation difference (typ.)
CL
Existing pavement structure
Proposed surface course
NO SCALE
DETAIL A
TANGENT SECTION
NATCHEZ TRACE PARKWAY
SUPERELEVATED SECTION
NATCHEZ TRACE PARKWAY
aggregate-topsoil.
8. Provide turf establishment on shoulder areas receiving
½-inch lower than the adjacent asphalt surface.
aggregate-topsoil to all areas that become more than elevation to the existing shoulder. Add additional
7. Place aggregate-topsoil to tie the new edge of pavement grass.
aggregate-topsoil is placed onto the existing shoulder
6. Cut grass to a height of ½-inch or less where the plans based on field conditions.
overlaying locations beyond the locations identified in
5. The CO will determine additional 3-inch milling and overlaying according to Subsections 401.13 and 413.03.
4. Clean residual asphalt immediately after milling and after milling as approved by the CO.
superelevation using asphalt wedge and leveling or
3. Match existing cross slope (2% minimum) and asphalt pavement adjacent to the shoulder.
2. Remove all vegetation and material off of the existing as directed by the CO prior to placing the asphalt overlay.
1. Seal and fill cracks according to Detail E414-01 and
NOTES:
CL
SECTION
3-INCH MILL & OVERLAY
1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Type I-A pavement roughness 5" to 9" depth, ACP
8" depth, Aggregate base
Existing ground
Existing ground
Existing ground topsoil course (typ.)
Existing aggregate-
6' 6'
6'6'
6' 6'
Shoulder
ShoulderTravel laneTravel lane
Travel lane Travel lane
Travel laneTravel lane
11' 11'
11' 11'
11' 11'
2' Lateral pay limit for aggregate-topsoil (typ.)
Varies (1V:3H) Max.)
Varies
(1V:3H) Max.)
Varies Varies
(1V:3H) Max.)
Varies Varies
(1V:3H Max.)
(1V:3H Max.)
(1V:3H Max.)
Lateral pay limit for aggregate-topsoil (typ.)2'
1V:
4H
1V:
4H
1V:
4H existing Match existing
Match existing Match existing
Match existing Match
8%
8%
8%
8%8%
Varies
Asphalt tack coat
Asphalt tack coat
Asphalt tack coat
Asphalt tack coat
8" depth, Aggregate base
8" depth, Aggregate base
5" to 9" depth, ACP
5" to 9" depth, ACP topsoil course (typ.)
Existing aggregate-topsoil course (typ.)
Existing aggregate-
Detail A See
Detail A See
Detail A See
1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Type I-A pavement roughness
1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Type I-A pavement roughness
3" depth, Asphalt pavement milling
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
8% Max.
Place tack coat between lifts 3" depth, ACP, Gyratory Mix, ½" NMSA, <0.3 million ESAL (two lifts), Turf establishment (typ.)
Proposed aggregate-topsoil course
EXISTING
EXISTING
EXISTING PROPOSED
PROPOSED
PROPOSED
2' Lateral pay limit for aggregate-topsoil (typ.)
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 1 of 7
NATCHEZ TRACE PARKWAY
:2
S e p te m b e r
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B01
Type I-A pavement roughness " NMSA, <0.3 million ESAL8
" depth, ACP, Gyratory Mix, 8
Asphalt tack coat reveal (See Note 4)
6" depth, minimum curb
Match existing
STYPICAL MILL AND OVERLAY SECTION AT BRIDGE
NATCHEZ TRACE PARKWAY
Match existing
(See Note 4)
Variable depth, Asphalt pavement milling
NO SCALE
Travel lane
11'
Travel lane
11'
Limits of disturbance
Shoulder
3' - 6'
Shoulder
3' - 6'
PROPOSED
Variable depth, ACP
Concrete deck
EXISTING
5" to 8" depth, Aggregate base
Varies existing Match
EXISTING PROPOSED
5" to 7" depth, Asphalt concrete pavement
PARKING AREA MILL AND OVERLAY SECTION
LC
Limits of disturbance
Shoulder
Varies
2'
8% aggregate-topsoil (typ.)
Lateral pay limit of ground
Existing course (typ.)
Variable depth, Aggregate-topsoil designated curb sections. (See Note 3)
Variable depth, Taper milling existing roadway along
Asphalt tack coat
Type IV pavement roughness
<0.3 million ESAL, " NMSA,8
" depth, ACP, Gyratory Mix, ⅜1 face of curb Milling depth at
3" to 4"
2" to 3"
1" to 2"
0 to 1"
TAPER MILLING TABLE
(ft) * Milling width
* See Note 4
See Taper Milling Table Milling width varies
(protect in place) Existing PCC curb
LC
or as directed by the CO.
the end of the bridge wingwalls as shown in the plans topsoil and turf establishment at the eroded areas at Place lean concrete backfill (flowable fill) and provide11.
aggregate-topsoil.
Provide turf establishment on shoulder areas receiving10.
½-inch lower than the adjacent asphalt surface.
aggregate-topsoil to all areas that become more than elevation to the existing shoulder. Add additional Place aggregate-topsoil to tie the new edge of pavement9.
grass.
aggregate-topsoil is placed onto the existing shoulder Cut grass to a height of ½-inch or less where 8.
overlaying according to Subsections 413.03 and 401.13.
Clean residual asphalt immediately after milling and after7.
milling as approved by the CO.
superelevation using asphalt wedge and leveling or Match existing cross slope (2% minimum) and 6.
asphalt pavement adjacent to the shoulder.
Remove all vegetation and material off of the existing 5.
bridge curb reveal depths.
See Bridge Work Summary for milling transition lengths and leveling. Ensure that parking areas and bridges drain properly.
Mill additional depth on all bridges that will receive wedge and4.
parking area curb sections after final paving.
Reestablish a minimum 6-inch curb reveal along all3.
as directed by the CO prior to placing the asphalt overlay.
Seal and fill cracks according to Details E414-01 and E414-A, and2.
according to Subsection 152.05(h).
Survey the Parkway centerline profile at each bridge1.
NOTES:
of wingwall Existing end ground Existing
DETAIL
ENDS OF WINGWALLS
EROSION REPAIR AT THE
(See Note 11) Eroded area
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 2 of 7
NATCHEZ TRACE PARKWAY
:2
S e p te m b e r
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B02
NATCHEZ TRACE PARKWAY AND PARKING AREAS ASPHALT PAVEMENT PATCH, TYPE 1
10" depth, Roadway excavation
1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Type IV pavement roughness
Type 1, (two lifts) in accordance with Section 403 4" depth minimum or match existing depth, ACP, Asphalt tack coat in accordance with Section 301 6" depth, Aggregate base course, Grading C or D
Existing ACP
Existing aggregate base
NO SCALE
Separation-stabilization geotextile, Class 2, Type E
Type I-A pavement roughness <0.3 million ESAL, 1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, Place tack coat between lifts in accordance with Section 403, 6" depth, ACP, Type 1, (two lifts)
Asphalt tack coat
Existing aggregate base
NATCHEZ TRACE PARKWAY WIDENING
Roadway excavation
2'
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
Existing ground
2' aggregate-topsoil Lateral pay limit for
Existing edge of pavement
Existing asphalt concrete pavement
16' and varies
2" to 4" depth, ACP
Asphalt tack coat
RAMP SECTION
Type IV pavement roughness <0.3 million ESAL, " NMSA,8
3" depth, ACP, Gyratory Mix, 8
Shoulder Shoulder
6" depth, Aggregate base
Travel lane
2' 2'
8%
BL
slope existing Match
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
EXISTING
PROPOSED
existing Match aggregate-topsoil.
7. Provide turf establishment on shoulder areas receiving
½-inch lower than the adjacent asphalt surface.
aggregate-topsoil to all areas that become more than elevation to the existing shoulder. Add additional
6. Place aggregate-topsoil to tie the new edge of pavement grass.
aggregate-topsoil is placed onto the existing shoulder
5. Cut grass to a height of ½-inch or less where milling as approved by the CO.
superelevation using asphalt wedge and leveling or
4. Match existing cross slope (2% minimum) and asphalt pavement adjacent to the shoulder.
3. Remove all vegetation and material off of the existing as directed by the CO prior to placing the asphalt overlay.
2. Seal and fill cracks according to Detail E414-01 and for pavement widening areas.
1. Transition lengths will be determined by the CO in the field
NOTES:
Asphalt tack coat
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 3 of 7
NATCHEZ TRACE PARKWAY
:2
S e p te m b e r
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B03
Limits of disturbance
2%
LC
Existing ground 2%
11'
Travel lane
Variable depth, ACP
11'
Travel laneShoulder Shoulder
6'6'
(1V:3H Max.)
Varies
NOTES:
Asphalt tack coat
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course
(1V:3H Max.)
Varies
2'
Limits of disturbance
11'
Travel lane aggregate-topsoil (typ.)
Lateral pay limit of
11'
Travel laneShoulder Shoulder
6'6'
2'
LC
PARKWAY TANGENT SECTION
WEDGE AND LEVEL
PARKWAY SUPERELEVATED SECTION
WEDGE AND LEVEL
Variable depth, ACP
Asphalt tack coat aggregate-topsoil (typ.)
Lateral pay limit of
(e)%Existing ground
Type 1-A pavement roughness
1⅜" depth ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Type 1-A pavement roughness 1⅜" depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL
<0.3 million ESAL, Wedge & Leveling Course Variable depth, ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, Wedge & Leveling Course Variable depth, ACP, Gyratory Mix, ⅜" NMSA, receiving aggregate-topsoil.
Provide turf establishment on shoulder areas5.
lower than the adjacent asphalt surface.
to all areas that become more than ½-inch shoulder. Add additional aggregate-topsoil of pavement elevation to the existing Place aggregate-topsoil to tie the new edge4.
grass shoulder.
aggregate-topsoil is placed onto the existing Cut grass to a height of ½-inch or less where3.
level may be required at some locations.
than 2 inches. Additional lifts of wedge and Do not exceed asphalt lift thickness of more2.
positive drainage exists across the roadway.
improvegrade and cross slope. Ensure by the CO. Mill repair areas as necessary to materialat locations, line and grade specified locations. Place asphalt wedge and leveling Milling depths vary at wedge and leveling1.
EXISTING
EXISTING
PROPOSED
PROPOSED
Turf establishment (typ.)
Variable depth, Aggregate-topsoil course existing Match
Asphalt tack coat
8% Max.
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 4 of 7
NATCHEZ TRACE PARKWAY
NO SCALE
:3 e p te m b e r
U n ti tl e d S h e t
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B04
Travel way Shoulder
Limits of clearing and grubbing
22'±
Match ExistingMatch Existing 8%
Select granular backfill (#57 stone)
CL
Existing 4" depth, Aggregate base
6'
DETAIL A
2.00%
Turf establishment
4" depth, Aggregate-topsoil course
Existing 8" depth, ACP collector pipes at a minimum 2% slope.
Place non-perforated outlet pipes and perforated 8.
low point or as directed by the CO.
Install a minimum of one outlet underdrain at the 7.
See Subsection 209.03 for excavation requirements.
Maintain excavation limits within the roadway limits.6.
Maintain existing profile grade.5.
netting.
Provide 100% biodegrable rolled erosion control product including rolled erosion control product, Type 3.B according to Section 629.
Provide turf establishment according to Section 625, and install 4.
Provide wire basket with support struts according to Detail E255-A.3.
Do not mix seed into topsoil to be used as backfill.2.
-inch below edge of pavement.2 of pavement, Maintain a final elevation of shoulder, adjacent to the edge course and turf establishment as directed by the CO.
Correct shoulder drop-off by adding aggregate-topsoil1.
DEEP PATCH EMBANKMENT REPAIR
MP 247.9 (Length = 80 lnft), 474+32 to 475+12
NATR Schedule F -
Depth varies (max. 72"), Roadway excavation
8" depth, Aggregate Base Grading C or D
<0.3 million ESAL, Type 1-A pavement roughness
1⅜" depth, ACP, Gyratory Mix, ⅜” NMSA, <0.3 million ESAL (two lifts) 4" depth, ACP, Gyratory Mix, ½” NMSA, Asphalt tack coat
See Note 5 geotextile, Class 1, Type B Separation-stabilization
Existing ground (typ.)
reconditioning Shoulder
Separation-stabilization geotextile, Class 1, Type B
See Detail A
Topsoil. See Note 2.
Geogrid (Type V) product, Type 3.B rolled erosion control Turf establishment and
See Note 3 18" X 18" X 8'-0" wire basket
Existing ground (typ.)
Topsoil. See Note 2.Type B Class 1, geotextile, stabilization Separation-
(#57 stone) backfill granular Select
See Note 6 Excavation limits, 1V:3H
SECTION A-A
Select granular backfill (#57 stone)
4" leveling course (#57 stone)
(6" perforated collector pipe) Underdrain system
Geogrid reinforcement
See Detail B
A
A
See Notes 7 and 8 (6" non-perforated outlet pipe) Underdrain system
Foundation elevation
1V :4H
16" overlap
32"8"
8" pipe and geotextile separation between
Provide 2" (min.)
DETAIL B
See Notes 7 and 8 (6'' perforated outlet pipe) Underdrain system
See Notes 7 and 8 (6'' perforated collector pipe) Underdrain system geotextile, Class 1, Type B Separation-stabilization
12"
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 5 of 7
NATCHEZ TRACE PARKWAY
15'
4'-0"
4"
18"
18"
:2
S e p te m b e r
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B05
22'±
Match ExistingMatch Existing 8%
Select granular backfill (#57 stone)
CL
Existing 4" depth, Aggregate base
6'
DETAIL A
2.00%
Turf establishment
4" depth, Aggregate-topsoil course
Existing 8" depth, ACP collector pipes at a minimum 2% slope.
Place non-perforated outlet pipes and perforated 7.
low point or as directed by the CO.
Install a minimum of one outlet underdrain at the 6.
Maintain existing profile grade.5.
netting.
Provide 100% biodegradable rolled erosion control product including rolled erosion control product, Type 3.B according to Section 629.
Provide turf establishment according to Section 625 and install 4.
Provide wire basket with support struts according to Detail E255-A.3.
Do not mix seed into topsoil to be used as backfill.2.
-inch below edge of pavement.2 of pavement, Maintain a final elevation of shoulder, adjacent to the edge course and turf establishment as directed by the CO.
Correct shoulder drop-off by adding aggregate-topsoil1.
DEEP PATCH EMBANKMENT REPAIR
MP 241 (Length = 200 lnft), 107+57 to 109+57
NATR Schedule D -
Depth varies (max. 72"), Roadway excavation
8" depth, Aggregate Base Grading C or D
<0.3 million ESAL, Type 1-A pavement roughness
1⅜" depth, ACP, Gyratory Mix, ⅜” NMSA, <0.3 million ESAL (two lifts) 4" depth, ACP, Gyratory Mix, ½” NMSA, Asphalt tack coat
See Note 5
Separation-stabilization geotextile, Class 1, Type B
See Detail A
Topsoil, See Note 2
Geogrid (Type V) product, Type 3.B rolled erosion control Turf establishment and
See Note 3 18" X 18" X 8'-0" wire basket
Existing ground (typ.)
Topsoil, See Note 2Type B Class 1, geotextile, stabilization Separation-
(#57 stone) backfill granular Select
1V:3H
SECTION A-A
4" leveling course (#57 stone)
(6" perforated collector pipe) Underdrain system
Geogrid reinforcement
See Notes 6 and 7 (6" perforated outlet pipe) Underdrain system
See Detail B
A
A
See Notes 6 and 7 (6" non-perforated outlet pipe) Underdrain system
Foundation elevation
12"
Shoulder 6'
Limits of clearing and grubbing
12"
8%
1V :3
H
1V :4H
16" overlap
32"8"
8"
DETAIL B
See Notes 6 and 7 (6'' perforated outlet pipe) Underdrain system
See Notes 6 and 7 (6'' perforated collector pipe) Underdrain system geotextile, Class 1, Type B Separation-stabilization
Select granular backfill (#57 stone)
CL
pipe and geotextile separation between
Provide 2" (min.)
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 6 of 7
NATCHEZ TRACE PARKWAY
4'-0"
4"
18"
18"
:0
O c to b e r
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B06
Match Existing 8%
See Detail E204-02 Embankment construction, 6'
See Subsection 204.10(c) for embankment requirements.3.
netting.
Rolled erosion control product must be 100% biodegrable including rolled erosion control product, Type 3.B according to Section 629.
Provide turf establishment according to Section 625 and install 2.
-inch below edge of pavement.2 of pavement, Maintain a final elevation of shoulder, adjacent to the edge course and turf establishment as directed by the CO.
Correct shoulder drop-off by adding aggregate-topsoil1.
MP 250 (Length = 110 lnft), 592+47 to 593+57
MP 246.5 (Length = 140 lnft), 398+88 to 400+18
NATR Schedule F -
Type 1-A pavement roughness 1⅜" depth ACP, Gyratory Mix, ⅜" NMSA, <0.3 million ESAL, EMBANKMENT REPAIR product, Type 3.B rolled erosion control Turf establishment and
Existing ground
Varies
(1V:3H Max.)
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
Sheet 7 of 7
NATCHEZ TRACE PARKWAY
:2
A u g u s t
S h e e t M o d
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \B
-N A
T R
E
F ty p .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 B07
SCHEDULE A
SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION
TABULATION OF QUANTITIES
NATCHEZ TRACE PARKWAY
:4
N o v e m b e r
T A
B O
F Q
U A
N T
S C
H A
S H
E E
T M
O D
E L
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v
\C A
D D
\C
-C
-N A
T R
E
F
Q n ty
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C01
TABULATION OF QUANTITIES
SCHEDULE C
:5 c to b e r
T
A B
O F
Q U
A N
T S
C H
B S
H E
E T
M O
D
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v
\C A
D D
\C
-C
-N A
T R
E
F
Q n ty
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C02
SCHEDULE E
SCHEDULE D
:5 c to b e r
T
A B
O F
Q U
A N
T S
C H
C S
H E
E T
M O
D
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v
\C A
D D
\C
-C
-N A
T R
E
F
Q n ty
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C03
SCHEDULE F
:5 c to b e r
T
A B
O F
Q U
A N
T S
C H
D S
H E
E T
M O
D
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v
\C A
D D
\C
-C
-N A
T R
E
F
Q n ty
.d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C04
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
.U
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C05
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C06
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
(MUTCD), latest edition.
Uniform Traffic Control Devices" accordance with the "Manual on
3. Construct and erect all signs in directed by the CO.
2. Adjust actual locations of signs as
Details E633-01 & E633-02.
1. Install sign post supports according to
NOTES:
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C07
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C08
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C09
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C10
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C11
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C12
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
(MUTCD), latest edition.
Uniform Traffic Control Devices" accordance with the "Manual on
3. Construct and erect all signs in directed by the CO.
2. Adjust actual locations of signs as
Details E633-01 & E633-02.
1. Install sign post supports according to
NOTES:
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C13
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
SUMMARIES AND SCHEDULES
:0 a r c h
B a s e .B
C A
D D
\O R
D \F
L H
-C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C14
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
NATCHEZ TRACE PARKWAY
:2
M a r c h
B a s e .B
G
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C15
NOTE:
Devices" (MUTCD), latest edition.
with the "Manual on Uniform Traffic Control
Construct and erect all sings in accordance
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
NATCHEZ TRACE PARKWAY
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C16
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
NATCHEZ TRACE PARKWAY
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C17
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
NATCHEZ TRACE PARKWAY
conditions warrant or as directed by the CO.
Work locations are subject to change as field
NOTE:
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C18
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES AND SCHEDULES
NATCHEZ TRACE PARKWAY
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 C19
M S
N
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
17+63 to 18+82, Structure 5570-058P, MS Route 32 Bridge at MP 239.30, for details
Parking Area Plans
See the Ramp and
SR 32 access road, NATCHEZ TRACE PKWY
See Note 2
Milling and overlay, 17+13 to 17+63 type 1, 1,453 sqyd, Perform full depth patch, 18+82 to 19+32 type 1, 1,344 sqft, Perform full depth patch, See Note 3
17+63 to 18+82, Milling and overlay (micromilling), See Note 3
16+35 to 17+13, Milling and overlay (micromilling), See Note 3
19+32 to 20+03, Milling and overlay (micromilling),SOFT
SHOULDERInstall signs W8-4
E 9547.7875
N 25569.5322
12+77 (MP 239.23)
BEGIN 1⅜" ASPHALT OVERLAY
BEGIN SCHEDULE C
BEGIN PROJECT
Sawcut pavement
AREA
MOUND PARKING
BEAR CREEK
MP
N
M A
T C
H L I N
E
0M
A T
C H
L I N
E
Proposed edge of pavement
Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening See Typical Sections, 54+03 to 60+00, Construct 2' pavement widening, for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
SCALE IN FEET
0 100 200
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTES 0001F AND 0001E)
2+00 TO 60+00
5 2 0 2 5 3
0 45
:0
A u g u s t
B
L
D
S h e t]
P
R O
J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D01
AREA
BEAR CREEK
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline See Note 2
70+79 to 71+39, Milling and overlay, NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 60+00 to 65+67, Construct 2' pavement widening, Sawcut pavement
Sawcut pavement
C R
C R
See Note 2
70+87 to 71+59, Milling and overlay, AREA
M O
U N
D
PARKIN
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
100+83 to 100+98, Structure 5570-407P, County Road Bridge at MP 240.90, NATCHEZ TRACE PKWY
See Note 3
99+84 to 101+94, Milling and overlay (micromilling), Schedule D
See Typical Sections, 107+57 to 109+57, Perform deep patch embankment repair, SOFT
SHOULDER
Install signs W8-4
See Typical Sections
109+57 to 118+00, 3-inch milling and overlay, U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
60+00 TO 118+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
0 8
0 1
:4 e p te m b e r
B L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D02
A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
Area Plans for details
See the Ramp and Parking
Chickasaw Agency parking, NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 125+40 to 133+50, Construct 2' pavement widening, See Typical Sections
118+00 to 127+57, 3-inch milling and overlay, N
M A
T C
H L I
N E
0M
A T
C H
L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
150+27 to 158+90, Structure 5570-057P, Chuquatonchee Creek Bridge at MP 242.00, NATCHEZ TRACE PKWY
See Note 3
148+77 to 160+37, Milling and overlay (micromilling), U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
118+00 TO 176+00
NOTES:
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
:1
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D03
A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline
NATCHEZ TRACE PKWY
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
217+64 to 217+99, Structure 5570-056P, Davis Lake Road Bridge at MP 243.10, Area Plans for details
See the Ramp and Parking
Hernando de Soto parking, details
Parking Area Plans for
See the Ramp and
Davis Lake access road, D a v is L a k e R o a d
D a v is L a k e R o a d
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 233+01 to 234+00, Construct 2' pavement widening, 216+77 to 217+27 type 1, 1,368 sqft, Perform full depth patch, 218+34 to 218+84 type 1, 1,374 sqft, Perform full depth patch, See Note 3
215+84 to 216+77, Milling and overlay (micromilling), See Note 3
217+27 to 218+34, Milling and overlay (micromilling), See Note 3
218+84 to 219+77, Milling and overlay (micromilling), Natchez Trace Parkway Widening
See Typical Sections, 223+34 to 229+41, Construct 2' pavement widening, SOFT
SHOULDER Install signs W8-4
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
176+00 TO 234+00
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
NOTES:
:1
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D04
A
T C
H L I
N E
M A
T C
H L I
N E
0 Proposed edge of pavement Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 234+00 to 238+67, Construct 2' pavement widening, N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
NATCHEZ TRACE PKWY
E 20051.6115
N 48751.0658
269+88 (MP 244.10)
END SCHEDULE C
BEGIN SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
234+00 TO 292+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
:1
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D05
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 307+67 to 319+61, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 316+72 to 321+00, Construct 2' pavement widening, SOFT
SHOULDER Install signs W8-4
E 21737.5184
N 53116.0139
316+72 (MP 245.00)
END SCHEDULE B
BEGIN SCHEDULE A
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 321+00 to 349+07, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 338+26 to 350+00, Construct 2' pavement widening, See Typical Sections
324+07 to 325+17, 3-inch milling and overlay, U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
292+00 TO 350+00
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
NOTES:
:1
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D06
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavementConstruction centerline
See Note 7
364+44 to 364+78, Structure 5570-409P, County Road Bridge at MP 245.90
Area Plans for details
See the Ramp and Parking
Monroe Mission parking, NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 351+77 to 364+44, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 364+79 to 379+00
Construct 2' pavement widening, See Note 3
363+74 to 365+48, Milling and overlay (micromilling), P O
N T
O T
O C C
O U
N T
Y
P O
N T
O T
O C C
O U
N T
Y
C H I C
K A
S A
W C
O U
N T
Y C
H I C
K A
S A
W C
O U
N T
Y
Natchez Trace Parkway Widening
See Typical Sections, 350+00 to 350+91, Construct 2' pavement widening, N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 389+63 to 394+86, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 379+00 to 383+97, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 399+47 to 402+64, Construct 2' pavement widening, See Typical Sections
4,689 sqft, Schedule F, 398+88 to 400+18, Embankment repair, U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
350+00 TO 408+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
:4
N o v e m b e r
B L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D07
P
D I
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
425+56 to 426+67, Structure 5570-055P, MS Route 41 Bridge at MP 247.00, for details
Parking Area Plans
See the Ramp and
SR 41 access road, NATCHEZ TRACE PKWY
See Note 3
424+20 to 429+27, Milling and overlay (micromilling), SOFT
SHOULDER Install signs W8-4
S R
S R
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
NATCHEZ TRACE PKWY
Natchez Trace Parkway Widening
See Typical Sections, 447+23 to 460+58, Construct 2' pavement widening, See Typical Sections
444+57 to 445+17, 3-inch milling and overlay, U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
408+00 TO 466+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
0 4
:0
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D08
O
UN
D
PARKIN
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline See Note 7
478+20 to 478+34, Structure 5570-459P, Farm Road Bridge at MP 248.01, See Note 7
469+77 to 470+99, Structure 5570-054P, Tallabinnela Creek Bridge at MP 247.90, NATCHEZ TRACE PKWY
See Note 3
468+51 to 474+32, Milling and overlay (micromilling), See Note 3
475+12 to 480+11, Milling and overlay (micromilling), Schedule F
See Typical Sections, 474+32 to 475+12, Perform deep patch embankment repair, AREA
MOUND PARKING
BEAR CREEK
A U
X r e fe r e n c e lin e s
A U
X m illin g a r e a s
A U
X
R I P B I P I
N F
O R
M A
T I O
N , N o t e s
N
M A
T C
H L I
N E
M A
T C
H L I
N E
0Proposed edge of pavement
Construction centerline
NATCHEZ TRACE PKWY
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
466+00 TO 524+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
:5
S e p te m b e r
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D09
BEGIN S
ECTION 3-D
END SECTION 3-E
AREA
S h a n n o n R o a d
S h a n n o n R o a d
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerlineSee Note 7
535+93 to 536+09, Structure 5570-191P, County Road Bridge at MP 249.10, NATCHEZ TRACE PKWY
See Note 3
533+92 to 533+43, Milling and overlay (micromilling), See Note 3
536+59 to 538+54, Milling and overlay (micromilling), 536+09 to 536+59 type 1, 1,422 sqft, Perform full depth patch, SOFT
SHOULDER
Install signs W8-4
Natchez Trace Parkway Widening
See Typical Sections, 529+92 to 533+92, Construct 2' pavement widening, BEGIN
SECTIO
N 3 -D
END S
ECTIO
N 3 -E
AREA
MOUND PARKING
BEAR CREEK
N
M A
T C
H L I
N E
0 M
A T
C H
L I
N E
Construction centerline for details
Parking Area Plans
See the Ramp and
Tockshish parking
NATCHEZ TRACE PKWY
See Typical Sections
560+07 to 565+07, 3-inch milling and overlay, Natchez Trace Parkway Widening
See Typical Sections, 565+95 to 569+77, Construct 2' pavement widening, Proposed edge of pavement
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
CONSTRUCTION PLAN
(ROUTE 0001F)
524+00 TO 582+00
for profiled pavement markings at bridge approaches.
E634-AFor bridges, see E552-A for joint sealing and Detail4.
See Detail E413-A for pavement milling transitions on bridges.3.
intersections, and ramps.
See Detail E401-01A for overlay pavement transitions for the Parkway, 2.
Confirm stationing in the field.
survey has been perfomed for this project. Stationing is approximate.
Plans developed from Parkway's land-use-plans and from as-builts. No1.
for the scope of work at bridges.
See the Bridge Work Summary and the Typical Sections7.
at intersections.
as directed by the CO. Break Parkway centerline striping pavement markings according to Subsection 634.03 or
Install new pavement markings that match the existing6.
areas.
Reestablish a minimum 6-inch curb reveal at all parking5.
NOTES:
:0
A u g u s t
B
L
D
S h e
P R
O J E
C T
S \n a tr
\3 e f2
\P ro j_ d e v \C
A D
D \D
-D
-N
A T
R
E
F P
L A
N .d g n
STATE PROJECT
NUMBER
SHEET
MS NP-NATR 3E16,3F25 D10
N
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
See Note 7
585+71 to 585+85, Structure 5570-331P, Field Road Bridge at MP 250.10, NATCHEZ TRACE PKWY
Widening Areas
Natchez Trace Parkway
See Typcal Sections, 605+42 to 610+78, Construct 2' pavement widening, Natchez Trace Parkway Widening
See Typical Sections, 595+42 to 601+43, Construct 2' pavement widening, See Note 3
583+88 to 587+67, Milling and overlay (micromilling), Schedule F
592+35, 24" RCP,
Remove and replace 30 lnft, 597+30 to 598+55 type 1, 2,875 sqft, Perform full depth patch, See Typical Sections
6,952 sqft, Schedule F, 592+47 to 593+57, Embankment repair, 24" concrete headwall
Remove and replace
AREA
N
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .