ROBO - NAP-NATR 3E16 3F25.pdf
PDF 152 KB Posted
- Attached to
- Natchez Trace Parkway Federal contract opportunity
- Solicitation number
- 693C73-23-B-000008
About this file
This document provides details of a bid opening for a federal highway construction project. The Natchez Trace Parkway Project NP-NATR 3E16, 3F25 has a total estimated cost between $10-20 million and includes resurfacing the parkway, bridges, and parking areas. The project will be split into multiple schedules, with bids due on March 14, 2023. Three contractors provided bids for the total project ranging from $17.3-20.2 million. The engineer's estimate was $13 million. The selected contractor must complete the total project within 201 calendar days or specific schedules ranging from 44-91 days to complete. The Eastern Federal Lands Highway Division of the US Department of Transportation Federal Highway Administration issued the solicitation for certified small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT SWPPP.docx | DOCX document | |
| IFB Solicitation - NP-NATR 3E16 3F25.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Bridge As-Built Drawings.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| VETS-4212 Form.pdf | ||
| FP14_Eng.pdf | ||
| NP NATR 3E16_3F25_FINAL Pavement Report.pdf | ||
| Plans - NP-NATR 3E16 3F25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Natchez Trace Parkway
PROJECT: NP-NATR 3E16, 3F25
SOLICITATION NO. 693C73-23-B-000008
March 14, 2023 at 2:00 p.m.
Ashburn, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-23-B-000008 Project: NP-NATR 3E16, 3F25
March 14, 2023, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Anderson Contracting, LLC SCHEDULE A - $8,019,920.00
SCHEDULE B (OPTION 1) - $994,643.65
SCHEDULE C ( OPTION 2) - $5,729,192.00
SCHEDULE D ( OPTION 3) - $1,454,907.00
SCHEDULE E ( OPTION 4) - $3,178,539.38
SCHEDULE F ( OPTION 5) - $887,297.35
SCHEDULE A + OPTION 1 + OPTION 2 +
OPTION 3 + OPTION 4 + OPTION 5 =
$20,264,500.13
Central Southern Construction, Corp.
SCHEDULE A - $8,463,735.00
SCHEDULE B (OPTION 1) - $772,063.75
SCHEDULE C ( OPTION 2) - $4,302,420.00
SCHEDULE D ( OPTION 3) - $1,250,990.00
SCHEDULE E ( OPTION 4) - $1,920,257.50
SCHEDULE F ( OPTION 5) - $634,361.00
SCHEDULE A + OPTION 1 + OPTION 2 +
OPTION 3 + OPTION 4 + OPTION 5 =
$17,343,827.25
Riley Bridge Co., Inc. SCHEDULE A - $7,342,974.92
SCHEDULE B (OPTION 1) - $846,357.47
SCHEDULE C ( OPTION 2) - $5,251,797.03
SCHEDULE D ( OPTION 3) - $902,342.05
SCHEDULE E ( OPTION 4) - $2,271,890.13
SCHEDULE F ( OPTION 5) - $880,117.24
SCHEDULE A + OPTION 1 + OPTION 2 +
OPTION 3 + OPTION 4 + OPTION 5 =
$17,495,478.84
If the Government awards the contract as Schedules A +B+C+D+E+F, the performance period will be 201 calendar days.
If separate: Schedule A will be 91 calendar days; Schedule B will be 44 calendar days; Schedule C will be 67 calendar days; Schedule D will be 90 calendar days; Schedule E will be 56 calendar days; and Schedule F will be 58 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-23-B-000008 Project: NP-NATR 3E16, 3F25
March 14, 2023, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Engineer’s Estimate SCHEDULE A - $4,910,000.00
SCHEDULE B (OPTION 1) - $606,500.00
SCHEDULE C ( OPTION 2) - $3,930,000.00
SCHEDULE D ( OPTION 3) - $1,320,000.00
SCHEDULE E ( OPTION 4) - $1,315,000.00
SCHEDULE F ( OPTION 5) - $880,000.00
SCHEDULE A + OPTION 1 + OPTION 2 +
OPTION 3 + OPTION 4 + OPTION 5 =
$12,961,500.00
If the Government awards the contract as Schedules A +B+C+D+E+F, the performance period will be 201 calendar days.
If separate: Schedule A will be 91 calendar days; Schedule B will be 44 calendar days; Schedule C will be 67 calendar days; Schedule D will be 90 calendar days; Schedule E will be 56 calendar days; and Schedule F will be 58 calendar days.
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-23-B-000008� Project: NP-NATR 3E16, 3F25�March 14, 2023, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-23-B-000008� Project: NP-NATR 3E16, 3F25�March 14, 2023, 2:00 p.m. local time� |