Plans - NP-BLRI 2J17.pdf
PDF 13 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-21-B-000001
About this file
This document provides details for a federal contract solicitation seeking bids for the Rehabilitation of Linville River Bridge project NP-BLRI 2J17. The project consists of installing a drainage system, replacing asphalt concrete pavement with lightweight concrete slab, replacing bridge sidewalk and curb, restoring stone masonry at piers, and milling and overlaying approaches. The project will be split into multiple work schedules with a total expected cost between $1,000,000 to $5,000,000. Sealed bids from certified Small Business Concerns will be accepted, with bid documents available starting September 30, 2020 and bids due on a date specified in the solicitation. The solicitation is being conducted by the Department of Transportation Federal Highway Administration. Bidders must register in the System for Award Management database and fill out required annual representations and certifications forms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - Project NP-BLRI 2J17.pdf | ||
| FP14_Eng.pdf | ||
| Bridge Inspection Report.pdf | ||
| IFB Solicitation - NP-BLRI 2J17.pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01
-A u g -2
:4
P
M M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n th
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B
G N .D
G N
No scale
INDEX OF BRIDGE PLAN SHEETS
C.I.P. Concrete Slab
Sidewalk Typical Section
Inlet and Drainage Layout
Typical Section
Plan and Elevation
General Notes and Index
SHEET NO. SHEET TITLE
Dead Load:
Normal Weight Concrete: 150 pcf
Lightweight Concrete: 110 pcf
DESIGN LOADS:
Field verify all dimensions prior to ordering materials.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
H-15.
Live Loads:
Provide 2-inch cover for reinforcing steel unless otherwise noted.
ASTM A775, Grade 60 defromed.
Furnish epoxy coated reinforcing steel for the sidewalk and concrete slab conforming to
Reinforcing Steel:
GENERAL NOTES AND INDEX
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017.
SPECIFICATIONS:
10. Repoint all the nose faces at piers and abutments.
9. Repoint bridge stone masory parapets inside face and top surface.
to each vertical expansion joint.
8. Remove and reset stone masory in parapet adjacent throughout the bridge.
7. Replace all vertical and sidewalk expansion joints pier and downstream side of south pier.
6. Repair damaged stone masonry on upstream side of north in plans.
5. Place reinforced lightweight concrete slab as shown located at MP 281.
excess salvaged stone to the NPS maintenance yard to the CO to match existing stone for approval. Deliver
4. Remove and reset stone curb. Submit stone samples construct the new sidewalk.
foam filled, galvanized stay-in-place forms to
3. Remove and replace existing sidewalks. Provide pipes with permanent caps as directed by the CO.
the remaining portions of the existing drainage drainage system. Cap the top and bottom of
CO, in a manner not to interfer with new existing drain pipe to depth determined by the the arches as shown in the plans. Remove new scuppers and pipe system to outlet below
2. Remove existing scuppers and replace with
1. Excavate and backfill as shown in plans.
SCOPE OF WORK
Concrete:
density of 110 pcf as determined by ASTM C567.
Furnish Lightweight coarse aggregate conforming to AASHTO M 195. Do not exceed LWC equilibrium
Furnish CLASS LWT-D(AE) lightweight concrete (LWC) for slab with f'c = 5.0 ksi at 28 days.
Furnish Class A(AE) normal weight concrete (NWC) for sidewalks with f'c = 4.5 ksi at 28 days.
MATERIALS:
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY
R02
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-A u g -2
:4
P
M
No scale
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B P
E .D
G N
PLAN
RoadwayCL
N pier stone masonry
Remove & reset masonry parapet
Existing stone arch (Typ.)
stone veneer concrete
Existing earth-filled
PLAN AND ELEVATION
102'-0"102'-0"102'-0"
(Typ.)
16'-0"
T y p
T y p sidewalk (Typ.)
Replace C.I.P.
NORTH ABUTMENT SOUTH ABUTMENT
105+00 104+00 103+00 102+00 101+00
PIER 2 PIER 1
(See Note 4)
C.I.P. slab system (Typ.)
existing drainage
Remove and replace scupper & drainage pipe
Remove existing system (Typ.)
existing drainage
Remove and replace
(Typ.)
drainage system
Install new system (Typ.)
existing drainage
Remove and replace exp. joint (Typ.)
Replace Vertical
(T y p
Notes:
beads and silicone band
Field-applied silicone corner silicone coating
Factory-applied
Epoxy adhesive foam
Impregnated
(Pre-compressed foam-supported silicone seal joint)
Joint opening
ELEVATION
(Typ.)
'-0 c u r b
T y p
(T y p
(T yp
T y p
(Typ.)
8'-0" sleeper slab
Roadwaysleeper slab
Roadway
(Typ.)
top and inside surface stone masonry, Repoint parapet exp. joint (Typ.)
Replace Vertical
(Typ.)
outlet pipes
8" ID, HDPE
(Typ.)
(See Note 1) existing stone curb
Remove & reset
EXPANSION JOINT
VERTICAL & HORIZONTAL
(Typ.)
stone masonry
Repoint abutment masonry (Typ.)
Repoint stone
STA. 102+51.51 STA. 101+50.47STA. 103+50.52
STA. 103+60.14
STA. 103+69.52
STA. 104+61.63
(See Note 10) (Typ.)
stone masory @ vertical jt.
Remove and reset
End sidewalk
End of C.I.P. slab
End bridge
Begin sidewalk
Begin bridge wingwall)
(match end of southwest
Begin of C.I.P. slab
CL ScupperCL ScupperCL Scupper
CL Scupper
CL Scupper
CL Scupper
(Typ.)
2 locations
Drainage Type 1, 8 locations (Typ.)
Drainage Type 2, coordinate with the manufacturer to determine seal size.
5. For pre-compressed foam-supported silicone seal joint,
4. See "C.I.P. CONCRETE SLAB" sheet for additional information.
the CO for approval.
permanent caps. Submit the caping and fastening method to remaining portions of the existing drainage pipe with new drainage system. Cap the top and bottom of the determined by the CO in a manner not to interfere with the in the plans. Remove existing drain pipes to depth as scuppers and pipe system to outlet below the arches as shown
3. Remove existing bridge scuppers and replace with the new information.
"INLET AND DRAINAGE LAYOUT" sheets for additional
2. See "TYPICAL SECTION" , "SIDEWALK TYPICAL SECTION" and maintenance yard at MP 281.
approval. Deliver excess salvaged stone to the NPS stone samples for the replacement sections to the CO for needed. Reset stone at its exact existing location. Submit
1. Remove, reset, and replace stone curb/stone masonry as in parapet.
11. Align expansion joints in sidewalk with vertical expansion joint opening to replace vertical expansion joint.
expansion joints at abutments and piers. Furnish 1-inch
10. Remove and reset stone masory adjacent to vertical parapets between begin and end of bridge stations.
9. Repoint the inside, top and terminal surface of the bridge repair or remove and reset work.
masonry for all location other than areas shown in plans for
8. Repoint each surface of pier and abutment nose faces' stone the original missing pier stones located adjacent to Pier 2.
joints, layout and configuration. Reuse to the extent possible match similar existing undamaged pier section stones, mortar
7. Repair pier stone masonry at the upstream end of Pier 2 to manufacturer's recommendations.
conforming to Subsection 712.01(h) and according to the
6. Furnish pre-compressed foam-supported silicone seal scupper & drainage pipe
Remove existing
(Typ.)
drainage system
Install new masonry (See Note 1 & 7)
Repair pier stone
(See Note 1 & 7) stone masonry
Repair pier
(See Note 11)
Exp. joints (Typ.)
Replace sidewalk
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
R03
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-A u g -2
:4
P
M
As shown
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B
T Y P I C
A L S
E C
T I O
N .D
G N
TYPICAL SECTION
TYPICAL SECTION
See Detail A
DETAIL A
and backfill
Existing earth-fill sheeting
10 mil Polyethylene
Asphalt overlay
Stone curb
Top of curb
A
A
SECTION A-A
" = 1'2 1Scale: 1
Scale: 1" = 1'
" = 1'2 1Scale:
parapet (Typ.)
Exiting t o
V a r ie s
M a x
C lr epoxy coated #5 rebar, Reinforced concrete C.I.P. lightweight existing sidewalk (Typ.)
Remove & replace
1'-0" depression, (Typ.)
12:1 radial asphalt
CL
CL
(Typ.)
(See Note 2) cleanout
8" ID pipe
Asphalt overlay
VariesVaries
(Typ.)
Existing subparapet
7"
Scale: 1" = 1'
Asphalt overlay
TYPICAL SECTION
CURB TO SLAB
existing sidewalk (Typ.)
Remove & replace (See Note 3) curb, (Typ.)
Remove & reset stone
3" Asphalt overlay
Seal joint
Seal joint (Typ.)
t o
V a r ie s
Seal joint (Typ.)
and backfill
Existing earth-fill
Detail B
See
CL
Asphalt overlay
DETAIL B
" = 1'2 1Scale: 1
S la b
A s p h a lt depression (Typ.)
12:1 radial asphalt stone curb, (Typ.)
Remove & reset
8" ID
HDPE pipe
(Typ.)
(See Note 2)
CL
Repoint Parapet stone masonry
(Typ.)
CL
(Typ.)
(see Note 1 & 2)
C.I. Scupper, (See Note 2)
C.I. 8" ID pipe cleanout
(Typ.)
(See Note 2)
8" ID pipe cleanout reinforced concrete
C.I.P. lightweight
Reinforced concrete
C.I.P. lightweight reinforced concrete slab
6" C.I.P. lightweight
6" min.)
grading C or D (varies, Aggregate base
(varies, 6"min) grading C or D Aggregate base
Aggregate base grading C or D grading C or D
Aggregate base finished roadway surface.
5. Ensure concrete surfaces are not visible within the limits of the
4. See "C.I.P. CONCRETE SLAB" sheet for additional information.
in locations where stone is non-salvageable or missing.
3. Place new stone curb and stone scupper cap to match existing information.
2. See "INLET AND DRAINAGE PIPE LAYOUT" sheet for additional
Provide new cast iron scuppers as shown in the plans.1.
wall
Existing spandrel
(Typ.) (See Note 2) w/metal casing
8" ID HDPE pipe
(See Note 4 & 5)
Reinforced concrete
C.I.P. lightweight
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
R04
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-A u g -2
:4
P
M
INLET AND DRAINAGE PIPE LAYOUT
As shown
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B I N
L E
T D
R A I N
A G
E L
A Y
O U
T .D
G N
4 Spa. @ 6" = 2'-0"
2'-6"
DRAINAGE TYPE 2
DRAINAGE TYPE 1
ELEVATION VIEW
ELEVATION VIEW
A A
SECTION A-A
5% slope
" = 1'4 3Scale:
" = 1'4 3Scale:
" = 1'2 1Scale: 1
DRAIN PIPE KEY
CL
B
B
5% slope
8" ID.
Cleanout
T y p
C u r b
T y p
E x is ti n g s u b p a r a p e t
9"
T y p
1 (Typ.)
"2
(Typ.)
"2
(Typ.)
"4
" ID
R
(Typ.)
"2
SECTION B-B
"2
"2
CL
9"
5% slope
SCUPPER PLAN AND ELEVATION
C.I. scupper
C.I. scupper
See Note 1
(Typ.)
5'-0"
CL
sub-parapet
Existing
DRAINAGE TYPE 1 PLAN VIEW
(Typ.)
5'-0"
CL
" = 1'4 1Scale:
TYPICAL PIPE CASING DETAIL
Existing earthfill
(Typ.)
Va rie s
CL
HDPE outlet pipe
8" ID,
CL
w/metal casing
HDPE outlet pipe
8" ID,
8" ID.
HDPE pipe w/grout (See Note 9)
10" Dia. Metal casing masonry
Existing stone
(T y p arch
Existing concrete wall (Typ.)
Existing spandrel
(Typ.)
pipe w/metal casing
8" ID HDPE outlet
8" ID HDPE
pipe (Typ.)
pipe (Typ.)
8" ID HDPE
scupper outlet
8" ID C.I.
(See Note 5)
C.I. cleanout grout conforming to Subsection 725.13(a)(c).
9. Grout space between metal casing and HDPE pipe. Furnish
8. The outlet pipes' angle of installtion varies.
7. See "TYPICAL SECTION" sheet for additional information.
according to the manufacturer's recommendations.
6. Furnish HDPE fittings and connections for drainage system installation.
cast iron cleanout access hole to the CO for approval prior to lid/cover is plane to the roadway's finished surface. Submit cleanout access hole. Ensure the cleanouts' access opening and shown in the plans. Furnish a secure cast iron lid/cover for
5. Furnish a cast iron cleanout access hole for Drainage Type 1 as arch surface.
likelihood of fines seeping out. Secure pipe in place at exterior provide a seal around the outlet pipe in a way to eliminate the damage the structure and the stone facing. In addition,
4. Core through the arch using extreme caution in a way not to masonry at underside of arch.
3. Extend outlet pipe 6-inches beyond the face of the stone according to the manufacturer's recommendations.
qualified in the manufacutring of HDPE products. Install system a single manufacturer who is fully experienced, reputable and system in place. Furnish all pipe, connections, and fittings ftom configuration, connections, slopes, and securing the drainage drainage system including but not limited to the pipes'
Submit shop drawings to the CO for approval for the entire 2.
casting.
Submit scupper shop drawings to the CO for approval prior to
1. Furnish new cast iron scuppers to match style of existing.
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
R05
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-A u g -2
:4
P
M
No scale
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B S I D
E W
A L
K T
Y P I C
A L S
E C
T I O
N .D
G N masonry parapet
Existing stone
TYPICAL SECTION
SIDEWALK TYPICAL SECTION
wall
Existing spandrel
Existing drain pipe
Existing earth-fill
Existing scupper
Existing stone curb
Existing asphalt overlay
Width of sidewalk = 4'-10"
Remove & replace existing sidewalk
(See Note 2)
#5 rebar @ 12", See Note 4
West sidewalk shown, East sidewalk similar
(looking upstation)
C lr
C lr
1" undercut sidewalks matches existing.
8. Ensure the top elevation and cross slopes of proposed parapet wall.
7. Align sidewalk expansion joint with vertical expasion joint in spacing.
6. Ensure the spacing between contraction joints matches existing
552. Submit concrete colorant samples to the CO for approval.
5. Provide normal weight concrete in accordance with Section concrete sidewalk.
foam filled corrugated galvanized deck forms for the C.I.P.
the new reinforced concrete sidewalk. Furnish stay-in-place, space below sidewalk prior to constructing new form work for
4. Remove any debris or existing stay-in-place form work in void
3. Remove sidewalk in accordance with Section 203.
1-foot 6-inches for longitudinal bars.
with epoxy coated reinforcement. Provide lap splice length of transverse reinforcing steel. Replace longitudinal reinforcement and epoxy new transverse reinforcing steel adjacent to existing more section loss with epoxy coated rebar of similar size. Drill steel. Replace existing transverse reinforcing steel with 15% or
Do not remove the existing sidewalk transverse reinforcing 2.
parapet.
remove more than 1-inch of concrete beyond the face of the during the removal of the existing sidewalk concrete. Do not
Do not damage the existing stone masonry parapet and curb 1.
#4 rebar, (See Note 2)
Existing rebars to remain, epoxy coated, (See Note 2)
#4 rebar @ 12", NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
R06
M
P R
O J E
C T
S b lr i\ j B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
Notes:
-A u g -2
:4
P
M
As shown
A C
T U
A L F I L E R
B L
R I
J L I N
V I L L E B
R I D
G E R
E H
A B
C O
N C
R E
T E S
L A
B .D
G N
Roadway crown
RoadwayCL
Contraction jt.-to-Contraction jt. (Typ.)
30'-0"
Asphalt overlay
C.I.P. slab
SECTION A-A
A A
223'-0"
3'-3"
jt. filler
Preformed expansion
T y p
T y p deck slab
Mid-span of slab
Roadway sleeper
#5 epoxy coated rebar
334 Spa. @ 8" = 222'-10"
CONTRACTION JOINT DETAIL
(Typ.)
See Detail, Contraction jt., C.I.P. slab
C.I.P. CONCRETE SLAB
(Typ.)
See Note 5, " = 1'4 1Scale:
" = 1'2 1Scale: 1
"4 silicone seal joint
Pre-compressed foam-supported beads and silicone band
Field-applied silicone corner silicone coating
Factory-applied foam
Impregnated
Epoxy adhesive
LC Joint
Scale: No scale
(Pre-compressed foam-supported silicone seal joint)
Roadway sleeper slab
3'-3" rebar spa. ea. direction
#5, epoxy rebar spa. @ 8" = 2"-8"
"4
Scale: No scale
See Detail A
DETAIL A
@ 70°
"2
Full Width of Slab
(Typ.)
5"
(Typ.)
8" Spa.
T y p
" galv. PL2
SLAB METAL JOINT ARMOR
A s p h a lt galv. anchor stud
" galv. PL w/ 6" 2 1" x 4 joint armoring
Slab metal e p o x y c o a te d r e b a r
T y p
S p a anchor stud (Typ.)
w/6" welded galv.
" galv. PL2 1" x 4
(See Note 3)
Joint sealant, (See Note 3)
Joint sealant, (See Note 2)
Saw-cut jt., C.I.P. LIGHTWEIGHT SLAB PLAN
End bridge
N "2
115'-11 concrete to contraction jt. (Typ.)
End of C.I.P. lightweight reinforced concrete slab lightweight reinforced
Continue to begin of C.I.P.
stud head
" galv.16 51" Ø x studs @ 8" centers
" Dia. x 6" galv.2 roadway/roadway crown
Symmetric about
CL
(Typ.)
mid-depth of slab, 4 - #4 rebar @
°9
E401-01) as shown in Detail pavement transition
Asphalt (construct
Construction jt.
" = 1'2 1Scale: 1
Waterstop
WATERSTOP DETAILc o v
M in
C.I.P. slab
6"
(Typ.)
Drain cleanout
Saw-cut jt.
C.I.P. slab adjacent to roadway surface.
roadway at the location of the joint. Remove all sharp edges shape of the armoring matches the transverse section of the dimensions before construction of expansion joint. Ensure the armoring.Galvanize according to ASTM A123. Verify all
9. Furnish AASHTO M 270, Grade 50 steel for slab metal joint manufacturer's recommendations.
conforming to Subsection 712.01(h) and according to the
8. Furnish pre-compressed foam-supported silicone seal coordinate with manufacturer to determine seal size.
7. For pre-compressed foam-supported silicone seal joint, throughout slab and sidewalk.
reinforcement. Ensure there are no adjacent lap splices
6. Provide lap splice length of 1-foot 6-inch for longitudinal manufacturer's recommendations.
of the C.I.P. lightweight slab. Install waterstop according to the
5. Provide waterstop for the full length of each construction joint on the face of stone curb.
permitted to extend beyond 1-inch above top of concrete slab to Subsection 712.01(a)(1). Sealant application limits not concrete/stone curb and scupper with joint sealant conforming
4. Seal interface joint of new concrete slab to existing
Subsection 712.01(a)(1).
3. Seal all sawcut joints with elastomeric sealant conforming to
ACI 360R-10 for additional information.
can support the weight to perform the saw cutting. Refer to the finishing of the slab in the area but not before the concrete
Contraction joints are to be cut within 4-hours after completing contraction joints using "early-entry dry-cut saw" methods.
2. Sawcut transverse contraction joints. Construct slab crown.
Crown the roadway sleeper slab to match proposed roadway 1.
26'-0"
(Lbs.)
Steel
Reinf.*
4'-10"Sidwalks
Element
C.I.P. Slab
Width Length
* Qty includes lap slices.
497'-0"
443'-7" 27860
11800
REINFORCED CONCRETE
ESTIMATED QUANTITIES FOR
26'-0"Sleeper slabs 3'-3" 340
C lr
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
165418
148036 NC NP-BLRI 2J17
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
CP
DRAWN BY
LTE LTE George Choubah of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-12896
Structure Number 5140-106P
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
BLUE RIDGE PARKWAY
REHABILITATION OF LINVILLE RIVER BRIDGE
July 2020
NOT
FOR
CO
NST
RUCTI
ON
PRE
| A01-BLRI 2J17_ttl-US_Sur2D-000 |
| A02-BLRI 2J17_sym-US_Sur2D-000 |
| A03-BLRI_2J17_loc-US_Sur_ft2D-000 |
| A04-BLRI_2J17_sur-US_Sur_ft2D-000 |
| B01-BLRI 2J17_typ-B01-000 |
| C01-BLRI_2J17_qnt-C01 - Quantity Tabulation Sheet-000 |
| C01-BLRI_2J17_qnt-C02 - Erosion Control Earthwork Sheet-000 |
| C01-BLRI_2J17_qnt-C03 - Pavement + Striping Summary-000 |
| C01-BLRI_2J17_qnt-C04 - Construction Signs-000 |
| C01-BLRI_2J17_qnt-C05 - Construction Signs-000 |
| C01-BLRI_2J17_qnt-C06 - Construction Signs-000 |
| D01-BLRI_2J17_pnp-D01-000 |
| D01-BLRI_2J17_pnp-D02-000 |
| D01-BLRI_2J17_pnp-D03-000 |
| M01-M03-BLRI 2J17_ec_narr-M01-000 |
| M01-M03-BLRI 2J17_ec_narr-M02-000 |
| M01-M03-BLRI 2J17_ec_narr-M03-000 |
| N01-BLRI_2J17_tcp-US_Sur_ft2D-000 |
| N02-BLRI_2J17_tcp-N02-000 |
| N02-BLRI_2J17_tcp-N03-000 |
| R01-BLRI 2J17 - PLANS - 99% |
| st15704a_detail-US_Sur_ft2D-000 |
| st40101_detail_Pavement Transitions-US Customary-000 |
| st62000a_detail-US Customary-000 |
| st62050_detail-01-US Customary-000 |
| st62901_detail-US Customary-000 |
| st63403_detail_Pavement_Markings-US Customary-000 |
| st63501_detail_TTC_Sign_Mounting-US Customary Border-000 |
| st63506_EFL_TEMP-USC-000 |
File details come from the government source that posted it. Updated .