This solicitation is for the Rehabilitation of Linville River Bridge project located in Avery County, North Carolina. The project consists of installing a drainage system, replacing asphalt concrete pavement with a lightweight concrete slab, replacing bridge sidewalks and curbs, replacing and resetting stone masonry at piers, and milling and overlaying approaches. The project will be split into multiple schedules with a total estimated cost between $1,000,000 to $5,000,000. Sealed bids from certified Small Business Concerns will be accepted, with bid documents available starting September 30, 2020. Bidders must register in the System for Award Management database and fill out annual representations and certifications online. The Department of Transportation Federal Highway Administration is the agency issuing this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - Project NP-BLRI 2J17.pdf | ||
| FP14_Eng.pdf | ||
| IFB Solicitation - NP-BLRI 2J17.pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Plans - NP-BLRI 2J17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5140-106P
LINVILLE RIVER BRIDGE INSPECTION DATE: 6/3/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 304.5 FT (92.8 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 101.5 FT (30.9 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 39.8 FT (12.1 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 25.8 FT (7.9 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2J3 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1983-JOINT REPAIR. 2008-CRACK OVER NORTH PIER SEAL. 2013-BRIDGE ROADWAY
RESURFACED AND RESTRIPED / GROUND PENETRATING RADAR TESTING FOR
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 316.57 (KM PT 509.36)
STATE: ................................. NORTH CAROLINA LOCATION: 0.8 MILES TO U.S. ROUTE 221
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. LINVILLE RIVER
STRUCTURE EVALUATION SUMMARY
This concrete arch bridge is in fair condition overall. Problems at this time include flood damaged masonry on the upstream end of the north pier; loose stones at downstream end of south pier; deterioration of the curbs and sidewalks; open core holes in the asphalt pavement at three locations; deterioration of the southeast approach parapet masonry; vegetation growth along the wingwalls, overhanging the parapets, and growing from the abutment and pier joints; and deteriorated masonry mortar joints.
It should be noted that this bridge has had problems with settlement in the past due to possible loss of spandrel fill material. Ground Penetrating Radar was used in an effort to detect possible subsurface voids, and the findings were outlined in a letter to Mr. Kent Cochran of the Southeast Region dated September 28, 2014.
The FHWA Bridge Design office is currently evaluating rehabilitation alternatives for this bridge.
INSPECTION TEAM: M. BURNETT, T. POWELL, M. ROBERTSON (VOLKERT, INC.)
CONDITION ASSESSMENT:
MATT BURNETT, FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/10/19
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-106P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
60.6 REMOVE VEGETATION FROM ALONG WINGWALLS, OVERHANGING PARAPETS,
AND GROWING FROM ABUTMENT AND PIER JOINTS.
1 LS $3,000 $3,000
58.3 FILL THREE OPEN CORE HOLES IN ASPHALT PAVEMENT. 1 LS $2,500 $2,500
PRELIM. MAINTENANCE TOTAL : $5,500
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
59, 60 REHABILITATE STRUCTURE. 1 LS $3,350,000 $3,350,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $3,350,000 $0
PRELIMINARY ESTIMATE TOTAL* : ........................................... $3,355,500
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates are based on historical data, including costs for similar projects when available.
The FHWA Bridge Design office is currently evaluating rehabilitation alternatives for this bridge.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-106P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N F N N N N F G
N G
F F P F G N
N
N
N
N
58.3,4 THREE 6 INCH DIAMETER OPEN CORE HOLES, ONE NEAR WEST
CURB OVER NORTH ABUTMENT, ONE NEAR EAST CURB OVER
SOUTH PIER, AND ONE NEAR EAST CURB OVER NORTH PIER.
MINOR DEPRESSION (1'-4" W X 3' L X 2-1/2" D) IN ASPHALT WEARING
SURFACE ALONG EAST CURB IN SOUTH SPAN APPROXIMATELY 30'
NORTH OF SOUTH BRIDGE END AND SIMILAR DEPTH DEPRESSION
FOR FULL WIDTH OF ROADWAY OVER SOUTH PIER.
58.5 MODERATE CRACKING, SPALLING, AND DELAMINATION OF CURBS
AND SIDEWALKS; CURBS ARE SEPARATING FROM SIDEWALKS IN
SOME AREAS. MODERATE DROP-OFF AT NORTH END OF EAST
SIDEWALK. MODERATE SPALLING OF WEST SIDEWALK EXPOSING
DRAIN SEAL AT NORTH ABUTMENT. MASONRY CURB ALONG EAST
SIDEWALK IN NORTH SPAN FRACTURED FOR 3' LONG. ISOLATED
MINOR SPALLING OF SIDEWALKS; SOME HAVE BEEN PATCHED.
58.6 MINOR TO MODERATE CRACKING OF MASONRY MORTAR JOINTS
WITH VEGETATION GROWTH AND EFFLORESCENCE IN JOINTS.
VEGETATION OVERHANGS PARAPETS.
59.3,8 ACTIVE LEAKAGE WITH MODERATE TO SEVERE EFFLORESCENCE
AND STALACTITES ON STONE MASONRY FACING ON ARCH
UNDERSIDES. MODERATE DETERIORATION OF NORTH SPAN ARCH
MASONRY MORTAR JOINTS. MODERATE EFFLORESCENCE ON
SPANDREL WALL MASONRY. MINOR LEAKAGE ALONG CENTERLINE
THROUGH ENDS OF ARCH IN CENTER SPAN.
GROUND PENETRATING RADAR WAS USED IN 2014 IN AN EFFORT
TO DETECT POSSIBLE SUBSURFACE VOIDS.
60.1 MODERATE CRACKING AND DETERIORATION OF ABUTMENT
BREASTWALL MASONRY MORTAR JOINTS WITH MODERATE
EFFLORESCENCE. ACTIVE LEAKAGE PRESENT AT NORTH
ABUTMENT. CORNERS OF MASONRY AT NORTH ABUTMENT ARE
DISPLACED WITH MINOR VEGETATION GROWTH IN CRACKS.
60.6,9 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS WITH
MODERATE EFFLORESCENCE. EXTENSIVE TREE GROWTH AND
DEBRIS ADJACENT TO ALL WINGWALLS. MODERATE EROSION
ALONG SOUTHEAST WINGWALL.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS (SPREAD FTG) G
6. WINGWALLS G
7. WEEP HOLES G
8. EXPANSION JOINTS F
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
F13. WALLS AND/OR COLUMNS
N14. PILE BENTS
N15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS (BURIED)
F17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 5140-106P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 7
G G N F N
MED
SUFF
35 FT.
SAND, ROCK
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N F G G G N G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
60.8 SEVERE DETERIORATION OF VERTICAL JOINT FILLER MATERIAL IN
PIERS AND ABUTMENTS. MINOR VEGETATION GROWTH IN SEVERAL
JOINTS.
60.13 MINOR TO MODERATE CRACKING AND DETERIORATION OF PIER
MORTAR JOINTS WITH MODERATE EFFLORESCENCE; VEGETATION
GROWING FROM JOINTS. WEST NOSE OF NORTH PIER DAMAGED
BY FLOOD DEBRIS WITH SEVERAL STONES MISSING AND LOOSE.
MODERATE DISPLACEMENT AND LOSS OF MASONRY WITH LOOSE
STONES; ESPECIALLY AT EAST END OF SOUTH PIER. PATCHED
VOID AT SOUTH PIER HAS SETTLED AND CRACKED (COULD NOT
VERIFY DURING THIS INSPECTION).
60.17 MINOR EROSION ADJACENT TO SOUTH PIER AND AROUND SOUTH
SIDE OF NORTH PIER EXCAVATED AND SMALL DIAMETER RIPRAP
PLACED AROUND PIERS TO ALLOW POSITIVE DRAINAGE; PIPES ARE
EXPOSED. MINOR SCOUR ON NORTH FACE OF WEST END OF
NORTH PIER.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 FLOOD DEBRIS LODGED ON UPSTREAM SIDE OF NORTH PIER.
222.3 ONE AREA OF MODERATE DETERIORATION OF SOUTHEAST
APPROACH PARAPET MASONRY MORTAR WITH THREE DISPLACED
STONES AND ONE MISSING.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-106P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 22 20 37 34
TYPE 3 21 19 36 32
TYPE 3S2 26 23 43 39
TYPE 3-3 28 25 47 42
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE
EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-106P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... LINVILLE RIVER BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 011 - AVERY
(204) STRUCTURE NUMBER: ..... 5140-106P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... LINVILLE RIVER
(207) ROAD SECTION NO: ..........106P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140106P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.8 MILES TO U.S. ROUTE 2
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................2J3 (11) MILE POINT: .............................316.57 (KM PT 509.36)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
11 - ARCH - DECK
101.5 FT (30.9 M)
304.5 FT (92.8 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 22.4 TONS (20.3 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 37.3 TONS (33.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-106P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°58'24.42"
(17) LONGITUDE: ......................... 81°56'12.42"
(19) DETOUR LENGTH: ............... 5 MI (8 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
25.8 FT (7.9 M)
39.8 FT (12.1 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
0 °
NO
25.9 FT (7.9 M)
5.1 FT (1.6 M)
5.1 FT (1.6 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
2.54 FT (0.77 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
C - MODERATE
$5,500
$3,350,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1983-JOINT REPAIR. 2008-CRACK OVER NORTH PIER SEAL. 2013-BRIDGE ROADWAY RESURFACED AND RESTRIPED / GROUND
PENETRATING RADAR TESTING FOR SUBSURFACE VOID DETECTION IN SPANDREL FILL
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://81�56'12.42 https://35�58'24.42
PHOTOGRAPHS STRUCTURE NO. 5140-106P
PHOTO #1 - LOOKING NORTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING
SOUTH
PHOTO #5 - TYPICAL VEGETATION GROWTH OVERHANGING
PARAPETS, EAST PARAPET AT NORTH END SHOWN
PHOTO #6 - TYPICAL DROP-OFF AT END OF SIDEWALKS, NORTH END
OF EAST SIDEWALK SHOWN
PHOTO #7 - SPALLING OF WEST SIDEWALK OVER NORTH ABUTMENT;
NOTE EXPOSED DRAIN SEAL
PHOTO #8 - TYPICAL TRANSVERSE CRACKING WITH SPALLING OF
SIDEWALKS, WEST SIDEWALK AT NORTH END SHOWN
PHOTO #9 - FRACTURED AND MISSING EAST CURB IN NORTH SPAN
PHOTO #10 - TYPICAL DETERIORATION OF SIDEWALK, EAST SIDEWALK
OVER NORTH PIER SHOWN; NOTE TYPICAL SEPARATION OF CURB
STONES FROM SIDEWALK
PHOTO #11 - MISSING AND DISPLACED CURB STONES ALONG EAST
SIDEWALK OVER SOUTH PIER; NOTE DEBRIS ACCUMULATION
PHOTO #12 - TYPICAL CORE HOLES IN ASPHALT PAVEMENT, CORE
HOLE IN NORTHBOUND LANE OVER SOUTH PIER SHOWN
PHOTO #13 - SETTLEMENT OF WEARING SURFACE ALONG EAST CURB
IN SOUTH SPAN
PHOTO #14 - DETERIORATED SOUTHEAST APPROACH PARAPET
MASONRY MORTAR; NOTE DISPLACED AND MISSING STONES
PHOTO #15 - GENERAL VIEW OF SOUTH ABUTMENT, NOTE
EFFLORESCENCE
PHOTO #16 - TYPICAL EFFLORESCENCE ALONG SOUTH ABUTMENT
RINGSTONES, WEST SIDE SHOWN
PHOTO #17 - GENERAL VIEW OF SOUTHEAST WINGWALL; NOTE
TYPICAL EFFLORESCENCE ON WINGWALLS
PHOTO #18 - EROSION ALONG SOUTHWEST WINGWALL
PHOTO #19 - TYPICAL VEGETATION GROWTH ON PIERS, EAST SIDE OF
SOUTH PIER SHOWN
PHOTO #20 - GENERAL VIEW OF SOUTH PIER, NORTH FACE SHOWN;
NOTE EFFLORESCENCE
PHOTO #21 - TYPICAL CONDITION OF VERTICAL PIER JOINTS, EAST
SIDE OF SOUTH PIER SHOWN
PHOTO #22 - LOOSE STONES AND DETERIORATED MASONRY MORTAR
ON NORTH FACE OF EAST NOSE FOR SOUTH PIER
PHOTO #23 - TYPICAL EFFLORESCENCE ALONG PIER RINGSTONES,
WEST SIDE NORTH PIER SHOWN
PHOTO #24 - TYPICAL EXPOSED DRAINAGE PIPE AT BASE OF PIERS,
SOUTH FACE OF NORTH PIER SHOWN
PHOTO #25 - FLOOD DEBRIS ON WEST SIDE OF NORTH PIER
PHOTO #26 - FLOOD DEBRIS DAMAGE TO WEST SIDE OF NORTH PIER
PHOTO #27 - GENERAL VIEW OF NORTH ABUTMENT; NOTE
EFFLORESCENCE
PHOTO #28 - TYPICAL EFFLORESCENCE ON RINGSTONES AT NORTH
ABUTMENT, WEST RINGSTONES SHOWN
PHOTO #29 - ACTIVE LEAKAGE FROM NORTH ABUTMENT WEEP HOLE
PHOTO #30 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS,
EAST END OF NORTH ABUTMENT SHOWN
PHOTO #31 - UPSTREAM CHANNEL
PHOTO #32 - DOWNSTREAM CHANNEL