About this file

This solicitation is for the Rehabilitation of Linville River Bridge project located in Avery County, North Carolina. The project consists of installing a drainage system, replacing asphalt concrete pavement with a lightweight concrete slab, replacing bridge sidewalks and curbs, replacing and resetting stone masonry at piers, and milling and overlaying approaches. The project will be split into multiple schedules with a total estimated cost between $1,000,000 to $5,000,000. Sealed bids from certified Small Business Concerns will be accepted, with bid documents available starting September 30, 2020. Bidders must register in the System for Award Management database and fill out annual representations and certifications online. The Department of Transportation Federal Highway Administration is the agency issuing this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway, newest first.
File Type Posted
Results of Bid Opening - Project NP-BLRI 2J17.pdf PDF
FP14_Eng.pdf PDF
IFB Solicitation - NP-BLRI 2J17.pdf PDF
VETS-4212 Form.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
Plans - NP-BLRI 2J17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 5140-106P

LINVILLE RIVER BRIDGE INSPECTION DATE: 6/3/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 304.5 FT (92.8 M)

DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 101.5 FT (30.9 M)

WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 39.8 FT (12.1 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 25.8 FT (7.9 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2J3 / NONE SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1983-JOINT REPAIR. 2008-CRACK OVER NORTH PIER SEAL. 2013-BRIDGE ROADWAY

RESURFACED AND RESTRIPED / GROUND PENETRATING RADAR TESTING FOR

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 316.57 (KM PT 509.36)

STATE: ................................. NORTH CAROLINA LOCATION: 0.8 MILES TO U.S. ROUTE 221

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. LINVILLE RIVER

STRUCTURE EVALUATION SUMMARY

This concrete arch bridge is in fair condition overall. Problems at this time include flood damaged masonry on the upstream end of the north pier; loose stones at downstream end of south pier; deterioration of the curbs and sidewalks; open core holes in the asphalt pavement at three locations; deterioration of the southeast approach parapet masonry; vegetation growth along the wingwalls, overhanging the parapets, and growing from the abutment and pier joints; and deteriorated masonry mortar joints.

It should be noted that this bridge has had problems with settlement in the past due to possible loss of spandrel fill material. Ground Penetrating Radar was used in an effort to detect possible subsurface voids, and the findings were outlined in a letter to Mr. Kent Cochran of the Southeast Region dated September 28, 2014.

The FHWA Bridge Design office is currently evaluating rehabilitation alternatives for this bridge.

INSPECTION TEAM: M. BURNETT, T. POWELL, M. ROBERTSON (VOLKERT, INC.)

CONDITION ASSESSMENT:

MATT BURNETT, FIELD TEAM LEADER

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/10/19

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-106P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

60.6 REMOVE VEGETATION FROM ALONG WINGWALLS, OVERHANGING PARAPETS,

AND GROWING FROM ABUTMENT AND PIER JOINTS.

1 LS $3,000 $3,000

58.3 FILL THREE OPEN CORE HOLES IN ASPHALT PAVEMENT. 1 LS $2,500 $2,500

PRELIM. MAINTENANCE TOTAL : $5,500

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

59, 60 REHABILITATE STRUCTURE. 1 LS $3,350,000 $3,350,000 $0

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $3,350,000 $0

PRELIMINARY ESTIMATE TOTAL* : ........................................... $3,355,500

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates are based on historical data, including costs for similar projects when available.

The FHWA Bridge Design office is currently evaluating rehabilitation alternatives for this bridge.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-106P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

N

N N F N N N N F G

N G

F F P F G N

N

N

N

N

58.3,4 THREE 6 INCH DIAMETER OPEN CORE HOLES, ONE NEAR WEST

CURB OVER NORTH ABUTMENT, ONE NEAR EAST CURB OVER

SOUTH PIER, AND ONE NEAR EAST CURB OVER NORTH PIER.

MINOR DEPRESSION (1'-4" W X 3' L X 2-1/2" D) IN ASPHALT WEARING

SURFACE ALONG EAST CURB IN SOUTH SPAN APPROXIMATELY 30'

NORTH OF SOUTH BRIDGE END AND SIMILAR DEPTH DEPRESSION

FOR FULL WIDTH OF ROADWAY OVER SOUTH PIER.

58.5 MODERATE CRACKING, SPALLING, AND DELAMINATION OF CURBS

AND SIDEWALKS; CURBS ARE SEPARATING FROM SIDEWALKS IN

SOME AREAS. MODERATE DROP-OFF AT NORTH END OF EAST

SIDEWALK. MODERATE SPALLING OF WEST SIDEWALK EXPOSING

DRAIN SEAL AT NORTH ABUTMENT. MASONRY CURB ALONG EAST

SIDEWALK IN NORTH SPAN FRACTURED FOR 3' LONG. ISOLATED

MINOR SPALLING OF SIDEWALKS; SOME HAVE BEEN PATCHED.

58.6 MINOR TO MODERATE CRACKING OF MASONRY MORTAR JOINTS

WITH VEGETATION GROWTH AND EFFLORESCENCE IN JOINTS.

VEGETATION OVERHANGS PARAPETS.

59.3,8 ACTIVE LEAKAGE WITH MODERATE TO SEVERE EFFLORESCENCE

AND STALACTITES ON STONE MASONRY FACING ON ARCH

UNDERSIDES. MODERATE DETERIORATION OF NORTH SPAN ARCH

MASONRY MORTAR JOINTS. MODERATE EFFLORESCENCE ON

SPANDREL WALL MASONRY. MINOR LEAKAGE ALONG CENTERLINE

THROUGH ENDS OF ARCH IN CENTER SPAN.

GROUND PENETRATING RADAR WAS USED IN 2014 IN AN EFFORT

TO DETECT POSSIBLE SUBSURFACE VOIDS.

60.1 MODERATE CRACKING AND DETERIORATION OF ABUTMENT

BREASTWALL MASONRY MORTAR JOINTS WITH MODERATE

EFFLORESCENCE. ACTIVE LEAKAGE PRESENT AT NORTH

ABUTMENT. CORNERS OF MASONRY AT NORTH ABUTMENT ARE

DISPLACED WITH MINOR VEGETATION GROWTH IN CRACKS.

60.6,9 MINOR CRACKING OF WINGWALL MASONRY MORTAR JOINTS WITH

MODERATE EFFLORESCENCE. EXTENSIVE TREE GROWTH AND

DEBRIS ADJACENT TO ALL WINGWALLS. MODERATE EROSION

ALONG SOUTHEAST WINGWALL.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS N

4. BACKWALLS AND/OR BULKHEADS N

5. FOUNDATIONS (SPREAD FTG) G

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS F

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

F13. WALLS AND/OR COLUMNS

N14. PILE BENTS

N15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS (BURIED)

F17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5140-106P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 7

G G N F N

MED

SUFF

35 FT.

SAND, ROCK

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N F G G G N G N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

60.8 SEVERE DETERIORATION OF VERTICAL JOINT FILLER MATERIAL IN

PIERS AND ABUTMENTS. MINOR VEGETATION GROWTH IN SEVERAL

JOINTS.

60.13 MINOR TO MODERATE CRACKING AND DETERIORATION OF PIER

MORTAR JOINTS WITH MODERATE EFFLORESCENCE; VEGETATION

GROWING FROM JOINTS. WEST NOSE OF NORTH PIER DAMAGED

BY FLOOD DEBRIS WITH SEVERAL STONES MISSING AND LOOSE.

MODERATE DISPLACEMENT AND LOSS OF MASONRY WITH LOOSE

STONES; ESPECIALLY AT EAST END OF SOUTH PIER. PATCHED

VOID AT SOUTH PIER HAS SETTLED AND CRACKED (COULD NOT

VERIFY DURING THIS INSPECTION).

60.17 MINOR EROSION ADJACENT TO SOUTH PIER AND AROUND SOUTH

SIDE OF NORTH PIER EXCAVATED AND SMALL DIAMETER RIPRAP

PLACED AROUND PIERS TO ALLOW POSITIVE DRAINAGE; PIPES ARE

EXPOSED. MINOR SCOUR ON NORTH FACE OF WEST END OF

NORTH PIER.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.4 FLOOD DEBRIS LODGED ON UPSTREAM SIDE OF NORTH PIER.

222.3 ONE AREA OF MODERATE DETERIORATION OF SOUTHEAST

APPROACH PARAPET MASONRY MORTAR WITH THREE DISPLACED

STONES AND ONE MISSING.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-106P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 22 20 37 34

TYPE 3 21 19 36 32

TYPE 3S2 26 23 43 39

TYPE 3-3 28 25 47 42

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE

EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-106P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... LINVILLE RIVER BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 011 - AVERY

(204) STRUCTURE NUMBER: ..... 5140-106P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... LINVILLE RIVER

(207) ROAD SECTION NO: ..........106P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140106P0000000

(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 0.8 MILES TO U.S. ROUTE 2

(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................2J3 (11) MILE POINT: .............................316.57 (KM PT 509.36)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

11 - ARCH - DECK

101.5 FT (30.9 M)

304.5 FT (92.8 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

N - NOT APPLICABLE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 22.4 TONS (20.3 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 37.3 TONS (33.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-106P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 35°58'24.42"

(17) LONGITUDE: ......................... 81°56'12.42"

(19) DETOUR LENGTH: ............... 5 MI (8 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

25.8 FT (7.9 M)

39.8 FT (12.1 M)

38.0 FT (11.6 M)

22.0 FT (6.7 M)

8.0 FT (2.4 M)

8.0 FT (2.4 M)

0 - NO MEDIAN

0 °

NO

25.9 FT (7.9 M)

5.1 FT (1.6 M)

5.1 FT (1.6 M)

3 - PARAPET ONLY

9 - OTHER

1 - CONTINUOUS RAIL

2.54 FT (0.77 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK: ................................. N

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

C - MODERATE

$5,500

$3,350,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1983-JOINT REPAIR. 2008-CRACK OVER NORTH PIER SEAL. 2013-BRIDGE ROADWAY RESURFACED AND RESTRIPED / GROUND

PENETRATING RADAR TESTING FOR SUBSURFACE VOID DETECTION IN SPANDREL FILL

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

https://81�56'12.42 https://35�58'24.42

PHOTOGRAPHS STRUCTURE NO. 5140-106P

PHOTO #1 - LOOKING NORTHBOUND TOWARD BLOWING ROCK

FLOW

PHOTO #2 - EAST (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH

PHOTO #4 - GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING

SOUTH

PHOTO #5 - TYPICAL VEGETATION GROWTH OVERHANGING

PARAPETS, EAST PARAPET AT NORTH END SHOWN

PHOTO #6 - TYPICAL DROP-OFF AT END OF SIDEWALKS, NORTH END

OF EAST SIDEWALK SHOWN

PHOTO #7 - SPALLING OF WEST SIDEWALK OVER NORTH ABUTMENT;

NOTE EXPOSED DRAIN SEAL

PHOTO #8 - TYPICAL TRANSVERSE CRACKING WITH SPALLING OF

SIDEWALKS, WEST SIDEWALK AT NORTH END SHOWN

PHOTO #9 - FRACTURED AND MISSING EAST CURB IN NORTH SPAN

PHOTO #10 - TYPICAL DETERIORATION OF SIDEWALK, EAST SIDEWALK

OVER NORTH PIER SHOWN; NOTE TYPICAL SEPARATION OF CURB

STONES FROM SIDEWALK

PHOTO #11 - MISSING AND DISPLACED CURB STONES ALONG EAST

SIDEWALK OVER SOUTH PIER; NOTE DEBRIS ACCUMULATION

PHOTO #12 - TYPICAL CORE HOLES IN ASPHALT PAVEMENT, CORE

HOLE IN NORTHBOUND LANE OVER SOUTH PIER SHOWN

PHOTO #13 - SETTLEMENT OF WEARING SURFACE ALONG EAST CURB

IN SOUTH SPAN

PHOTO #14 - DETERIORATED SOUTHEAST APPROACH PARAPET

MASONRY MORTAR; NOTE DISPLACED AND MISSING STONES

PHOTO #15 - GENERAL VIEW OF SOUTH ABUTMENT, NOTE

EFFLORESCENCE

PHOTO #16 - TYPICAL EFFLORESCENCE ALONG SOUTH ABUTMENT

RINGSTONES, WEST SIDE SHOWN

PHOTO #17 - GENERAL VIEW OF SOUTHEAST WINGWALL; NOTE

TYPICAL EFFLORESCENCE ON WINGWALLS

PHOTO #18 - EROSION ALONG SOUTHWEST WINGWALL

PHOTO #19 - TYPICAL VEGETATION GROWTH ON PIERS, EAST SIDE OF

SOUTH PIER SHOWN

PHOTO #20 - GENERAL VIEW OF SOUTH PIER, NORTH FACE SHOWN;

NOTE EFFLORESCENCE

PHOTO #21 - TYPICAL CONDITION OF VERTICAL PIER JOINTS, EAST

SIDE OF SOUTH PIER SHOWN

PHOTO #22 - LOOSE STONES AND DETERIORATED MASONRY MORTAR

ON NORTH FACE OF EAST NOSE FOR SOUTH PIER

PHOTO #23 - TYPICAL EFFLORESCENCE ALONG PIER RINGSTONES,

WEST SIDE NORTH PIER SHOWN

PHOTO #24 - TYPICAL EXPOSED DRAINAGE PIPE AT BASE OF PIERS,

SOUTH FACE OF NORTH PIER SHOWN

PHOTO #25 - FLOOD DEBRIS ON WEST SIDE OF NORTH PIER

PHOTO #26 - FLOOD DEBRIS DAMAGE TO WEST SIDE OF NORTH PIER

PHOTO #27 - GENERAL VIEW OF NORTH ABUTMENT; NOTE

EFFLORESCENCE

PHOTO #28 - TYPICAL EFFLORESCENCE ON RINGSTONES AT NORTH

ABUTMENT, WEST RINGSTONES SHOWN

PHOTO #29 - ACTIVE LEAKAGE FROM NORTH ABUTMENT WEEP HOLE

PHOTO #30 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS,

EAST END OF NORTH ABUTMENT SHOWN

PHOTO #31 - UPSTREAM CHANNEL

PHOTO #32 - DOWNSTREAM CHANNEL