Plans Horse Mesa Bridge.pdf
PDF 7 MB Posted
- Attached to
- AZ FTBR SALT 80(1) Horse Mesa Bridge
- Solicitation number
- 6982AF22B000034
About this file
This invitation for bid solicits offers for the construction of the Horse Mesa Bridge project located in Arizona. The scope of work includes bridge rehabilitation, approach road construction, signage installation, and erosion control measures. Bids are due by August 22, 2022 and the contract is to be awarded by September 30, 2022. The project is funded by the Federal Highway Administration and administered by the Department of Transportation under solicitation number 6982AF22B000034. Site visits can be arranged by contacting the point of contact provided.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/5/2022
ALEXANDER
SMITH
Digitally signed by ALEXANDER
SMITH
Date: 2022.08.11 09:11:41 -07'00'
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT
Date: 2022.08.24 11:15:10 -06'00' jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:2
A
M u g u s t
S h e e t
N
A
Z \s a lt (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ A
Z s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
AZ
AZ FTBR SALT 80(1)
A2
HORSE MESA BRIDGE
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS
1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS
National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick
ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
N
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS :3 a rc h
S h e e
A
Z \s a lt (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ A
Z s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
AZ
A3
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
Created SJS
SURVEY CONTROL SHEET
2/22/22
:1
P a r c h
U n ti tl e d
S h e e t]
A Z
\s a lt
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ A
Z
S A
L T
C o n tr o l_
S h e e t.
d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
AZ
HORSE MESA BRIDGE
A4
SITE MAP
STA 102+98.70
End Bridge Realignment
Horse Mesa Bridge
AZ FTBR SALT 80(1)
STA 100+00
Begin Bridge Realignment
Horse Mesa Bridge
AZ FTBR SALT 80(1) (pullout)
Possible staging area area (pullout)
Possible staging
(pullout)
Possible staging area
Salt River
Apache Junction
20 miles to
Claypool
70 miles to
FR
FR 80
Tonto
National
Forest
Salt River
To Dam 1.4 miles
FR
0 2000' 4000'
Scale in Feet
To waste site 0.5 mile
:0
J u ly
S it e M a p
A Z
\s a lt
(1
R o a d w a y
\C A
D D
S h e e ts
\A -G e n s h t\ A
Z
S A
L T
(1
S it e M a p
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
AZ
HORSE MESA BRIDGE
A5 aggregate) roadway
(top of
Profile grade
Clear zone Clear zone
Method 2
6" Roadway Aggregate, Existing aggregate base depth varies limit stake
Slope limits
Slope stake
See Detail A
Existing curb traveled way
Proposed edge of
Sta 100+00 to 102+98.70
EXISTING TYPICAL SECTION
Sta 102+07.86 to 102+98.70
Sta 100+00 to 101+07.86
TYPICAL SECTION
Traveled way
Subgrade
8'
10'
2'
Clearing and construction limits
Traveled way
8' mulching limits Seeding and
Subgrade
10' mulching limits Seeding and
2'6' ditch
Graded
6'
2'2'
See note 2
Fill slope
S e e n o te
C u t slo p e
2.
3. 3.
1:4 1:4
3. See the cross sections for cross slopes.
See the cross sections for cut and fill slope ratios. 2.
stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
The gradient and width of roadway ditches and the 1.
NOTE:
NO SCALE
Sta 102+88 to 102+98.70
Detail A
15' Existing width average
0.0190.038TOTALS (mi)
100198.70TOTALS (ft)
90.84102+07.86 to 102+98.70
100101+07.86 to 102+07.86
107.86100+00 to 101+07.86
(ft)
Bridge
(ft)
Roadway Station to Station
LENGTH OF PROJECT
5'
5'
:5 u g u s t
U n ti tl e d
S h e
A Z
\s a lt
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ A
Z
T y p ic a l_
S e c ti o n
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
STATE PROJECT
NUMBER
SHEET
AZ
HORSE MESA BRIDGE
A6
Method 2
6" Roadway Aggregate, limits
Clearing and seeding
Method 2
6" Roadway Aggregate, limits
Clearing and seeding of the existing curb
Match elevation at the bottom of the existing curb
Match elevation at the bottom traveled way or wingwall
Match proposed edge of bridge
Edge of proposed edge of roadway
Match existing of roadway
Match existing edge limits
Clearing and seeding
Existing curb of roadway
Match existing edge
Method 2
6" Roadway Aggregate, ground
Match existing limits seeding
Clearing and removed)
(to be curb
Existing
Method 2
6" Roadway Aggregate, of traveled way
Match proposed edge existing edge of roadway of traveled way or
Match proposed edge slop e exis ting Tie to retaining wall.
and dimensions of the proposed reinforced concrete
4. See Special 258-A for more details on the construction
See the cross sections for cross slopes.3.
widths, elevations and offsets.
See Approach Roads And Pullouts Grading Plan Sheet for 2.
stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
The gradient and width of roadway ditches and the 1.
NOTE:
NO SCALE
3.
Sta 101+82 to 102+06.86
APPROACH ROAD TYPICAL SECTION
S e e n o te
C u t slo p e
3.
Sta 102+06.86 to 102+88
APPROACH ROAD TYPICAL SECTION
3.
Sta 100+95 to 101+17
APPROACH ROAD TYPICAL SECTION
3.
Sta 100+72 to 100+95
APPROACH ROAD TYPICAL SECTION
2'
2.
2.
2.
2.
4.
4.
5' Varies, 10' min.
V a r ie s
5' Varies
V a r ie s centerline 8' offset from
5' Varies
5' Varies m in m in
:5 u g u s t
U n ti tl e d
S h e
A Z
\s a lt
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ A
Z
T y p ic a l_
S e c ti o n
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPICAL SECTIONS
APPROACH ROAD
STATE PROJECT
NUMBER
SHEET
AZ
HORSE MESA BRIDGE
A7
Sheet and Description
B3 B4 B5 S2
GRADING AND
SURFACING
SUMMARIES
MISCELLANEOUS
SUMMARIES
MISCELLANEOUS
SUMMARIES
BRIDGE
SUMMARY ALLOWANCE Bid
Schedule
A0001 15101-0000 MOBILIZATION LPSM ALL
A0021 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0041 15215-1000 SURVEY AND STAKING, APPROACH
ROAD EACH 2 2
A0061 15225-0000 SLOPE, REFERENCE, AND CLEARING
AND GRUBBING CONTROL MILE 0.037 0.037
A0081 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.037 0.037
A0101 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0121 15401-0000 CONTRACTOR TESTING LPSM ALL
A0141 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0161 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0181 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0201 20101-0000 CLEARING AND GRUBBING ACRE 0.33 0.02 0.35
A0221 20301-2300 REMOVAL OF SIGN/MARKER EACH 3 3
A0241 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 157 8 165
A0261 20302-1200 REMOVAL OF GUARDRAIL LNFT 6.5 3.5 10.0
A0281 20401-0000 ROADWAY EXCAVATION CUYD 336 34 370
A0301 20801-0000 STRUCTURE EXCAVATION CUYD 130 130 Contract Quantity
A0321 20803-0000 STRUCTURAL BACKFILL CUYD 45 45 Contract Quantity
A0341 25801-0000 REINFORCED CONCRETE RETAINING
WALL SQFT 398 12 410
A0361 30202-2100 ROADWAY AGGREGATE, METHOD 2,
SURFACE COURSE TON 230 12 242
A0381 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 28 28
A0401 55401-1000 REINFORCING STEEL LB 3,600 3,600 Contract Quantity
A0421 55504-0000 PRE-FABRICATED STEEL BRIDGE
(16'x98') LPSM All ALL
A0441 60101-0000 CONCRETE CUYD 10 10
A0461 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 20
A0481 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT
MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 20
A0501 62201-0950 WHEEL LOADER, 3 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20
A0521 62201-2750 MOTOR GRADER HOUR 20
A0541 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY HOUR 20
A0561 62301-0000 GENERAL LABOR HOUR 40
MileStone: 100% Date Completed: 08/03/22 Report Date: 08/03/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 3-
Au g-
:1
PM
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities
N
AZ
\s al t8
0( 1)
\R oa dw ay
\C
AD
D _S he et s\ B -S um m
SO
Q _9
5% _S
AL
T8
0( 1)
.x ls m ]S he et
STATE PROJECT
B1AZ FTBR SALT 80(1)
HORSE MESA BRIDGEAZ
SHEET
NUMBER
Sheet and Description
B3 B4 B5 S2
GRADING AND
SURFACING
SUMMARIES
MISCELLANEOUS
SUMMARIES
MISCELLANEOUS
SUMMARIES
BRIDGE
SUMMARY ALLOWANCE Bid
Schedule
A0581 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 40
A0601 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40
A0621 62303-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES (BIOLOGIST) LPSM ALL
A0641 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 814 41 855
A0661 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 814 41 855
A0681 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0701 63309-0000 DELINEATOR EACH 1 1
A0721 63316-1000 REMOVE AND RESET SIGN EACH 1 1
A0741 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
3- Au g-
:1
PM
MileStone: 100% Date Completed: 08/03/22 Report Date: 08/03/22
N
AZ
\s al t8
0( 1)
\R oa dw ay
\C
AD
D _S he et s\ B -S um m
SO
Q _9
5% _S
AL
T8
0( 1)
.x ls m ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B2AZ FTBR SALT 80(1)
HORSE MESA BRIDGEAZ
:0 u g u s t
G r a d in g S u m m a r y
A Z
\s a lt
\R o a d w a y \C
A D
D S h e e ts
\B S u m m \A ll B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SUMMARIES
GRADING AND SURFACING
STATE PROJECT
NUMBER
SHEET
AZ
B3
:0 u g u s t
M is c e ll a n e o u s S u m m a r ie s
A Z
\s a lt
\R o a d w a y \C
A D
D S h e e ts
\B S u m m \A ll B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
AZ
B4
:1 u g u s t
M is c e ll a n e o u s S u m m a r ie s
A Z
\s a lt
\R o a d w a y \C
A D
D S h e e ts
\B S u m m \A ll B
S h e e ts
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
MISCELLANEOUS SUMMARIES
STATE PROJECT
NUMBER
SHEET
AZ
B5
ETW
S L
O T D
R A I N
J H4 2 B O
L T
E T
W
N09 °0
3'
"W
N20°52'37"E
N °3
'4 "W
N39°04'48"E
'26.13L =
'13.37T =
'50.00R =
(RT)29°56'20"Δ =
100+92.85PI
'53.70L = '27.90T = '80.00R =
(LT)38°27'26"Δ =
102+45.02PI
.1
C
2+
.8
PT
.4
.6
T
3+
.2
PC
.6
T
.0
P O
B
.6
P O
E
0 1
Scale in Feet
50'0 100' place.
remain in Bridge to Existing
Type 3.
Install object marker 102+07.86 Lt. & Rt.
marker Type 3.
Install object 101+07.86 Lt. & Rt.
Profile grade
Existing ground
Do Not Disturb.
Overhead power line, concrete curb.
Remove existing 100+00 to 100+28 Lt.
marker.
Remove object 100+98 Lt.
S sheets).
Bridge (See 102+07.86 101+07.86 to
Remove existing curb.
100+72 to 100+95 Lt.
object marker.
guardrail and Remove existing 101+81.5 to 101+88 Lt. E: 871148.1650
N: 936967.3340 Station 100+00 Begin project
AZ FTBR SALT80(1)
E: 871171.1374 N: 937254.9593 Station 102+98.70 End project
AZ FTBR SALT80(1)
weight limits sign.
Remove and reset 100+36 Rt.
See Sheet C2.
Construct approach road.
100+67 to 101+17 Lt.
See Sheet C2.
Construct approach road.
101+82 to 102+98.70 Lt.
retaining wall. See Sheet G1.
curb and construct reinforced concrete 101+82 to 102+88 Lt. Remove existing existing delineator.
Remove and replace 102+61 Rt.
Sheet C2.
Construct pullout. See 100+31 to 100+92 Rt.
Sheet C2.
Construct pullout. See 102+07.86 to 102+98.70 Rt.
retaining wall. See Sheet G1.
Construct 25'L x 2'H reinforced concrete 101+82 to 102+06.86
100+00 101+00 102+00 103+00
1,810 1,810
1,820 1,820
1,830 1,830
-14.271%
-6.000%
-6.000%
-10.043%
.0
V P
I
.0
V P
I
' VC35
8.66K =
'284.49SSD =
' VC38
5K =
,8
.2
,8
.7
ROADWAY PLAN AND PROFILE SHEET
100+00 TO 102+98.70
HORSE MESA BRIDGE
100' Bridge (See S Sheets)
:2 u g u s t
B
L
P la n -8
S h e
A
Z \s a lt (1
R o a d w a y \C
A D
D D e s ig n \S
A L T
\d g n \P
N P
S
A L T
(1 d g n
STATE PROJECT
NUMBER
SHEET
AZ
C1
ETW
L
O T D
R A I N
J H4 2 B O
L T
E T
W
N09 °0
3'
"W
N20°52'37"E
N °3
'4 "W
N39°04'48"E
.4
.7
.9
Scale in Feet
20'0 40'
E: 871148.1650
N: 936967.3340
Station 100+00
Begin project
AZ FTBR SALT80(1)
E: 871171.1374
N: 937254.9593
Station 102+98.70
End project
AZ FTBR SALT80(1)
EL 1814.7'
OFF 8'
STA 102+07.86
EL 1813.7'
OFF 25.7'
STA 102+23
EL 1812.8'
OFF 22.6'
STA 102+36
EL 1810.7'
OFF 28.1'
STA 102+59
EL 1807.4'
OFF 12.4'
STA 102+91
EL 1806.6'
OFF 12'
STA 102+98.7
EL 1829.7'
OFF 8'
STA 100+31
EL 1825.1'
OFF 20'
STA 100+63
EL 1823'
OFF 17.9'
STA 100+78
EL 1821.8'
OFF 8'
STA 100+92
EL 1821.6'
OFF 8'
STA 100+95
EL 1822.4'
OFF 18.5'
STA 100+95
EL 1821.8'
OFF 23.1'
STA 101+00
EL 1821.3'
OFF 28'
STA 101+07.86
EL 1821.2'
OFF 8'
STA 101+00
EL 1820.9'
OFF 11.5'
STA 101+07.86
EL 1816.2'
OFF 32.1'
STA 101+82
EL 1814.4'
OFF 26.5'
STA 102+00
EL 1812.4'
OFF 20.6'
STA 102+20
EL 1810.6'
OFF 17.3'
STA 102+36
EL 1815.3'
OFF 16.6'
STA 101+82
EL 1815.2'
OFF 14.5'
STA 102+00
EL 1814'
OFF 8.1'
STA 102+20
EL 1812.8'
OFF 8.3'
STA 102+36
EL 1813.5'
OFF 13.8'
STA 102+06.86
EL 1824.5'
OFF 8'
STA 100+67
EL 1813.6'
OFF 24.4'
STA 102+06.86
EL 1823.9'
OFF 11'
STA 100+67
EL 1809.4'
OFF 12.7'
STA 102+60
EL 1810.6'
OFF 8.5'
STA 102+60
EL 1806.7'
OFF 8.9'
STA 102+98.70
EL 1823'
OFF 8'
STA 100+80
EL 1823.3'
OFF 11.5'
STA 100+80
APPROACH ROADS AND PULLOUTS GRADING PLAN SHEET
100+00 TO 102+98.70
HORSE MESA BRIDGE
See the cross sections for tie in slopes. 2.
roadway.
proposed edge of travel way to match existing edge of and the pullouts are approximate. Grade from the
Stations, offsets and elevations for the approach roads 1.
NOTE:
:2 u g u s t
B
L
P la n
S h e e t] a p p r o a c h a n d p u ll o u
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \P
N P
S
A L
T
(1 d g n
STATE PROJECT
SHEET
AZ
AZ FTBR SALT 80(1)
C2
NO SCALE
RETAINING WALL
REINFORCED CONCRETE
258-A
ADOPTED FROM SRP-CIVIL ENGINEERING SERVICES
PROFILE VIEW
PROFILE VIEW TYPICAL SECTION VIEW
TYPICAL SECTION VIEW
(TOP OF WALL)
(TOP OF WALL)
:0
J u n e
U n ti tl e d
S h e
A Z
\s a lt
\R o a d w a y
\C A
D D
S h e e ts
\G
\S P
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
AZ
G1
ESTIMATE NOTES
(1) Contract Quantity.
(2) Includes cost of furnishing and installing geocomposite sheet drain, (est. qty. = 25 square yards), weepholes, and drain grates.
(3) Includes cost of furnishing and erecting modular steel bridge including structural steel girders and diaphragms, steel railing posts, thrie beam railing, open steel grid decking, splice plates, elastomeric bearing pads, bearing plates, anchor bolts, and all associated hardware.
(4) Includes cost of furnishing and placing section 704.03 backfill material.
(5) Includes cost of minor concrete as required to meet footing embedment requirements.
Item No. Item Quantity Unit Notes
15214-1000 Survey and staking, bridge All Req'd LPSM
20801-0000 Structure excavation 130 CUYD (1)
20803-0000 Structural backfill 45 CUYD (1)(4)
55201-0200 Structural concrete, class A(AE) 28 CUYD (2)(1)
55401-1000 Reinforcing steel 3600 LB (1)
55504-0000 Pre-fabricated steel bridge (16' wide x 98' long modular steel vehicular bridge) All Req'd LPSM (3)
60101-0000 Concrete 10 CUYD (5)
ESTIMATE
GENERAL NOTES:
SPECIFICATIONS:
DESIGN: AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017.
CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 (dual units).
DEAD LOAD:
CONCRETE: 150 lbs. per cubic foot.
STRUCTURAL STEEL: 490 lbs. per cubic foot.
SOIL: 125 lbs. per cubic foot.
No allowance for future wearing surface
LIVE LOAD:
HL-93, single lane. Maximum Dynamic Load Allowance (Impact), IM = 33%.
LATERAL EARTH PRESSURE:
ACTIVE PRESSURE: Equivalent to a fluid unit weight of soil = 35 lbs. per cubic foot.
AT REST PRESSURE: Equivalent to a fluid unit weight of soil = 50 lbs. per cubic foot.
LIVE LOAD SURCHARGE: Equivalent to a height of soil. For Abutments heq = 3 feet.
For wingwalls heq = 2 feet.
WIND LOAD:
Design Wind Speed (Strength III Limit State), V = 110 mph, Wind Exposure Category = C.
SEISMIC:
Peak Ground Acceleration (PGA = 0.074 g), modified by the Site Coefficient (FPGA =1.0) to give a spectrum acceleration, AS = 0.074 g.
Short period acceleration at 0.2 seconds (SS = 0.172 g) modified by the Site Coefficient (Fa = 1.0) to give the short period spectrum acceleration, SDS = 0.172 g.
Long period acceleration at 1.0 seconds (S1 = 0.050 g) modified by the Site Coefficient (FV = 1.0) to give the long period spectrum acceleration, SD1 = 0.050 g.
Site Class = B. Seismic Zone = A.
DESIGN CRITERIA:
CONCRETE:
All cast in place concrete shall be Structural Concrete, Class A(AE), with a minimum 28-day compressive strength, f'c= 4500 psi. Chamfer exposed edges of all concrete ¾ inch, unless noted otherwise on the plans. All concrete shall be made with Type II cement.
REINFORCING STEEL:
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed. The minimum concrete covering to the face of any bar shall be 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes shall be as shown on the plans. Bar splices other than those shown on the plans will not be paid for.
PREFABRICATED STEEL BRIDGE:
Provide modular steel girder bridge with open grid steel decking, and steel vehicular railing as shown on the plans. See Section 555 of the Special Contract Requirements for additional requirements.
The steel fabricating company shall be Certified Bridge Fabricator - Intermediate under the AISC Quality Certification Program. All structural steel for girders, diaphragms, and bridge rail posts shall be high-strength low alloy steel conforming to AASHTO M270, Grade 50 (ASTM A709, Grade 50) unless otherwise shown on the plans. The contractor shall be responsible for the stability of the structure during all phases of construction. All field connections shall be designed as slip critical, friction type, and shall be made with fasteners conforming to ASTM F3125, Grade A325, Type 3. All structural steel components of bridge including girder, diaphragms, splices and connection bolts shall be galvanized after fabrication according to AASHTO M111 or AASHTO M232, as applicable. All welding shall conform to the ANSI/AASHTO/AWS D1.5, and shall be by a certified welder.
Open grid steel decking shall conform to ASTM A709, Grade 50, or ASTM A572, Grade 50. All deck components and hardware shall be galvanized after fabrication according to AASHTO M111 or AASHTO M232, as applicable.
Thrie-beam guardrail elements shall be galvanized steel conforming to AASHTO M180, Type I, Class B (10 gauge).
Guardrail shall provide a minimum TL-2 crash test level rating.
Anchor bolts shall conform to ASTM F1554, Grade 55 or 105. Hex nuts shall conform to ASTM A563, Grade A. All anchor bolt hardware shall be galvanized.
Steel reinforced bearing pads shall conform to AASHTO M251, 60 Durometer hardness, elastomer grade 2 or higher. Design pads per AASHTO LRFD Design Method A.
DRAINAGE:
Drainage pipe shall conform to AASHTO M252.
EXISTING BRIDGE:
For existing bridge plans see Salt River Project Drawing No. A-650-6 “Horse Mesa Dam Access Road Crevice Crossing Bridge”, final revision dated 06/2010.
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P (optional)
W13-1P (optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
T1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
HORSE MESA BRIDGE
AZ FTBR SALT 80(1)
AZ
U
A
Z \s a lt (1
R o a d w a y \C
A D
D S h e e ts
\T -6
\S td -1
.d g n
:1 u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
A
B
C
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
Pr oje ct Lim its
A
A
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
LENGTH AND SPACING TABLE
APPROACH
SPEED* 1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
BUFFER SPACE
LENGTH
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
Flagger location
Flagger location
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
T2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
HORSE MESA BRIDGE
AZ FTBR SALT 80(1)
AZ
U
A Z
\s a lt
\R o a d w a y
\C A
D D
S h e e ts
\T
\S td
.d g n
:1 u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
635-13
(WITH TEMPORARY BARRIER)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
T3
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
HORSE MESA BRIDGE
AZ FTBR SALT 80(1)
AZ
U
A Z
\s a lt
\R o a d w a y \C
A D
D S h e e ts
\T \S td .d g n
:1 u g u s t
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
Install signs and other devices for single lane closure according to
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
CONCRETE
BARRIER
FLARE
RATE
1:8
1:8
1:8
1:9
1:10
1:12
1:14
1:16
1:16
1:16
1:16
1.
2.
3.
4.
5.
6.
BUFFER SPACE
LENGTH
* Approach speed based on the regulatory posted speed, not the advisory speed.
NOTE:
WORK ZONE
CLEAR ZONE
WIDTH
devices may be changed to fit field conditions as approved by the CO.
Place barrier according to the AASHTO Roadside Design Guide. Terminate barrier ends outside the work zone clear zone or protect the barrier ends
For project specific minimum width, refer to Special Contract Requirements, Section 156.
Place channelizing devices at downstream taper during non-work hours or when access is not needed.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
Reduce or eliminate drums and barrier in downstream taper if necessary to provide access to work space.
pavement markings
Remove conflicting
Channelizing devices
See Note 2
Temporary concrete barrier.
50' - 100')
(50' - 100') with a crash cushion. Include reflectors on barrier at 25' intervals.
Standard 635-6, 7, 8, or 9. Final location and spacing of signs and
FEETSPACING IN FEETFEETMPH
See Note 2
See Note 2 spacing
Device
See Note 4
TAPER AREA (
BUFFER SPACE
VARIABLE WORK SPACE
(See Length and Spacing Table)
BUFFER SPACE
TAPER AREA
See Note 3
10' min.
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f t r a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL
NO SCALE
Post
Local tangent
Bottom of sign panel
See post detail (typ.)
Break-away holes.
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
" dia. bolts 4 1Attach sign panels with a minimum of 2 -
STATE PROJECT
NUMBER
SHEET
T4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
HORSE MESA BRIDGE
AZ FTBR SALT 80(1)
AZ
U S
C
N A
Z \s a lt (1
R o a d w a y \C
A D
D S h e e ts
\T -6
\S td -1
.d g n
:3
J u n e
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
1.5
1.5
1.5
1.5
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X 0.2X
D
Long side of post
D
90°
93°
200' m in m in
6' - 12'
100+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
1,820 1,820
1,830 1,830
1,840 1,840
1,834.21 Des Grade = 1,834.21 Des Grade =
-2.0% -1.0% 1:4
1,833.71 Subgrade = 1,833.71 Subgrade =
1,834.21 Original Grnd = 1,834.21 Original Grnd =
100+20.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
1,820 1,820
1,830 1,830
1,840 1,840
1,850 1,850
1,831.36 Des Grade = 1,831.36 Des Grade =
1:3 .22
-1.6% -1.0% 1:41:6
1,830.86 Subgrade = 1,830.86 Subgrade =
1,832.09 Original Grnd = 1,832.09 Original Grnd =
1:3 .22
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:1 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X1
AZ
100+40.00
1,820 1,820
1,830 1,830
1,840 1,840
1,828.51 Des Grade = 1,828.51 Des Grade =
1:4.
22 -1.3% -1.0% 1:4
1:4 1:4
1,828.01 Subgrade = 1,828.01 Subgrade =
1,829.96 Original Grnd = 1,829.96 Original Grnd =
100+60.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
1,820 1,820
1,830 1,830
1,840 1,840
1,825.65 Des Grade = 1,825.65 Des Grade =
1:1.5
.46
-0.9% -0.9% 1:41:4
1:4
1,825.15 Subgrade = 1,825.15 Subgrade =
1,827.82 Original Grnd = 1,827.82 Original Grnd =
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X2
100+80.00
1,810 1,810
1,820 1,820
1,830 1,830
1,823.01 Des Grade = 1,823.01 Des Grade =
-0.5% -0.5% 1:4 1:4
1:4
1,822.51 Subgrade = 1,822.51 Subgrade =
1,824.70 Original Grnd = 1,824.70 Original Grnd =
9.6%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:4 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X3
100+90.00
1,810 1,810
1,820 1,820
1,830 1,830
1,821.99 Des Grade = 1,821.99 Des Grade =
-0.3% -0.3% 1:4 1:4
1:3
1,821.49 Subgrade = 1,821.49 Subgrade =
1,823.81 Original Grnd = 1,823.81 Original Grnd =
101+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
1,810 1,810
1,820 1,820
1,830 1,830
1,821.19 Des Grade = 1,821.19 Des Grade =
-0.2% -0.2% 1:4
1:3
1,820.69 Subgrade = 1,820.69 Subgrade =
1,823.46 Original Grnd = 1,823.46 Original Grnd =
10%
4.4%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X4
101+07.86
1,810 1,810
1,820 1,820
1,820.70 Des Grade = 1,820.70 Des Grade =
BRIDGE STATIONS 101+07.86 TO 102+07.86
1:4 1:4
1,820.20 Subgrade = 1,820.20 Subgrade =
1,821.43 Original Grnd = 1,821.43 Original Grnd =
0%0%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.8
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X5
101+15.81
1,800 1,800
1,810 1,810
1,820 1,820
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.8
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X6
101+82.00
1,780 1,780
1,790 1,790
1,800 1,800
1,810 1,810
1,820 1,820
1:1.47
5.2%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X7
101+90.00
1,780 1,780
1,790 1,790
1,800 1,800
1,810 1,810
1:1.5
6.4%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X8
102+00.00
1,790 1,790
1,800 1,800
1,810 1,810
9.1%
1:1.53
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X9
102+20.00
1,800 1,800
1,810 1,810
1,820 1,820
1,813.97 Des Grade = 1,813.97 Des Grade =
-0.1% 1:4 1:6
1,813.47 Subgrade = 1,813.47 Subgrade =
1,811.87 Original Grnd = 1,811.87 Original Grnd =
0%-2.5%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X10
102+40.00
1,800 1,800
1,810 1,810
1,820 1,820
1,830 1,830
1,812.49 Des Grade = 1,812.49 Des Grade =
-0.2% 1:4 1:6
1,811.99 Subgrade = 1,811.99 Subgrade =
1,810.44 Original Grnd = 1,810.44 Original Grnd =
0%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X11
102+60.00
1,800 1,800
1,810 1,810
1,820 1,820
1,830 1,830
1,810.59 Des Grade = 1,810.59 Des Grade =
-0.3% 1:4
1,810.09 Subgrade = 1,810.09 Subgrade =
1,809.14 Original Grnd = 1,809.14 Original Grnd =
0%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X12
102+80.00
1,800 1,800
1,810 1,810
1,820 1,820
1,808.58 Des Grade = 1,808.58 Des Grade =
-0.5% 1:41:6
1,808.08 Subgrade = 1,808.08 Subgrade =
1,808.02 Original Grnd = 1,808.02 Original Grnd =
0%
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:2 u g u s t
B
L
.0
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X13
102+98.70
1,800 1,800
1,810 1,810
1,806.70 Des Grade = 1,806.70 Des Grade =
1,806.20 Subgrade = 1,806.20 Subgrade =
1,806.70 Original Grnd = 1,806.70 Original Grnd =
HORSE MESA BRIDGE
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:1 u g u s t
B
L
.7
S h e
A Z
\s a lt
(1
R o a d w a y
\C A
D D
D e s ig n \S
A L
T
\d g n \A
L I_
S e c o n d a ry
S
A L
T
(1
X
S E
.d g n
HORSE MESA BRIDGE
X14
| 100%_Plans_AZ_SALT80(1).pdf |
| salt80(1)_title |
| AZ_Control_Sheet.pdf |
| AZ_SALT_80(1)_Control_Sheet |
| AZ_SALT_80(1)_SiteMap_3.pdf |
| AZ_SALT_80(1)_Site Map |
| Symbols.pdf |
| AZ_sym |
| AZ_sym |
| Typ sec.pdf |
| AZ_Typical_Section |
| AZ_Typical_Section |
| TSheets2.pdf |
| Std635-1_2 |
| Std635-5_2 |
| Std635-13_2 |
| Std635-14_2 |
| XSE_SALT80(1).pdf |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| ALI_Secondary_SALT80(1)_XSE |
| B SHEETS.pdf |
| All B_Sheets |
| All B_Sheets |
| All B_Sheets |
| B1-B2 Sheets.pdf |
| Sheet |
| Sheet (2) |
| PNP_SALT80(1).pdf |
| PNP_SALT80(1) |
| PNP_SALT80(1) |
File details come from the government source that posted it. Updated .