Bid Opening Summary_AZ FTBR SALT 80(1) Horse Mesa Bridge.pdf

PDF 163 KB Posted

Attached to
AZ FTBR SALT 80(1) Horse Mesa Bridge
Solicitation number
6982AF22B000034
Issued by

About this file

This document provides details of a bid opening for the AZ FTBR SALT 80(1) Horse Mesa Bridge project. The bid opening was held on October 25, 2022 at 2:00 PM MDT in Lakewood, Colorado and was conducted by Sheri Walsh. Five contractors submitted bids ranging from $1,570,000 to $3,064,775.50. The lowest bidder was Technology Construction, Inc. at $1,570,000, followed by Whelcon Contractors, LLC at $1,827,676.43. The engineer's estimate for the project was $1,690,222. All bids remain subject to verification by the contracting agency, the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Horse Mesa Bridge Project Number: AZ FTBR SALT 80(1) Bid Opening Date: 10/25/2022 Time: 2:00 p.m. MDT Bid Opening Location: Lakewood, CO Bid Opening Officer: Sheri Walsh

Amendments: (1)A001 10/05/2022 (2) A002 10/13/2022_

Bidder’s Name Schedule A BID TOTAL 1.

Larison Contracting Corp.

Long Beach, CA

$2,484,236.25 $2,484,236.25

2.

Meridian Engineering Corp.

Tucson, AZ

$3,064,775.50 $3,064,775.50

3.

Whelcon Contractors, LLC Tucson, AZ

$1,827,676.43 $1,827,676.43

4.

Technology Construction, Inc, $1,570,000.00 $1,570,000.00

5.

6.

7.

Engineer’s Estimate $1,690,222.00 $1,690,222.00

*All bids are subject to verification.

Prescott, AZ

Bid Opening Summary
Bid Opening Date: 10/25/2022 Time: 2:00 p.m. MDT
*All bids are subject to verification.

File details come from the government source that posted it. Updated .