Plans.pdf
PDF 31 MB Posted
- Attached to
- FY26 Kingston Estates Water Main Improvements State and local contract opportunity
- Solicitation number
- 26-018MK
- Issued by
- Manatee County, Florida
About this file
This is a construction drawings file prepared by the City of Bradenton Public Works and Utilities Department for the FY 2026 Water Main Improvements project in the Kingston Estates area of Manatee County, Florida. The project involves the installation of approximately 3,300 linear feet of 8-inch PVC water mains using open-cut construction methods, including associated infrastructure such as gate valves, fire hydrants, tapping sleeves, service connections, and meter boxes. The Invitation to Bid (IFB #26-018MK) includes removal of trench asphalt pavement, abandonment of existing water mains, disinfection and testing procedures, final milling and paving, and related appurtenances. A non-mandatory pre-proposal meeting is scheduled for January 22, 2026, at 11:00 a.m., with a question submission deadline of January 29, 2026, at 10:00 a.m., and a bid response deadline of February 12, 2026, at 2:00 p.m. The contract duration is a maximum of 180 calendar days from the Notice to Proceed, with liquidated damages assessed at $500 per day for delays beyond the completion date.
Bidders must be licensed general contractors and demonstrate experience by completing at least two projects involving a minimum of 3,300 linear feet of stormwater piping, with at least one project valued at $1,000,000 or more. A 5% bid bond is required with the proposal, and the apparent low bidder must provide an original performance and payment bond totaling 100% of the contract amount within five business days of notification. The project budget is estimated between $1,500,000 and $2,500,000, which includes a 10% contingency amount and a $2,500 cash allowance for quality control testing. All submissions must be made electronically through the OpenGov procurement portal. The City intends to award the contract to the lowest responsive and responsible bidder, with no specific set-aside designations mentioned for disadvantaged business enterprises.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| FY26_Kingston_Estates_Water_Main_Improvements_(Addendum_#7_Revision).pdf | ||
| FY26_Kingston_Estates_Water_Main_Improvements_(Addendum_#7_Revision).pdf | ||
| Vendor_Analytics.xlsx | XLSX spreadsheet | |
| Vendor_Analytics.xlsx | XLSX spreadsheet | |
| FY26_Kingston_Estates_Water_Main_Improvements.pdf | ||
| Technical_Specifications.pdf | ||
| Other_Contract_Forms.pdf | ||
| Standard_General_Conditions.pdf | ||
| Supplementary_Conditions.pdf | ||
| Technical_Specifications.pdf | ||
| Technical_Specifications.pdf | ||
| Plans.pdf | ||
| Standard_General_Conditions.pdf | ||
| Supplementary_Conditions.pdf | ||
| Other_Contract_Forms.pdf | ||
| Other_Contract_Forms.pdf | ||
| Standard_General_Conditions.pdf | ||
| Supplementary_Conditions.pdf | ||
| Plans.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
T E 20
S T
E
11 AVE ELN
15 AVE E
17 ST CT E
WOODWINDS
S
T
CT
E
13 AVE E
S
T E
WOODWINDS
S
T E
17 AVE E
15 AVE E
S
T
CT
E
17 ST E
AVE E
S
T E
17 ST CIR E
WOODWINDS DR
14 AVE E
CIR
13 AVE E 21
S
T E
S
T E
16 AVE E
CONSTRUCTION DRAWINGS
MANATEE
COUNTY
p
BRADENTON
o o
CITY OF BRADENTON
PREPARED BY:
PUBLIC WORKS and UTILITIES DEPARTMENT
DECEMBER 2025
PROJECT NUMBER: 40859000-563000-26502
LOCATION MAP
SITE VICINITY MAP
FY 2026 WATER MAIN IMPROVEMENTS
-KINGSTON ESTATES-
PROJECT AREA
ENGINEER OF RECORD:
.RI67OFER 6� ECC/E6� 3�E�
3�E� NO�: �����
CI7< OF %R$DEN7ON
��� ��7+ $9EN8E E$67
%R$DEN7ON� F/ �����
F
LO
HQ
DP
H:
E N
GI
N E E R
IN
G?
IN
7E R N
R O-
E C
$7
E R
$I N I R O9
E E N
?F
�B
<R
IN
G6 7O
N E
7$
7E
BD
E
IG
N
IN
G6
7O N E
7$
7E �D
G
DY
HG
R
Q:
B6 I%
E R
D
DW
H
OR
WW
HG
KR
ISTOFER S. ECCLES
P R
O
FESS I ON A L ENGIN
EE
R
F L O R I D A
L I C E N S E
No 99424
STATE OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MANATEE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MYAKKA
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GENERAL
CONSTRUCTION LAYOUT/LIMITS OF CONSTRUCTION
EXISTING CONDITIONS
GENERAL NOTES
UTILITY COORDINATION
SAFETY
RESTORATION
ACCESS/MAINTENANCE OF FACILITIES
MAINTENANCE OF TRAFFIC
PIPING NOTES
UTILITY SEPARATION
PROJECT SPECIFIC:
GENERAL NOTES and
DRAWING INDEX
Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.
Check positive response codes before you dig!
CITY OF BRADENTON
PUBLIC WORKS DEPARTMENT
DRAWING INDEX
DESCRIPTION
DWG.
NO.
F il en am e:
P
E N
GI
N E E R
IN
G\
IN
TE
R N
AL
P R
OJ
E C
TS
\W
AT
E R M
AI
N I M P R
OV
E M E N
TS
\F Y2
6_
YR
\K
IN
GS
TO
N E
S
TA
TE
S \1
_D E S
IG
N \K
IN
GS
TO
N E
S
TA
TE
S .D
W G
S av ed o n:
2/
/2
1:
:2
P M B y:
S
_S
IB
E R T
D at e P lo tt ed
/1 6/
:5 2:
P M
WATER MAIN IMPROVEMENTS F.Y. 2026
KINGSTON ESTATES
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text 40859000-563000-26502
AutoCAD SHX Text
1. THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS OF ALL THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS OF ALL PERMITS (CITY OF BRADENTON, MANATEE CO., FDEP, SWFWMD, FDOT, ETC) OBTAINED FOR THIS PROJECT. 2. THE CONTRACTOR IS ADVISED NOT TO SCALE FROM DRAWINGS BUT TO FIELD VERIFY THE CONTRACTOR IS ADVISED NOT TO SCALE FROM DRAWINGS BUT TO FIELD VERIFY ALL DIMENSIONS. THE DIMENSIONS OF SPECIFIED AND FURNISHED PRODUCTS AND MATERIALS TAKE PRECEDENCE OVER DIMENSIONS INDICATED ON THE DRAWINGS. IF SIGNIFICANT DEVIATIONS OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AT LEAST 72 HOURS PRIOR TO CONSTRUCTION FOR A DETERMINATION AND RESOLUTION. 3. CONSTRUCTION MATERIALS QUALITY AND WORKMANSHIP SHALL BE IN ACCORDANCE CONSTRUCTION MATERIALS QUALITY AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE PROJECT THE CITY OF BRADENTON INFRASTRUCTURE SPECIFICATIONS AND FDOT SPECIFICATIONS AND STANDARDS, AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 4. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL LAND THE CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF FLORIDA FOR LAYOUT. PROOF OF LICENSE SHALL BE SUBMITTED TO THE ENGINEER BEFORE BEGINNING LAYOUT. 5. NO DISTURBANCE SHALL BE ALLOWED OUTSIDE OF THE RIGHT OF WAYS AND/OR NO DISTURBANCE SHALL BE ALLOWED OUTSIDE OF THE RIGHT OF WAYS AND/OR THE LIMITS OF CONSTRUCTION SHOWN ON THE DRAWINGS UNLESS APPROVED BY THE OWNER OR SPECIFICALLY NOTED ON THE DRAWINGS. 6. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE DRAWINGS BUT ARE NOT PURPORTED TO BE ABSOLUTELY CORRECT. THERE MAY BE OTHER IMPROVEMENTS, UTILITIES, ETC. WHICH ARE WITHIN THE PROJECT AREA. CONTRACTOR SHALL VERIFY, PRIOR TO CONSTRUCTION, THE LOCATIONS, ELEVATIONS, DIMENSIONS, TYPES, AND CONDITIONS OF ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (WHETHER OR NOT SHOWN ON THE DRAWINGS) AFFECTING HIS WORK. 7. PRIOR TO SHOP DRAWING PREPARATION AND SUBMITTAL AND PURCHASE OF PRIOR TO SHOP DRAWING PREPARATION AND SUBMITTAL AND PURCHASE OF RELATED MATERIALS, THE CONTRACTOR SHALL FIELD VERIFY EXISTING UTILITIES (LOCATION, SIZE, MATERIALS OF CONSTRUCTION, OUTSIDE DIAMETER, WALL THICKNESS, ROUNDNESS, ELEVATIONS, ETC.) TO WHICH CONNECTION(S) WILL BE MADE. CONTRACTOR SHALL INCLUDE FIELD MEASUREMENTS ON SHOP DRAWINGS. 8. THE CONTRACTOR SHALL NOTIFY THE OWNER/ENGINEER IN WRITING, WITHIN 24 THE CONTRACTOR SHALL NOTIFY THE OWNER/ENGINEER IN WRITING, WITHIN 24 HOURS, IF CONFLICTS BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS ARE DISCOVERED. THE CONTRACTOR SHALL ACCURATELY RECORD ANY SUCH CONFLICTS ON THE RECORD DRAWINGS. 9. ANY PROPERTY CORNERS, MONUMENTS, OR BENCH MARKS WITHIN THE PROJECT ANY PROPERTY CORNERS, MONUMENTS, OR BENCH MARKS WITHIN THE PROJECT AREA SHALL BE PROTECTED UNLESS OTHERWISE INDICATED FOR DEMOLITION. IF ANY SUCH ITEMS ARE IN DANGER OF DAMAGE OR HAVE BEEN DAMAGED, THE CONTRACTOR SHALL NOTIFY THE OWNER/ENGINEER IMMEDIATELY AND REPLACE/RESTORE THESE ITEMS AT NO ADDITIONAL COST TO THE OWNER. IF OWNER CHOOSES TO SELF PERFORM THE WORK OR INCURS RELATED EXPENSES, THE CONTRACTOR SHALL REIMBURSE THE OWNER FOR ALL COSTS ASSOCIATED WITH THE EFFORT.
AutoCAD SHX Text
13. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES NEAR THE PROJECT AREA AT LEAST THE CONTRACTOR SHALL NOTIFY ALL UTILITIES NEAR THE PROJECT AREA AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE NOTIFYING "SUNSHINE STATE ONE CALL OF FLORIDA" AT LEAST 48 HOURS PRIOR TO ANY DIGGING WORK TO HAVE ALL EXISTING UTILITIES LOCATED. THE PHONE NUMBER IS 1-800-432-4770 AND THE WEB SITE IS WWW.CALLSUNSHINE.COM. IN INSTANCES WHERE DIGGING OCCURS IN WETLANDS, THE NOTIFICATION PERIOD SHALL BE INCREASED FROM AT LEAST 48 HOURS TO AT LEAST 10 DAYS. 14. FLORIDA LAW (FS 553.851) REQUIRES THAT PERSONS MAKING EXCAVATIONS IN FLORIDA LAW (FS 553.851) REQUIRES THAT PERSONS MAKING EXCAVATIONS IN PUBLIC STREETS, ALLEYS, RIGHT-OF-WAYS OR UTILITY EASEMENTS MUST FIRST OBTAIN INFORMATION ON LOCATIONS OF UNDERGROUND GAS PIPELINES. 15. THE CONTRACTOR SHALL PRESERVE AND MAINTAIN EXISTING UTILITIES, STRUCTURES, THE CONTRACTOR SHALL PRESERVE AND MAINTAIN EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES WITHIN THE PROJECT AREA. ANY DAMAGE SHALL BE REPAIRED BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. 16. THE CONTRACTOR IS RESPONSIBLE FOR BRACING, SHORING, OR PROVIDING OTHER THE CONTRACTOR IS RESPONSIBLE FOR BRACING, SHORING, OR PROVIDING OTHER MEANS NECESSARY TO PROTECT AND SUPPORT EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (EXPOSED OR UNEXPOSED) THAT MAY BE IMPACTED BY HIS WORK. 17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING POWER/TELEPHONE THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING POWER/TELEPHONE COMPANIES AND ARRANGING TO HAVE UTILITIES POLES HELD AND/OR GUY WIRES REMOVED AND REPLACED, IF NECESSARY FOR CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. 18. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH THE OSHA EXCAVATION SAFETY STANDARDS AND TO ABIDE BY THEM AS COVERED UNDER THE FLORIDA TRENCH SAFETY ACT. 19. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION SAFETY. 20. ALL PAVING, STABILIZED EARTH, DRIVEWAYS, CURBS, SIDEWALKS, FENCES, SOD, ALL PAVING, STABILIZED EARTH, DRIVEWAYS, CURBS, SIDEWALKS, FENCES, SOD, LANDSCAPING, CULVERTS, ETC. DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS OR BETTER BY AND AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE OWNER. 21. THE CONTRACTOR SHALL PROVIDE ACCESS TO ALL EXISTING UTILITIES/FACILITIES THE CONTRACTOR SHALL PROVIDE ACCESS TO ALL EXISTING UTILITIES/FACILITIES AND MAINTAIN UNINTERRUPTED SERVICES THROUGHOUT THE CONTRACT PERIOD. 22. THE CONTRACTOR SHALL MAINTAIN TRAFFIC IN ACCORDANCE WITH FDOT STANDARD THE CONTRACTOR SHALL MAINTAIN TRAFFIC IN ACCORDANCE WITH FDOT STANDARD INDEX SERIES 600 AND THE TECHNICAL SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN ALL NECESSARY TRAFFIC CONTROL AND SAFETY DEVICES THROUGHOUT THE PROJECT. ONE TRAFFIC LANE MUST BE MAINTAINED AT ALL TIMES WITH THE USE OF FLAGGER IF NECESSARY. ALL TRAFFIC LANES MUST BE OPEN FOR TRAFFIC AT THE CLOSE OF WORKDAYS. ALL SIGNING, BARRICADES, LIGHTING, AND FLAGGERS SHALL BE INCLUDED IN THE LUMP SUM COST. 23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFE MAINTENANCE OF PEDESTRIAN THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFE MAINTENANCE OF PEDESTRIAN AND VEHICULAR TRAFFIC AT ALL TIMES DURING THE DURATION OF THE PROJECT. 24. TRAFFIC CONTROL ON ALL FDOT, LOCAL AND COUNTY RIGHTS-OF-WAY SHALL MEET TRAFFIC CONTROL ON ALL FDOT, LOCAL AND COUNTY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT. THE MOST STRINGENT SHALL GOVERN.
AutoCAD SHX Text
25. LAY PIPE TO UNIFORM GRADE BETWEEN INDICATED ELEVATION POINTS. CONTRACTOR LAY PIPE TO UNIFORM GRADE BETWEEN INDICATED ELEVATION POINTS. CONTRACTOR SHALL TAKE CARE TO PROVIDE PROPER GRADE ELEVATIONS AND ALIGNMENTS. 26. SIZE OF FITTINGS SHOWN ON PLANS SHALL CORRESPOND TO THE ADJACENT STRAIGHT SIZE OF FITTINGS SHOWN ON PLANS SHALL CORRESPOND TO THE ADJACENT STRAIGHT RUN OF PIPE UNLESS NOTED OTHERWISE. TYPE OF JOINT AND FITTING MATERIAL SHALL BE AS SPECIFIED FOR THE ADJACENT STRAIGHT RUN OF PIPE UNLESS NOTED OTHERWISE. 27. EACH PROPOSED UTILITY SHALL BE LAID TO ACHIEVE THE MINIMUM HORIZONTAL EACH PROPOSED UTILITY SHALL BE LAID TO ACHIEVE THE MINIMUM HORIZONTAL SEPARATION BETWEEN IT AND OTHER UTILITIES IN ACCORDANCE WITH THE TYPICAL UTILITY HORIZONTAL SEPARATION DETAIL AND FDEP REQUIREMENTS. 28. AT LOCATIONS WHERE A PROPOSED UTILITY CROSSES ANOTHER UTILITY, THE PROPOSED AT LOCATIONS WHERE A PROPOSED UTILITY CROSSES ANOTHER UTILITY, THE PROPOSED UTILITY SHALL BE INSTALLED IN ACCORDANCE WITH THE TYPICAL UTILITY CONFLICT DETAIL AND FDEP REQUIREMENTS. 29. IN THE EVENT THAT A UTILITY CONFLICT CAN NOT BE RESOLVED BY MAKING A MINOR IN THE EVENT THAT A UTILITY CONFLICT CAN NOT BE RESOLVED BY MAKING A MINOR ROUTE ADJUSTMENT OR BY UTILIZING THE TYPICAL UTILITY CONFLICT DETAIL, THE CONTRACTOR SHALL NOTIFY THE OWNER/ENGINEER FOR A WORK AROUND TO THE UTILITY CONFLICT. 30. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY TEMPORARY THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY TEMPORARY CONSTRUCTION EASEMENTS THAT MAY BE REQUIRED FOR THE INSTALLATION OF THE WATER MAIN. 31. IT IS THE INTENT OF THIS CONTRACT THAT EXISTING WATER LINES WILL REMAIN IN IT IS THE INTENT OF THIS CONTRACT THAT EXISTING WATER LINES WILL REMAIN IN SERVICE AND UNDAMAGED UNTIL SERVICE CONNECTIONS ON THAT SECTION OF PIPE HAVE BEEN SUCCESSFULLY MOVED TO THE NEWLY INSTALLED AND ACCEPTED WATER MAINS. 32. THE FIRE HYDRANT ASSEMBLY SHALL BE EXCAVATED AND REMOVED TO 24" BELOW THE FIRE HYDRANT ASSEMBLY SHALL BE EXCAVATED AND REMOVED TO 24" BELOW GRADE LEVEL AND THE PIPE CAPPED WITH CONCRETE. SALVAGED FIRE HYDRANTS SHALL BE TRANSPORTED BY THE CONTRACTOR TO THE CITY'S FACILITY AT 705 13TH AVENUE WEST IN A CITY DESIGNATED AREA. 33. ALL CONSTRUCTION SHALL MEET THE MINIMUM REQUIREMENTS OF THE CITY OF ALL CONSTRUCTION SHALL MEET THE MINIMUM REQUIREMENTS OF THE CITY OF BRADENTON PUBLIC WORKS UTILITY STANDARDS, LATEST REVISION AND EXCEED THE REQUIREMENTS OF THOSE SPECIFICATIONS WHERE INDICATED ON THESE CONSTRUCTION DRAWINGS OR IN THE PROJECT SPECIFICATIONS. 34. THE CONTRACTOR SHALL INVESTIGATE AND VERIFY OR HAVE VERIFIED THE LOCATION OF THE CONTRACTOR SHALL INVESTIGATE AND VERIFY OR HAVE VERIFIED THE LOCATION OF EXISTING UTILITIES AND ANY OTHER SUBSURFACE FACILITIES BEFORE STARTING WORK. HE SHALL BE LIABLE FOR ANY EXPENSE RESULTING FROM DAMAGE TO SAME. ANY CONFLICTS WITH EXISTING UTILITIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER AS SOON AS POSSIBLE. 35. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE CITY OF IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE CITY OF BRADENTON PUBLIC WORKS AND UTILITIES DEPARTMENT, ENGINEER 24 HOURS PRIOR TO ANY WORK AT SITE & 48 HOURS PRIOR TO ANY TESTING. WATER MAINS TIE-INS REQUIRING WATER SERVICE TO BE SHUT OFF SHALL BE MADE WHEN REQUIRED BY CITY OF BRADENTON PUBLIC WORKS AND UTILITIES DEPARTMENT. 36. THE CONTRACTOR SHALL COORDINATE HOLDING OF POLES WITH UTILITY COMPANIES IN THE CONTRACTOR SHALL COORDINATE HOLDING OF POLES WITH UTILITY COMPANIES IN ADVANCE SO UNNECESSARY DELAYS OF PROJECT SHALL NOT BE INCURRED. THE COST FOR THE HOLDING OF THE POWER POLES SHALL BE INCLUDED IN THE WATER MAIN UNIT COST ITEMS CONTAINED IN THE PROPOSAL.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300
AutoCAD SHX Text G-2
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text G-1
AutoCAD SHX Text G-3
AutoCAD SHX Text
GENERAL NOTES AND DRAWING INDEX
AutoCAD SHX Text G-4
AutoCAD SHX Text
KEY MAP
AutoCAD SHX Text G-5
AutoCAD SHX Text G-6
AutoCAD SHX Text G-7
AutoCAD SHX Text
STORMWATER POLLUTION PREVENTION PLAN NOTES
AutoCAD SHX Text ABBREVIATIONS, CIVIL LEGEND and UTILITY CONTACTS
AutoCAD SHX Text
TRENCH DETAILS
AutoCAD SHX Text C-23
AutoCAD SHX Text C-9
AutoCAD SHX Text 17th STREET EAST STA. 17+00 to STA. 19+50
AutoCAD SHX Text 17th STREET EAST STA. 15+00 to STA. 17+00
AutoCAD SHX Text 17th STREET EAST STA. 13+00 to STA. 15+00
AutoCAD SHX Text 17th STREET EAST STA. 10+50 to STA. 13+00
AutoCAD SHX Text 17th STREET EAST STA. 8+50 to STA. 10+50
AutoCAD SHX Text 14th AVENUE EAST STA. 7+00 to 17th STREET EAST STA. 8+50
AutoCAD SHX Text 14th AVENUE EAST STA. 4+50 to STA. 7+00
AutoCAD SHX Text 14th AVENUE EAST STA. 2+00 to STA. 4+50
AutoCAD SHX Text 14th AVENUE EAST STA. 0+00 to STA. 2+00
AutoCAD SHX Text C-8
AutoCAD SHX Text C-7
AutoCAD SHX Text C-6
AutoCAD SHX Text C-5
AutoCAD SHX Text C-4
AutoCAD SHX Text C-3
AutoCAD SHX Text C-2
AutoCAD SHX Text C-1
AutoCAD SHX Text C-11
AutoCAD SHX Text 16th STREET EAST STA. 0+00 to STA. 2+00
AutoCAD SHX Text 17th STREET EAST STA. 19+50 to STA. 22+00
AutoCAD SHX Text C-10
AutoCAD SHX Text C-12
AutoCAD SHX Text 16th STREET EAST STA. 2+00 to STA. 4+50
AutoCAD SHX Text C-13
AutoCAD SHX Text 16th STREET EAST STA. 4+50 to STA. 6+00
AutoCAD SHX Text C-14
AutoCAD SHX Text 16th STREET EAST STA. 6+00 to STA. 8+00
AutoCAD SHX Text C-15
AutoCAD SHX Text 16th STREET EAST STA. 8+00 to STA. 8+74
AutoCAD SHX Text C-18
AutoCAD SHX Text C-19
AutoCAD SHX Text C-20
AutoCAD SHX Text C-21
AutoCAD SHX Text C-22
AutoCAD SHX Text G-2
AutoCAD SHX Text
STORMWATER POLLUTION PREVENTION PLAN DETAILS
AutoCAD SHX Text
STORMWATER POLLUTION PREVENTION PLAN DETAILS
AutoCAD SHX Text
DEC., 2025
AutoCAD SHX Text
WATER MAIN DETAILS
AutoCAD SHX Text
WATER MAIN DETAILS
AutoCAD SHX Text
WATER MAIN DETAILS
AutoCAD SHX Text
WATER MAIN DETAILS
AutoCAD SHX Text
TRENCH DETAILS
AutoCAD SHX Text C-16
AutoCAD SHX Text WATER MAIN CONNECTION TO 17th STREET COURT EAST
AutoCAD SHX Text C-17
AutoCAD SHX Text
ABANDONMENT OF EXISTING 8" WATER MAIN
AutoCAD SHX Text
KRISTOFER S. ECCLES, PE
AutoCAD SHX Text
REG. PROF. ENGINEER #99424
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
KRISTOFER S. ECCLES, P.E.
AutoCAD SHX Text
SIBE
AutoCAD SHX Text K.S.E.
K.S.E.
EOP EDGE OF PAVEMENT
STANDARD ABBREVIATIONS
CIVIL LEGEND
ROW
UTILITY CONTACTS
SECTION DESIGNATION
DETAIL/SECTION DESIGNATION
A
ABBREVIATIONS, CIVIL LEGEND
and UTILITY CONTACTS
Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.
Check positive response codes before you dig!
CITY OF BRADENTON
PUBLIC WORKS DEPARTMENT
F il en am e:
P
E N
GI
N E E R
IN
G\
IN
TE
R N
AL
P R
OJ
E C
TS
\W
AT
E R M
AI
N I M P R
OV
E M E N
TS
\F Y2
6_
YR
\K
IN
GS
TO
N E
S
TA
TE
S \1
_D E S
IG
N \K
IN
GS
TO
N E
S
TA
TE
S .D
W G
S av ed o n:
2/
/2
1:
:2
P M B y:
S
_S
IB
E R T
D at e P lo tt ed
/1 6/
:5 4:
P M
WATER MAIN IMPROVEMENTS F.Y. 2026
KINGSTON ESTATES
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
ARV
AutoCAD SHX Text
AIR RELEASE VALVE
AutoCAD SHX Text
ASTM
AutoCAD SHX Text
AMERICAN SOCIETY FOR TESTING AND MATERIALS
AutoCAD SHX Text
AVE
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AWWA
AutoCAD SHX Text
AMERICAN WATER WORKS ASSOCIATION
AutoCAD SHX Text B/L
AutoCAD SHX Text
BASELINE OF CONSTRUCTION
AutoCAD SHX Text
BFP
AutoCAD SHX Text
BACKFLOW PREVENTER
AutoCAD SHX Text
BFV
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
BOULEVARD
AutoCAD SHX Text
BM
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
BO
AutoCAD SHX Text
BLOW-OFF
AutoCAD SHX Text (C)
AutoCAD SHX Text
COMPUTED MEASUREMENT
AutoCAD SHX Text
COB
AutoCAD SHX Text
CITY OF BRADENTON
AutoCAD SHX Text
C/L, CL,
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CI
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text
CIP
AutoCAD SHX Text
CAST IN PLACE, CAST IRON PIPE
AutoCAD SHX Text
CLF
AutoCAD SHX Text
CHAIN LINK FENCE
AutoCAD SHX Text
CMP
AutoCAD SHX Text
CORRUGATED METAL PIPE
AutoCAD SHX Text
COM
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONST
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
CP
AutoCAD SHX Text
CONTROL POINT
AutoCAD SHX Text
DBI
AutoCAD SHX Text
DITCH BOTTOM INLET
AutoCAD SHX Text
DET
AutoCAD SHX Text
DETAIL
AutoCAD SHX Text
DI
AutoCAD SHX Text
DUCTILE IRON
AutoCAD SHX Text
DIA
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
DIP
AutoCAD SHX Text
DUCTILE IRON PIPE
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text E
AutoCAD SHX Text
EAST
AutoCAD SHX Text
EA
AutoCAD SHX Text
EACH
AutoCAD SHX Text
EL, ELEV
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
ERCP
AutoCAD SHX Text
ELLIPTICAL REINFORCED CONCRETE PIPE
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
FFE
AutoCAD SHX Text
FINISHED FLOOR ELEVATION
AutoCAD SHX Text
FDC
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION
AutoCAD SHX Text
FDEP
AutoCAD SHX Text
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
AutoCAD SHX Text
FDOT
AutoCAD SHX Text
FLORIDA DEPARTMENT OF TRANSPORTATION
AutoCAD SHX Text
FG
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
FH
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
FL
AutoCAD SHX Text
FLOW LINE
AutoCAD SHX Text
FO
AutoCAD SHX Text
FIBER OPTIC
AutoCAD SHX Text
FT
AutoCAD SHX Text
FOOT
AutoCAD SHX Text
GAL
AutoCAD SHX Text
GALLON
AutoCAD SHX Text
GEN
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text
GND
AutoCAD SHX Text
GROUND
AutoCAD SHX Text
GV
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
HDD
AutoCAD SHX Text
HORIZONTAL DIRECTIONAL DRILL
AutoCAD SHX Text
HDPE
AutoCAD SHX Text
HIGH DENSITY POLYETHYLENE
AutoCAD SHX Text
HWL
AutoCAD SHX Text
HIGH WATER LEVEL
AutoCAD SHX Text
ID
AutoCAD SHX Text
INSIDE DIAMETER
AutoCAD SHX Text
LF
AutoCAD SHX Text
LINEAR FEET
AutoCAD SHX Text
LS
AutoCAD SHX Text
LIFT STATION
AutoCAD SHX Text
LT
AutoCAD SHX Text
LEFT
AutoCAD SHX Text
LWL
AutoCAD SHX Text
LOW WATER LEVEL
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MES
AutoCAD SHX Text
MITERED END SECTION
AutoCAD SHX Text
MH
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MISC
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text
MJ
AutoCAD SHX Text
MECHANICAL JOINT
AutoCAD SHX Text N
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N/A
AutoCAD SHX Text
NOT APPLICABLE
AutoCAD SHX Text
NAD
AutoCAD SHX Text
NORTH AMERICAN DATUM
AutoCAD SHX Text
NAVD
AutoCAD SHX Text
NORTH AMERICAN VERTICAL DATUM
AutoCAD SHX Text
NE
AutoCAD SHX Text
NORTH EAST
AutoCAD SHX Text
NGVD
AutoCAD SHX Text
NATIONAL GEODETIC VERTICAL DATUM
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NPDES
AutoCAD SHX Text
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NW
AutoCAD SHX Text
NORTH WEST
AutoCAD SHX Text
OD
AutoCAD SHX Text
OUTSIDE DIAMETER
AutoCAD SHX Text P/L
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
PB
AutoCAD SHX Text
PULL BOX
AutoCAD SHX Text
PID
AutoCAD SHX Text
PARCEL INDENTIFICATION
AutoCAD SHX Text
PP
AutoCAD SHX Text
POWER POLE
AutoCAD SHX Text
PSI
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
PT
AutoCAD SHX Text POINT of TANGENT
AutoCAD SHX Text
PV
AutoCAD SHX Text
PLUG VALVE
AutoCAD SHX Text
PVC
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
PVMT
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
PWR
AutoCAD SHX Text
POWER
AutoCAD SHX Text (R)
AutoCAD SHX Text
RECORD MEASUREMENT
AutoCAD SHX Text
RAD
AutoCAD SHX Text
RADIUS
AutoCAD SHX Text
R/W, ROW
AutoCAD SHX Text
RIGHT-OF-WAY
AutoCAD SHX Text
RCP
AutoCAD SHX Text
REINFORCED CONCRETE PIPE
AutoCAD SHX Text
RED
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
RJ
AutoCAD SHX Text
RESTRAINED JOINT
AutoCAD SHX Text
RT
AutoCAD SHX Text
RIGHT
AutoCAD SHX Text S
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SANITARY
AutoCAD SHX Text
SCH
AutoCAD SHX Text
SCHEDULE
AutoCAD SHX Text
SE
AutoCAD SHX Text
SOUTH EAST
AutoCAD SHX Text
SR
AutoCAD SHX Text
STATE ROAD
AutoCAD SHX Text
STA
AutoCAD SHX Text
STATION
AutoCAD SHX Text
STCI
AutoCAD SHX Text
STORMWATER CURB INLET
AutoCAD SHX Text
STD
AutoCAD SHX Text
STANDARD
AutoCAD SHX Text
STM
AutoCAD SHX Text
STORM
AutoCAD SHX Text
STMH
AutoCAD SHX Text
STORMWATER MANHOLE
AutoCAD SHX Text
SW
AutoCAD SHX Text
SOUTH WEST
AutoCAD SHX Text
SWFWMD
AutoCAD SHX Text
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT
AutoCAD SHX Text
SY
AutoCAD SHX Text
SQUARE YARD
AutoCAD SHX Text
TBM
AutoCAD SHX Text
TEMPORARY BENCHMARK
AutoCAD SHX Text
TOB
AutoCAD SHX Text
TOP OF BANK
AutoCAD SHX Text
TOC
AutoCAD SHX Text
TOP OF CONCRETE, TOP OF CURB
AutoCAD SHX Text
TOE
AutoCAD SHX Text
TOE OF SLOPE
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UG
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
UGE
AutoCAD SHX Text
UNDERGROUND ELECTRIC
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UNDERGROUND GAS
AutoCAD SHX Text
UGT
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
UGW
AutoCAD SHX Text
UNDERGROUND WATER
AutoCAD SHX Text
VCP
AutoCAD SHX Text
VITRIFIED CLAY PIPE
AutoCAD SHX Text
VERT
AutoCAD SHX Text
VERTICAL
AutoCAD SHX Text W
AutoCAD SHX Text
WEST
AutoCAD SHX Text W/
AutoCAD SHX Text
WITH
AutoCAD SHX Text
WM
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
WSE, WSEL
AutoCAD SHX Text
WATER SURFACE ELEVATION
AutoCAD SHX Text
WT
AutoCAD SHX Text
WEIGHT
AutoCAD SHX Text
WV
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text NOTE: 1. NOT ALL ABBREVIATIONS MAY NOT ALL ABBREVIATIONS MAY BE USED FOR THIS PROJECT.
AutoCAD SHX Text
EXISTING OR WORK OF OTHER TRADES, BOLD LINES
AutoCAD SHX Text
NOTE: IN GENERAL, LIGHT OR LINES INDICATE
AutoCAD SHX Text
INDICATE PROPOSED WORK
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
SCREENED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text W
AutoCAD SHX Text C
AutoCAD SHX Text
EB
AutoCAD SHX Text
MB
AutoCAD SHX Text T
AutoCAD SHX Text W
AutoCAD SHX Text
CO
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text
FO
AutoCAD SHX Text e
AutoCAD SHX Text
GV
AutoCAD SHX Text
OE
AutoCAD SHX Text
OE
AutoCAD SHX Text
PALM
AutoCAD SHX Text
OAK
AutoCAD SHX Text
PINE
AutoCAD SHX Text
BRADENTON, FL. 34208
AutoCAD SHX Text
PALMETTO, FL. 34221
AutoCAD SHX Text
BRADENTON, FL. 34205
AutoCAD SHX Text 1411-9th STREET WEST
AutoCAD SHX Text
SARASOTA, FL. 34240
AutoCAD SHX Text
TECO/PEOPLE'S GAS SYSTEM, INC.
AutoCAD SHX Text
ORGANIZATION
AutoCAD SHX Text
CONTACT AND TITLE
AutoCAD SHX Text CAREY McCOY
AutoCAD SHX Text
BRIGHT HOUSE
AutoCAD SHX Text
BRADENTON
AutoCAD SHX Text
CITY OF
AutoCAD SHX Text
TELEPHONE NUMBER
AutoCAD SHX Text
8261 VICO CT.
AutoCAD SHX Text
5413 SR. 64 EAST
AutoCAD SHX Text 1253 12th AVENUE EAST
AutoCAD SHX Text
ADDRESS
AutoCAD SHX Text
(941) 708-6300
AutoCAD SHX Text
SUNSHINE ONE-CALL
AutoCAD SHX Text 1-800-432-4770
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(941) 748-3816
AutoCAD SHX Text
(941) 342-4030
AutoCAD SHX Text
(941) 723-4426
AutoCAD SHX Text
(941) 906-6722
AutoCAD SHX Text
1701 RINGLING BLVD. MCFLSS 4113 SARASOTA, FL. 34236
AutoCAD SHX Text
FLORIDA POWER AND LIGHT DISTRIBUTION
AutoCAD SHX Text
FLORIDA POWER AND LIGHT TRANSMISSION
AutoCAD SHX Text
(941) 483-2049
AutoCAD SHX Text
420 ALBEE FARM RD. VENICE, FL 34285
AutoCAD SHX Text
MANATEE COUNTY UTILITIES
AutoCAD SHX Text
792-8811 EXT. 5059
AutoCAD SHX Text
4422 C 66TH ST WEST BRADENTON, FL. 34210
AutoCAD SHX Text
FRONTIER
AutoCAD SHX Text
TOM WRIGHT
AutoCAD SHX Text
INFRASTRUCTURE ENGINEER
AutoCAD SHX Text
KIM CLAYBACK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DANNY SHANAHAN
AutoCAD SHX Text
DENISE HUTTON
AutoCAD SHX Text
KRISTIN GARDNER
AutoCAD SHX Text
OLGA ROSIER
AutoCAD SHX Text
DWG NUMBER DETAIL OR
AutoCAD SHX Text
SECTION APPEARS ON
AutoCAD SHX Text
DETAIL/SECTION DESIGNATION
AutoCAD SHX Text
SECTION DESIGNATION
AutoCAD SHX Text
DIRECTION OF SECTION
AutoCAD SHX Text
DWG NUMBER SECTION
AutoCAD SHX Text
APPEARS ON
AutoCAD SHX Text C1
AutoCAD SHX Text A-1
AutoCAD SHX Text
4901 BELFORD RD. SUITE 130 JACKSONVILLE, FL 32256
AutoCAD SHX Text
DOUGLAS HALPIN
AutoCAD SHX Text
CSX R/R TRANSPORTATION
AutoCAD SHX Text
(904) 245-1057
AutoCAD SHX Text
GERARDO "JERRY" TRAVERSO
AutoCAD SHX Text
(941) 749-3500 EXT. 7859
AutoCAD SHX Text 2101 47th TERRACE EAST BRADENTON, FL. 34203
AutoCAD SHX Text
MANATEE COUNTY TRAFFIC DESIGN DIVISION
AutoCAD SHX Text CONTROL POINT PIPE FOUND IRON ROD FOUND MONUMENT FOUND CONCRETE POWER POLE TRAFFIC POLE LIGHT POLE WOOD UTILITY POLE GUY WIRE ELECTRIC BOX UTILITY PEDESTAL WATER METER WATER VALVE BACKFLOW PREVENTER FIRE HYDRANT MITERED END SECTION SANITARY MANHOLE STORM MANHOLE TELEPHONE MANHOLE MANHOLE GAS MARKER TELEPHONE UTILITY MAILBOX SIGN FIBER OPTIC UTILITY VAULT CLEAN OUT GAS VALVE FENCE LINES OVERHEAD ELECTRIC LINES UNDERGROUND ELECTRIC LINES UNDERGROUND WATER LINES UNDERGROUND GAS LINES SANITARY SEWER LINES STORM SEWER LINES UNDERGROUND TELEPHONE RIGHT OF WAY WATER MAIN TO BE ABANDONED IN PLACE
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text
3405 W MLKJR BLVD SUITE 125 TAMPA, FL 33607
AutoCAD SHX Text
KEN SOULE
AutoCAD SHX Text
BLACK AND VEATCH-TAMPA
AutoCAD SHX Text
(813) 539-2274
AutoCAD SHX Text
NATIONAL FIBER
AutoCAD SHX Text
MCI
AutoCAD SHX Text
(800) 624-9675 (800) 289-3427
AutoCAD SHX Text
SECURITY DEPARTMENT
AutoCAD SHX Text
ASHBURN, VA
AutoCAD SHX Text
NICK IAFFALDANO
AutoCAD SHX Text
OPITCALTEL
AutoCAD SHX Text
(888) 860-4088
AutoCAD SHX Text
MIAMI, FL
AutoCAD SHX Text
STAKE CENTER LOCATING
AutoCAD SHX Text
CROWN CASTLE NG
AutoCAD SHX Text
(888) 860-4088
AutoCAD SHX Text
SARASOTA, FL
AutoCAD SHX Text G-3
AutoCAD SHX Text 40859000-563000-26502
AutoCAD SHX Text
DEC., 2025
AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300
AutoCAD SHX Text
KRISTOFER S. ECCLES, PE
AutoCAD SHX Text
REG. PROF. ENGINEER #99424
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
KRISTOFER S. ECCLES, P.E.
AutoCAD SHX Text
SIBE
AutoCAD SHX Text K.S.E.
S
T E 20
S T
E
15 AVE E
17 ST CT E
S
T
CT
E
13 AVE E
S
T E
17 AVE E
15 AVE E
S
T
CT
E
17 ST E
AVE E
S
T E
17 ST CIR E
14 AVE E
13 AVE E
S
T E
16 AVE E
KEY MAPCall 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.
Check positive response codes before you dig!
CITY OF BRADENTON
PUBLIC WORKS DEPARTMENT
C-1
F il en am e:
P
E N
GI
N E E R
IN
G\
IN
TE
R N
AL
P R
OJ
E C
TS
\W
AT
E R M
AI
N I M P R
OV
E M E N
TS
\F Y2
6_
YR
\K
IN
GS
TO
N E
S
TA
TE
S \1
_D E S
IG
N \K
IN
GS
TO
N E
S
TA
TE
S .D
W G
S av ed o n:
2/
/2
1:
:2
P M B y:
S
_S
IB
E R T
D at e P lo tt ed
/1 6/
:5 4:
P M
WATER MAIN IMPROVEMENTS F.Y. 2026
KINGSTON ESTATES
C-2 C-3 C-4
C-
C-6
C-7
C-9
C-8
C-
C-1
C-14
C-13
C-
C- 11 C-
C-16
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text G-4
AutoCAD SHX Text 40859000-563000-26502
AutoCAD SHX Text
DEC., 2025
AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300
AutoCAD SHX Text
KRISTOFER S. ECCLES, PE
AutoCAD SHX Text
REG. PROF. ENGINEER #99424
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
KRISTOFER S. ECCLES, P.E.
AutoCAD SHX Text K.S.E.
AutoCAD SHX Text K.S.E.
SIBE
STORMWATER POLLUTION
PREVENTION PLAN NOTES
GENERAL
EROSION AND SEDIMENT TRANSPORT PREVENTION
EROSION PRACTICES
STABILIZATION PRACTICES
STRUCTURAL PRACTICES
WASTE DISPOSAL
OFFSITE VEHICLE TRACKING
TIMING OF CONTROL MEASURES
STORMWATER POLLUTION PREVENTION NOTESSEDIMENT AND EROSION CONTROL NOTES
Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.
Check positive response codes before you dig!
CITY OF BRADENTON
PUBLIC WORKS DEPARTMENT
F il en am e:
P
E N
GI
N E E R
IN
G\
IN
TE
R N
AL
P R
OJ
E C
TS
\W
AT
E R M
AI
N I M P R
OV
E M E N
TS
\F Y2
6_
YR
\K
IN
GS
TO
N E
S
TA
TE
S \1
_D E S
IG
N \K
IN
GS
TO
N E
S
TA
TE
S .D
W G
S av ed o n:
2/
/2
1:
:2
P M B y:
S
_S
IB
E R T
D at e P lo tt ed
/1 6/
:5 3:
P M
WATER MAIN IMPROVEMENTS F.Y. 2026
KINGSTON ESTATES
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
1. THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE EROSION AND SEDIMENT CONTROL PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS. 2. ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN AND THE STATE OF FLORIDA NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THEIR CONTENTS. 3. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO THE OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. 4. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER. 5. CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. 6. SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOATATION BOOMS SHALL BE SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOATATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE DETENTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE DETENTION POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN CONJUNCTION WITH THE STABILIZATION OF THE SITE. 8. ON-SITE AND OFF-SITE SOIL STOCKPILE, AND BORROW AREAS SHALL BE PROTECTED FROM ON-SITE AND OFF-SITE SOIL STOCKPILE, AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW AREA LOCATIONS SHALL BE NOTED ON THE EROSION CONTROL PLAN AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS. 9. FUEL AND OTHER PETROLEUM PRODUCT SPILLS SHALL BE CONTAINED, CLEANED UP AND FUEL AND OTHER PETROLEUM PRODUCT SPILLS SHALL BE CONTAINED, CLEANED UP AND REPORTED IMMEDIATELY. 10. THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES FOR THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS. 11. IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE ENGINEER PRIOR TO ANY EXCAVATION. 12. STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE AS REQUIRED. IN SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS DIRECTED BY THE OWNER. 13. FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO FDOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 14. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SODDED AS SPECIFIED IN THE PLANS, FERTILIZED, AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED AND MULCHED AS SHOWN ON THE PLANS. 15. ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL): 1 (VERTICAL) OR FLATTER UNLESS ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL): 1 (VERTICAL) OR FLATTER UNLESS OTHERWISE SHOWN. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 17. THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO CONTROL TURBIDITY, INCLUDING THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO CONTROL TURBIDITY, INCLUDING BUT NOT LIMITED TO THE INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK. TURBIDITY BARRIERS MUST BE MAINTAINED IN EFFECTIVE CONDITION AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND DISTURBED SOIL AREAS ARE STABILIZED. THEREAFTER, THE CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES STATE WATER QUALITY STANDARDS. 18. THE WORK SPECIFIED IN THIS SECTION CONSISTS OF MEASURES REQUIRED TO CONTROL THE WORK SPECIFIED IN THIS SECTION CONSISTS OF MEASURES REQUIRED TO CONTROL EROSION AND TRANSPORT OF SEDIMENTS WITHIN AND FROM THE PROJECT AREA, SO AS TO PREVENT THE DEGRADATION OF RECEIVING WATERS, DETRIMENTAL EFFECTS ON PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE PROJECT AND DAMAGE WITHIN THE PROJECT AREA. THESE MEASURES WILL INCLUDE THE CONSTRUCTION AND MAINTENANCE OF TEMPORARY AND PERMANENT EROSION CONTROLS. 19. CONSTRUCTION OPERATIONS SHALL BE RESTRICTED TO THOSE AREAS WHERE IT IS CONSTRUCTION OPERATIONS SHALL BE RESTRICTED TO THOSE AREAS WHERE IT IS NECESSARY TO PERFORM FILLING OR EXCAVATION TO ACCOMPLISH THE WORK SHOWN ON THE DRAWINGS AND TO THOSE AREAS WHICH MUST BE ENTERED TO CONSTRUCT TEMPORARY OR PERMANENT STRUCTURES. AS SOON AS THE CONDITIONS WILL PERMIT, RIVERS, STREAMS, IMPOUNDMENT, STORMWATER STORAGE AND CONVEYANCE SYSTEMS AND ANY ONSITE RECEIVING WATER BODIES SHALL BE PROMPTLY CLEARED OF ALL OBSTRUCTIONS PLACED THEREIN OR CAUSED BY CONSTRUCTION OPERATIONS. RUNOFF FROM UNSTABILIZED AREAS SHALL BE DIRECTED TO EITHER THE OFFSITE POND OR TREATED THROUGH SILT FENCES BEFORE DISCHARGING FROM THE PROPERTY. 20. PERMANENT EROSION CONTROL FEATURES SHALL BE INCORPORATED INTO THE PROJECT AT PERMANENT EROSION CONTROL FEATURES SHALL BE INCORPORATED INTO THE PROJECT AT THE EARLIEST PRACTICAL TIME. TEMPORARY CONTROL FEATURES WILL BE USED TO CORRECT CONDITIONS THAT DEVELOP DURING CONSTRUCTION WHICH WERE NOT FORESEEN AT THE TIME OF DESIGN TO CONTROL EROSION PRIOR TO THE TIME IT IS PRACTICAL TO CONSTRUCT PERMANENT CONTROL FEATURES. 21. TEMPORARY EROSION CONTROL MAY BE USED IN CONTROLLING EROSION IN AREAS WHERE TEMPORARY EROSION CONTROL MAY BE USED IN CONTROLLING EROSION IN AREAS WHERE CONDITIONS NOT UNDER THE CONTROL OF THE CONTRACTOR, PRECLUDE COMPLETION OF A SECTION OF A PROJECT IN A CONTINUOUS MANNER, AND FOR CONTROLLING EROSION IN AREAS WHERE CONSTRUCTION OPERATIONS MUST BE PERFORMED SUBSEQUENTLY THAT WILL CAUSE DAMAGE TO PERMANENT EROSION CONTROL FEATURES. TEMPORARY EROSION AND WATER POLLUTION CONTROL FEATURES SHALL CONSIST OF, BUT NOT BE LIMITED TO, GRASS, TEMPORARY MULCHING, SANDBAGGING, SEDIMENT BASINS, SEDIMENT CHECKS/EARTH DITCH CHECKS, BERMS, FLOATING TURBIDITY BARRIERS AND SILT FENCE. 22. TEMPORARY STABILIZATION - SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE TEMPORARY STABILIZATION - SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR AT LEAST 21 DAYS WILL BE STABILIZED WITHIN 7 DAYS FROM THE LAST CONSTRUCTION ACTIVITY IN THAT AREA. THESE AREAS SHALL BE STABILIZED WITH TEMPORARY SEED AND MULCH. THE SURFACE AREAS OF UNPROTECTED ERODIBLE EARTH EXPOSED BY CLEARING AND GRUBBING, EXCAVATION OR FILLING OPERATIONS SHALL BE KEPT TO A MINIMUM AS PRACTICAL. 23. PERMANENT STABILIZATION - ALL DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION PERMANENT STABILIZATION - ALL DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE PERMANENTLY CEASED WILL BE STABILIZED BY SOD IN ACCORDANCE WITH THE LANDSCAPING PLANS AND/OR CONSTRUCTION PLANS. 24. STAKED SILT SCREENS - WILL BE INSTALLED ACCORDING TO THE PLANS TO PROTECT STAKED SILT SCREENS - WILL BE INSTALLED ACCORDING TO THE PLANS TO PROTECT OFFSITE AREAS FROM ANY POSSIBLE ADVERSE EFFECTS FROM SEDIMENTS. SEDIMENT WILL BE REMOVED FROM THE UPSTREAM SIDE OF ANY SILT SCREEN ONCE THE ACCUMULATED SEDIMENT REACHES 1/3 THE HEIGHT OF THE SILT SCREEN. ANY SEDIMENT DEPOSITS OR SOIL DISTURBANCE CREATED DURING THE INSTALLATION AND REMOVAL OF SILT SCREEN SHALL BE DRESSED TO CONFORM TO THE FINISHED GRADE. THE SILT SCREEN SHALL BE INSPECTED ALONG WITH THE REST OF THE PROJECT ONCE EVERY SEVEN DAYS OR WITHIN 24 HOURS OF A RAINFALL EVENT EXCEEDING 0.5”. WHERE DEFICIENCIES EXIST, . WHERE DEFICIENCIES EXIST, ADDITIONAL SILT FENCES SHALL BE INSTALLED OR REPLACED. ATTACHMENT OF SILT SCREEN TO EXISTING TREES WILL NOT BE PERMITTED UNLESS APPROVED BY THE PROJECT ENGINEER. NOTE: THE FOLLOWING CONTROLS CONCERN DAY-TO-DAY ACTIVITIES ON THE SITE. THE SITE THE FOLLOWING CONTROLS CONCERN DAY-TO-DAY ACTIVITIES ON THE SITE. THE SITE SUPERINTENDENT IS RESPONSIBLE FOR SEEING THAT THEY ARE CARRIED OUT APPROPRIATELY. 25. WASTE MATERIALS - ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN METAL WASTE MATERIALS - ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN METAL DUMPSTERS AND THEN HAULED TO AN APPROVED DISPOSAL SITE. THE DUMPSTERS WILL MEET ALL CITY SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER. NO CONSTRUCTION WASTE WILL BE BURIED ON THE SITE. ALL PERSONNEL WILL BE INSTRUCTED IN THE CORRECT PROCEDURE FOR WASTE DISPOSAL. EMPLOYEE WASTE AND OTHER LOOSE MATERIALS, E.G., CUPS, CANS, BAGS, ETC., WILL BE COLLECTED SO AS TO PREVENT THE RELEASE OF “FLOATABLES” DURING RUNOFF EVENTS. FLOATABLES” DURING RUNOFF EVENTS. DURING RUNOFF EVENTS. 26. HAZARDOUS WASTE - ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE HAZARDOUS WASTE - ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATIONS, OR BY THE MANUFACTURER. 27. SANITARY WASTE - ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS SANITARY WASTE - ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS IN A TIMELY MANNER MEETING ALL LOCAL AND STATE REGULATIONS. 28. MONITORING OF OFFSITE TRACKING OF SEDIMENTS AT THE ENTRANCES IS ESSENTIAL WHERE MONITORING OF OFFSITE TRACKING OF SEDIMENTS AT THE ENTRANCES IS ESSENTIAL WHERE SILT FENCE WILL NOT BE PLACED TO ENABLE ACCESS TO THE SITE. IF IT APPEARS THAT SIGNIFICANT AMOUNTS OF SEDIMENT ARE BEING TRACKED OFF THE SITE, GRAVEL ENTRANCES OR OTHER EQUIVALENT MEASURES ARE RECOMMENDED TO HELP DISLODGE THE SOIL, SEDIMENT AND DIRT BEFORE THE VEHICLES LEAVE THE SITE. 29. AREAS WHERE THE GROUND HAS BEEN DISTURBED AND CONSTRUCTION ACTIVITIES AREAS WHERE THE GROUND HAS BEEN DISTURBED AND CONSTRUCTION ACTIVITIES TEMPORARILY WILL CEASE FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY SEED AND MULCH WITHIN 7 DAYS OF THE LAST DISTURBANCE. ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA WHERE THE GROUND HAS BEEN DISTURBED, THAT AREA WILL BE STABILIZED WITH SOD OR OTHER SUITABLE STABILIZATION MATERIALS. AFTER THE SITE IS STABILIZED, ALL EXCESS SEDIMENTS AND DEBRIS WILL BE REMOVED FROM THE PONDS AND STORMWATER CONVEYANCE SYSTEM/STRUCTURES RECEIVING DIRECT RUNOFF FROM THE AREA.
AutoCAD SHX Text
1. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL NON-REUSABLE SILT FROM THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL NON-REUSABLE SILT FROM THE SITE AND ASSURING PLAN ALIGNMENT AND GRADE IN ALL DITCHES AND SWALES AT COMPLETION OF CONSTRUCTION. 2. THE SITE CONTRACTOR IS RESPONSIBLE FOR REMOVING THE TEMPORARY EROSION THE SITE CONTRACTOR IS RESPONSIBLE FOR REMOVING THE TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER COMPLETION OF CONSTRUCTION AND ONLY WHEN AREAS HAVE BEEN STABILIZED. 3. ADDITIONAL PROTECTION - ON-SITE PROTECTION IN ADDITION TO THE ABOVE MUST ADDITIONAL PROTECTION - ON-SITE PROTECTION IN ADDITION TO THE ABOVE MUST BE PROVIDED THAT WILL NOT PERMIT SILT TO LEAVE THE PROJECT CONFINES DUE TO UNSEEN CONDITIONS OR ACCIDENTS. 4. CONTRACTOR SHALL INSURE THAT ALL DRAINAGE STRUCTURES, PIPES, ETC. ARE CONTRACTOR SHALL INSURE THAT ALL DRAINAGE STRUCTURES, PIPES, ETC. ARE CLEANED OUT AND WORKING PROPERLY AT TIME OF ACCEPTANCE. 5. WIRE MESH SHALL BE LAID OVER EACH DROP INLET SO THAT THE WIRE EXTENDS A WIRE MESH SHALL BE LAID OVER EACH DROP INLET SO THAT THE WIRE EXTENDS A MINIMUM IF 1FT BEYOND EACH SIDE OF THE INLET STRUCTURE. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS SHALL BE USED. IF MORE THAN ONE STRIP OF MESH IS NECESSARY, THE STRIPS SHALL BE OVERLAPPED. 6. FDOT NO. 1 COARSE AGGREGATE SHALL BE PLACED OVER THE WIRE MESH AS FDOT NO. 1 COARSE AGGREGATE SHALL BE PLACED OVER THE WIRE MESH AS INDICATED ON SEDIMENT FILTER DETAIL (SEE DETAIL G-8). THE DEPTH OF STONE SHALL BE AT LEAST 1FT OVER THE ENTIRE INLET OPENING. THE STONE SHALL EXTEND BEYOND THE INLET OPENING AT LEAST 1.5FT ON ALL SIDES. 7. IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER IF THE STONE FILTER BECOMES CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONES MUST BE PULLED AWAY FROM THE INLET, CLEANED AND REPLACED. 8. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL OR WHEN THE SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL OR WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-THIRD THE HEIGHT OF THE BARRIER. 9. ANY SEDIMENT DEPOSITS REMAINING IN PLACE, AFTER THE SYNTHETIC BALE OR FILTER ANY SEDIMENT DEPOSITS REMAINING IN PLACE, AFTER THE SYNTHETIC BALE OR FILTER BARRIERS, AND OR SILT FENCES ARE NO LONGER REQUIRED, SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SODDED. 10. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED IMMEDIATELY. 11. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED 1/3 THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE. 12. THE CONTRACTOR SHALL MAINTAIN A CLEAR PATH FOR ALL SURFACE WATER DRAINAGE THE CONTRACTOR SHALL MAINTAIN A CLEAR PATH FOR ALL SURFACE WATER DRAINAGE STRUCTURES AND SWALES AS WELL AS PROVIDE MEASURES TO PREVENT SILTATION OF STORMWATER TREATMENT SYSTEMS AND CONTROL STRUCTURES DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL UTILIZE WHATEVER MEANS NECESSARY TO MANAGE STORMWATER SUCH THAT IMPACT TO CONSTRUCTION IS MINIMIZED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK, INCLUDING PROVIDING EQUIPMENT, LABOR, FILL, ETC. NECESSARY TO REMEDIATE AND/OR RESTORE ALL AREAS IMPACTED BY EROSION, RUNOFF, AND STORMWATER. 13. FOR ADDITIONAL INFORMATION ON SEDIMENT AND EROSION CONTROL REFER TO "THE FOR ADDITIONAL INFORMATION ON SEDIMENT AND EROSION CONTROL REFER TO "THE FLORIDA DEVELOPMENT MANUAL - A GUIDE TO SOUND LAND AND WATER MANAGEMENT" FROM THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL REGULATION (FDER) CHAPTER 6. 14. EROSION AND SEDIMENT CONTROL BARRIERS SHALL BE PLACED ADJACENT TO ALL EROSION AND SEDIMENT CONTROL BARRIERS SHALL BE PLACED ADJACENT TO ALL WETLAND AREAS WHERE THERE IS POTENTIAL FOR DOWNSTREAM WATER QUALITY DEGRADATION. 15. SOD SHALL BE PLACED IN AREAS WHICH REQUIRE IMMEDIATE EROSION PROTECTION SOD SHALL BE PLACED IN AREAS WHICH REQUIRE IMMEDIATE EROSION PROTECTION TO ENSURE WATER QUALITIES ARE MAINTAINED. 16. ANY DISCHARGE FROM DEWATERING ACTIVITY SHALL BE FILTERED AND CONVEYED TO A ANY DISCHARGE FROM DEWATERING ACTIVITY SHALL BE FILTERED AND CONVEYED TO A SEDIMENTATION BASIN IN A MANNER WHICH PREVENTS EROSION AND TRANSPORTATION OF SUSPENDED SOLIDS TO THE RECEIVING OUTFALLS. 17. DEWATERING PUMPS SHALL NOT EXCEED THE CAPACITY OF THAT WHICH REQUIRES A DEWATERING PUMPS SHALL NOT EXCEED THE CAPACITY OF THAT WHICH REQUIRES A CONSUMPTIVE USE PERMIT FROM THE SWFWMD. 18. ALL DEWATERING, EROSION, AND SEDIMENT CONTROL SHALL REMAIN IN PLACE UNTIL ALL DEWATERING, EROSION, AND SEDIMENT CONTROL SHALL REMAIN IN PLACE UNTIL AFTER COMPLETION OF CONSTRUCTION, AND REMOVED ONLY WHEN AREAS HAVE BEEN STABILIZED. 19. ALL DISTURBED AREAS SHALL BE GRASSED, FERTILIZED AND MULCHED UNTIL A ALL DISTURBED AREAS SHALL BE GRASSED, FERTILIZED AND MULCHED UNTIL A PERMANENT VEGETATIVE COVER IS ESTABLISHED. CONTRACTOR SHALL USE ADDITIONAL MEASURES TO STABILIZE DISTURBED AREAS THROUGH COMPACTION, SILT SCREENS AND GRASSING. ALL FILL SLOPES 6:1 OR STEEPER TO RECEIVE STAKED SOLID SOD. 20. THE CONTRACTOR SHALL BE REQUIRED TO RESPOND TO ALL WATER MANAGEMENT THE CONTRACTOR SHALL BE REQUIRED TO RESPOND TO ALL WATER MANAGEMENT DISTRICT INQUIRIES, RELATIVE TO COMPLIANCE OF SWFWMD FOR EROSION AND SEDIMENTATION CONTROL. THE COST OF THIS COMPLIANCE SHALL BE PART OF THE CONTRACT. 21. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE BEST EROSION AND THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING THE BEST EROSION AND SEDIMENT CONTROL PRACTICES AS OUTLINED IN THE PLANS AND SPECIFICATIONS AND THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RULES AND REGULATIONS. 22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING A PERMANENT STAND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING A PERMANENT STAND OF SOD AND/OR GRASS PER THE CONTRACT DOCUMENTS, THE SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT, CITY OF BRADENTON STANDARDS, AND MEETING THE NPDES FINAL STABILIZATION REQUIREMENTS. 23. THESE PLANS INCLUDING THE POLLUTION PREVENTION PLAN INDICATE THE MINIMUM THESE PLANS INCLUDING THE POLLUTION PREVENTION PLAN INDICATE THE MINIMUM EROSION & SEDIMENT CONTROL MEASURES REQUIRED FOR THIS PROJECT. CONTRACTOR IS REQUIRED TO INSURE CONFORMANCE TO STATE AND FEDERAL WATER QUALITY STANDARDS AND MAY NEED TO INSTALL ADDITIONAL CONTROLS TO CONFORM TO AGENCIES REQUIREMENTS. IF A WATER QUALITY VIOLATION OCCURS, THE CONTRACTOR SHALL BE WHOLLY RESPONSIBLE FOR ALL DAMAGE AND ALL COSTS WHICH MAY RESULT INCLUDING LEGAL FEES, CONSULTANT FEES, CONSTRUCTION COSTS, AND FINES. 24. 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR WILL 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR WILL SUBMIT A "NOTICE OF INTENT" TO THE FDEP IN ACCORDANCE WITH NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM RULES AND REGULATIONS. (FOR ANY CONSTRUCTION NOT COVERED BY THE OWNER'S "NOTICE OF INTENT" PERMIT")
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
BY
AutoCAD SHX Text G-5
AutoCAD SHX Text 40859000-563000-26502
AutoCAD SHX Text
DEC., 2025
AutoCAD SHX Text 888 13th AVENUE EAST BRADENTON, FLORIDA 34208 (941) 708-6300
AutoCAD SHX Text
KRISTOFER S. ECCLES, PE
AutoCAD SHX Text
REG. PROF. ENGINEER #99424
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
PROJECT ENGINEER
AutoCAD SHX Text
KRISTOFER S. ECCLES, P.E.
AutoCAD SHX Text K.S.E.
AutoCAD SHX Text K.S.E.
PREVENTION PLAN DETAILS
POLLUTION PREVENTION PLAN CERTIFICATION
SILT FENCE DETAIL1
Call 811 or www.sunshine811.com two full business days before digging to have utilities located and marked.
Check positive response codes before you dig!
CITY OF BRADENTON
PUBLIC WORKS DEPARTMENT
F il en am e:
P
E N
GI
N E E R
IN
G\
IN
TE
R N
AL
P R
OJ
E C
TS
\W
AT
E R M
AI
N I M P R
OV
E M E N
TS
\F Y2
6_
YR
\K
IN
GS
TO
N E
S
TA
TE
S \1
_D E S
IG
N \K
IN
GS
TO
N E
S
TA
TE
S .D
W G
S av ed o n:
2/
/2
1:
:2
P M B y:
S
_S
IB
E R T
D at e P lo tt ed
/1 6/
:5 3:
P M
WATER MAIN IMPROVEMENTS F.Y. 2026
KINGSTON ESTATES
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
NONE
AutoCAD SHX Text
DWG. NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text CONTRACTOR'S CERTIFICATION THIS SWPPP MUST CLEARLY IDENTIFY, FOR EACH MEASURE IDENTIFIED WITHIN THE SWPPP, THE CONTRACTOR(S) OR SUBCONTRACTOR(S) THAT WILL IMPLEMENT EACH MEASURE. ALL CONTRACTOR(S) AND SUBCONTRACTOR(S) IDENTIFIED IN THE SWPPP MUST SIGN THE FOLLOWING CERTIFICATION: I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF UNDER PENALTY OF LAW THAT I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .