PLANS.pdf

PDF 106 MB Posted

Attached to
LEE ROAD TRAIL - PHASE 1 State and local contract opportunity
Solicitation number
CT-24-14860; FED. NO. 5031(040)
Issued by
Santa Cruz County, Torrance City, California

About this file

PLANS.pdf is a technical document related to the Lee Road Trail - Phase 1 project for the City of Watsonville in Santa Cruz County, California. The project encompasses comprehensive infrastructure improvements on Harkins Slough Road and the adjacent Lee Road area, involving road widening, sidewalk installation, ADA ramps, storm drain modifications, pavement repairs, fencing, guard rail placement, and construction of an 8' wide bike and pedestrian path with 2' shoulders. The project is scheduled for construction between April 15th and October 15th, 2026, with the contract opportunity posted on September 9, 2025, and proposals due by October 7, 2025.

The contract includes a Disadvantaged Business Enterprise (DBE) participation goal of 16%, requiring detailed documentation of DBE involvement. While a specific contract value is not explicitly stated, the project involves federal funding and necessitates performance and payment bonds. The project requires contractors to demonstrate technical capabilities in transportation infrastructure construction, comply with federal wage determinations, and navigate complex environmental and regulatory requirements. Geotechnical considerations include challenging site conditions with liquefaction potential and seismic risks, particularly for the pedestrian bridge spanning Struve Slough. Contractors must provide specific insurance, offer a one-year warranty on work, and adhere to prevailing wage regulations.

View the file

Other files for this state and local contract opportunity

Other files attached to LEE ROAD TRAIL - PHASE 1, newest first.
File Type Posted
Revised_EXHIBIT_B_AGREEMENT_REVISION_Federal_Wage_Rate_Determination_ADDENDUM_NO._1.pdf PDF
Revised_Plans_Addendum_No._1.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
20'_Trail_Easement_Map.pdf PDF
20'_Trail_Easement_Map.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
PLANS.pdf PDF
PLANS.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
Bid_Guarantee_Bond_Form.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Bid_Guarantee_Bond_Form.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Bid_Guarantee_Bond_Form.pdf PDF
02_Contract_Documents.docx DOCX document
Project_Labor_Agreement.pdf PDF
Project_Labor_Agreement.pdf PDF
02_Contract_Documents.docx DOCX document
Project_Labor_Agreement.pdf PDF
02_Contract_Documents.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .