APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf

PDF 119 KB Posted

Attached to
LEE ROAD TRAIL - PHASE 1 State and local contract opportunity
Solicitation number
CT-24-14860; FED. NO. 5031(040)
Issued by
Santa Cruz County, Torrance City, California

About this file

The document is an Appendix listing Project Permits and Approval Documents for a project in Santa Cruz County, specifically detailing the various permits and regulatory approvals required for a construction or development project. The listed permits include a Coastal Development Permit with a Riparian Exception, Santa Cruz County Encroachment and Building Permits, Regional Water Quality Control Board (RWQCB) Section 401 Certification, US Army Corps of Engineers Section 404 permit, an Erosivity Waiver from RWQCB, and Santa Cruz County Conditions of Approval.

All of these documents are noted as being "Available Upon Request," indicating that potential contractors or interested parties would need to contact the relevant agency or project management team to obtain the full details of these permits. The comprehensive list suggests a complex regulatory environment, likely involving environmental considerations, water quality protections, and local county development standards, which will need to be carefully navigated during the project's planning and execution phases.

View the file

Other files for this state and local contract opportunity

Other files attached to LEE ROAD TRAIL - PHASE 1, newest first.
File Type Posted
Revised_Plans_Addendum_No._1.pdf PDF
Revised_EXHIBIT_B_AGREEMENT_REVISION_Federal_Wage_Rate_Determination_ADDENDUM_NO._1.pdf PDF
20'_Trail_Easement_Map.pdf PDF
20'_Trail_Easement_Map.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
PLANS.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
PLANS.pdf PDF
PLANS.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Bid_Guarantee_Bond_Form.pdf PDF
Bid_Guarantee_Bond_Form.pdf PDF
Bid_Guarantee_Bond_Form.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Project_Labor_Agreement.pdf PDF
02_Contract_Documents.docx DOCX document
02_Contract_Documents.docx DOCX document
Project_Labor_Agreement.pdf PDF
Project_Labor_Agreement.pdf PDF
02_Contract_Documents.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX

APPENDIX

PROJECT PERMITS AND APPROVAL

DOCUMENTS

Available Upon Request

List:

Coastal Development Permit and Riparian Exception

Santa Cruz County Encroachment Permit

Santa Cruz County Building Permit

Regional Water Quality Control Board Certification Section 401

US Army Corp of Engineers Section 404

Erosivity Waiver from RWQCB

Santa Cruz County Conditions of Approval

PLG 235
PLG 300
SEISMIC UPDATE LETTER
GEOTECHNICAL REPORT
THRESHOLD DETERMINATION APPX A
SPECIFICATION BOOK
NOTICE INVITING SEALED BIDS
CONTRACT DOC TO BE SUBMITTED ON BID OPENING DATE
PROPOSAL
CONTRACT DOCUMENTS TO BE SUBMITTED TO CITY 5 DAYS AFTER BID OPENING
SUCESSFUL BIDDERS CONTRACT DOCUMENTS AFTER AWARD
DAVID BACON FEDERAL WAGE RATES
GENERAL PROVISIONS
SPECIAL PROVISIONS
TECHNICAL SPECIAL PROVISIONS
APPENDIX MATERIAL ACCEPTANCE AND SAMPLE CERTI OF COMPLIANCE
APPENDIX GEOTECHNICAL REPORT
APPENDIX PROJECT PERMITS AND APPROVAL DOCUMENTS
CONCEPTUAL MITIGATION PLAN
Timeline for Mitigation for Phase 1
Seasonal Wetland
Table 5 Mitigation site 2
Plantings Chart for Mitigation Area 2
Monitoring
REporting
Mitigation Area 2
Appendix A - 18196_Lee Road Ph1_Ex Contour Map
Appendix B - SCC-Rational-method-hydrology-calculations
Appendix C-Hydroflow Express Calculations
C - Lee Rd - PH1 - Culvert A
C - Lee Rd - PH1 - Culvert B
C - Lee Rd - PH1 - Culvert C
C - Lee Rd - PH1 - Culvert D

File details come from the government source that posted it. Updated .