About this file

This document is a Storm Water Multiple Application and Report Tracking System (SMARTS) form from the California Water Resources Control Board, specifically related to a construction project with WDID # 3 44W006134 and Order # 2022-0057-DWQ. The project has a defined construction window from April 15th, 2026 to October 15, 2026, and notably, an erosivity waiver has been issued for this project. The form appears to be a standard tracking document for monitoring environmental compliance during construction activities, with various data fields capturing project-specific details.

While the image provides limited substantive information beyond administrative tracking details, the key distinguishing feature is the erosivity waiver, which suggests the project has been assessed and determined to have minimal potential for soil erosion during the specified construction period. The WDID number indicates this is a regulated construction activity within California's water resource management framework, requiring documentation and potential environmental mitigation strategies.

View the file

Other files for this state and local contract opportunity

Other files attached to LEE ROAD TRAIL - PHASE 1, newest first.
File Type Posted
Revised_EXHIBIT_B_AGREEMENT_REVISION_Federal_Wage_Rate_Determination_ADDENDUM_NO._1.pdf PDF
Revised_Plans_Addendum_No._1.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
County_of_Santa_Cruz_Encroachment_Permit_23-017_signed.pdf PDF
20'_Trail_Easement_Map.pdf PDF
20'_Trail_Easement_Map.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_A_-_GEOTECHNICAL_REPORT_Pacific_Crest.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
DBE_Goal_REquired_documents_5_calendar_days_from_bid_opening.pdf PDF
APPENDIX_D-_PROJECT_PERMITS_AND_APPROVAL_DOCUMENTS.pdf PDF
APPENDIX_B-_Materials_accepted_by_certificate.pdf PDF
APPENDIX_C_-_Erosivity_Waiver.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
Post-Bid_Contract_Documents.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
PLANS.pdf PDF
PLANS.pdf PDF
PLANS.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
TECHNICAL_SPECIFICATIONS_Mesiti_and_Miller.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Bid_Guarantee_Bond_Form.pdf PDF
Bid_Guarantee_Bond_Form.pdf PDF
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Agreeement_for_Marco_to_Populate_Lee_Road_Trail_Phase_1.docx DOCX document
Bid_Guarantee_Bond_Form.pdf PDF
02_Contract_Documents.docx DOCX document
02_Contract_Documents.docx DOCX document
Project_Labor_Agreement.pdf PDF
Project_Labor_Agreement.pdf PDF
Project_Labor_Agreement.pdf PDF
02_Contract_Documents.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EROSIVITY WAIVER WAS ISSUED

TO THIS PROJECT.

Construction Window April 15th, 2026 to October 15, 2026

WDID # 3 44W006134

ORDER # 2022-0057-DWQ