Plans - Cover Sheet - Signed.pdf

PDF 496 KB Posted

Attached to
OK ERFO RS KERR 10301(1) Powerhouse Parking Lot
Solicitation number
6982AF21B000003
Issued by

About this file

This document outlines a federal contract opportunity for reconstruction of an existing parking facility and decommissioning of a roadway. The project is located at the Robert S. Kerr Lock and Dam in Le Flore County, Oklahoma along the Arkansas River. Key work includes clearing and grubbing, roadway obliteration, replacement of guardrail, asphalt concrete pavement, sidewalk, curb and gutter, and signing and striping. Significant line items consist of 140 tons of asphalt concrete, 175 square yards of concrete sidewalk, 45 cubic yards of concrete cutoff wall, 260 linear feet of guardrail removal and reset, 3,700 square yards of roadway obliteration. The anticipated award date is February 2021, with a construction duration from February to April 2021. The estimated cost range is between $250,000 to $700,000. The solicitation is set aside for women-owned small businesses. The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY MAP OF OKLAHOMA

TYPE OF CONSTRUCTION:

Parking lot construction, asphalt paving, guardrail, drainage, roadway obliteration

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

PLANS FOR PROPOSED

°'L PROJECT LOCATION

) OK ERFO RS KERR 10301(1) OK ERFO RS KERR 10301(1)

POWERHOUSE PARKING LOT

N

U.S. Army Corps of Engineers Robert S. Kerr Lock and Dam

Le Flore COUNTY LENGTH 0.05 miles

SHEET

Al A2-A3

A4

AS

A6 Bl B2

Cl-C2 El Tl T2 T3

T4

TS

T6

T7-T9 Tl0 Tll

STATE PROJECT

INDEX TO SHEETS

DESCRIPTION

TITLE SHEET

CONVENTIONAL PLAN SYMBOLS AND ABBREVIATIONS

CONTROL SHEET

SITE MAP

TYPICAL SECTIONS

SUMMARY OF QUANTITIES

MISCELLANEOUS SUMMARY

POWERHOUSE PARKING LOT

C1S7-SS FIBER ROLL

604-1 CATCH BASIN TYPE 1

604-2 METAL FRAME AND GRATE TYPE A

609-A CONCRETE CURB AND GUTTER

61S-A SIDEWALK

61S-B ACCESSIBILITY RAMP

619-A STEEL PIPE FENCE AND GATE

619-B CLOSURE GATE DOUBLE LANE

633-A PERMANENT SIGN INSTALLATION

SIGNING AND STRIPING PLAN

SHEET

NUMBER

T12 634-A PAVEMENT MARKINGS AND SIGNING IN PARKING

U.S. CUSTOMARY DIMENSIONS:

Slopes are expressed as RISE:RUN

SPECIFICATIONS:

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

fHUU LANDI �IGHln

C@IIIIIITIIIHT TO HC��u�c�

Know what's below.

Call before you dig.

www.call811.com

PROJECT MANAGER LEAD DESIGNER

::: D. EISENBRAUN K. TERRELL PROSE

G

Powerhouse Parking Area u_'b<:,� t'r

0 0.5 miles 1 mile �t.....�-�---�....Jiiiiiiiil�����I

Scale in Feet

G

Google

AREAS

APPROVED:

CHIEF OF ENGINEERING

PLANS PREPARED BY

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DENVER,COLORADO

DATE:

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

11/24/2020

2020-11-24T14:24:38-0700
CURTIS R SCOTT

File details come from the government source that posted it. Updated .