Bid Tabs - OK ERFO RS KERR 10301(1) Powerhouse Parking Lot .pdf
PDF 674 KB Posted
- Attached to
- OK ERFO RS KERR 10301(1) Powerhouse Parking Lot
- Solicitation number
- 6982AF21B000003
About this file
This document provides details for a federal construction contract opportunity for the OK ERFO RS KERR 10301(1) Powerhouse Parking Lot project. The project consists of reconstruction of an existing parking facility and decommissioning a section of roadway at the Robert S. Kerr Lock and Dam located approximately 8 miles south of Sallisaw, Oklahoma. Work includes clearing, grubbing, roadway obliteration, removal and replacement of guardrail, asphalt concrete pavement, sidewalk, curb and gutter, and signing and striping. Significant work quantities include 140 tons of asphalt concrete pavement, 175 square yards of concrete sidewalk, and 45 cubic yards of concrete cutoff wall. The solicitation number is 6982AF21B000003 and it is advertised as a Women-Owned Small Business set aside. The anticipated award date is February 2021, with a construction duration from February to April 2021. The estimated cost range is between $250,000 to $700,000. The opportunity is funded by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 01/26/21
1 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000003
Division: Central Federal Lands
State: OK County:
Federal Land: USACE Opened at: Lakewood, CO
Opened by: Jorey Deml
Date: 01/21/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Lutz Contractors, LLC $396,510.00 128 UHL Road Red Oak Texas 75154
Natural State Construction Solutions $414,182.60 PO Box 5745 Bella Vista, AR 72714
JGM Property Group Inc $419,378.99 504 S. Water St.
Marine City, MI 48039
Goodwin & Goodwin Inc $445,245.00 3503 Free Ferry Road Fort Smith Arkansas 72903
Shamrock Hills LLC $510,281.00 6541 Donahoo Rd Kansas City Kansas 66104
MDM MAC Enterprises Inc $580,227.42 2431Madeira Circle Waxhaw, NC 28173
Dream Worx Construction & Roofing LLC $594,173.88 373 Dave Creek Pkwy Fairfield Bay , AR 72088
C-A Native Constructors Inc $620,242.24 4000 E Harris Road Muskogee, OK 74403
Diversified Construction of Oklahoma $623,835.48 6288 Boucher Dr Edmond, OK 73034
RFB Construction Co. Inc. $623,925.00
2 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000003
Division: Central Federal Lands
State: OK County:
Federal Land: USACE Opened at: Lakewood, CO
Opened by: Jorey Deml
Date: 01/21/21
565 East 520th Ave.
Pittsburg Kansas 66762
3 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF21B000003
Division: Central Federal Lands
State: OK County:
Federal Land: USACE Opened at: Lakewood, CO
Opened by: Jorey Deml
Date: 01/21/21
Contractor Comment Bid Amount Responsive
AJ Commercial Services, Inc. $664,367.00 1716 S. San Marcos #224 San Antonio Texas 78207
McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $687,116.50 306 N. Main St.
Mulberry Arkansas 72947
Genesis Design and Development, LLC $699,950.00 7033 Kalgan Rd NE Rio Rancho, NM 87144
JD Martin Construction Services $747,456.28 5205 Highway 89 S Cabot Arkansas 72023
J&S Construction and Demolition LLC ( $1,500,231.00 ) no 509 S. Scraper St.
Vinita Oklahoma 74301
Engineer's Estimate $640,000.00
4 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0050 15101-0000 MOBILIZATION
Lutz Contractors, LLC Lump Sum $4,800.00 Natural State Construction Solutions Lump Sum $37,646.00 JGM Property Group Inc Lump Sum $26,037.87 Goodwin & Goodwin Inc Lump Sum $20,000.00 Shamrock Hills LLC Lump Sum $43,500.00 MDM MAC Enterprises Inc Lump Sum $27,181.43 Dream Worx Construction & Roofing LLC Lump Sum $40,525.18 C-A Native Constructors Inc Lump Sum $28,900.00 Diversified Construction of Oklahoma Lump Sum $27,192.99 RFB Construction Co. Inc. Lump Sum $93,000.00 AJ Commercial Services, Inc. Lump Sum $53,693.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works Lump Sum $42,566.00 Genesis Design and Development, LLC Lump Sum $70,000.00 JD Martin Construction Services Lump Sum $75,142.76 J&S Construction and Demolition LLC Lump Sum $3,500.00 Engineer's Estimate ALL LPSM Lump Sum $81,565.00
A0100 15201-0000 CONSTRUCTION SURVEY AND STAKING
Lutz Contractors, LLC Lump Sum $3,600.00 Natural State Construction Solutions Lump Sum $9,500.00 JGM Property Group Inc Lump Sum $11,835.40 Goodwin & Goodwin Inc Lump Sum $3,500.00 Shamrock Hills LLC Lump Sum $19,750.00 MDM MAC Enterprises Inc Lump Sum $12,121.91 Dream Worx Construction & Roofing LLC Lump Sum $26,707.39 C-A Native Constructors Inc Lump Sum $4,760.00 Diversified Construction of Oklahoma Lump Sum $20,929.01 RFB Construction Co. Inc. Lump Sum $20,000.00 AJ Commercial Services, Inc. Lump Sum $9,877.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works Lump Sum $14,741.00 Genesis Design and Development, LLC Lump Sum $20,000.00 JD Martin Construction Services Lump Sum $17,340.63 J&S Construction and Demolition LLC Lump Sum $3,200.00 Engineer's Estimate ALL LPSM Lump Sum $6,000.00
A0150 15301-0000 CONTRACTOR QUALITY CONTROL
Lutz Contractors, LLC Lump Sum $40,320.00 Natural State Construction Solutions Lump Sum $15,000.00 JGM Property Group Inc Lump Sum $19,965.03 Goodwin & Goodwin Inc Lump Sum $2,500.00 Shamrock Hills LLC Lump Sum $12,550.00 MDM MAC Enterprises Inc Lump Sum $32,000.20 Dream Worx Construction & Roofing LLC Lump Sum $43,858.29 C-A Native Constructors Inc Lump Sum $6,800.00 Diversified Construction of Oklahoma Lump Sum $35,641.60 RFB Construction Co. Inc. Lump Sum $85,000.00 AJ Commercial Services, Inc. Lump Sum $7,901.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works Lump Sum $36,860.00 Genesis Design and Development, LLC Lump Sum $20,000.00 JD Martin Construction Services Lump Sum $6,936.25 J&S Construction and Demolition LLC Lump Sum $1,500.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
5 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0200 15401-0000 CONTRACTOR TESTING
Lutz Contractors, LLC Lump Sum $2,400.00 Natural State Construction Solutions Lump Sum $15,000.00 JGM Property Group Inc Lump Sum $7,827.50 Goodwin & Goodwin Inc Lump Sum $3,500.00 Shamrock Hills LLC Lump Sum $9,346.00 MDM MAC Enterprises Inc Lump Sum $5,422.37 Dream Worx Construction & Roofing LLC Lump Sum $20,168.79 C-A Native Constructors Inc Lump Sum $8,160.00 Diversified Construction of Oklahoma Lump Sum $9,192.59 RFB Construction Co. Inc. Lump Sum $30,000.00 AJ Commercial Services, Inc. Lump Sum $9,877.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works Lump Sum $6,306.00 Genesis Design and Development, LLC Lump Sum $15,000.00 JD Martin Construction Services Lump Sum $1,734.06 J&S Construction and Demolition LLC Lump Sum $2,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0250 15501-0000 CONSTRUCTION SCHEDULE
Lutz Contractors, LLC Lump Sum $1,200.00 Natural State Construction Solutions Lump Sum $0.00 JGM Property Group Inc Lump Sum $5,267.55 Goodwin & Goodwin Inc Lump Sum $5,000.00 Shamrock Hills LLC Lump Sum $2,600.00 MDM MAC Enterprises Inc Lump Sum $9,224.75 Dream Worx Construction & Roofing LLC Lump Sum $23,390.06 C-A Native Constructors Inc Lump Sum $4,080.00 Diversified Construction of Oklahoma Lump Sum $3,399.12 RFB Construction Co. Inc. Lump Sum $6,500.00 AJ Commercial Services, Inc. Lump Sum $1,975.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works Lump Sum $10,462.00 Genesis Design and Development, LLC Lump Sum $10,000.00 JD Martin Construction Services Lump Sum $1,500.00 J&S Construction and Demolition LLC Lump Sum $3,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
A0300 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Lutz Contractors, LLC $3.60 $5,940.00 Natural State Construction Solutions $2.75 $4,537.50 JGM Property Group Inc $11.84 $19,536.00 Goodwin & Goodwin Inc $3.00 $4,950.00 Shamrock Hills LLC $14.50 $23,925.00 MDM MAC Enterprises Inc $4.47 $7,375.50 Dream Worx Construction & Roofing LLC $4.02 $6,633.00 C-A Native Constructors Inc $9.25 $15,262.50 Diversified Construction of Oklahoma $3.60 $5,940.00 RFB Construction Co. Inc. $3.00 $4,950.00 AJ Commercial Services, Inc. $5.00 $8,250.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $4.00 $6,600.00 Genesis Design and Development, LLC $8.00 $13,200.00 JD Martin Construction Services $17.34 $28,611.00 J&S Construction and Demolition LLC $3.00 $4,950.00 Engineer's Estimate 1,650 LNFT $5.00 $8,250.00
6 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0350 20103-0000 CLEARING AND GRUBBING
Lutz Contractors, LLC $21.60 $7,776.00 Natural State Construction Solutions $11.60 $4,176.00 JGM Property Group Inc $17.75 $6,390.00 Goodwin & Goodwin Inc $5.00 $1,800.00 Shamrock Hills LLC $21.00 $7,560.00 MDM MAC Enterprises Inc $43.27 $15,577.20 Dream Worx Construction & Roofing LLC $38.16 $13,737.60 C-A Native Constructors Inc $39.01 $14,043.60 Diversified Construction of Oklahoma $24.54 $8,834.40 RFB Construction Co. Inc. $25.00 $9,000.00 AJ Commercial Services, Inc. $38.00 $13,680.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $49.00 $17,640.00 Genesis Design and Development, LLC $25.00 $9,000.00 JD Martin Construction Services $17.34 $6,242.40 J&S Construction and Demolition LLC $3,600.00 $1,296,000.00 Engineer's Estimate 360 SQYD $5.00 $1,800.00
A0400 20302-1200 REMOVAL OF GUARDRAIL
Lutz Contractors, LLC $7.20 $9,792.00 Natural State Construction Solutions $1.84 $2,502.40 JGM Property Group Inc $4.73 $6,432.80 Goodwin & Goodwin Inc $8.00 $10,880.00 Shamrock Hills LLC $6.00 $8,160.00 MDM MAC Enterprises Inc $20.27 $27,567.20 Dream Worx Construction & Roofing LLC $17.88 $24,316.80 C-A Native Constructors Inc $5.44 $7,398.40 Diversified Construction of Oklahoma $8.36 $11,369.60 RFB Construction Co. Inc. $3.50 $4,760.00 AJ Commercial Services, Inc. $8.00 $10,880.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $24.00 $32,640.00 Genesis Design and Development, LLC $6.00 $8,160.00 JD Martin Construction Services $5.78 $7,860.80 J&S Construction and Demolition LLC $3.00 $4,080.00 Engineer's Estimate 1,360 LNFT $10.00 $13,600.00
A0450 20303-1600 REMOVAL OF PAVEMENT, ASPHALT
Lutz Contractors, LLC $1.80 $8,460.00 Natural State Construction Solutions $0.91 $4,277.00 JGM Property Group Inc $3.55 $16,685.00 Goodwin & Goodwin Inc $15.00 $70,500.00 Shamrock Hills LLC $4.10 $19,270.00 MDM MAC Enterprises Inc $8.14 $38,258.00 Dream Worx Construction & Roofing LLC $7.18 $33,746.00 C-A Native Constructors Inc $13.06 $61,382.00 Diversified Construction of Oklahoma $7.95 $37,365.00 RFB Construction Co. Inc. $5.50 $25,850.00 AJ Commercial Services, Inc. $5.00 $23,500.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $9.00 $42,300.00 Genesis Design and Development, LLC $5.00 $23,500.00 JD Martin Construction Services $41.61 $195,567.00 J&S Construction and Demolition LLC $3.00 $14,100.00 Engineer's Estimate 4,700 SQYD $8.00 $37,600.00
7 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 20420-0000 EMBANKMENT CONSTRUCTION
Lutz Contractors, LLC $48.00 $48,000.00 Natural State Construction Solutions $15.00 $15,000.00 JGM Property Group Inc $23.67 $23,670.00 Goodwin & Goodwin Inc $28.00 $28,000.00 Shamrock Hills LLC $42.00 $42,000.00 MDM MAC Enterprises Inc $42.15 $42,150.00 Dream Worx Construction & Roofing LLC $37.35 $37,350.00 C-A Native Constructors Inc $16.80 $16,800.00 Diversified Construction of Oklahoma $36.98 $36,980.00 RFB Construction Co. Inc. $15.00 $15,000.00 AJ Commercial Services, Inc. $37.00 $37,000.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $49.00 $49,000.00 Genesis Design and Development, LLC $25.00 $25,000.00 JD Martin Construction Services $23.12 $23,120.00 J&S Construction and Demolition LLC $20.00 $20,000.00 Engineer's Estimate 1,000 CUYD $50.00 $50,000.00
A0550 20425-1000 DITCH, EXCAVATION
Lutz Contractors, LLC $120.00 $15,000.00 Natural State Construction Solutions $6.40 $800.00 JGM Property Group Inc $35.47 $4,433.75 Goodwin & Goodwin Inc $15.00 $1,875.00 Shamrock Hills LLC $42.00 $5,250.00 MDM MAC Enterprises Inc $31.43 $3,928.75 Dream Worx Construction & Roofing LLC $27.67 $3,458.75 C-A Native Constructors Inc $45.42 $5,677.50 Diversified Construction of Oklahoma $85.39 $10,673.75 RFB Construction Co. Inc. $25.00 $3,125.00 AJ Commercial Services, Inc. $58.00 $7,250.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $36.00 $4,500.00 Genesis Design and Development, LLC $10.00 $1,250.00 JD Martin Construction Services $13.87 $1,733.75 J&S Construction and Demolition LLC $6.00 $750.00 Engineer's Estimate 125 LNFT $20.00 $2,500.00
A0600 21101-1000 ROADWAY OBLITERATION, METHOD 1
Lutz Contractors, LLC $6.00 $22,200.00 Natural State Construction Solutions $5.41 $20,017.00 JGM Property Group Inc $2.37 $8,769.00 Goodwin & Goodwin Inc $8.00 $29,600.00 Shamrock Hills LLC $3.10 $11,470.00 MDM MAC Enterprises Inc $7.20 $26,640.00 Dream Worx Construction & Roofing LLC $6.34 $23,458.00 C-A Native Constructors Inc $14.40 $53,280.00 Diversified Construction of Oklahoma $5.68 $21,016.00 RFB Construction Co. Inc. $2.55 $9,435.00 AJ Commercial Services, Inc. $6.00 $22,200.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $8.50 $31,450.00 Genesis Design and Development, LLC $24.00 $88,800.00 JD Martin Construction Services $7.51 $27,787.00 J&S Construction and Demolition LLC $3.00 $11,100.00 Engineer's Estimate 3,700 SQYD $12.00 $44,400.00
8 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0650 25101-2500 PLACED RIPRAP, METHOD B, CLASS 5
Lutz Contractors, LLC $54.00 $10,800.00 Natural State Construction Solutions $77.00 $15,400.00 JGM Property Group Inc $112.44 $22,488.00 Goodwin & Goodwin Inc $105.00 $21,000.00 Shamrock Hills LLC $130.00 $26,000.00 MDM MAC Enterprises Inc $69.55 $13,910.00 Dream Worx Construction & Roofing LLC $61.81 $12,362.00 C-A Native Constructors Inc $186.05 $37,210.00 Diversified Construction of Oklahoma $133.25 $26,650.00 RFB Construction Co. Inc. $100.00 $20,000.00 AJ Commercial Services, Inc. $612.00 $122,400.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $80.00 $16,000.00 Genesis Design and Development, LLC $225.00 $45,000.00 JD Martin Construction Services $69.36 $13,872.00 J&S Construction and Demolition LLC $87.00 $17,400.00 Engineer's Estimate 200 CUYD $240.00 $48,000.00
A0700 30202-2000 ROADWAY AGGREGATE, METHOD 2
Lutz Contractors, LLC $7.20 $5,400.00 Natural State Construction Solutions $54.00 $40,500.00 JGM Property Group Inc $41.42 $31,065.00 Goodwin & Goodwin Inc $55.00 $41,250.00 Shamrock Hills LLC $47.00 $35,250.00 MDM MAC Enterprises Inc $32.32 $24,240.00 Dream Worx Construction & Roofing LLC $28.32 $21,240.00 C-A Native Constructors Inc $51.68 $38,760.00 Diversified Construction of Oklahoma $31.73 $23,797.50 RFB Construction Co. Inc. $89.00 $66,750.00 AJ Commercial Services, Inc. $45.00 $33,750.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $38.00 $28,500.00 Genesis Design and Development, LLC $55.00 $41,250.00 JD Martin Construction Services $63.58 $47,685.00 J&S Construction and Demolition LLC $20.00 $15,000.00 Engineer's Estimate 750 TON $100.00 $75,000.00
A0750 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Lutz Contractors, LLC $240.00 $96,000.00 Natural State Construction Solutions $60.00 $24,000.00 JGM Property Group Inc $147.94 $59,176.00 Goodwin & Goodwin Inc $135.00 $54,000.00 Shamrock Hills LLC $157.00 $62,800.00 MDM MAC Enterprises Inc $222.17 $88,868.00 Dream Worx Construction & Roofing LLC $199.85 $79,940.00 C-A Native Constructors Inc $204.00 $81,600.00 Diversified Construction of Oklahoma $186.95 $74,780.00 RFB Construction Co. Inc. $175.00 $70,000.00 AJ Commercial Services, Inc. $220.00 $88,000.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $270.00 $108,000.00 Genesis Design and Development, LLC $200.00 $80,000.00 JD Martin Construction Services $136.41 $54,564.00 J&S Construction and Demolition LLC $120.00 $48,000.00 Engineer's Estimate 400 TON $190.00 $76,000.00
9 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0800 41102-1000 PRIME COAT, METHOD 1
Lutz Contractors, LLC $2.40 $5,640.00 Natural State Construction Solutions $1.92 $4,512.00 JGM Property Group Inc $1.48 $3,478.00 Goodwin & Goodwin Inc $1.00 $2,350.00 Shamrock Hills LLC $1.60 $3,760.00 MDM MAC Enterprises Inc $0.20 $470.00 Dream Worx Construction & Roofing LLC $0.19 $446.50 C-A Native Constructors Inc $1.70 $3,995.00 Diversified Construction of Oklahoma $2.03 $4,770.50 RFB Construction Co. Inc. $2.80 $6,580.00 AJ Commercial Services, Inc. $3.00 $7,050.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $0.75 $1,762.50 Genesis Design and Development, LLC $3.50 $8,225.00 JD Martin Construction Services $1.15 $2,702.50 J&S Construction and Demolition LLC $2.00 $4,700.00 Engineer's Estimate 2,350 SQYD $2.50 $5,875.00
A0850 60101-0000 CONCRETE (CUTOFF WALL)
Lutz Contractors, LLC $300.00 $12,000.00 Natural State Construction Solutions $300.00 $12,000.00 JGM Property Group Inc $828.48 $33,139.20 Goodwin & Goodwin Inc $1,200.00 $48,000.00 Shamrock Hills LLC $1,140.00 $45,600.00 MDM MAC Enterprises Inc $838.26 $33,530.40 Dream Worx Construction & Roofing LLC $746.40 $29,856.00 C-A Native Constructors Inc $884.00 $35,360.00 Diversified Construction of Oklahoma $1,177.57 $47,102.80 RFB Construction Co. Inc. $600.00 $24,000.00 AJ Commercial Services, Inc. $1,219.00 $48,760.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $963.00 $38,520.00 Genesis Design and Development, LLC $575.00 $23,000.00 JD Martin Construction Services $751.42 $30,056.80 J&S Construction and Demolition LLC $10.00 $400.00 Engineer's Estimate 40 CUYD $500.00 $20,000.00
A0900 60201-0600 18-INCH PIPE CULVERT
Lutz Contractors, LLC $120.00 $1,200.00 Natural State Construction Solutions $50.00 $500.00 JGM Property Group Inc $118.35 $1,183.50 Goodwin & Goodwin Inc $85.00 $850.00 Shamrock Hills LLC $130.00 $1,300.00 MDM MAC Enterprises Inc $607.98 $6,079.80 Dream Worx Construction & Roofing LLC $539.38 $5,393.80 C-A Native Constructors Inc $89.46 $894.60 Diversified Construction of Oklahoma $177.09 $1,770.90 RFB Construction Co. Inc. $100.00 $1,000.00 AJ Commercial Services, Inc. $169.00 $1,690.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $696.00 $6,960.00 Genesis Design and Development, LLC $450.00 $4,500.00 JD Martin Construction Services $231.20 $2,312.00 J&S Construction and Demolition LLC $20.00 $200.00 Engineer's Estimate 10 LNFT $125.00 $1,250.00
10 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0950 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
Lutz Contractors, LLC $600.00 $600.00 Natural State Construction Solutions $500.00 $500.00 JGM Property Group Inc $710.12 $710.12 Goodwin & Goodwin Inc $1,000.00 $1,000.00 Shamrock Hills LLC $875.00 $875.00 MDM MAC Enterprises Inc $3,382.32 $3,382.32 Dream Worx Construction & Roofing LLC $2,967.20 $2,967.20 C-A Native Constructors Inc $1,088.00 $1,088.00 Diversified Construction of Oklahoma $2,121.05 $2,121.05 RFB Construction Co. Inc. $1,400.00 $1,400.00 AJ Commercial Services, Inc. $2,492.00 $2,492.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $3,900.00 $3,900.00 Genesis Design and Development, LLC $3,500.00 $3,500.00 JD Martin Construction Services $4,046.15 $4,046.15 J&S Construction and Demolition LLC $200.00 $200.00 Engineer's Estimate 1 EACH $700.00 $700.00
A1000 60404-0000 CATCH BASIN
Lutz Contractors, LLC $4,200.00 $4,200.00 Natural State Construction Solutions $2,200.00 $2,200.00 JGM Property Group Inc $4,970.87 $4,970.87 Goodwin & Goodwin Inc $4,800.00 $4,800.00 Shamrock Hills LLC $6,300.00 $6,300.00 MDM MAC Enterprises Inc $12,368.00 $12,368.00 Dream Worx Construction & Roofing LLC $10,882.07 $10,882.07 C-A Native Constructors Inc $1,088.00 $1,088.00 Diversified Construction of Oklahoma $8,157.90 $8,157.90 RFB Construction Co. Inc. $6,500.00 $6,500.00 AJ Commercial Services, Inc. $5,465.00 $5,465.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $14,038.00 $14,038.00 Genesis Design and Development, LLC $12,500.00 $12,500.00 JD Martin Construction Services $4,046.15 $4,046.15 J&S Construction and Demolition LLC $400.00 $400.00 Engineer's Estimate 1 EACH $5,500.00 $5,500.00
A1050 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
Lutz Contractors, LLC $24.00 $6,240.00 Natural State Construction Solutions $164.75 $42,835.00 JGM Property Group Inc $53.26 $13,847.60 Goodwin & Goodwin Inc $40.00 $10,400.00 Shamrock Hills LLC $57.00 $14,820.00 MDM MAC Enterprises Inc $76.43 $19,871.80 Dream Worx Construction & Roofing LLC $66.95 $17,407.00 C-A Native Constructors Inc $54.55 $14,183.00 Diversified Construction of Oklahoma $40.27 $10,470.20 RFB Construction Co. Inc. $42.00 $10,920.00 AJ Commercial Services, Inc. $48.00 $12,480.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $87.00 $22,620.00 Genesis Design and Development, LLC $75.00 $19,500.00 JD Martin Construction Services $45.08 $11,720.80 J&S Construction and Demolition LLC $40.00 $10,400.00 Engineer's Estimate 260 LNFT $30.00 $7,800.00
11 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1100 61501-0100 SIDEWALK, CONCRETE
Lutz Contractors, LLC $66.00 $11,418.00 Natural State Construction Solutions $210.90 $36,485.70 JGM Property Group Inc $94.68 $16,379.64 Goodwin & Goodwin Inc $50.00 $8,650.00 Shamrock Hills LLC $105.00 $18,165.00 MDM MAC Enterprises Inc $81.45 $14,090.85 Dream Worx Construction & Roofing LLC $71.75 $12,412.75 C-A Native Constructors Inc $61.08 $10,566.84 Diversified Construction of Oklahoma $118.28 $20,462.44 RFB Construction Co. Inc. $105.00 $18,165.00 AJ Commercial Services, Inc. $122.00 $21,106.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $93.00 $16,089.00 Genesis Design and Development, LLC $125.00 $21,625.00 JD Martin Construction Services $86.70 $14,999.10 J&S Construction and Demolition LLC $7.00 $1,211.00 Engineer's Estimate 173 SQYD $120.00 $20,760.00
A1150 61505-1000 ACCESSIBILITY RAMP, CONCRETE
Lutz Contractors, LLC $6,000.00 $6,000.00 Natural State Construction Solutions $5,000.00 $5,000.00 JGM Property Group Inc $2,130.37 $2,130.37 Goodwin & Goodwin Inc $1,000.00 $1,000.00 Shamrock Hills LLC $2,600.00 $2,600.00 MDM MAC Enterprises Inc $5,371.69 $5,371.69 Dream Worx Construction & Roofing LLC $4,719.38 $4,719.38 C-A Native Constructors Inc $952.00 $952.00 Diversified Construction of Oklahoma $1,849.12 $1,849.12 RFB Construction Co. Inc. $2,500.00 $2,500.00 AJ Commercial Services, Inc. $4,504.00 $4,504.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $6,100.00 $6,100.00 Genesis Design and Development, LLC $7,500.00 $7,500.00 JD Martin Construction Services $2,890.10 $2,890.10 J&S Construction and Demolition LLC $1,000.00 $1,000.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00
A1200 61901-2250 FENCE, RAIL
Lutz Contractors, LLC $18.00 $8,280.00 Natural State Construction Solutions $80.00 $36,800.00 JGM Property Group Inc $59.18 $27,222.80 Goodwin & Goodwin Inc $75.00 $34,500.00 Shamrock Hills LLC $63.00 $28,980.00 MDM MAC Enterprises Inc $88.25 $40,595.00 Dream Worx Construction & Roofing LLC $79.35 $36,501.00 C-A Native Constructors Inc $42.16 $19,393.60 Diversified Construction of Oklahoma $181.81 $83,632.60 RFB Construction Co. Inc. $90.00 $41,400.00 AJ Commercial Services, Inc. $143.00 $65,780.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $103.00 $47,380.00 Genesis Design and Development, LLC $45.00 $20,700.00 JD Martin Construction Services $289.01 $132,944.60 J&S Construction and Demolition LLC $10.00 $4,600.00 Engineer's Estimate 460 LNFT $50.00 $23,000.00
12 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1250 61902-2000 GATE, METAL, 28 FEET WIDTH
Lutz Contractors, LLC $9,000.00 $9,000.00 Natural State Construction Solutions $9,500.00 $9,500.00 JGM Property Group Inc $10,533.50 $10,533.50 Goodwin & Goodwin Inc $7,000.00 $7,000.00 Shamrock Hills LLC $11,125.00 $11,125.00 MDM MAC Enterprises Inc $21,749.35 $21,749.35 Dream Worx Construction & Roofing LLC $19,553.83 $19,553.83 C-A Native Constructors Inc $2,720.00 $2,720.00 Diversified Construction of Oklahoma $15,286.77 $15,286.77 RFB Construction Co. Inc. $8,850.00 $8,850.00 AJ Commercial Services, Inc. $13,513.00 $13,513.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $25,225.00 $25,225.00 Genesis Design and Development, LLC $28,000.00 $28,000.00 JD Martin Construction Services $5,202.19 $5,202.19 J&S Construction and Demolition LLC $2,000.00 $2,000.00 Engineer's Estimate 1 EACH $14,000.00 $14,000.00
A1300 62201-0150 DUMP TRUCK, 7 CUBIC YARD MINIMUM CAPACITY
Lutz Contractors, LLC $66.00 $528.00 Natural State Construction Solutions $95.00 $760.00 JGM Property Group Inc $95.00 $760.00 Goodwin & Goodwin Inc $85.00 $680.00 Shamrock Hills LLC $95.00 $760.00 MDM MAC Enterprises Inc $289.19 $2,313.52 Dream Worx Construction & Roofing LLC $256.27 $2,050.16 C-A Native Constructors Inc $204.00 $1,632.00 Diversified Construction of Oklahoma $125.09 $1,000.72 RFB Construction Co. Inc. $75.00 $600.00 AJ Commercial Services, Inc. $140.00 $1,120.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $331.00 $2,648.00 Genesis Design and Development, LLC $250.00 $2,000.00 JD Martin Construction Services $144.50 $1,156.00 J&S Construction and Demolition LLC $200.00 $1,600.00 Engineer's Estimate 8 HOUR $105.00 $840.00
A1350 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
Lutz Contractors, LLC $66.00 $528.00 Natural State Construction Solutions $100.00 $800.00 JGM Property Group Inc $150.00 $1,200.00 Goodwin & Goodwin Inc $75.00 $600.00 Shamrock Hills LLC $150.00 $1,200.00 MDM MAC Enterprises Inc $57.59 $460.72 Dream Worx Construction & Roofing LLC $49.93 $399.44 C-A Native Constructors Inc $204.00 $1,632.00 Diversified Construction of Oklahoma $82.94 $663.52 RFB Construction Co. Inc. $75.00 $600.00 AJ Commercial Services, Inc. $153.00 $1,224.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $65.00 $520.00 Genesis Design and Development, LLC $250.00 $2,000.00 JD Martin Construction Services $144.50 $1,156.00 J&S Construction and Demolition LLC $190.00 $1,520.00 Engineer's Estimate 8 HOUR $110.00 $880.00
13 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1400 62301-0000 GENERAL LABOR
Lutz Contractors, LLC $18.00 $288.00 Natural State Construction Solutions $32.00 $512.00 JGM Property Group Inc $40.00 $640.00 Goodwin & Goodwin Inc $60.00 $960.00 Shamrock Hills LLC $40.00 $640.00 MDM MAC Enterprises Inc $108.54 $1,736.64 Dream Worx Construction & Roofing LLC $96.66 $1,546.56 C-A Native Constructors Inc $61.20 $979.20 Diversified Construction of Oklahoma $48.27 $772.32 RFB Construction Co. Inc. $30.00 $480.00 AJ Commercial Services, Inc. $49.00 $784.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $125.00 $2,000.00 Genesis Design and Development, LLC $90.00 $1,440.00 JD Martin Construction Services $63.58 $1,017.28 J&S Construction and Demolition LLC $40.00 $640.00 Engineer's Estimate 16 HOUR $40.00 $640.00
A1450 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Lutz Contractors, LLC $30.00 $240.00 Natural State Construction Solutions $44.00 $352.00 JGM Property Group Inc $250.00 $2,000.00 Goodwin & Goodwin Inc $140.00 $1,120.00 Shamrock Hills LLC $500.00 $4,000.00 MDM MAC Enterprises Inc $234.89 $1,879.12 Dream Worx Construction & Roofing LLC $209.35 $1,674.80 C-A Native Constructors Inc $204.00 $1,632.00 Diversified Construction of Oklahoma $271.93 $2,175.44 RFB Construction Co. Inc. $150.00 $1,200.00 AJ Commercial Services, Inc. $100.00 $800.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $270.00 $2,160.00 Genesis Design and Development, LLC $100.00 $800.00 JD Martin Construction Services $98.26 $786.08 J&S Construction and Demolition LLC $60.00 $480.00 Engineer's Estimate 8 HOUR $130.00 $1,040.00
A1500 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Lutz Contractors, LLC $30.00 $240.00 Natural State Construction Solutions $300.00 $2,400.00 JGM Property Group Inc $350.00 $2,800.00 Goodwin & Goodwin Inc $160.00 $1,280.00 Shamrock Hills LLC $500.00 $4,000.00 MDM MAC Enterprises Inc $234.89 $1,879.12 Dream Worx Construction & Roofing LLC $209.35 $1,674.80 C-A Native Constructors Inc $204.00 $1,632.00 Diversified Construction of Oklahoma $210.75 $1,686.00 RFB Construction Co. Inc. $150.00 $1,200.00 AJ Commercial Services, Inc. $100.00 $800.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $275.00 $2,200.00 Genesis Design and Development, LLC $100.00 $800.00 JD Martin Construction Services $98.26 $786.08 J&S Construction and Demolition LLC $40.00 $320.00 Engineer's Estimate 8 HOUR $150.00 $1,200.00
14 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1550 62401-0100 FURNISHING AND PLACING TOPSOIL, 2-INCH DEPTH
Lutz Contractors, LLC $7.20 $25,920.00 Natural State Construction Solutions $4.45 $16,020.00 JGM Property Group Inc $4.02 $14,472.00 Goodwin & Goodwin Inc $3.00 $10,800.00 Shamrock Hills LLC $5.10 $18,360.00 MDM MAC Enterprises Inc $4.74 $17,064.00 Dream Worx Construction & Roofing LLC $4.23 $15,228.00 C-A Native Constructors Inc $14.96 $53,856.00 Diversified Construction of Oklahoma $4.49 $16,164.00 RFB Construction Co. Inc. $3.00 $10,800.00 AJ Commercial Services, Inc. $3.00 $10,800.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $5.00 $18,000.00 Genesis Design and Development, LLC $10.00 $36,000.00 JD Martin Construction Services $2.89 $10,404.00 J&S Construction and Demolition LLC $3.00 $10,800.00 Engineer's Estimate 3,600 SQYD $8.00 $28,800.00
A1600 62511-2000 SEEDING, HYDRAULIC METHOD
Lutz Contractors, LLC $1.50 $5,400.00 Natural State Construction Solutions $1.25 $4,500.00 JGM Property Group Inc $0.89 $3,204.00 Goodwin & Goodwin Inc $1.00 $3,600.00 Shamrock Hills LLC $1.20 $4,320.00 MDM MAC Enterprises Inc $1.45 $5,220.00 Dream Worx Construction & Roofing LLC $1.30 $4,680.00 C-A Native Constructors Inc $9.52 $34,272.00 Diversified Construction of Oklahoma $6.54 $23,544.00 RFB Construction Co. Inc. $2.50 $9,000.00 AJ Commercial Services, Inc. $1.00 $3,600.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $2.00 $7,200.00 Genesis Design and Development, LLC $3.50 $12,600.00 JD Martin Construction Services $0.87 $3,132.00 J&S Construction and Demolition LLC $0.20 $720.00 Engineer's Estimate 3,600 SQYD $3.00 $10,800.00
A1650 62516-2000 MULCHING, HYDRAULIC METHOD
Lutz Contractors, LLC $1.50 $5,400.00 Natural State Construction Solutions $2.00 $7,200.00 JGM Property Group Inc $1.48 $5,328.00 Goodwin & Goodwin Inc $1.00 $3,600.00 Shamrock Hills LLC $1.90 $6,840.00 MDM MAC Enterprises Inc $1.45 $5,220.00 Dream Worx Construction & Roofing LLC $1.30 $4,680.00 C-A Native Constructors Inc $9.52 $34,272.00 Diversified Construction of Oklahoma $6.30 $22,680.00 RFB Construction Co. Inc. $0.60 $2,160.00 AJ Commercial Services, Inc. $1.00 $3,600.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $2.00 $7,200.00 Genesis Design and Development, LLC $3.50 $12,600.00 JD Martin Construction Services $0.87 $3,132.00 J&S Construction and Demolition LLC $0.50 $1,800.00 Engineer's Estimate 3,600 SQYD $2.00 $7,200.00
15 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1700 63301-0000 SIGN SYSTEM
Lutz Contractors, LLC $1,200.00 $3,600.00 Natural State Construction Solutions $1,400.00 $4,200.00 JGM Property Group Inc $591.77 $1,775.31 Goodwin & Goodwin Inc $400.00 $1,200.00 Shamrock Hills LLC $630.00 $1,890.00 MDM MAC Enterprises Inc $725.00 $2,175.00 Dream Worx Construction & Roofing LLC $651.79 $1,955.37 C-A Native Constructors Inc $680.00 $2,040.00 Diversified Construction of Oklahoma $584.11 $1,752.33 RFB Construction Co. Inc. $1,700.00 $5,100.00 AJ Commercial Services, Inc. $601.00 $1,803.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $841.00 $2,523.00 Genesis Design and Development, LLC $750.00 $2,250.00 JD Martin Construction Services $578.00 $1,734.00 J&S Construction and Demolition LLC $200.00 $600.00 Engineer's Estimate 3 EACH $500.00 $1,500.00
A1750 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Lutz Contractors, LLC $3.00 $6,000.00 Natural State Construction Solutions $7.50 $15,000.00 JGM Property Group Inc $1.48 $2,960.00 Goodwin & Goodwin Inc $1.50 $3,000.00 Shamrock Hills LLC $1.60 $3,200.00 MDM MAC Enterprises Inc $0.44 $880.00 Dream Worx Construction & Roofing LLC $0.39 $780.00 C-A Native Constructors Inc $4.76 $9,520.00 Diversified Construction of Oklahoma $0.68 $1,360.00 RFB Construction Co. Inc. $1.50 $3,000.00 AJ Commercial Services, Inc. $2.00 $4,000.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $2.00 $4,000.00 Genesis Design and Development, LLC $4.00 $8,000.00 JD Martin Construction Services $1.45 $2,900.00 J&S Construction and Demolition LLC $5.00 $10,000.00 Engineer's Estimate 2,000 LNFT $1.00 $2,000.00
A1800 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL
Lutz Contractors, LLC $300.00 $900.00 Natural State Construction Solutions $500.00 $1,500.00 JGM Property Group Inc $59.18 $177.54 Goodwin & Goodwin Inc $100.00 $300.00 Shamrock Hills LLC $65.00 $195.00 MDM MAC Enterprises Inc $725.00 $2,175.00 Dream Worx Construction & Roofing LLC $651.80 $1,955.40 C-A Native Constructors Inc $612.00 $1,836.00 Diversified Construction of Oklahoma $339.91 $1,019.73 RFB Construction Co. Inc. $500.00 $1,500.00 AJ Commercial Services, Inc. $601.00 $1,803.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $32.00 $96.00 Genesis Design and Development, LLC $350.00 $1,050.00 JD Martin Construction Services $57.80 $173.40 J&S Construction and Demolition LLC $300.00 $900.00 Engineer's Estimate 3 EACH $300.00 $900.00
16 out of 16
Project No: OK ERFO RS KERR 10301(1)
Project Name: Powerhouse Parking Lot
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1850 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Lutz Contractors, LLC $300.00 $600.00 Natural State Construction Solutions $500.00 $1,000.00 JGM Property Group Inc $295.88 $591.76 Goodwin & Goodwin Inc $300.00 $600.00 Shamrock Hills LLC $650.00 $1,300.00 MDM MAC Enterprises Inc $1,449.96 $2,899.92 Dream Worx Construction & Roofing LLC $1,303.59 $2,607.18 C-A Native Constructors Inc $646.00 $1,292.00 Diversified Construction of Oklahoma $543.86 $1,087.72 RFB Construction Co. Inc. $1,500.00 $3,000.00 AJ Commercial Services, Inc. $180.00 $360.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $1,682.00 $3,364.00 Genesis Design and Development, LLC $350.00 $700.00 JD Martin Construction Services $115.60 $231.20 J&S Construction and Demolition LLC $500.00 $1,000.00 Engineer's Estimate 2 EACH $300.00 $600.00
A1900 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Lutz Contractors, LLC $300.00 $600.00 Natural State Construction Solutions $625.00 $1,250.00 JGM Property Group Inc $147.94 $295.88 Goodwin & Goodwin Inc $300.00 $600.00 Shamrock Hills LLC $310.00 $620.00 MDM MAC Enterprises Inc $2,174.93 $4,349.86 Dream Worx Construction & Roofing LLC $1,955.39 $3,910.78 C-A Native Constructors Inc $646.00 $1,292.00 Diversified Construction of Oklahoma $271.93 $543.86 RFB Construction Co. Inc. $300.00 $600.00 AJ Commercial Services, Inc. $300.00 $600.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $2,523.00 $5,046.00 Genesis Design and Development, LLC $250.00 $500.00 JD Martin Construction Services $115.60 $231.20 J&S Construction and Demolition LLC $80.00 $160.00 Engineer's Estimate 2 EACH $250.00 $500.00
Total Schedule - All Items
Lutz Contractors, LLC $396,510.00 Natural State Construction Solutions $414,182.60 JGM Property Group Inc $419,378.99 Goodwin & Goodwin Inc $445,245.00 Shamrock Hills LLC $510,281.00 MDM MAC Enterprises Inc $580,227.42 Dream Worx Construction & Roofing LLC $594,173.88 C-A Native Constructors Inc $620,242.24 Diversified Construction of Oklahoma $623,835.48 RFB Construction Co. Inc. $623,925.00 AJ Commercial Services, Inc. $664,367.00 McCormick Asphalt Paving and Excavating, Inc. dba McCormick Works $687,116.50 Genesis Design and Development, LLC $699,950.00 JD Martin Construction Services $747,456.28 J&S Construction and Demolition LLC $1,500,231.00 Engineer's Estimate $640,000.00