QnA 1 19 2021.pdf
PDF 420 KB Posted
- Attached to
- OK ERFO RS KERR 10301(1) Powerhouse Parking Lot
- Solicitation number
- 6982AF21B000003
About this file
This document contains questions and answers regarding a solicitation for the OK ERFO RS KERR 10301(1) Powerhouse Parking Lot project. The project is located along the Arkansas River in Le Flore County, Oklahoma and consists of reconstructing an existing parking facility and decommissioning a section of roadway. Construction work includes clearing and grubbing, roadway obliteration, guardrail removal and replacement, asphalt concrete pavement, sidewalk, curb and gutter, and signing and striping. Significant line items include 140 tons of asphalt concrete, 175 square yards of concrete sidewalk, 45 cubic yards of concrete cutoff wall, 260 linear feet of guardrail removal and reset, 1,100 linear feet of guardrail removal, and 3,700 square yards of roadway obliteration. The anticipated award date is February 2021 with an estimated construction duration of February to April 2021. The estimated cost range for the project is between $250,000 to $700,000. The solicitation is set aside for women-owned small businesses.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for OK ERFO RS KERR 10301(1), Powerhouse Parking Lot
December 16, 2020
Questions Answers 1 See Note to Bidders in Answer section. NOTE TO BIDDERS: U.S. Mailing providers such as: FedEx; UPS and USPS, have been experiencing a large volume due to COVID-
19. Please plan the mailing of your bids accordingly. Late bids will not be considered and processed in accordance with FAR provision 52.214-7.
2 How is a site visit arranged? The project area is open to the public during daylight hours. Formal site visit(s) coordinated by FHWA or USACE staff will not be held.” See 52.236-27, page B- 28.
January 12, 2021
3 Can you please provided the type of hydroseed & mulch required for this RFP? The specifications do not include.
Refer to 713.04 (SCR) for seed mix.
Refer to SCR 713.05 (FP) for mulch.
January 15, 2021
4 Referring to the bid schedule on PROJECT NUMBER: OK ERFO RS
KERR 10301(1) is the Government asking us to perform the work required of the job by the hours given(ex. General Labor: 16Hrs)?
Refer to Section 623 – General Labor in the FP-14
5 Is there a requirement on what amount of work the WOSB has to do on this project?
Refer to FAR 52.219-30
6 Are the bids being accepted via electronic mail as well as mail-in submission?
Refer to the Invitation to Bid, A-i to A-iii pages
January 19, 2021
7 Is the DOT preference to relocate the parking lot to the “higher ground southeast of the existing footprint” as outlined in the Technical Memorandum or to remain within the existing footprint of parking lot based on risks of poor performance for the area southeast?
The parking lot will not be relocated. Parking lot reconstruction will be as shown on the plans.