Plans 2 of 4 18412.pdf

PDF 2 MB Posted

Attached to
472/18412; Brooks CF - Pole Building
Solicitation number
RFQ 171 200000000001 1
Issued by
Mackinac County, Michigan

About this file

This is an architectural plan document for the State of Michigan Department of Technology, Management and Budget (DTMB), Facilities and Business Services Administration, Design and Construction Division, detailing a new storage facility project at E.C. Brooks Correctional Facility located at 2500 S Sheridan Drive, Muskegon, Michigan 49444. The document is identified as Plans 2 of 4 from file number 472-18412-GAG with contract number 00815. The plan review was completed on September 19, 2019, with a bidding issue date of October 1, 2019. The project is under the direction of Robert C. Hall, RA, NCARB, Director of the Design and Construction Division.

The document serves as part of the bidding package for contractors interested in constructing the new storage facility at the correctional facility. This appears to be a multi-sheet plan set (2 of 4), containing AutoCAD drawings with technical specifications and design details necessary for bidders to develop competitive proposals. The specific scope of work, pricing terms, and detailed project specifications would be contained in accompanying bid documents and supporting exhibits not visible in this particular plan sheet.

View the file

Other files

File Type Posted
Plans 1 of 4 18412.pdf PDF
Advertisement 18412.pdf PDF
Specifications 18412 (s).pdf PDF
Plans 4 of 4 18412.pdf PDF
LEIN Request 18412.pdf PDF
Plans 3 of 4 18412.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOM DTMB:

FILE NO: 472-18412-GAG

INDEX NO: 472LRFMaintProj

ISID CONTRACT NO: 00815

DEPT. OF CORRECTIONS

REVIEW:

ARCHITECT

OWNER

CHECKED BY: INITIALS

PROJECT MANAGER TRM

JNM

NE

W

S

TO

RA

GE

F

AC

IL

IT

Y

AT

E.

C.

B

RO

OK

S

CO

RR

EC

TI

ON

AL

F

AC

IL

IT

Y

S

S

HE

RI

DA

N

DR

, M

US

KE

GO

N, M

I 4

D

EP

A R

TM

EN

T O

F

TE

C H

N O

LO

G

Y , M

A N

A G

EM

EN

T A

N D

B U

D G

ET

ST

A

TE

O

F M

IC

H

IG

A

N

FA

C

IL

IT

IE

S

A N

D B

U

SI

N

ES

S

SE

R V

IC

ES

A D

M

IN

IS

TR

A

TI

O N

D

ES

IG

N

A N

D C

O N

ST

R

U C

TI

O

N D

IV

IS

IO

N

R O

B

ER

T C

. H A

LL

, R

A , N

C A

R B

, D

IR

EC

TO

R

PLAN REVIEW 09/19/19

DRAWING ISSUE:

BIDDING 10/01/19

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text B

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text Q

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text M

File details come from the government source that posted it. Updated .