Plans 1 to 13.pdf

PDF 20 MB Posted

Attached to
TSB/Bid Ops
Solicitation number
Noah & Wilcox E. AML Project Bid No. IA-113-363
Issued by
Mahaska County, Lake Park City, Iowa

About this file

This is a set of engineering plans and bid specifications for an Abandoned Mine Land (AML) reclamation project prepared by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality, in partnership with the U.S. Department of the Interior Office of Surface Mining Reclamation and Enforcement. The project encompasses two sites—Noah AML and Wilcox East AML—located in Marion County, Iowa, within sections 4, 5, 8, and 9 of Township 74 North, Range 18 West. The scope of work includes site clearing and preparation (106.5 acres), excavation (1,347,611 cubic yards), installation of terraces (16,734 linear feet total), installation of drainage infrastructure including PPHP, HDPE, and PVC pipes, riprap placement (2,538 tons), wetland creation and restoration (5.0 acres undercut and replacement), seeding with native and wetland plant mixes (103.2 acres), field fencing (4,734 linear feet), and sediment control measures. The project was designed by Shive-Hattery, Inc. and issued on August 18, 2026, with bid number IA-113-363. The engineer's contact is listed as Shive-Hattery, Inc. at 4125 Westown Parkway, Suite 100, West Des Moines, Iowa 50266, phone (515) 223-8104.

The contractor is responsible for all survey layout, control, mobilization, construction dewatering, utility verification, and compliance with the Storm Water Pollution Prevention Plan (SWPPP) requirements and Department of Natural Resources NPDES permit conditions. A Section 404 Nationwide Permit has been obtained by the Division. The project includes five surveyed control points established by Shive-Hattery, Inc., with elevations based on NAVD 1988 datum. Contractors must provide at least 48 hours notice to the engineer prior to commencing construction and are required to complete detailed grading within specified tolerances. The contract includes incidental costs for property monument replacement, construction debris disposal, all disturbed area restoration, tree protection, and grade adjustments for shrinkage factor variations. Specific restrictions include no tree clearing between April 1 and September 30, no ponding of water except at proposed impoundments, and coordination with Marion County regarding right-of-way work. The project is funded through grant number S25AF00167 from the U.S. Department of the Interior.

View the file

Other files

File Type Posted
Supplemental Const Specs.pdf PDF
Plans 14 to 36.pdf PDF
General Requirements.pdf PDF
Appendix.pdf PDF
Construction Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8T

H

PL

SARATOGA DR

REAGAN ST

HWY T17

0T

H A

V E

0T

H A

VE

QUEBEC ST

5T

H A

V E

SHAW ST

8T

H

PL

QUAKER DR 23

0T

H A

V E

HWY G71

5T

H A

V E

SA

RA

TO

G

A D

R

REAGAN DR

REAG

AN ST

RE

A

G A

N S

T

8T

H

PL

3R

D A

V E

Creek

Hone y WILCOX

WILDLIFE

AREA

31 32 33 34

9 10

CLAY 58325018KNOX 59362547

‒‒53

T17

G71

IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP

DIVISION OF SOIL CONSERVATION AND WATER QUALITY

NOAH AND WILCOX EAST AML RECLAMATION PROJECT

BID NO. IA-113-363

SECTIONS 4, 5, 8, AND 9 TOWNSHIP 74 NORTH, RANGE 18 WEST, MARION COUNTY

FUNDED BY:

U.S. DEPARTMENT OF THE INTERIOR

OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT

ENGINEER:

SHIVE-HATTERY, INC.

4125 WESTOWN PARKWAY, SUITE 100

WEST DES MOINES, IOWA 50266

PHONE - (515) 223-8104

INDEX OF SHEETS:

1 COVER SHEET

2 PROJECT NOTES, QUANTITIES, & LEGEND

3 SURVEY CONTROL

4 SITUATION PLAN - EXISTING CONDITIONS

5-13 GRADING PLANS

14-17 CUT-FILL PLANS

18 DRAINAGE PLAN

19-21 PIPE PROFILES

22-26 PROJECT DETAILS

27-31 CROSS SECTIONS

32-33 STREAM PLAN & PROFILE

34 FOREBAY CHANNELS PLAN & PROFILE

35 SWPPP NOTES

36 SWPPP & SEEDING PLAN

DES MOINES

STATE OF IOWA

MARION COUNTY

LOCAL VICINITY

GRANT NUMBER: S25AF00167

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31, Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

ALL SHEETS

ANTHONY J. HARBAUGH

26394

CIVIL ENGINEER

XX/XX/2026

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

1 36

G H

K

LT

M

-1 7-

TO

P

SH

EE

T

PROJECT LOCATION

PROJECT LOCATION

MARION COUNTY

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

EN

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

PREPARED FOR:

DIVISION OF SOIL CONSERVATION AND WATER QUALITY

IOWA DEPARTMENT OF AGRICULTURE & LAND STEWARDSHIP

HOOVER STATE OFFICE BUILDING

1305 E. WALNUT STREET, FIFTH FLOOR

DES MOINES, IOWA 50319

(515) 281-5321

08/18/2026

BID QUANTITIES:

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

2 36

G H

K

LT

M

-1 7-

PR

O

JE

C

T N

O

TE

S Q

U

AN

TI

TI

ES

L

EG

EN

D

# ITEM DESCRIPTION SPEC. SECTION NOAH

QUANTITY

WILCOX EAST

QUANTITY

TOTAL

QUANTITY UNITS

1 MOBILIZATION 02100 0.5 0.5 1 LS

2 SITE CLEARING AND PREPARATION 02100 28.8 77.7 106.5 ACRE

3 OFF SITE WASTE DISPOSAL 02100 50 50 100 TON

4 BRUSH PILES 02100 7 0 7 EA

5 APPROVED SEDIMENT CONTROL MEASURES 02120 1,660 6,458 8,118 LF

6 SILT FENCE 02120 0 3,340 3,340 LF

7 FILTER SOCK 02120 220 460 680 LF

8 RECP - TYPE 3B 02120 0 1,818 1,818 SY

9 FLEXAMAT TIED CONCRETE BLOCK MAT 02120 873 0 873 SY

10 STABILIZED CONSTRUCTION ENTRANCE - GRANULAR

SURFACING 02120 0 300 300 TON

11 EXCAVATION 02200 341,247 1,006,364 1,347,611 CY

12 CLASS 'E' RIPRAP 02300 1,166 1,372 2,538 TON

13 STONE FILTER (3" MACADAM STONE) 02300 158 332 490 TON

14 TERRACES (4' TALL) 02300 0 12,136 12,136 LF

15 TERRACES (5' TALL) 02300 4,598 0 4,598 LF

16 CMP RISER-TERRACE (10", 3' TALL) 02300 0 18 18 EA

17 CMP RISER-TERRACE (12", 3' TALL) 02300 0 3 3 EA

18 CMP RISER-TERRACE (10", 4' TALL) 02300 5 0 5 EA

19 CMP RISER-TERRACE (12", 4' TALL) 02300 4 0 4 EA

20 HDPE PIPE (8") 02300 0 754 754 LF

21 PIPE OUTLET (8") 02300 0 12 12 EA

22 STRUCTURE - MODIFIED CONCRETE RISER (48" X 48") 02310 1 0 1 EA

23 STRUCTURE - CONCRETE RISER (48") 02310 1 2 3 EA

24 PPHP PIPE (12") 02310 1,432 1,951 3,383 LF

25 PPHP PIPE (36") 02310 0 224 224 LF

26 C900 PVC PIPE (24") 02310 323 0 323 LF

27 CONCRETE GRAVITY THRUST BLOCK 02310 1 1 2 EA

28 WETLAND UNDERCUT AND REPLACEMENT 02400 2.4 2.6 5.0 ACRE

29 DEEP RIPPING, SUBGRADE 02400 1.3 0.7 2.0 ACRE

AGRICULTUAL LIME, SUBGRADE (40 TONS

ECCE/ACRE) 02400 1,152 3,096 4,248 TON

31 MULCH, SUBGRADE (5 TONS/ACRE) 02400 28.8 77.4 106.2 ACRE

32 NITROGEN, N, WETLAND FERTILIZER (30 LBS/ACRE) 02400 72 78 150 LBS

33 FIELD FENCE 02500 1,956 2,778 4,734 LF

34 FIELD GATE 02500 0 2 2 LS

AGRICULTURAL LIME, SEEDING (10 TONS

ECCE/ACRE) 02700 277 757 1,034 TON

36 NITROGEN, N, SEEDING (50 LBS/ACRE) 02700 145 145 290 LBS

37 PHOSPHORUS, P, SEEDING (100 LBS/ACRE) 02700 290 290 580 LBS

38 POTASSIUM, K, SEEDING (160 LBS/ACRE) 02700 464 464 928 LBS

39 PERMANENT SEEDING, NATIVE MIX 02700 24.8 72.8 97.6 ACRE

40 PERMANENT SEEDING, WETLAND MIX 02700 2.9 2.9 5.8 ACRE

41 MULCH, SEEDING (2 TONS/ACRE) 02700 27.7 75.7 103.4 ACRE

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

PROPOSED RIP-RAP/ROCK

EXISTING DRAINAGE DITCH OR STREAM

LEGEND:

GRID STATION

EXISTING SPOT ELEVATION

EXISTING CONTOUR MINOR

PROJECT BOUNDARY

PROPOSED 4' TALL TERRACE RIDGELINE

PROPOSED CONTOUR MINOR

POWER POLE

SHEET MATCH LINE

PROPERTY LINE (APPROX)

PROPOSED STORM PIPE

PROPOSED STREAM

EXISTING WETLAND

EXISTING POND

PROPOSED POND/WETLAND

NO BURN RADIUS

INTAKE

1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS SHOWN IN THESE PLANS ARE APPROXIMATE ONLY AND WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY, INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS, STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE

RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR(S).

2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48 HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS. THE CONTRACTOR IS RESPONSIBLE OF CONTACTING IOWA

ONE-CALL.

3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

4. ALL OPEN UTILITY TRENCH EXCAVATIONS SHALL BE PROTECTED.

5. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING PUBLIC AND/OR PRIVATE UTILITIES AND PUBLIC

ROADWAYS, INCLUDING ANY NOT SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION AND NOTIFY THE ENGINEER IF ANY CONFLICTS WITH THE DRAWINGS OCCUR. ANY DAMAGE TO EXISTING UTILITIES AND/OR PUBLIC ROADWAYS CAUSED BY CONTRACTOR TRENCHING SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

UTILITY NOTES:

GENERAL NOTES:

1. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY CONSTRUCTION. MONUMENTS SHALL REPLACED IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH IN THE IOWA CODE AND SHALL BE SET BY A LAND SURVEYOR REGISTERED TO PRACTICE IN THE STATE OF IOWA. THIS WORK SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND COMPLETED AT NO ADDITIONAL COST TO THE

DIVISION.

2. ANY WORK REQUIRED TO COMPLETE THE SCOPE OF THIS PROJECT BUT NOT SPECIFICALLY CALLED OUT, SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED FOR THE COMPLETION OF THIS WORK.

3. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN THE PROJECT BOUNDARY, OR DIRECTED BY THE ENGINEER, SHALL

BE PROPERLY DISPOSED OF ACCORDING TO THE PROJECT REQUIREMENTS.

4. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING THAT IS REQUIRED, EXCLUDING IMPOUNDMENT DISCHARGE, AT NO

ADDITIONAL COST TO THE DIVISION.

5. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES, FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO THE DIVISION. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE DIVISION IF OUTSIDE OF PROJECT BOUNDARY

AND NOT APPROVED BY ENGINEER.

6. CONTRACTOR SHALL PROTECT ALL TREES THAT ARE NOT DESIGNATED TO BE REMOVED OR ARE OUTSIDE OF PROJECT BOUNDARY.

CONTRACTOR SHALL NOT PARK OR TRAVEL WITH ANY VEHICLE UNDER THE DRIP LINE OF A TREE TO REMAIN.

7. A SHRINKAGE FACTOR OF 12% WAS ESTIMATED FOR THIS PROJECT. THE CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION AND APPROVAL BY THE ENGINEER AND DIVISION. NO ADDITIONAL COMPENSATION SHALL BE GIVEN FOR ANY GRADE

ADJUSTMENTS DUE TO DEVIATIONS OF SHRINKAGE FACTOR.

8. NO PONDING OF WATER WILL BE ACCEPTED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY ANY AREAS OF EXISTING OR PROPOSED GROUND THAT HAVE POTENTIAL TO POND WATER AND MAKE ANY ADJUSTMENTS NECESSARY TO ENSURE THAT WATER WILL POSITIVELY DRAIN. ADJUST GRADES AT PROJECT BOUNDARY TO ALLOW SMOOTH TRANSITION FROM PROPOSED GRADES TO EXISTING

GRADES.

9. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN

ACCORDANCE WITH THEIR STANDARDS.

10. NO TREES SHALL BE CLEARED BETWEEN THE DATES OF APRIL 1 TO SEPTEMBER 30.

11. CONTRACTORS WILL BE REQUIRED TO COMPLETE THE DETAILED GRADING SHOWN ON THE PLANS WITHIN THE SPECIFIED GRADING

TOLERANCES. CONTRACTORS WILL BE REQUIRED TO COMPLETE SURVEY LAYOUT OF FINAL GRADES OR USE STAKE-LESS GRADING

TECHNIQUES TO MEET PROPOSED GRADES AND PROJECT TOLERANCES.

PROJECT CONSTRUCTION NOTES:

1. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE, FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL BE REMOVED AND REPLACED IN AN ACCEPTABLE

MANNER, AS REQUIRED BY THE OWNER AT THE CONTRACTOR'S EXPENSE.

2. CONTRACTOR IS RESPONSIBLE FOR ALL SURVEY LAYOUT AND CONTROL REQUIRED TO COMPLETE ALL WORK.

3. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS

OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.

4. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.

5. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC AT ALL TIMES.

6. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT BOUNDARY WITHOUT PRIOR AUTHORIZATION FROM THE DIVISION.

7. SOME CONTOUR LINES MAY NOT BE SHOWN FOR CLARITY.

8. BURNING OF LANDSCAPE WASTE PRODUCED IN CLEARING, GRUBBING AND CONSTRUCTION OPERATIONS SHALL BE LIMITED TO LOCATIONS

LOCATED AT LEAST 1/4 MILE FROM ANY BUILDING INHABITED BY ANYONE OTHER THAN THE LANDOWNER OR TENANT CONDUCTING THE OPEN BURNING. PERMISSION IS REQUIRED TO BURN WITHIN 1/4 MILE OF INHABITED RESIDENCES. CONTRACTOR TO INSTALL TEMPORARY SIGNAGE WHEN BURNING OPERATIONS COULD AFFECT VISIBILITY ON ADJACENT ROADS - COORDINATE WITH LOCAL GOVERNING OFFICIALS.

9. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY

THE OWNERS REPRESENTATIVE.

10. THE FOLLOWING STANDARD ROAD PLANS OF THE IOWA DEPARTMENT OF TRANSPORTATION ARE INCLUDED BY REFERENCE:

MI-103 & MI-104 DETAILS FOR FIELD FENCE CONSTRUCTION

EC-201 EROSION CONTROL DETAILS FOR SILT FENCE

11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEPARTMENT OF NATURAL RESOURCES (DNR) NPDES PERMIT AND STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REQUIREMENTS AND REQUIRED CONTAINMENT STRUCTURES. THE DIVISION HAS OBTAINED THE DNR GENERAL PERMIT #2 FOR THE PROJECT AND A TEMPLATE SWPPP HAS BEEN PREPARED BY THE ENGINEER. THE DIVISION WILL PERFORM SWPPP INSPECTIONS, MAINTAIN, AND UPDATE THE SWPPP AS REQUIRED TO MEET ALL LOCAL, STATE, AND FEDERAL

REQUIREMENTS. REFER TO THE SWPPP AND SWPPP DRAWINGS FOR ADDITIONAL INFORMATION.

12. THE DIVISION HAS RECEIVED A DETERMINATION FROM THE U.S. ARMY CORPS THAT A SECTION 404 NATIONWIDE PERMIT IS REQUIRED AND HAS BEEN OBTAINED BY THE DIVISION. DO NOT DISTURB ANY DELINEATED WETLANDS THAT ARE NOT SHOWN TO BE DISTURBED AND

MITIGATED.

13. REFERENCE TO PARTICULAR PRODUCTS, TRADENAMES, OR MANUFACTURERS IS INTENDED FOR CLARITY ONLY AND DOES NOT REPRESENT ENDORSEMENT BY THE STATE OF IOWA. EQUIVALENT PRODUCTS OR MATERIALS MAY BE SUITABLE, SUBJECT TO APPROVAL OF THE

ENGINEER OR DIVISION.

14. NEITHER SHIVE-HATTERY NOR THE DIVISION GUARANTEE THE WETLANDS TO FILL OR MAINTAIN A CONSISTENT POOL OF WATER.

15. REFERENCES TO "DIVISION" SHALL MEAN "DIVISION OF SOIL CONSERVATION & WATER QUALITY"

16. ALL IMPROVEMENTS SHOWN ON THESE PLANS SHALL COMPLY WITH THE GENERAL CONDITIONS, STANDARDS, AND SPECIFICATIONS SET

FORTH IN PROJECT DOCUMENTS. SPECIFICATIONS OR STANDARDS INCORPORATED BY REFERENCE SHALL ALSO BE FOLLOWED.

17. OWNERSHIP: THIS DOCUMENT, AND THE IDEAS AND DESIGN CONTAINED IN THIS DOCUMENT, ARE AN INSTRUMENT OF PROFESSIONAL

SERVICE, AND MAY NOT BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN CONSENT OF THE DIVISION.

18. REFERENCES TO PARTICULAR PRODUCTS, TRADENAMES, OR MANUFACTURERS ARE INTENDED FOR CLARITY ONLY AND DO NOT

REPRESENT EXCLUSION OR ENDORSEMENT BY THE DIVISION OR THE STATE OF IOWA. EQUIVALENT PRODUCTS OR MATERIALS MAY BE

SUITABLE, SUBJECT TO THE APPROVAL OF THE ENGINEER.

19. CONTRACTOR SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE ENGINEER AND/OR DIVISION PRIOR TO COMMENCING CONSTRUCTION.

CONTROL POINT

SEDIMENT CONTROL MEASURE

EXISTING CONTOUR MAJOR

PROPOSED CONTOUR MAJOR

STA:45+00

711.89

1. PG = PROPOSED GRADE

2. EG = EXISTING GRADE

3. FG = FORM GRADE ELEVATION; THE LOWEST INLET OPENING

ELEVATION FOR A RISER OR STRUCTURE TO RECEIVE WATER FROM A

POND OR CHANNEL

4. IE = INVERT ELEVATION

5. HDPE = DUAL-WALL CORRUGATED HIGH DENSITY POLYETHYLENE

CONDUIT (I.E. ADS N12 OR APPROVED EQUIVALENT)

6. PPHP = POLYPROPYLENE HIGH PERFORMANCE CORRUGATED

DUAL-WALL PIPE (I.E. ADS HP STORM OR APPROVED EQUIVALENT)

7. CR = CONCRETE RISER

8. MR = METAL RISER

9. PR = PLASTIC RISER

10. RIM = ELEVATION OF A STRUCTURE LID

11. LF = LINEAL FEET

12. FL = FLOWLINE

13. HP = HIGH POINT ELEVATION, TYPICALLY IN A TERRACE FLOWLINE

14. CL = CENTERLINE

15. PC = POINT OF CURVATURE, TRANSITION FROM A STRAIGHT LINE TO A

CURVE

16. PT = POINT OF TANGENCY, TRANSITION FROM A CURVE TO A

STRAIGHT LINE

17. PI = POINT OF INTERSECTION OR BEND POINT ON A LINE

18. EX. = "EXISTING" I.E. "EXISTING CMP CULVERT"

NOTE: THE LEGEND OF SYMBOLS, LINETYPES, AND LIST OF

ABBREVIATIONS SHOWN ABOVE ARE GENERIC. NOT ALL SYMBOLS,

LINETYPES, OR ABBREVIATIONS LISTED APPEAR ON THE ACCOMPANYING

DRAWINGS FOR THIS PROJECT. SYMBOLS, LINETYPES, OR

ABBREVIATIONS NOT LISTED HERE ARE SPECIFICALLY CALLED OUT

WHERE NECESSARY.

GLOSSARY OF COMMON ABBREVIATIONS:

PROPOSED RIDGELINE

PROPOSED 5' TALL TERRACE RIDGELINE

SILT FENCE

BRUSH PILE

PROPOSED RECP

PROPOSED DEEP RIPPING

PROPOSED FENCEX X

PROPOSED TIED CONCRETE MAT

PROPOSED ROAD CENTERLINE

CP-1

CP-3

CP-4

CP-5

500 FEET

500 FEET

500 FEET

FE

ET

FE

ET

500 FEET

A

MARION COUNTY HWY T17

SARATOGA DR

A

B B B

C C

C

D

E

EBCB

A

PROJECT BOUNDARY

APPROXIMATE

PROPERTY LINE (TYP)

HONEY CREEK

INSTALL "TRUCKS TURNING

AHEAD" SIGNAGE

- SEE DETAIL #4 ON SHEET 24

INSTALL "W8-5"

- SEE DETAIL #4 ON SHEET 24

INSTALL "W20-7B"

- SEE DETAIL #4 ON SHEET 24

DURING TIMES OF ACTIVE

BURNING, INSTALL "CAUTION

SMOKE AHEAD" SIGNAGE

- SEE DETAIL #4 ON SHEET 24

INSTALL "W20-7B"

- SEE DETAIL #4 ON SHEET 24

INSTALL "W8-5"

- SEE DETAIL #4 ON SHEET 24

DURING TIMES OF ACTIVE

BURNING, INSTALL "CAUTION

SMOKE AHEAD" SIGNAGE

- SEE DETAIL #4 ON SHEET 24

INSTALL "TRUCKS TURNING

AHEAD" SIGNAGE

- SEE DETAIL #4 ON SHEET 24

WILCOX EAST AML

PROJECT BOUNDARY

NOAH AML PROJECT

BOUNDARY

CP-1

TIE MAG EA

TIE MAG SM BP

TIE MAG SM BP

TIE MAG SM GP

TIE MAG SM PP

.19

'20.46'

29.77'

88.42'

CP-2

TIE MAG FP

TIE MAG FP STUMP

.9

2'

127.47'

CP-4

TIE MAG EA

TIE MAG FP

TIE MAG FP

TIE MAG PP

10.97'

30.56'

.8

7'

CP-3

TIE MAG DTREE

TIE MAG PP

.3

5'

89.97'

CP-5

TIE MAG FP

TIE MAG FP

TIE SIN WL MGMT

28.94'

18.62' 33.00'

452797.4170'N 1790775.7250'E

ELEV. = 769.097'

CP - 1

SURVEY CONTROL

NOTE:

GROUND CONTROL AND REFERENCE

TIES BY SHIVE-HATTERY, INC.

SCALE: 1" = 50'

SURVEY DATUM:

HORIZONTAL - NAD83, IOWA STATE

PLANES, SOUTH ZONE, US FOOT.

VERTICAL - NAVD88

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

3 36

G H

K

LT

M

-1 7-

SU

R

VE

Y

C O

N

TR

O L

LANDOWNER TABLE

A. MARION COUNTY

B. GULICK, RACHEL

C. STEELE, LEONA

D. LENGER, JACK

E. NICHOLSON, TOBY

NOTES:

1. BURNING OF LANDSCAPE WASTE

PRODUCED IN CLEARING,

GRUBBING AND CONSTRUCTION

OPERATIONS SHALL BE LIMITED TO

LOCATIONS LOCATED AT LEAST 1/4

MILE FROM ANY INHABITED

BUILDING EXCLUDING THOSE

BUILDINGS INHABITED BY THE

LAND OWNER OR TENANT

CONDUCTING THE OPEN BURNING.

PERMISSION IS REQUIRED TO

BURN WITHIN 1/4 MILE OF

INHABITED RESIDENCES.

CONTRACTOR TO INSTALL

TEMPORARY SIGNAGE WHEN

BURNING OPERATIONS COULD

AFFECT VISIBILITY ON ADJACENT

ROADS - COORDINATE WITH LOCAL

GOVERNING OFFICIALS.

2. CONTRACTOR TO STAKE PROJECT

BOUNDARY, DIVISION AND

ENGINEER TO APPROVE

BOUNDARY PRIOR TO

COMMENCEMENT OF WORK.

NORTH

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

454210.4480'N 1792533.1440'E

ELEV. = 777.920'

CP - 2

448500.2330'N 1792548.0460'E

ELEV. = 854.451'

CP - 3

449546.4530'N 1788997.6210'E

ELEV. = 853.477'

CP - 4

451199.9150'N 1792486.0050'E

ELEV. = 828.846'

CP - 5

SET 58" IRON ROD WITH RED CAP

SET 58" IRON ROD WITH RED CAP

SET 58" IRON ROD WITH RED CAP

SET 58" IRON ROD WITH RED CAP

SET 58" IRON ROD WITH RED CAP

5 800

825825

M

ARION COUNTY HW

Y T17

SA

R

AT

O

G A

D R

PROTECT

EXISTING FIELDS

PROTECT EXISTING TREES

OUTSIDE OF PROJECT

BOUNDARY (TYP.)

PROTECT EXISTING

BUILDING

PROJECT BOUNDARY

APPROXIMATE

PROPERTY LINE (TYP)

300 TONS OF GRANULAR

TRACK OUT SURFACE.

POND #1

POND #2

POND #3

PROTECT

EXISTING BRIDGE

CONSTRUCTION SITE ENTRANCE,

CONTRACTOR TO MAINTAIN AND REPAIR

THROUGHOUT PROJECT. MINIMIZE GRADING

AND DISTURBANCE DURING CONSTRUCTION,

RESTORE AFTER PROJECT COMPLETION.

HONEY CREEK

PROTECT EXISTING

BACKSTOP

PROTECT EXISTING

SEPTIC SYSTEM

EXISTING GRAVEL PARKING LOT SHALL

NOT BE USED FOR STAGING, NO

CONSTRUCTION TRAFFIC ALLOWED

ENTRANCE SHARED WITH MARION

COUNTY SHERIFF'S DEPARTMENT,

COORDINATE CLOSURES WITH SHERIFF

PROTECT EXISTING CULVERT

PROTECT EXISTING

CULVERT

STREAM #1

STREAM #2

STREAM #4

PROJECT SIGN LOCATION

- SEE DETAIL

STAGING AREA

- COORDINATE WITH

LANDOWNER

MAINTAIN DITCH DRAINAGE FROM

RIGHT OF WAY THROUGHOUT

DURATION OF CONSTRUCTION

STREAM #3

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

4 36

G H

K

LT

M

-1 7-

SI

TU

AT

IO

N P

LA

N

EX

IS

TI

N G

C O

N D

IT

IO

N S

SURVEY NOTES:

1. LIMITED TOPOGRAPHIC SURVEY

COMPLETED BY SHIVE- HATTERY ON

04-24-2024.

2. THIS DRAWING IS SET TO THE NAD

1983 IOWA STATE PLANE, SOUTH

ZONE COORDINATE SYSTEM.

ELEVATION INFORMATION IS BASED

UPON THE NAVD 1988.

3. DURABLE CONTROL POINTS WERE

ESTABLISHED FOR THIS PROJECT.

CONTRACTOR SHALL FIELD VERIFY

THEIR LOCATIONS AND ELEVATIONS.

IF ANY ADDITIONAL CONTROL

POINTS ARE REQUIRED, SUCH WORK

BECOMES THE RESPONSIBILITY OF

THE CONTRACTOR.

4. CONTRACTOR SHALL VERIFY

SURVEY CONTROL AND EXISTING

SURFACE PRIOR TO CONSTRUCTION.

IF SIGNIFICANT DIFFERENCES EXIST

BETWEEN THE LIDAR ELEVATIONS

SHOWN AND THOSE REPORTED BY

SURVEYING EQUIPMENT, THE

CONTRACTOR SHALL CALIBRATE

THE SURVEYING INSTRUMENTS TO

THE LIDAR INFORMATION IN

CONSULTATION WITH THE DIVISION.

REFER TO PROJECT

SPECIFICATIONS.

5. EXISTING SURFACE INFORMATION

SHOWN IS BASED ON LIGHT

DETECTION AND RANGING (LIDAR)

INFORMATION FROM THE IOWA DNR.

LIDAR WAS COLLECTED IN THE

SPRING OF 2020 AND PUBLISHED

MARCH, 2022. LIDAR DATA IS

PUBLICLY AVAILABLE FROM IOWA

GEODATA, https://geodata.iowa.gov/

6. AERIAL IMAGE OBTAINED FROM

COUNTY GIS.

DEMOLITION NOTES:

1. ALL DEBRIS AND TRASH

ENCOUNTERED DURING

CONSTRUCTION WITHIN THE PROJECT

BOUNDARY OR DIRECTED BY THE

ENGINEER, SHALL BE PROPERLY

DISPOSED OF ACCORDING TO THE

PROJECT SPECIFICATIONS.

N O

R

TH

CONTRACTOR TO STAKE PROJECT BOUNDARY -

DIVISION AND ENGINEER TO APPROVE

BOUNDARY PRIOR TO COMMENCEMENT OF WORK

STAGING NOTES:

1. CONTRACTOR STAGING AND LAYDOWN

AREAS TO BE DETERMINED BY

CONTRACTOR AND LOCATED WITHIN

THE PROJECT BOUNDARY. THE

ESTABLISHMENT OF STAGING AND

LAYDOWN AREAS SHALL BE

CONSIDERED INCIDENTAL TO THE

PROJECT.

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

POND NOTES:

1. ALL EXISTING PONDS SHOWN WERE

SURVEYED ON JANUARY 23, 2023. AT

THE TIME OF THE SURVEY, NO POND

HAD ENOUGH WATER TO PERFORM

EITHER A DEPTH TO REFUSAL PROBE

OR A WATER SAMPLING SURVEY.

EXISTING STREAM

# LENGTH (FEET) FATE

1 673 FILLED

2 2037 FILLED

3 1007 FILLED

4 1611 FILLED

X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

XXXXXXXXXXXX

C P-

C P-

C P-

0 82

800 825

75075

5:1

5:1

5:

5:

9:

5:1

8:1

25:1

5:

5:1

5:

5:

6:

6:

5:1

5:1

5:1

5:

6:

5:

5:

:1

6:

6:

8:1

36:1 6:1

4:1

6:1

5:1

5:

9:

4:1

8:1

:1

9:1

:1

:1

PROJECT BOUNDARY (TYP.)

APPROXIMATE

PROPERTY LINE (TYP.)

CENTRAL CHANNEL

NORTH WETLAND

SOUTHWEST WETLAND

SOUTHEAST CHANNEL #1

SOUTHEAST CHANNEL #2

SOUTH WETLAND #1

SOUTH WETLAND #3

SOUTH WETLAND #2

PROPOSED ROAD

CENTERLINE (TYP.)

P2

P1

P6

P9

P13

P15

P17

P21

P33B

P1

P1

P7

P31

P32 B

P4 P3

P1

P19

P12

P8B

P1

P1

P30B

P29

P2

P25

P2

P2

P2 3B

P34

P8A

P22

P24

P5

P20

P32 A

P2 3A

P30A

P33A

P33D

P33C

M

AT

C H

LI

N

E

M

AT

C H

LI

N

E

M

AT

C H

LI

N

E

M

AT

C H

LI

N

E

M

AT

C H

LI

N

E

MATCHLINE

- 8

6 6 MATCHLINE

8 10

7 7 MATCHLINE

10 12

9 9 MATCHLINE

12 - 11 11

M

AT

C H

LI

N

E

0 77

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

5 36

G H

K

LT

M

-1 7-

O

VE

R

AL

L G

R

AD

IN

G

P

LA

N

NOTES:

NO PONDING OF WATER WILL BE ACCEPTED, EXCEPT AT PROPOSED

IMPOUNDMENTS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY

ANY AREA OF EXISTING OR PROPOSED GROUND THAT HAVE POTENTIAL TO

POND WATER AND MAKE ANY ADJUSTMENTS NECESSARY TO ENSURE THAT

WATER WILL POSITIVELY DRAIN. ADJUST GRADES AT PROJECT BOUNDARY TO

ALLOW SMOOTH TRANSITION FROM PROPOSED GRADES TO EXISTING GRADES.

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

STREAM SUMMARY

NAME LENGTH (FEET)

CENTRAL CHANNEL 2325

SOUTHEAST CHANNEL #1 98

SOUTHEAST CHANNEL #2 962

TOTAL 3385

WETLAND SUMMARY

NAME AREA (ACRES)

NORTH WETLAND 1.1

SOUTHWEST WETLAND 0.7

SOUTH WETLAND #1 0.7

SOUTH WETLAND #2 0.5

SOUTH WETLAND #3 0.2

TERRACE WETLANDS 0.8

TOTAL 4.0

N O

R

TH

5:1

5:

5:1

5:1

5:1

4:

5:1

5:1

2.

4%

1.8% 2.3%

1.4

1.7%

1.4%

1.

1%

P2

P1

P4

P3

CP-1

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

280 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 3' TALL 12" CMP

RISER AND CONNECT TO

51 LF OF 12" PPHP

- REFER TO DETAIL

12" PIPE OUTLET WITH RODENT GUARD

IE = 742.00

PROJECT BOUNDARY (TYP.)

PROPOSED 4' TALL TERRACE (TYP.)

- SEE DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

237 LF OF 12" PPHP

- REFER TO DETAIL

PROTECT

EXISTING DITCH

TOE ARMORING

- PLACE 220 TONS OF CLASS

'E' RIPRAP OVER 50 TONS

OF FILTER STONE

INSTALL 3' TALL 12" CMP

RISER AND CONNECT TO

79 LF OF 12" PPHP

- REFER TO DETAIL

MATCHLINE

6 6 7 7

M

AT

C H

LI

N

E

7 8

NORTH N

O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

6 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

5:1

6:1

5:1

5:1

8:1

5:1

5:1

5:1

8:1

2.4

2.

2%

2.2

1.9

2.

4%

2.6%

5:1

0:1

P7

P3

P8 B

P8 A

P5

INSTALL 3' TALL 12" CMP

RISER AND CONNECT TO

98 LF OF 12" PPHP

- REFER TO DETAIL

PROTECT EXISTING

STREAM CHANNEL AND

FLOODPLAIN (TYP.)

PROTECT EXISTING

STREAM CHANNEL AND

FLOODPLAIN (TYP.)

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 750.00

PROPOSED 4'-TALL

TERRACE (TYP.)

- SEE DETAIL

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 755.30

PROTECT EXISTING

CULVERT

PROTECT EXISTING

CULVERT

EXISTING

STREAM (TYP.)

300 TONS OF GRANULAR

TRACK OUT SURFACE

MATCHLINE

6 6 7 7

6 8 M

AT

C

H

LI

N E

MATCHLINE

7 7 9 9

9 10

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

212 LF OF 12" PPHP

- REFER TO DETAIL

VERTICAL BEND -

CONNECT TO

216 LF OF 12" PPHP

MAINTAIN DITCH DRAINAGE FROM

RIGHT OF WAY THROUGHOUT

DURATION OF CONSTRUCTION

PROPOSED ROAD

CENTERLINE (TYP.)

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 753.50INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

82 LF OF 8" HDPE

- REFER TO DETAIL

R =60.00'

NORTH N

O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

7 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

8:1

5:1

6:1

12:1

8:1

5:

7:1

14:1

5:1

6:1

2.1

2.1%

2.

2%

1.4%

1.

7%

2.0

2.

2%

13:1

13:1

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

P6

P9

P31

P8 A

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

54 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

233 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 48" CONCRETE RISER AND

CONNECT TO 132 LF OF 12" PPHP

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 748.00

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 10 TONS OF CLASS 'E' RIPRAP

OVER 3 TONS OF FILTER STONE

IE = 744.00

12" PIPE OUTLET WITH RODENT GUARD

IE = 766.25

PROPOSED WETLAND

NWL = 766.00

AREA = 1.1 ACRES

OVER EXCAVATE TO PROPOSED GRADES

DURING CONSTRUCTION. 3' MINIMUM

POOL DEPTH PRIOR TO SEEDING

WETLAND UNDERCUT AND REPLACEMENT

INCLUDES WETLAND POOL AREA AND

EXTENDS 20' OUTSIDE NWL

AREA = 1.5 ACRES

PROJECT BOUNDARY (TYP.)

PROPOSED 4'-TALL TERRACE (TYP.)

- SEE DETAIL

6 8 M

AT

C

H

LI

N E

7 8

MATCHLINE

8 8

10 10

WETLAND AUXILIARY SPILLWAY

CREST ELEV = 769.00

BOTTOM WIDTH = 20 FEET

SIDE SLOPES = 4:1

5' X 5' ANTI-SEEP COLLAR

MAX SPACING = 25 FEET

- SEE DETAIL

WETLAND TOP OF DAM

ELEV = 770.00

TOP WIDTH = 10 FEET

PLACE 40 TONS OF CLASS

'E' RIPRAP OVER 13 TONS

OF FILTER STONE

INSTALL 1,043 LF OF FIELD FENCE

- SEE DETAIL

NORTH N

O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

8 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

5:1

5:1

4:1

6:1

5:1

9:1

5:1

6:

5:1

1.9

2.

1%

2.

5%

1.9

2.2%

2.2%

1.7%

7:1

5:1

2:

15:1

P17P32B

P1

P20

P32A

INSTALL 48" CONCRETE RISER AND

CONNECT TO 111 LF OF 36" PPHP

- REFER TO DETAIL

PROJECT BOUNDARY (TYP.)

PROPOSED WETLAND

NWL = 790.00

AREA = 0.7 ACRES

OVER EXCAVATE TO PROPOSED GRADES

DURING CONSTRUCTION. 3' MINIMUM

POOL DEPTH PRIOR TO SEEDING

WETLAND UNDERCUT AND REPLACEMENT

INCLUDES WETLAND POOL AREA AND

EXTENDS 20' OUTSIDE NWL

AREA = 1.1 ACRES

PROPOSED RIDGE (TYP.)

PROTECT

BACKSTOP PILE

PROPOSED 4'-TALL

TERRACE (TYP.)

- SEE DETAIL

7 10

MATCHLINE

9 9

11 11

MATCHLINE

7 7 9 9

M

AT

C H

LI

N

E

11 12

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

91 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

81 LF OF 8" HDPE

- REFER TO DETAIL

SHOOTING RANGE BACKSTOP BERM

TOP ELEV = 796.00

TOP WIDTH = 16 FEET

SIDE SLOPES = 1.5:1

- COORDINATE WITH LANDOWNER

INSTALL FOUR 8' X 8'

ANTI-SEEP COLLAR

MAX SPACING = 25 FEET

- SEE DETAIL

WETLAND AUXILIARY SPILLWAY

CREST ELEV = 795.00

BOTTOM WIDTH = 30 FEET

SIDE SLOPES = 4:1

WETLAND TOP OF DAM

ELEV = 796.00

TOP WIDTH = 10 FEET

PLACE 60 TONS OF CLASS

'E' RIPRAP OVER 17 TONS

OF FILTER STONE

BURIED TERRACE DITCH CHECK

PLACE 18 TONS OF CLASS 'E' RIPRAP

OVER 5 TONS OF FILTER STONE

- SEE DETAIL

PLACE 40 TONS

CLASS 'E' RIPRAP

36" PIPE OUTLET WITH RODENT GUARD

IE = 765.20

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

87 LF OF 8" HDPE

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 766.00

VERTICAL BEND -

CONNECT TO

92 LF OF 36" PPHP

BURIED TERRACE DITCH CHECK

PLACE 18 TONS OF CLASS 'E' RIPRAP

OVER 5 TONS OF FILTER STONE

- SEE DETAIL

THRUST BLOCK

- SEE DETAIL

NORTH N

O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

9 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

7:1

5:1

5:1

5:1

5:1

8:1

5:1

5:1

6:1

5:

16:1

12:1

8:1

5:1

11:1

5:

1.8%

1.9%

2.4%

2.3

2.

3%

2.

1%

2.

5%

2.2%

2.

3%

2.3%

2.

3%

2.3

2.

3%

13:1

13:1

:1

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

P13

P15

P14

P1

P8 B

P11

CP-5

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

79 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

81 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

127 LF OF 8" HDPE

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 804.20

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 800.00

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 801.10

7 10

MATCHLINE

8 8 10 10

MATCHLINE

10 10 12 12

M

AT

C H

LI

N

E 9 10

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

212 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

100 LF OF 8" HDPE

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 805.70

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 811.00

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

82 LF OF 8" HDPE

- REFER TO DETAIL

PROJECT BOUNDARY (TYP.)

PROPOSED 4'-TALL TERRACE (TYP.)

- SEE DETAIL

PROPOSED CHANNEL (TYP.)

ROCK RIFFLE (TYP.)

PLACE 85 TONS OF CLASS 'E' RIP RAP

OVER 20 TONS OF FILTER STONE

- SEE DETAIL

PROPOSED

RIDGE (TYP.)

PROPOSED

RIDGE (TYP.)

PROPOSED ROAD

CENTERLINE (TYP.)

WIDTH = 25 FEET

INSTALL 452 LF OF FIELD FENCE

- SEE DETAIL

INSTALL FIELD GATE

- SEE DETAIL

INSTALL 1,283 LF OF FIELD FENCE

- SEE DETAIL

ROCK RIFFLE

WING DIKE (TYP.)

- SEE DETAIL

DITCH CHECK

PLACE 40 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- SEE DETAIL

R=6 0.0

0'

INSTALL FIELD GATE

- SEE DETAIL

NORTH N

O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

10 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

5:1

9:1

5:1

6:

5:

17:1

9:1 9:1

8:1

6:

6:1

6:

5:

5:1

5:1

7:1

5:1

5:1

5:1

7:1 17:1

2.1

2.

2%

2.

2%

2.

5%

2.1%

2.2%

2.1%

2.1%

2.5%

2.6%

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

P21

P33B

P1

P26

P25

P23B

P22

P24

P23A

P33A

P33D

P33C

MATCHLINE

9 9

11 11

9 12 M

AT

C

H

LI

N E

MATCHLINE

11 11 13 13

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

67 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL MODIFIED 48" CONCRETE RISER AND

CONNECT TO 94 LF OF 24" C900 PVC

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 773.00

PROJECT BOUNDARY (TYP.)

PROPOSED 4'-TALL TERRACE (TYP.)

- SEE DETAIL

PROPOSED CHANNEL (TYP.)

ROCK RIFFLE

PLACE 140 TONS OF CLASS 'E' RIP RAP

OVER 35 TONS OF FILTER STONE

- SEE DETAIL

PROTECT EXISTING

STREAM CHANNEL AND

FLOODPLAIN (TYP.)

PROPOSED WETLAND

NWL = 819.00

AREA = 0.7 ACRES

OVER EXCAVATE TO PROPOSED GRADES

DURING CONSTRUCTION. 3' MINIMUM

POOL DEPTH PRIOR TO SEEDING

TOP OF BERM

ELEVATION = 827.00

TOP WIDTH = 40 FEET

WETLAND UNDERCUT AND REPLACEMENT

INCLUDES WETLAND POOL AREA AND

EXTENDS 20' OUTSIDE NWL

AREA = 1.1 ACRES

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 793.20

ROCK RIFFLE

PLACE 85 TONS OF CLASS 'E' RIP RAP

OVER 20 TONS OF FILTER STONE

- SEE DETAIL

PROPOSED WETLAND FOREBAY

NWL = 830.00

AREA = 0.5 ACRES

OVER EXCAVATE TO PROPOSED GRADES

DURING CONSTRUCTION. 3' MINIMUM

POOL DEPTH PRIOR TO SEEDING

WETLAND UNDERCUT AND REPLACEMENT

INCLUDES WETLAND POOL AREA AND

EXTENDS 20' OUTSIDE NWL

AREA = 0.9 ACRES

INSTALL 4' TALL 12" CMP

RISER AND CONNECT TO

105 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 4' TALL 10" CMP

RISER AND CONNECT TO

204 LF OF 12" PPHP

- REFER TO DETAIL

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 830.25

WETLAND FOREBAY OUTLET CHANNEL

DEPTH = 2.5 FEET

BOTTOM WIDTH = 12 FEET

INSTALL 626 SY OF FLAME-RESISTANT

FLEXAMAT TIED CONCRETE BLOCK MAT

PROPOSED 5'-TALL

TERRACE (TYP.)

INSTALL FIVE 8' X 8'

ANTI-SEEP COLLARS

MAX SPACING = 25 FEET

- SEE DETAIL

WETLAND FOREBAY OUTLET CHANNEL

DEPTH = 3.5 FEET

BOTTOM WIDTH = 20 FEET

INSTALL 247 SY OF FLAME-RESISTANT

FLEXAMAT TIED CONCRETE BLOCK MAT

PLACE 40 TONS

CLASS 'E' RIPRAP

PLACE 32 TONS OF CLASS 'E'

RIPRAP OVER 10 TONS OF

FILTER STONE

WETLAND AUXILIARY SPILLWAY

CREST ELEV = 825.00

BOTTOM WIDTH = 30 FEET

SIDE SLOPES = 4:1

INSTALL 4' TALL 12" CMP

RISER AND CONNECT TO

90 LF OF 12" PPHP

- REFER TO DETAIL

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 819.25

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 819.25

INSTALL 4' TALL 10" CMP

RISER AND CONNECT TO

129 LF OF 12" PPHP

- REFER TO DETAIL

LOCATION OF EXISTING LAKE

OUTLET SHALL BE FIELD

PLACED WITH ENGINEER

VERTICAL BEND -

CONNECT TO

229 LF OF 24" C900 PVC

24" PIPE OUTLET WITH RODENT GUARD

IE = 790.25

THRUST BLOCK

- SEE DETAIL

NORTH

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

11 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

6:1

6:1

5:1

5:1

7:1

6:1

7:1

5:1

8:1

7:1

2.

5%

2.

2%

2.

4%

2.

6%

2.

3%

2.2

2.1

2.

2%

2.

2%

47:1

:1

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

P17

P16

P18

P10

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

129 LF OF 12" PPHP

- REFER TO DETAIL

PROJECT BOUNDARY (TYP.)

PROPOSED 4'-TALL TERRACE (TYP.)

- SEE DETAIL

PROPOSED RIDGE (TYP.)

INSTALL 1,955 LF OF FENCE, CENTER

FENCE IN 40' WIDE CORRIDOR.

- SEE DETAIL

MATCHLINE

10 10 12 12

9 12 M

AT

C

H

LI

N E

11 12

PROPOSED CHANNEL (TYP.)

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 798.30

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 818.00

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

63 LF OF 8" HDPE

- REFER TO DETAIL

INSTALL 3' TALL 10" CMP

RISER AND CONNECT TO

139 LF OF 12" PPHP

- REFER TO DETAIL

8" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

- INCLUDES 20' OUTLET SECTION

IE = 797.00

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 796.30

INSTALL 4' TALL 10" CMP

RISER AND CONNECT TO

191 LF OF 12" PPHP

- REFER TO DETAIL

ROCK RIFFLE (TYP.)

PLACE 85 TONS OF CLASS 'E' RIP RAP

OVER 20 TONS OF FILTER STONE

- SEE DETAIL

TERRACE WETLAND (TYP.)

INSTALL 1,304 LF OF FIELD FENCE

- SEE DETAIL

ROCK RIFFLE

WING DIKE (TYP.)

- SEE DETAIL

NORTH

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

12 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

7:1

9:1

12:1

6:

7:1

:1

1.

9%

2.

1%

1.9%

1.

9%

2.1%

2.5%

2.

5%

2.4%

2.

4%

2.3%

P30 B

P29

P28

P27

P34

P3 0A

11 -

MATCHLINE

11 11 13 13

PROJECT BOUNDARY (TYP.)

PROPOSED RIDGE (TYP.)

PROPOSED 5'-TALL

TERRACE (TYP.)

PROPOSED WETLAND

NWL = 822.00

AREA = 0.2 ACRES

OVER EXCAVATE TO PROPOSED GRADES

DURING CONSTRUCTION. 3' MINIMUM

POOL DEPTH PRIOR TO SEEDING

WETLAND UNDERCUT AND REPLACEMENT

INCLUDES WETLAND POOL AREA AND

EXTENDS 20' OUTSIDE NWL

AREA = 0.3 ACRES

INSTALL 4' TALL 10" CMP

RISER AND CONNECT TO

161 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 4' TALL 12" CMP

RISER AND CONNECT TO

88 LF OF 12" PPHP

- REFER TO DETAIL

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 831.70

12" PIPE OUTLET WITH RODENT GUARD

- PLACE 5 TONS OF CLASS 'E' RIPRAP

OVER 2 TONS OF FILTER STONE

IE = 822.25

INSTALL 4' TALL 12" CMP

RISER AND CONNECT TO

84 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 4' TALL 10" CMP

RISER AND CONNECT TO

145 LF OF 12" PPHP

- REFER TO DETAIL

INSTALL 48" CONCRETE RISER AND

CONNECT TO 84 LF OF 12" PPHP

- REFER TO DETAIL

12" PIPE OUTLET WITH RODENT GUARD

IE = 817.00

WETLAND AUXILIARY SPILLWAY

CREST ELEV = 825.00

BOTTOM WIDTH = 20 FEET

SIDE SLOPES = 4:1

WETLAND TOP OF DAM

ELEV = 826.00

TOP WIDTH = 10 FEET

TERRACE WETLAND (TYP.)

PLACE 24 TONS OF

CLASS 'E' RIPRAP OVER

8 TONS FILTER STONE

BLEND TERRACE

GRADING TO PROVIDE

25' WIDE ACCESS PATH

BLEND TERRACE

GRADING TO PROVIDE

25' WIDE ACCESS PATH

INSTALL ONE 5' X 5' ANTI-SEEP COLLAR

MAX SPACING = 25 FEET

- SEE DETAIL

VERTICAL BEND -

CONNECT TO

49 LF OF 12" PPHP

ROAD CENTERLINE (TYP.)

WIDTH = 12 FEET

NORTH

N O

AH

A

N D

W

IL

C O

X

EA

ST

AJ

H

13 36

G H

K

LT

M

-1 7-

G R

AD

IN

G P

LA

N

AM

L

R

EC

LA

M

AT

IO

N P

R O

JE

C

T

IO

W A

D

EP

AR

TM

EN

T

O F

AG

R

IC

U

LT

U

R E

AN

D

L

AN

D S

TE

W

AR

D

SH

IP

D

IV

IS

IO

N O

F

SO

IL

C

O N

SE

R

VA

TI

O N

AN

D

W

AT

ER

Q

U

AL

IT

Y

H O

O

VE

R S

TA

TE

O

FF

IC

E

BU

IL

D

IN

G

E

. W

AL

N U

T

ST

R

EE

T D

ES

M

O

IN

ES

, I

A

(5

1-

SHEET

OF

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

KD

. B

Y:

IS

SU

ED

R

EV

IS

ED

Ill in oi s

Fi rm

N um be r:

-0

W es to w n Pa rk w ay , S ui te

W es t D es M oi ne s, Io w a

5.

3.

f ax

: 5

.2

.0 s hi ve -h at te ry .c om

Io w a

Il lin oi s

M is so ur i

S- H

P R

O

JE

C T

N U

M

BE

R

IOWA D

EP

A R

TM

E N

T O F

A G R I C U L T UR E

L A

ND

S

File details come from the government source that posted it. Updated .