Plans-006215A-Local_Group_113-signed.pdf

PDF 30 MB Posted

Attached to
FY25 Pavement Preservation Package No 2
Solicitation number
24-0756-ITB-C
Issued by
Pinellas County, Clewiston City, Florida

About this file

The document is a project plan (PID 24-0756-006215A) for the FY2025 Pavement Preservation Package 2, Local Group 113, prepared by Pinellas County, Florida, under the professional engineering guidance of Jeffrey S. Thompson. The project involves milling existing asphalt pavement to a depth of 1.5 inches and resurfacing with a Type SP 12.5 Structural Course (Traffic C) at the same depth, with potential variance of 2% (or up to 4% as directed by the engineer). The project is part of a larger pavement preservation initiative encompassing four paving locations within the county, totaling approximately 34.65 lane miles of roadway, including one collector and three local neighborhood projects.

The technical specifications include detailed plan sheets (14 total) covering general notes, road typical sections, plan sheets, core location maps, and typical section details. The document indicates a precise approach to road maintenance, with specific milling and resurfacing requirements. While specific pricing details are not provided in this file, the project appears to be a systematic approach to infrastructure maintenance, likely funded through county transportation or infrastructure budgets. The plan includes precise measurements and engineering specifications, suggesting a comprehensive and methodical approach to road rehabilitation and preservation.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID 24-0756-006215A

FY2025 PACKAGE 2

LOCAL GROUP 113

FINANCIAL PID 004192A

STATE OF

No.

PR

O

FESSIONAL ENGIN

EE

R

JE

FFR

EY S. THOMPSON

FLORIDA

93254

MILLING

MILL EXISTING ASPHALT

PAVEMENT FOR DEPTH (1.5")

RESURFACING

TYPE SP 12.5 STRUCTURAL COURSE (TRAFFIC C) (1.5")

* 2% (OR AS DIRECTED BY THE ENGINEER - 4% MAX)

NOTE: SEE SHEET 12 - FOR CORE LOCATION MAPS

Feet 80400 20

Sheets and Views
1 Eng_Cover_SSM
2 GENERAL NOTES
3 ROAD TYPICAL SECTION
4 PW - Plan SHEET 4
5 PW - Plan SHEET 5
6 PW - Plan SHEET 6
7 PW - Plan SHEET 7
8 PW - Plan SHEET 8
9 PW - Plan SHEET 9
10 PW - Plan SHEET 10
11 PW - Plan SHEET 11
12 CORE LOCATION MAP_1
13 Typical Sections A_B
14 Typical Section C
15 LOOP DETAIL
2024-06-06T13:17:52-0400
Jeffrey S Thompson

File details come from the government source that posted it. Updated .