Plan Sheets.pdf
PDF 10 MB Posted
- Attached to
- Marylhurst Sanitary Sewer Pump Station Rehab
- Solicitation number
- S-KW0397-00017118
- Issued by
- Clackamas County, Medford City, Oregon
About this file
This is a Plan Sheets document for the Marylhurst Sanitary Sewer Pump Station Rehabilitation project in Oregon. The project encompasses the replacement of electrical components, mechanical piping, and submersible pumps, along with the installation of a valve vault for an aging sanitary pump station facility. The plan sheets provide detailed technical specifications and design drawings necessary for bidders to understand the scope of work, site conditions, and construction requirements for this infrastructure rehabilitation project.
The Engineer's estimate for the project is $410,300.00. The plan sheets serve as essential bidding documents that outline construction details, equipment specifications, and installation requirements that contractors must follow when preparing their bids and executing the work. These documents are fundamental to ensuring that all bidders have a clear understanding of the project scope and technical standards required for the pump station rehabilitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTLAND
TROUTDALE
GRESHAM
HAPPY
VALLEY
US-84
US-26
I-2
I-5
HILLSBORO
OR-99E
MILWAUKIE
US-26
LAKE
OSWEGO
I-205
BEAVERTON
TIGARD
US-30
I-4
I-5
O R -2
O R- W
WEST LINN
PORTLAND METRO
CLACKAMAS COUNTY
MULTNOMAH COUNTY
W
AS
H
IN
G
TO
N C
O U
N
TY
N
C I T Y
O F F
C I A
I
L S
I C I N I T Y
M A P
V
CITY OF WEST LINN
2026 SEWER PUMP STATION IMPROVEMENTS PROJECTS
CITY ENGINEER: ERICH LAIS, PE
PHONE: 503-722-3434
EMAIL: ELAIS@WESTLINNOREGON.GOV
ENVIRONMENTAL SERVICES: JOE CONRAD
PHONE: 503-742-6072
EMAIL: JOSEPH.CONRAD@WESTLINNOREGON.GOV
DWG SHEET TITLE
G0.0 1 COVER
C1.1 2 DEMOLITION PLAN - MARYLHURST PUMP STATION
C1.2 3 DEMOLITION PLAN - CEDAROAK PUMP STATION
C2.1 4 SITE PLAN - MARYLHURST PUMP STATION
C2.2 5 SITE PLAN - CEDAROAK PUMP STATION
C3.1 6 CIVIL DETAILS
E0.0 7 ELECTRICAL- SYMBOLS AND LEGEND SHEET
E1.1 8 ELECTRICAL SITE PLAN- MARYLHURST PUMP STATION
E1.2 9 ELECTRICAL SITE PLAN - CEDAROAK PUMP STATION
E2.1 10 SINGLE LINE DIAGRAM - MARYLHURST PUMP STATION
E2.2 11 SINGLE LINE DIAGRAM - CEDAROAK PUMP STATION
E3.1 12 WIRING DIAGRAM
E4.1 13 ELECTRICAL SCHEDULES
E5.1 14 ELECTRICAL DETAILS
E5.2 15 ELECTRICAL DETAILS
S H E E T I N D E X
PROJECT VICINITY
N
MARYLHURST PUMP STATION
CEDAROAK PUMP STATION
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
W es t L in n, C ity o f\0
Se w er
P um p St at io n Im pr ov em en ts \C
AD
W O
R
KI
N G
\S he et s\
G -0
(C ov er
).d w g
CENTURY WEST ENGINEERING CORPORATION
REUSE OF DOCUMENTS
CENTURY WEST ENGINEERING CORPORATION.
PROJECT WITHOUT THE WRITTEN CONSENT OF
USED, IN WHOLE OR IN PART, FOR ANY OTHER
ENGINEERING CORPORATION, AND IS NOT TO BE
SERVICE, IS THE PROPERTY OF CENTURY WEST
HEREIN, AS AN INSTRUMENT OF PROFESSIONAL
THIS DRAWING, AND THE DESIGNS INCORPORATED
OFSCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
PORTLAND OFFICE
5500 MEADOWS ROAD, SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130
503.639.2710 FAX
41469.005.01APRIL 2026
SEWER PUMP STATION IMPROVEMENTS PROJECT
CITY OF WEST LINN
R
DGR
NS
JAJ
G0.0
COVER
AS NOTED
DIGITALLY SIGNED
12/ 31/ 2026 2026-04-14 jlumpkin Line jlumpkin Line jlumpkin Line jlumpkin Line
22'
REMOVE EXISTING 4'' DI 90 ELBOW
REMOVE EXISTING 4'' DI SPOOL REMOVE 4'' DI PLUG VALVE
REMOVE EXISTING 4'' DI WYE
REMOVE EXISTING 4'' SUBMERSIBLE PUMP
N
SCALE 1" =
2' 4'
2'
EXISTING PUMP CONTROLLER
SEE ELECTRICAL FOR DEMOLITION
EXISTING CATCH BASIN
PRESERVE
PROTECT EXISTING BOLLARD
PRESERVE AND PROTECT
EXISTING BOLLARD
ELECTRICAL HANDHOLE
SEE ELECTRICAL FOR DEMOLITION
PRESERVE AND PROTECT
EXISTING 8'' GRAVITY SEWER
EXISTING 8'' AC GRAVITY SEWER
REMOVE EXISTING 4'' DI SPOOL
REMOVE EXISTING 4'' DI SWEEPING ELBOW
REMOVE EXISTING PUMP MOUNT
REMOVE EXISTING GUIDE RAIL SYSTEM
AND MOUNTING BRACKET
REMOVE EXISTING BRACE
REMOVE EXISTING GUIDE RAIL BRACE
REMOVE EXISTING 4''
DI SPOOL
REMOVE EXISTING 4'' DI
45 ELBOW
REMOVE EXISTING 4'' DI SPOOL
REMOVE EXISTING 4'' DI PLUG
VALVE
REMOVE EXISTING
4'' DI PLUG VALVE
REMOVE EXISTING
4'' DI SPOOL
REMOVE EXISTING 4'' DI SPOOL
REMOVE EXISTING 4''
DI WYE
CUT EXISTING 4'' AC
FORCEMAIN
REMOVE EXISTING SUBMERSIBLE PUMP
REMOVE EXISTING 4'' CHECK VALVE
REMOVE EXISTING 4'' CHECK VALVE
CONDUIT FROM HANDHOLE
TO REMAIN
PRESERVE
AND PROTECT
EXISTING 8'' AC
GRAVITY SEWER
EXISTING 7' DIA WETWELL
REMOVE ACCESS HATCH
REMOVE ACCESS HATCH
REMOVE EXISTING WET WELL TOP SLABRIM ELEV = 629.9 ±
ASSUMED BOTTOM ELEV = 617.2 ±
EXISTING 4'' AC FORCEMAIN
FIELD VERIFY FITTINGS
SAWCUT PAVEMENT
PAVEMENT REMOVAL LIMITS
PRESSURE WASH AND VACUUM
WETWELL
I.E. 625.6 +/-
GENERAL NOTES
THE SCOPE OF THE PROJECT GENERALLY INCLUDES:
1. CONTRACTOR TO INSTALL BYPASS SYSTEM TO
ENSURE OPERATION OF UPSTREAM AND
DOWNSTREAM MANHOLES CONTINUE DURING
CONSTRUCTION.
2. CONTRACTOR TO DE-WATER WETWELL DURING
CONSTRUCTION.
3. CONTRACTOR TO INSTALL INFLATABLE BAG PLUG IN
EACH INLET FOR EXISTING PUMP STATION
REMOVE EXISTING 8'' GRAVITY SEWER
INSTALL PIPE BAG PLUG
PRIOR TO CONSTRUCTION
INSTALL BAG PLUG
PRIOR TO CONSTRUCTION
I.E. 625.6 +/-
FIELD VERIFY FITTINGS
2.
8'
3.8'
CUT4 '' AC FORCEMAIN, CLEAN AND PREPARE FOR COUPLER
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
W es t L in n, C ity o f\0
Se w er
P um p St at io n Im pr ov em en ts \C
AD
W O
R
KI
N G
\S he et s\
C -0
EX
IS
TI
N G
S
IT
E.
dw g
CENTURY WEST ENGINEERING CORPORATION
REUSE OF DOCUMENTS
CENTURY WEST ENGINEERING CORPORATION.
PROJECT WITHOUT THE WRITTEN CONSENT OF
USED, IN WHOLE OR IN PART, FOR ANY OTHER
ENGINEERING CORPORATION, AND IS NOT TO BE
SERVICE, IS THE PROPERTY OF CENTURY WEST
HEREIN, AS AN INSTRUMENT OF PROFESSIONAL
THIS DRAWING, AND THE DESIGNS INCORPORATED
OFSCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
PORTLAND OFFICE
5500 MEADOWS ROAD, SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130
503.639.2710 FAX
41469.005.01APRIL 2026
SEWER PUMP STATION IMPROVEMENTS PROJECT
CITY OF WEST LINN
R
DGR
NS
JAJ
C1.1
DEMOLITION PLAN
MARYLHURST PUMP STATIONAS NOTED
REMOVE PORTION OF 4'' AC FORCEMAIN
LENGTH AS NECESSARY FOR VALVE ASSEMBLY AND COUPLER
MARYLHURST
CIRCLE
REMOVE EXISTING WETWELL
PENETRATION GROUT AND PREP FOR NEW PIPE
CUT 8'' AC PIPE GRAVITY SEWER, CLEAN, AND PREPARE FOR COUPLER
REMOVE EXISTING 8'' AC GRAVITY SEWER
INSTALL BAG PLUG FOLLOWING PIPE CUT
2.
0'
DIGITALLY SIGNED
12/ 31/ 2026 2026-04-14
N
SCALE 1" =
2' 4'
2'
INSTALL 3.0 ' X 5.0' DOUBLE PANE ACCESS
HATCH WITH FALL PROTECTION GRATES
4'' DI PLUG VALVE
4'' PLUG VALVE
4'' DI CHECK VALVE
4'' DI CHECK VALVE
4'' DI PIPE
FL X PE
NEW SUBMERSIBLE PUMP #1
NEW SUBMERSIBLE PUMP #2
INSTALL NEW WETWELL TOP SLAB
MATCH EXISTING GRADE
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
W es t L in n, C ity o f\0
Se w er
P um p St at io n Im pr ov em en ts \C
AD
W O
R
KI
N G
\S he et s\
C 2.
Pr op os ed .d w g
CENTURY WEST ENGINEERING CORPORATION
REUSE OF DOCUMENTS
CENTURY WEST ENGINEERING CORPORATION.
PROJECT WITHOUT THE WRITTEN CONSENT OF
USED, IN WHOLE OR IN PART, FOR ANY OTHER
ENGINEERING CORPORATION, AND IS NOT TO BE
SERVICE, IS THE PROPERTY OF CENTURY WEST
HEREIN, AS AN INSTRUMENT OF PROFESSIONAL
THIS DRAWING, AND THE DESIGNS INCORPORATED
OFSCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
PORTLAND OFFICE
5500 MEADOWS ROAD, SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130
503.639.2710 FAX
41469.005.01APRIL 2026
SEWER PUMP STATION IMPROVEMENTS PROJECT
CITY OF WEST LINN
R
DGR
NS
JAJ
C2.1
SITE PLAN
MARYLHURST PUMP STATIONAS NOTED
CONNECT TO EXISTING
4'' AC FORCEMAIN
6.
0'
5.0'
5.0' 6.
2'
INSTALL 4'' DI 90 ELBOW
FL X FL
INSTALL 4'' DI PIPE
PE X FL
LENGTH AS NEEDED
INSTALL 4'' DUCTILE SPOOL
LENGTH AS NEEDED
INSTALL 4'' MACRO HP WIDE RANGE COUPLING
CONNECTION TO EXISTING 4'' AC FORCEMAIN
INSTALL 4'' DI EXTERNAL SWING
CHECK VALVE
INSTALL 4'' PLUG VALVE
FL X FL
INSTALL 4'' DI CROSS
FL X FL
INSTALL 4'' PLUG VALVE
FL X FL
INSTALL FL X PE SPOOL
LENGTH AS NEEDED
INSTALL FLANGED COUPLING ADAPTER
INSTALL 4'' FL X PE SPOOL
LENGTH AS NEEDED
INSTALL STAINLESS STEEL PUMP GUIDE
RAIL SYSTEM AND MOUNTING BRACKET
INSTALL SUBMERSIBLE PUMP
INSTALL DISCHARGE BASE ELBOW ASSEMBLY
WITH AUTOMATIC PUMP MOUNT FLANGE
INSTALL GUIDE RAIL BRACING
INSTALL SUBMERSIBLE PUMP #1
INSTALL SUBMERSIBLE PUMP #2
INSTALL NEW TOP SLAB
MATCH EXISTING RIM ELEV
MATCH EXISTING PAVEMENT
INSTALL NEW 6.0' X 5.0' X 5.0' VALVE VAULT
INSTALL LATERAL AND LONGITUDINAL
SEISMIC BRACING
INSTALL BRACE
CONNECT TO WETWELL WALL
WITH WEDGE ANCHOR
INSTALL NEW 3'.0' X 5.0' ACCESS HATCH
WITH FALL PROTECTION GRATES
INSTALL NEW 3.0' X 5.0' ACCESS HATCH
WITH FALL PROTECTION GRATES
INSTALL 12'' OF GRANULAR BACKFILL
BELOW VAULT
MARYLHURST
CIRCLE
INSTALL FLOAT RACK
SEE ELECTRICAL DETAILS
C3.1
DOG HOUSE PIPE PENETRATION
TYPICAL BOTH SIDES FOR 8'' GRAVITY SEWER
CAST IN PLACE VAULT FLOOR
SLOPE TO DRAIN
2'' DI DRAIN PIPE 2% SLOPE MIN
DRAIN TO WETWELL
PIPE SADDLE SUPPORT
(TYP OF 2)
C3.1
VAULT ACCESS LADDER
C3.1
CAST IN PLACE 2'' FLOOR DRAIN
VAULT ACCESS LADDER
C3.1
INSTALL LATERAL AND LONGITUDINAL
SEISMIC BRACING
C3.1
GROUT PIPE PENETRATION
(TYP OF 3)
APPLY COATING TO ALL PIPES IN ACCORDANCE
WITH SPECIFICATION 099000 COATING SYSTEM 10
2" FLAP VALVE
INSTALL 4" DI ELBOW
FL X FL
INSTALL 4" DI ELBOW
FL X FL, TURNED UP
INSTALL 4'' DI EXTERNAL SWING
CHECK VALVE
INSTALL 4'' PLUG VALVE
FL X FL
4" SS CAMLOCK FLANGE
ADAPTER W/DUST CAP
INSTALL 4" ROMAC STYLE
FLEXIBLE COUPLING
INSTALL 4" ROMAC STYLE
FLEXIBLE COUPLING
4'' DI PIPE
FL X PE
4" FLEXIBLE COUPLING
APPLY COATING TO INLET BAFFLES IN
ACCORDANCE WITH SPECIFICATION
099000 COATING SYSTEM 10
C3.1
INSTALL LATERAL SEISMIC BRACING
8'' FLEXIBLE COUPLING
8'' C900 DR18 PVC PIPE
CONNECT TO EXISTING 8'' GRAVITY SEWER
INSTALL 8'' ROMAC STYLE
FLEXIBLE COUPLING
INSTALL 8'' MACRO HP WIDE RANGE COUPLING
CONNECTION TO EXISTING 8'' AC GRAVITY SEWER
APPLY COATING TO WET WELL
INTERIOR IN ACCORDANCE WITH
SPECIFICATION 099000
COATING SYSTEM 70
4'' DI PIPE
FL X PE
INSTALL 8'' ROMAC STYLE FLEXIBLE COUPLING
APPLY COATING TO VALVE VAULT EXTERIOR IN ACCORDANCE WITH SPECIFICATION
099000 COATING SYSTEM 75
2.
0'
DIGITALLY SIGNED
PROJECT NO: SCALE:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
Y:
\P ro je ct s\
W es t L in n, C ity o f\0
Se w er
P um p St at io n Im pr ov em en ts \C
AD
W O
R
KI
N G
\S he et s\
G -0
(C ov er
).d w g
CENTURY WEST ENGINEERING CORPORATION
REUSE OF DOCUMENTS
CENTURY WEST ENGINEERING CORPORATION.
PROJECT WITHOUT THE WRITTEN CONSENT OF
USED, IN WHOLE OR IN PART, FOR ANY OTHER
ENGINEERING CORPORATION, AND IS NOT TO BE
SERVICE, IS THE PROPERTY OF CENTURY WEST
HEREIN, AS AN INSTRUMENT OF PROFESSIONAL
THIS DRAWING, AND THE DESIGNS INCORPORATED
OFSCALES ACCORDINGLY.
THIS SHEET, ADJUST
IF NOT ONE INCH ON
0" 1"
ORIGINAL DRAWING.
BAR IS ONE INCH ON
VERIFY SCALES
APPRBYNO. DATE REVISIONS
SHEET NO.
DRAWING NO.
DATE:
PORTLAND OFFICE
5500 MEADOWS ROAD, SUITE #250
LAKE OSWEGO, OR 97035
503.419.2130
503.639.2710 FAX
41469.005.01APRIL 2026
SEWER PUMP STATION IMPROVEMENTS PROJECT
CITY OF WEST LINN
R
DGR
NS
JAJ
C3.1
CIVIL DETAILS
AS NOTED
C2.1,2
PIPE SADDLE SUPPORT DETAIL - TYPICAL
NTS
C2.1,2
SEISMIC LOAD SUPPORT DETAIL - TYPICAL
NTS
C2.1,2
PREFABRICATED VAULT ACCESS LADDER - TYPICAL
NTS
NOTE:
1. ALL MATERIALS 316 STAINLESS STEEL CONSTRUCTION
LATERAL SWAY BRACE
TOP VIEW
EXISTING WETWELL WALL
CONCRETE WEDGE ANCHOR
SWAY BRACE
ATTACHMENT
BRACE ROD UNIVERSAL SWIVEL
SWAY BRACE ATTACHMENT
UNIVERSAL SWIVEL SWAY
BRACE ATTACHMENT
SWAY BRACE
ATTACHMENT
BRACE ROD
UNIVERSAL SWIVEL SWAY
BRACE ATTACHMENT
LONGITUDINAL SWAY BRACE
SIDE VIEW
CONCRETE WEDGE ANCHOR
UNIVERSAL SWIVEL SWAY
BRACE ATTACHMENT
BASE PLATE DETAIL
WELDED BASEPLATE
THREADED ADJUSTABLE
SADDLE
2" SCHEDULE 40 EXTENSION
PIPE, LENGTH AS NEEDED
2" CONCRETE WEDGE ANCHORS (X4)
NOTES:
1) ALL LADDER MATERIALS ARE TO BE 316
STAINLESS STEEL.
EXTENSION SLEEVES
STANDARD LENGTH = 24"
DIGITALLY SIGNED
| Sheets and Views |
| 1 G0.0 |
| 2 C1.1 |
| 3 C1.2 |
| 4 C2.1 |
| 5 C2.2 |
| 6 C3.1 |
4.14.26 41469.005.01 DRAWINGS (ELEC)
File details come from the government source that posted it. Updated .