Ward Mine Reclamation Project Summary
This is a plan sheets document for the Ward Mine Reclamation Project (AML-IFrE-2514) in Franklin County, Illinois, prepared by the State of Illinois Department of Natural Resources, Office of Mines and Minerals Division of Abandoned Mined Lands Reclamation. The project encompasses the reclamation and remediation of two abandoned coal mine shafts (the Main Shaft and East Air Shaft) located near Benton, Illinois. The scope of work includes special clearing and excavation of mine refuse, directional boring and demolition of existing shaft structures, installation of rockfill and concrete caps over the shafts, construction of a new access road with asphalt paving, erosion control measures, seeding and restoration of disturbed areas, installation of mine opening markers, water service line installation, and repairs to haul route roadways. Key quantities include 5,500 tons of rockfill for each shaft, 47 cubic yards of Portland cement concrete cap for the Main Shaft and 24 cubic yards for the East Air Shaft, 1,050 linear feet of perimeter erosion barrier, 1.9 acres of seeding at the Main Shaft and 0.7 acres at the East Air Shaft, and approximately 826 square yards of pavement removal with 921 tons of hot-mix asphalt surface course and 116 tons of binder course for roadway repairs.
The project is funded by the United States Department of Interior Federal Office of Surface Mining through the Infrastructure Investment and Jobs Act Abandoned Mined Land Grant. Construction sequencing is mandated, with the East Air Shaft directional boring and demolition required to be performed prior to work on the Main Shaft. Contractors must visit the site prior to bidding and are responsible for all field engineering services, utility location and protection, and comprehensive safety precautions including monitoring of potentially hazardous gases (methane and other mine gases), use of multi-gas detectors, and implementation of fall prevention measures around shaft openings. The project includes specific application schedules for seeding, fertilizer nutrients, mulch, and mowing between August 2026 and May 2027, with agricultural ground limestone, nitrogen, phosphorous, and potassium fertilizers applied at specified rates. A pre-bid meeting is referenced in the solicitation documents. The engineer retains the right to adjust pay items and quantities based on actual field conditions encountered during construction.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I 11 ., ., z:
i ti
I 'I
State of Illinois
Department of Natural Resources Office of Mines and Minerals
Division of Abandoned Mined Lands Reclamation
Funded by the United States Department of Interior Federal Office of Surface Mining
Ward Mine Reclamation Project AML-IFrE-2514 Franklin County
SCHEDULE OF DRAWINGS:
1. Cover Sheet
2. Summary of Quantities / General Notes I Location Map
3. Existing Conditions and Site Information - East Air Shaft & Main Shaft
4. Existing Conditions and Site Information - Main Shaft
5. Existing Conditions and Site Information - East Air Shaft
6. Special Excavation - Concrete and Junk Removal
7. Directional Boring and Demolition Plan - East Air Shaft
8. Directional Boring and Demolition Plan - Main Shaft
9. New Access Road - Plan and Profile
10. Erosion Control & Temporary Safety Fencing Plan - Both Sites
11. Planting Plan & New Water Services Plan - Main Shaft Site
12. Mine Marker and Construction Sign Details
13. Haul Route Roadway Repairs
PRE-BIO MEETING, REFER TO THE BIO
SOllCITA TION FOR INFORMATION
ABOUT THE PRE-BID MEETING.
Approved for Bidding:
�or Office of Mines and Minerals
Ward Mine Franklin County
Approved By:
LJ/4C&L�Lance Range, Manager AMLR Division
A
:l{Owr.t, .. ._.
Lici��t��.�:���� FAineer
V.•, 'r{//" .-t.tf.-;\,� � •. �:':'/.' �,_.-, t,��:.41{.,� Brown and Roberts, Inc. Job#: 24142 x.,_ _____________________________________________________________________________________________________ _.
# Item Section Quantity Unit Rates/Remarks
1 SPECIAL CLEARING 201 1 L SUM
FURNISHED EXCAVATION 204
CU YD
MINE REFUSE EXCAVATION 202
CU YD4
SPECIAL EXCAVATION 215 L SUM5
DIRECTIONAL BORING (EAST AIR SHAFT) 218
NITROGEN FERTILIZER NUTRIENT 380 POUND
SEE SCHEDULE BELOW
PHOSPHOROUS FERTILIZER NUTRIENT 190 POUND13
POTASSIUM FERTILIZER NUTRIENT 190 POUND14
AGRICULTURAL GROUND LIMESTONE 9.5 TON 5.0 TON / ACRE
SEEDING, CLASS 1 (MAIN SHAFT) IDOT 250 1.2 ACRE
MULCH, METHOD 2 IDOT 251 3.8 TON PROCEDURE 1, 2 TON/ACRE
PORTLAND CEMENT CONCRETE CAP 425 47 CU YD
REMOVAL OF EXISTING STRUCTURES 501 1 L SUM
666MINE OPENING MARKER 2 EACH
PERIMETER EROSION BARRIER 280 1,050 FOOT
SCHEDULE OF SEEDING, FERTILIZER NUTRIENTS, MULCH AND MOWING
ITEM
(unit)
INITIAL APPLICATION
AUG 1-NOV 15 2026
SECOND APPLICATION
FEB 15-MAR 15 2027 MAY 2027 TOTAL
QUANTITY
SEEDING
(acres) 1.9 1.9
AGRICULTURAL
GROUND LIMESTONE
(tons) 9.5
NITROGEN
FERTILIZER NUTRIENT
(pounds)
(100 Lb./A) 380
PHOSPHOROUS
FERTILIZER NUTRIENT
(pounds)
POTASSIUM
FERTILIZER NUTRIENT
(pounds)
MULCH, METHOD 2
PROCEDURE 1
(tons)
3.8 (2 Ton/A) 3.8
MOWING (acres) 1.9 1.9
GENERAL NOTES
Unless otherwise noted on the plans, all disturbed areas within the construction limits will be amended with agricultural ground limestone, fertilizer nutrients, seeded, and mulched at the required rates specified in the plans.
The Contractor is responsible for visiting the site and familiarizing himself with the existing and proposed reclamation work prior to submitting a bid.
The Contractor shall provide and pay for all field engineering services to execute the project as specified in the Field Engineering section of the Special Provisions.
The Contractor is responsible for locating and protecting all existing utility lines pertaining to the work.
Unless noted on the plans, all onsite access roads may be used for construction but must be maintained during construction and restored to original or better condition at the completion of work by the contractor. Public access roads to the site as designated in the plans are to be maintained to the satisfaction of the City of Benton.
The construction limits will be staked by the contractor prior to construction. The contractor is responsible for the repair and/or restitution at his own expense for all damaged done to any area outside the construction limits.
Application rates specified in the plans are shown in the Summary of Quantities-Rates/Remarks column.
The engineer shall observe the excavation of the mine openings and provide direction on the depth and extent of excavation. The engineer shall determine the method of backfill based on the plan details and calculate the required quantities of materials based on conditions encountered during excavation. The engineer reserves the right to increase, decrease, or delete any of the contract pay items. Quantities included in the contract are based on best available information and may be adjusted dependent upon the actual conditions encountered in the field.
Contractor must abide construction sequence when opening shafts. Air Shaft must be opened first.
CONSTRUCTION NOTES
ROADS - The Contractor shall comply with requirements of state and local roadway jurisdiction authorities as part of the satisfactory performance of the reclamation work.
BURIAL/REMOVAL OF MATERIAL - All concrete and other debris items encountered will be removed or buried as directed by the Engineer. Items such as concrete or other suitable items without rebar may be buried in the shafts on site and shall be buried with 3 feet minimum cover. Trash and unsuitable organic debris shall be disposed of in an IEPA approved offsite landfill in accordance with Sections 201 and 501 of the Special Provisions.
TREE REMOVAL- Trees and vegetative items resulting from Special Clearing are to be chipped and made available to landowners or removed from the project site and disposed of at an IEPA approved disposal site. Clearing of trees may only occur from October 16th to March 14th.
ACID WATER TREATMENT - If acid mine drainage treatment is determined necessary by the engineer, and not otherwise specified in the plans, any water treatment will be paid for in accordance with Article
109.04 of the Standard Specifications.
EROSION CONTROL - The contractor shall schedule his operations and take such precautions that may be necessary to prevent or minimize erosion. Failure to comply with this requirement shall cause the contractor to be fully responsible for repairing any eroded areas and cleaning up areas or drainage structures that have become silted in or damaged. Deductions and conditions stated in Article 105 of the Standard Specifications apply.
AGRICULTURAL GROUND LIMESTONE-Immediately prior to seed bed preparation, fertilizer nutrients and agricultural ground limestone shall be uniformly spread at the rates specified in the plans.
Location Map
N.T.S.
SUMMARY OF QUANTITIES
D ra w n
By
C he ck ed
B y
D at e
JK
3/
Su m m ar y of
Q ua nt iti es
G en er al
N ot es
Lo ca tio n
M ap
St at e of
Il lin oi s
D ep ar tm en t o f N at ur al
R es ou rc es O ffi ce o f M in es a nd
M in er al s Ab an do ne d
M in ed L an d
R ec la m at io n D iv is io n
W ar d M in e
R ec la m at io n Pr oj ec t
AM
L-
IF
rE -2
Fr an kl in
C ou nt y
Sh ee t 2 o f 1
St uy ve sa nt S t.
Cutler St.
G ol dh ei m er
A ve
E. Taylor St.
Ward Mine
Creek
1.1 Miles to Benton Square
0.
M ile s
0.1 Miles
PAVEMENT REMOVAL 440 826 SQ YD
AGGREGATE BASE COURSE, TYPE A IDOT 351 470 TON
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 406 921 TON
HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 406 116 TON
BITUMINOUS MATERIALS (PRIME COAT) 406 21,850 POUND
BITUMINOUS MATERIALS (TACK COAT) 406 2,210 POUND
PIPE CULVERTS, CLASS A, TYPE 1, 12" 542 64 FOOT
CONSTRUCTION NOTES (CONT'D)
MULCHING - Within 24 hours from the time seeding has been performed, the seeded area shall be given a covering of mulch at the rates specified in the plans. The mulch is to the anchored into the soil in accordance with the requirements for method 2, procedure 1 of Article 251.03 of the Standard Specifications. If Excelsior or Special Excelsior Blanket is to be used, the blanket shall be placed the same day that the areas are seeded.
PRECAUTIONS AND PROCEDURES
1. All workers will be instructed on these precautions and procedures prior to working at the site.
2. All work shall be conducted during daylight hours and/or the site shall have sufficient lighting.
3. The edges of the shaft shall be barricaded to prevent persons or equipment from falling into the opening.
4. If trucks are used to haul and dump material near the edge of the shaft, the shaft shall have sufficient size concrete barriers to all approaches to prevent anyone/anything from falling into the opening.
5. When equipment is used to push material into the shaft or when trucks dump directly into the shaft, the edge to which the operator pushes shall be clearly marked and an individual shall act as a "spotter'' to prevent equipment from getting too close to the opening.
6. All personnel working near the shaft shall carry an operating multi-gas detector and a fire extinguisher will be on site until the effective seal is complete.
7. There shall be no welding, cutting with a torch, or device causing a spark within 50 feet of the shaft.
8. During the 72 hour period after shaft penetration the contractor shall monitor the methane level at the entrance of the hole every 8 hours and record the methane concentration. The results of the examination shall be recorded in a logbook to be kept at the project site and emailed to the construction observer immediately after collection and recording.
9. A multi-gas detector shall be placed on the downwind side of the shaft opening during any backfilling operations. If a gas check is made over the shaft opening, a sufficient length probe shall be used to prevent anyone from reaching over the exposed shaft opening.
St uy ve sa nt S t.
0.
M ile s
TEMPORARY DITCH CHECK 280 32 FOOT
EARTH EXCAVATION 202 247 CU YD
TREE, QUERCUS PALUSTRIS (PIN OAK), 2-1/2" CALIPER, 253 1 EACH
9.5 (5 Ton/A)
(100 Lb./A)
(100 Lb./A)
(100 Lb./A)
EVERGREEN, PINUS STROBUS (EASTERN WHITE PINE), 6' HEIGHT, 253 1 EACH
BALLED AND BURLAPPED
BALLED AND BURLAPPED
MOBILIZATION (Maximimum 6% of bid) 671 1 L SUM
USE STRAW OR HAY BALES WITH
TWO STAKES PER BALE
USE IDOT STANDARD 280001-07
MOWING 258 1.9 ACRE
6 ROCKFILL, C4 (EAST AIR SHAFT)
9 DIRECTIONAL BORING (MAIN SHAFT)
ROCKFILL, C4 (MAIN SHAFT)
5,500
5,500
L SUM
L SUM
TON
TON
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH IDOT 424 120 SQ FT
SCARIFYING, GRADING, AND COMPACTING ROAD BASE 440 8,860 SQ YD
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70 406 830 TON
AGGREGATE SHOULDERS, TYPE A IDOT 481 500 TON
MANHOLES TO BE ADJUSTED IDOT 602 5 EACH
VALVE VAULTS TO BE ADJUSTED IDOT 602 5 EACH
See Sheet 13 for Repairs
SEEDING, CLASS 1B (EAST AIR SHAFT) 0.7 ACREIDOT 250
IDOT 250
IDOT 250
IDOT 250
IDOT 250
NIGP #
912-19
912-23
912-44
912-44
912-44
912-16
912-16
988-52
988-52
988-52
988-52
988-52
988-14
988-14
912-23
750-70
750-70
912-40
912-40
912-23
912-40
913-39
913-56
913-56
750-70
962-39
988-52
988-52
988-52
988-52
988-52
912-23
912-23
745-00
745-00
745-00
745-00
745-00
WATER SERVICE LINE 1" 562 600 FOOT913-60
TEMPORARY SAFETY FENCE 665 675 FOOT330-55
ROADS
MAJOR HIGHWAYS34
LEGEND
W
X
X X X X
X
E E
E E
E
EE
E E
E
E
E E
E
E
E E
E E
E EE E E
EE
E
E E
EEEEEE
E E
E E
E E
E
E E
E E
E E
E E E E
E E E E E E E E E EE
E
E
E
E E
E
E
E
E
X
G G
G G
G G
G G
G
G G
G G
G G
G G
G G
G
G G
G G
G G
G G
W W
W W
W W
W
W W
W W
W
FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO
W W W
W W
W
H O
U
SE
H O
U
SE
HOUSE
HOUSE
GARAGE
HOUSE HOUSE
GARAGE
HOUSE
HOUSE
H O
U
SE
SH
ED
SH
ED
SHEDS
GARAGE
BRIDGE
CARPORT
WATER SURFACE
ELEVATION=420.4
ON 8/16/2024
MAIN
SHAFT
EAST AIR
SHAFT
CP3
CP4 CP5
M B
E. TAYLOR ST.
N486596.4 E821290.6
N486760.5 E821286.2
N486761.9 E821285.3
N486786.9 E821305.6
N486886.9 E821307.5
N486766.9 E821393.7
N486749.5 E821830.2
N486889.3 E821836.0 N486873.7
E822061.4
N486486.4 E821340.0
N486600.9 E821532.4
N486617.0 E821435.0
N486766.9 E821433.7
N486749.3 E821794.8
N486718.2 E821850.0
N486849.8 E821834.4
N486825.8 E821846.4
N486796.8 E821832.2
N486525.9 E821410.2
N486559.6 E821466.8
N486718.5 E821794.8
N486676.4 E821849.9
N486675.9 E821917.2
N486740.5 E821917.2
N486848.1 E822061.3
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
PROPOSED MINE
OPENING MARKER
LOCATION. (10' EAST
OF MAIN SHAFT EDGE)
PROPOSED MINE
OPENING MARKER
LOCATION. (10' EAST OF
EAST AIR SHAFT EDGE)
N486591.0 E821516.7
N486567.1 E821531.7
N486556.5 E821514.7
N486580.3 E821499.7
N486886.3 E821879.7 N486882.8
E821929.6
N486886.3 E821284.5
N486895.4 E821880.1
N486892.8 E821930.0
N486898.6 E821284.7
N486899.5 E821399.4 D ep ar tm en t o f N at ur al R es ou rc es
St at e of
Il lin oi s
Sh ee t 3 o f 1
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
JK
3/
SCALE IN FEET
Ex is tin g
C on di tio ns a nd S ite In fo rm at io n
- E as t A ir Sh af t
M ai n
Sh af t
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
0 40 80
SITE CONTROL
Point Northing Easting Elevation Description
3 486868.43 822143.03 416.38 IRON PIN AND CAP
4 486919.41 821187.52 430.40 5 486917.15 821920.13 419.78
WARNING:
Potentially poisonous and explosive gases are escaping from the coal mine shafts. The Contractor shall be responsible for all safety precautions associated with the work including:
A) Monitoring escaping gases and/or atmospheric conditions in the vicinity of the work.
B) Providing safety equipment, breathing apparatus, etc. as needed to protect the health and safety of the Contractor's personnel.
C) Providing warnings and safety instructions to the Contractor's personnel to advise of potential dangers and necessary precautions to prevent ignition of explosive gases and/or breathing of poisonous gases.
D) Keeping unauthorised persons from the work area during the course of the work.
E) Implementing any and all other safety precautions which the Contractor determines nesessary to protect his workforce and equipment.
WARNING:
The original depth of the East Air Shaft as well as the Main Shaft was approximately 640 feet. The shafts have been previously sealed near the surface. The nature and integrity of the seals, and the shaft linings below those seals, are undetermined. Consequently, the reaction of the ground surface near the shafts when subjected to stress from equipment cannot be predicted. Use of equipment, particularly heavy equipment, could cause sloughing or shaft cave-in. The Contractor shall be responsible for all necessary safety precautions to protect the Contractor's equipment and personnel from damage, injury, or loss in performance of the work, including:
A) Choice of type and size of equipment.
B) Use of safety lines.
C) Providing warnings and safety instructions to the Contractor's personnel to advise of potential dangers associated with shaft collapse.
D) Implementing any and all other safety precautions the Contractor shall determine nesessary to protect his workforce and equipment.
LEGEND
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS COORDINATESN 369,940
E 882,830
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
WATER CHANNEL/EDGE
TRANSFORMER
G G G
W W W
FO FO FO
E E E APPROXIMATE UNDERGROUND ELECTRIC
APPROXIMATE GAS
APPROXIMATE WATER
APPROXIMATE COMMUNICATIONS
JUNK AND CONCRETE
TO BE REMOVED (SEE SHEET 6)
IRON PIN AND CAP
IRON PIN AND CAP
NOTE:
UTILITIES SHOWN ARE APPROXIMATE. CONTRACTOR
TO VERIFY LOCATION OF ALL EXISTING UTILITIES.
AutoCAD SHX Text
PROPOSED CONSTRUCTION SIGN LOCATION
W
X X
X
X X X X X X X X X
X X
X
E E E E
E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E E
E
E
E
E
E
E E E E E
E E
E E
E E E
E E E E E E E
E
E E
E E
E E
E E
E E
EEEEEEEEEEEEE
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
W W
W W
W W
W W
W W
W
W
W
W
W
W W
W W
W W
W
W W
W
FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
W W W W W W
W W
W W
W W
HOUSE
HOUSE
GARAGE
HOUSE
HOUSE
HOUSE
SHED
SHED
SHEDS
GARAGE
WATER SURFACE
ELEVATION=420.4
ON 8/16/2024
430431
MAIN
SHAFT
CP4
M B
E. TAYLOR ST.
Remove Existing Trees
Remove Existing Tree Stump
Mailboxes to be Temporarily Relocated During Construction then Permanently Relocated to Realigned Cedar Lane.
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FOFOFO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 4 o f 1
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
JK
3/
SCALE IN FEET
Ex is tin g
C on di tio ns a nd S ite In fo rm at io n
- M ai n
Sh af t
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
0 20 40
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
JUNK AND CONCRETE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
APPROXIMATE UNDERGROUND ELECTRIC
WATER CHANNEL/EDGE
TRANSFORMER
G G G APPROXIMATE GAS
W W W APPROXIMATE WATER
FO FO FO APPROXIMATE COMMUNICATIONS
E E E
CONTOUR
TO BE REMOVED (SEE SHEET 6)
E E E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
W
FO FO FO
GARAGE
HOUSE
GARAGE
BRIDGE
CARPORT
WATER SURFACE
ELEVATION=420.4
ON 8/16/2024
420421422423424425
CP3
CP5
AREA TO BE CLEARED
EAST AIR
SHAFT
E. TAYLOR ST.
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 5 o f 1
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
JK
3/
SCALE IN FEET
Ex is tin g
C on di tio ns a nd S ite In fo rm at io n
- E as t A ir Sh af t
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
0 20 40
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
JUNK AND CONCRETE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
APPROXIMATE UNDERGROUND ELECTRIC
WATER CHANNEL/EDGE
TRANSFORMER
G G G APPROXIMATE GAS
W W W APPROXIMATE WATER
FO FO FO APPROXIMATE COMMUNICATIONS
E E E
CONTOUR
TO BE REMOVED (SEE SHEET 6)
AREA TO BE CLEARED
TEMPORARY CROSSING PER SECTION 616 OF THE SPECIAL PROVISIONS
X X X X
X
H O
U
SE
H O
U
SE
HOUSE
HOUSE
GARAGE
HOUSE HOUSE
GARAGE
HOUSE
HOUSE
H O
U
SE
SH
ED
SH
ED
SHEDS
GARAGE
BRIDGE
CARPORT
WATER SURFACE
ELEVATION=420.4
ON 8/16/2024
MAIN
SHAFT
EAST AIR
SHAFT
CP3
CP4 CP5
M B
E. TAYLOR ST.
9 10
APPROXIMATE AREA
OF PROPOSED MINE
REFUSE EXCAVATION
(100 CU YD)
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 6 o f 1
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
JK
3/
SCALE IN FEET
Sp ec ia l E xc av at io n
- C on cr et e an d
Ju nk
R em ov al
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
JUNK AND CONCRETE TO BE REMOVED
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
WATER CHANNEL/EDGE
0 40 80
NOTE:
VOIDS LEFT BY REMOVAL OF CONCRETE SHALL BE
GRADED AND BACKFILLED TO MATCH ADJACENT AREAS
AND FOR DRAINAGE. EARTH FILL MATERIAL SHALL BE
FROM SPECIAL EXCAVATION, EARTH EXCAVATION OR
PROPOSED FURNISHED EXCAVATION (100 CU YD).
EXISTING CAP UNKNOWN THICKNESS
TO BE REMOVED
PLAN
PROFILE
EXISTING EAST AIR SHAFT BEFORE DEMOLITION
PROFILE
EAST AIR SHAFT AFTER DEMOLITION
18.5'
11' +/- 1.5'
Approx 1.0'
THIS AREA PRESENTLY FILLED WITH DIRT AND
DEBRI TO BE REMOVED AND DISPOSED OF
Approx 5'
Approx 640' Deep
EXISTING GROUND LEVEL
TWO MATTS #6 REBAR @ 12" CENTERS
PROPOSED ROCKFILL, C4 (5500 TONS) AND ON-SITE RUBBLE.
FILL WITH RR#4 OR NON-COMBUSTIBLE MATERIAL FROM
WITHIN CONSTRUCTION LIMITS. NO STEEL BARS CAN
PROTRUDE FROM CONCRETE.
PROPOSED PORTLAND CEMENT
CONCRETE CAP (23 CU YD)
36" THICK
COVERED CARPORT
(RV PARKING)
12'
2.5'
FILL 3:1FILL 3:1
NOTE:
ALL DIRECTIONAL BORING AND PERFORATION OF THE EAST AIR SHAFT
SHALL BE PERFORMED PRIOR TO DIRECTIONAL BORING AND
PERFORATION OF THE MAIN SHAFT.
PLAN
EAST AIR SHAFT PROFILE DIRECTIONAL BORING PLAN
60' Minimum
48" MINIMUM DIAMETER
FAN
DRILL MINIMUM 8" HOLE THROUGH SHAFT WALL
BORING STEM
SUBMERGENCE PIT
TWELVE FEET DEEP x 5
FEET x 5 FEET
AIR SHAFT
48" FAN WITH MINIMUM
CAPACITY OF 19,000 CFPM
SUBMERGENCE PIT BORING STEM
DIRECTIONAL
BORING MACHINE
EXISTING GROUND LEVEL
KEEP TWO FEET OF WATER ABOVE
BIT AT ALL TIMES DURING DRILLING
10'0" Minimum
DRILL MINIMUM 8" HOLE
THROUGH SHAFT WALL
SEE SPECIAL PROVISIONS:
- SECTION 218 FOR EAST AIR SHAFT DIRECTIONAL BORING
- SECTION 501 FOR EAST AIR SHAFT EXISTING CAP REMOVAL
- SECTION 216 FOR EAST AIR SHAFT FILL
C he ck ed
B y
W ar d
M in e R ec la m at io n
Pr oj ec t
AM
L-
IF
rE
-2
Fr an kl in C ou nt y
D ire ct io na l B or in g an d D em ol iti on
Pl an
Ea st A ir Sh af t
Sh ee t 7 o f 1
D ra w n
By
D at e
R M
S 3/
M ar
- 9
:5 1a m X
:\2
4\
2\ ac \2
4-
B en to n Sh ee t D et ai ls
-8 .d w g:
L ay ou t T ab 'S he et
LEGEND
SHAFT STRUCTURE
GROUND SURFACE
BORING MACHINE
CONCRETE
FILL MATERIAL
CONCRETE REMOVED
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
0 16'8'
EXISTING CAP
UNKNOWN THICKNESS
TO BE REMOVED
PLAN
PROFILE
EXISTING MAIN SHAFT BEFORE DEMOLITION
PROFILE
MAIN SHAFT AFTER DEMOLITION
17'
11'
UNKNOWN
Approx 640' Deep
EXISTING GROUND
LEVEL
TWO MATTS #6 REBAR
@ 12" CENTERS
3' Minimum
EXISTING ACCESS ROAD
NOTE: EXACT SHAFT DIMENSIONS AND
WALL THICKNESS ARE UNKNOWN
TA
YL
O R
S
TR
EE
T
NOTE:
ALL DIRECTIONAL BORING AND PERFORATION OF THE EAST AIR SHAFT
SHALL BE PERFORMED PRIOR TO DIRECTIONAL BORING AND
PERFORATION OF THE MAIN SHAFT.
PROPOSED PORTLAND CEMENT
CONCRETE CAP (24 CU YD)
36" THICK
NOTES:
1. EXISTING SUPPORT STRUCTURE (NOT SHOWN)
TO BE REMOVED AS NOTED ON SHEET 6.
2. EXISTING PIPES TO BE REMOVED TO BELOW
PROPOSE CAP (INCIDENTAL).
AREA TO BE FILLED WITH SUITABLE
EARTH EXCAVATION
2" PVC PIPE WITH VALVE INSTALLED IN CONCRETE CAP. VALVE
TO BE ENCLOSED IN 24" DIAMETER CONCRETE ENCLOSURE
WITH LID FLUSH WITH GROUND. (VALVE AND ENCLOSURE
INCIDENTAL TO PORTLAND CEMENT CONCRETE CAP PAY ITEM.
PROPOSED ROCKFILL, C4 (5500 TONS) AND ON-SITE RUBBLE.
FILL WITH RR#4 OR NON-COMBUSTIBLE MATERIAL FROM
WITHIN CONSTRUCTION LIMITS. NO STEEL BARS CAN
PROTRUDE FROM CONCRETE.
2" PVC PIPE
VALVE
24" DIAMETER CONCRETE
ENCLOSURE WITH LID
VALVE DETAIL
ROCKFILL
EARTH
EXCAVATION
PORTLAND CEMENT
CONCRETE CAP
PLAN
SECTION
MAIN SHAFT PROFILE DIRECTIONAL BORING PLAN
60' Minimum
48" MINIMUM
DIAMETER FAN
DRILL MINIMUM 8" HOLE
THROUGH SHAFT WALL
BORING STEM
SUBMERGENCE PIT
TWELVE FEET DEEP x 5 FEET x 5 FEET
AIR SHAFT
48" FAN WITH MINIMUM
CAPACITY OF 19,000 CFPM
SUBMERGENCE PIT
BORING STEM
DIRECTIONAL
BORING MACHINE
EXISTING GROUND LEVEL
KEEP TWO FEET OF
WATER ABOVE BIT AT ALL
TIMES DURING DRILLING
10.0' Minimum
DRILL MINIMUM
8" HOLE
THROUGH
SHAFT WALL
EXISTING ACCESS ROAD
TA
YL
O R
S
TR
EE
T
SEE SPECIAL PROVISIONS:
- SECTION 218 FOR MAIN SHAFT DIRECTIONAL BORING
- SECTION 501 FOR MAIN SHAFT EXISTING CAP REMOVAL
- SECTION 216 FOR MAIN SHAFT FILL
C he ck ed
B y
W ar d
M in e R ec la m at io n
Pr oj ec t
AM
L-
IF
rE
-2
Fr an kl in C ou nt y
D ire ct io na l B or in g an d D em ol iti on
P la n
- M ai n
Sh af t
Sh ee t 8 o f 1
D ra w n
By
D at e
R M
S 3/
M ar
- 9
:5 1a m X
:\2
4\
2\ ac \2
4-
B en to n Sh ee t D et ai ls
-8 .d w g:
L ay ou t T ab 'S he et
LEGEND
SHAFT STRUCTURE
GROUND SURFACE
BORING MACHINE
CONCRETE
FILL MATERIAL
CONCRETE REMOVED
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
W
XXX
X X
X X
E E
E E
E E E E E E E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E E E E E E
E E
E E
E E
E E
E
E E
E E E E E E E E
E E
E E
E E E E E E E E E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
G
G G G G G G G G G G G G G G G G G
G G
G G
G G
G G
G
G G G G G G G G G G G G G G
G G
G G G G G G G G G G G G G G G
W W
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
FO FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W W
W W
W W
W W W W W W
H O
U
SE
H O
U
SE
H O
U
SE
SHED
SH
ED
S
G
AR
AG
E
M
AIN
SH
AFT
MB
0+
1+
2+00
3+00
4+00 5+00 5+24
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
W W
W W
W W
W
W
W
W
W
W W
W W W W W W W W W
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00
7.
EX
9.
EX
/P R
8.
EX
/P R
8.
EX
/P R
0.
EX
/P R
0.
EX
/P R
0.
EX
/P R
0.
EX
/P R
1.
EX
1.
P
R
0.
EX
0.
P
R
9.
EX
9.
P
R
1.4% -1.9% -0.9%
PV
C
S
TA
.3 +8
2.
PV
C
E
LE
V.
1.
PV
I S
TA
.3
+9 5.
PV
I E
LE
V.
1.
PV
T
ST
A.
4+
.5
PV
T
EL
EV
.4
.2
25.00VC
347.29SD
CREST STA.3+93.10
CREST ELEV.431.40
7.76K-Val 1.4% -1.9%
PV
C
S
TA
.4 +8
7.
PV
C
E
LE
V.
9.
PV
I S
TA
.5
+0 0.
PV
I E
LE
V.
9.
PV
T
ST
A.
5+
.5
PV
T
EL
EV
.4
.4
25.00VC
1000.00SD
25.23K-Val
-1.9% -0.9%
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 9 o f 1
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
R M
3/
SCALE IN FEET
N ew
A cc es s
R oa d
- P la n an d
Pr of ile
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
0 20 40
SCALE IN FEET
0 20 40
0 10 20VERTICAL
HORIZONTAL
Notes
1. NOTE 1
EARTH EXCAVATION AND AGGREGATE BASE TO
BE CONSTRUCTED ALONG REALIGNED
SECTION OF THE ENTRANCE FOR TEMPORARY
ACCESS TO PRIVATE PROPERTIES PRIOR TO
RECLAMATION WORK ON MAIN SHAFT. HMA TO
BE CONSTRUCTED AFTER RECLAMATION IS
COMPLETE.
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
WATER CHANNEL/EDGE
TRANSFORMER
G G G
W W W
FO FO FO
E E E
CONTOUR
PAVEMENT REMOVAL
PROPOSED CULVERT
PROPOSED ROAD EDGE
JUNK AND CONCRETE
TO BE REMOVED (SEE SHEET 6)
APPROXIMATE UNDERGROUND ELECTRIC
APPROXIMATE GAS
APPROXIMATE WATER
APPROXIMATE COMMUNICATIONS
AutoCAD SHX Text PLACE 8" AGGREGATE BASE COURSE AND PAVE HOT-MIX ASPHALT BINDER AND SURFACE COURSES
AutoCAD SHX Text REMOVE EXISTING PAVEMENT, PLACE 8" AGGREGATE BASE COURSE AND PAVE HOT-MIX ASPHALT BINDER AND SURFACE COURSES
AutoCAD SHX Text
PROPOSED PRIVATE ENTRANCE TYPICAL SECTION
AutoCAD SHX Text
NO SCALE STA 0+29 TO STA 1+00 STA 3+68 TO STA 5+16
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text
2.00% MAX & VARIES
AutoCAD SHX Text
PROPOSED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 - 1 "34"
AutoCAD SHX Text
PROPOSED HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 - 2 "14"
AutoCAD SHX Text
PROPOSED AGGREGATE BASE COURSE, TY. A, 8"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text
2.00% MAX & VARIES
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text
PROPOSED PRIVATE ENTRANCE TYPICAL SECTION
AutoCAD SHX Text
NO SCALE STA 1+00 TO STA 3+68
AutoCAD SHX Text
25' RADIUS (BOTH SIDES)
AutoCAD SHX Text
STA 5+09.95, 27.48' LT PROPOSED ELEV 427.70
AutoCAD SHX Text PROPOSED REALIGNED HOT-MIX ASPHALT ENTRANCE WITH AGGREGATE BASE (SEE TYPICAL SECTION STA 3+68 TO STA 5+16)
AutoCAD SHX Text
PROPOSED PAVEMENT REMOVAL AND REGRADING
AutoCAD SHX Text 1'
AutoCAD SHX Text
STA 3+68
AutoCAD SHX Text REMOVE PAVEMENT AND REPLACE WITH 8" AGGREGATE BASE COURSE AND HOT-MIX ASPHALT BINDER AND SURFACE COURSE ON SAME ALIGNMENT (SEE TYPICAL SECTION STA 1+00 TO STA 3+68)
AutoCAD SHX Text
PROPOSED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70 - 1 "34"
AutoCAD SHX Text
PROPOSED HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 - 2 "14"
AutoCAD SHX Text
PROPOSED AGGREGATE BASE COURSE, TY. A, 8"
AutoCAD SHX Text 1'
AutoCAD SHX Text
EXISTING HMA PAVEMENT
AutoCAD SHX Text
64' PROPOSED CULVERT (12" RCCP)
AutoCAD SHX Text
STA 5+10.61, 36.52' RT PROPOSED ELEV 427.45
AutoCAD SHX Text
REMOVE EXISTING 8" CMP CULVERT
AutoCAD SHX Text
EXISTING CONCRETE PAD
AutoCAD SHX Text 30 TONS PROPOSED AGGREGATE BASE COURSE, TYPE A (6" DEPTH 50'x13')
AutoCAD SHX Text 120 SQ FT PROPOSED PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (4'x30')
AutoCAD SHX Text PROPOSED REALIGNED HOT-MIX ASPHALT ENTRANCE WITH AGGREGATE BASE (SEE TYPICAL SECTION STA 0+29 TO STA 1+00)
AutoCAD SHX Text
REGRADE DITCH IN 50'
REGRADE DITCH IN 50'
XXX
X
X
H O
U
SE
SHED
SH
ED
S
G
AR
AG
E
M
AIN
SH
AFT
MB
0+00
1+
2+00
3+00
4+00 5+00 5+24
E E E
E E
E
E
E
E
E
E
E
E
W W
FO
HOUSE
GARAGE
BRIDGE
CARPORT
CP3
420421422423424425
EAST AIR
SHAFT
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 1 of
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
R M
6/
Er os io n C on tro l & T em po ra ry
Sa fe ty F en ci ng P la n
Bo th S ite s
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
WATER CHANNEL/EDGE
TRANSFORMER
CONTOUR
PROPOSED CULVERT
PROPOSED SILT FENCE
PROPOSED DITCH CHECK
PROPOSED ROAD EDGE
SCALE IN FEET
0 20 40
SCALE IN FEET
0 20 40
JUNK AND CONCRETE
TO BE REMOVED (SEE SHEET 6)
PROPOSED TEMPORARY SAFETY FENCING
AutoCAD SHX Text
PROPOSED TEMPORARY DITCH CHECK (16 FT)
AutoCAD SHX Text
PROPOSED PERIMETER EROSION BARRIER (550 FT)
AutoCAD SHX Text
PROPOSED PERIMETER EROSION BARRIER (150 FT)
AutoCAD SHX Text
PROPOSED PERIMETER EROSION BARRIER (350 FT)
AutoCAD SHX Text
PROPOSED TEMPORARY DITCH CHECK (16 FT)
AutoCAD SHX Text PROPOSED TEMPORARY SAFETY FENCE IN ACCORDANCE WITH SECTION 665 OF THE SPECIAL PROVISIONS (425 FT)
PROPOSED TEMPORARY SAFETY FENCE IN ACCORDANCE WITH SECTION 665 OF THE SPECIAL PROVISIONS (250 FT)
W
XXX
X X
X X
X X
X X
X
X X X
E E
E E
E E E E E E E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E E E E E E
E E
E E
E E
E E
E
E E
E E E E E E E E
E E
E E
E E E E E E E E E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
G
G G G G G G G G G G G G G G G G G
G G
G G
G G
G G
G
G G G G G G G G G G G G G G
G G
G G G G G G G G G G G G G G G
W W
FO
FO
FO
FO
FO
FO
FO FO FO FO FO
FO
FO FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
W W
W W
W W
W W W W W W
H O
U
SE
H O
U
SE
G
AR
AG
E
H O
U
SE
SHED
SH
ED
S
G
AR
AG
E
W
ATER
SU
R
FAC
E
ELEVATIO
N
=420.4 O
N 8/16/2024
M
AIN
SH
AFT
MB
E. TAYLO
R
ST.
0+00
1+
2+00
3+00
4+00 5+00 5+24
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
W W
W W
W W
W
W
W
W
W
W W
W W W W W W W W W
W W W W W W W W W W W W W W W W W W W
W
W
W
W W W
W W W W W W W W W W W W W W W W W W W W W W W
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 1 of
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W ar d M in e
R M
6/
Pl an tin g Pl an
N ew
W at er S er vi ce s
Pl an
M ai n
Sh af t S ite
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
LEGEND
CONSTRUCTION LIMITS
CONTROL POINT
CULVERT
EDGE OF MINE REFUSE
X X X X X FENCE
ROADS OTHER
ROADS PAVED
STRUCTURE
TREELINE
WATER CHANNEL/EDGE
TRANSFORMER
CONTOUR
PROPOSED CULVERT
PROPOSED ROAD EDGE
PROPOSED EVERGREEN, EASTERN WHITE
PROPOSED TREE, PIN OAK, 2-1/2" CALIPER,
PINE, 6' HEIGHT, BALLED AND BURLAPPED
BALLED AND BURLAPPED
SCALE IN FEET
0 20 40
JUNK AND CONCRETE
TO BE REMOVED (SEE SHEET 6)
G G G
W W W
FO FO FO
E E E APPROXIMATE UNDERGROUND ELECTRIC
APPROXIMATE GAS
APPROXIMATE WATER
APPROXIMATE COMMUNICATIONS
W W W PROPOSED WATER
AutoCAD SHX Text (1)
AutoCAD SHX Text (2)
AutoCAD SHX Text (1)
AutoCAD SHX Text (2)
AutoCAD SHX Text MAIN SHAFT AREA: PROPOSED SEEDING CLASS 1 (1.2 ACRES) EAST AIR SHAFT AREA: PROPOSED SEEDING CLASS 1B (0.7 ACRES)
AutoCAD SHX Text NOTE: EXACT LOCATION OF PROPOSED TREES TO BE DETERMINED BY ENGINEER AFTER CONSULTING LANDOWNERS. AN ADDITIONAL JULIE LOCATE REQUEST WILL BE REQUIRED AT THAT TIME. CONSTRUCTION LIMITS WILL BE EXTENDED TO FACILITATE PLANTING, BUT NO ADDITIONAL SEEDING WILL BE REQUIRED.
AutoCAD SHX Text
TIE TO MR. BEBOUT'S EXISTING SERVICE LINE
AutoCAD SHX Text
TIE TO MRS. HALLIS' EXISTING SERVICE LINE
AutoCAD SHX Text
PROPOSED WATER METERS. (INCIDENTAL TO WATER SERVICE LINE 1" PAY ITEM)
PROPOSED WATER SERVICE LINE 1"
3'
5" DIAMETER BRASS TABLET
TO BE ANCHORED AND SET
IN CONCRETE
BRASS TABLET PROVIDED
BY I.D.N.R.
EXISTING GRADE
TUBULAR CONCRETE FORM
3'-0" INSIDE DIAMETER
(TO BE LEFT IN PLACE)
CLASS SI CONCRETE
(APPROX. 1 CUBIC YARD)
SOIL AT BASE OF
HOLE TO BE TAMPED
MINE OPENING MARKER DETAIL
FOR EACH SHAFT
EXACT LOCATION TO BE SET BY ENGINEER
1. Furnishing, erecting and removing the sign shall be incidental to the contract.
2. The sign shall be painted on 12" or thicker exterior plywood (4' x 8'), color shall be black on white, and a
10" diameter Illinois state seal shall be provided by the D.N.R.
3. The posts shall be made of 4" x 4" wood or 2.5" metal pipe, and shall be 10' long. The sign shall be securely fastened to the posts with six 2.5" long, round head wood screws (for wood posts) or four 5" long, 3 8" diameter carriage bolts (for wood or metal posts).
4. The top of the sign shall be level with the top of the posts, and the posts shall be 1' from the edges of the sign. The posts shall be set in the ground 3', so that the bottom of the sign is 3' from the ground.
Natalie Phelps Finnie, Director Funding provided by the US Department of the Interior, Office of Surface Mining, with funding from the Infrastructure Investment & Jobs Act Abandoned Mined Land Grant
1.75" 1.75"1.0"
4.5"
10" dia.
state seal
ABANDONED MINED LANDS
RECLAMATION PROJECT
STATE OF ILLINOIS
J.B. PRITZKER, GOVERNOR
Department of Natural Resources
3.5"
3.5"
3.5"
3.5"
3.5"
1.5"
3.5
4.5"
2.5"
2.5"
SPACING LETTERS
1.5"
2.5"
2.5"
CONSTRUCTION SIGN DETAIL
EXACT LOCATION TO BE SET BY ENGINEER
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 1 of
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W
AR
D M
IN
E
JK
3/
M in e M ar ke r a nd
C on st ru ct io n Si gn D et ai ls
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
D ep ar tm en t o f N at ur al
R es ou rc es St at e of Il lin oi s
Sh ee t 1 of
D ra w n
By
C he ck ed
B y
D at e
AM
L-
IF
rE
-2
M in e
R ec la m at io n Pr oj ec t
Fr an kl in
C ou nt y
W
AR
D M
IN
E
R M
/2
H au l R ou te R oa dw ay R ep ai rs
Ab an do ne d M in ed
L an ds R ec la m at io n
D iv is io n O ffi ce o f M in es a nd
M in er al s
2" HMA
C
VARIES 10'
L
BUTT JOINT
NOT TO SCALE
NOT TO SCALE
EXISTING SURFACE
MATCH EXISTING
RADIUS
EDGE OF SHOULDER
EDGE OF PAVEMENT
EDGE OF SHOULDER
EDGE OF PAVEMENT
MATCH EXISTING
RADIUS OR FLARE
EDGE OF SHOULDER
EDGE OF PAVEMENT
EDGE OF SHOULDER
EDGE OF PAVEMENT
1-1/2" BUTT JOINT
1-1/2" BUTT JOINT
H M
A
SU
R
FA
C E
C O
U R
SE
H M
A
SU
R
FA
C E
C O
U R
SE
NOT TO SCALE
NOT TO SCALE
2" HMA
C
VARIES 5' MIN & VAR
L
BUTT JOINT
EXISTING SURFACE
5' M
IN
VA
R
IE
S
SURFACE
EXISTING
2" BUTT JOINT
TRANSITION LENGTH 50' AND VARIES
HMA SC C N705' TEMP RAMP
HAUL ROAD REPAIR NOTES:
After completion of major hauling activities related to filling of the mine shafts, debris and pavement removal, entrance replacement, etc. included in the Ward Mine Reclamation Project, the existing oil and chip access roadways shall be repaired as detailed in these Plans.
The limits of the repairs shall be Stuyvesant Street from IL Route 14 through the intersection with Taylor Street as well as East Taylor Street from Stuyvesant Street to the bridge just east of the East Air Shaft site.
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text
20' FOR AND VAR FOR STUYVESANT ST 18' AND VAR FOR TAYLOR ST
AutoCAD SHX Text
EXISTING OIL & CHIP PAVEMENT
AutoCAD SHX Text
EXISTING AGGREGATE BASE
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
EXISTING TYPICAL SECTION
AutoCAD SHX Text
NO SCALE STUYVESANT STREET TAYLOR STREET
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
EXISTING EARTH SHOULDER
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text
MATCH EX
AutoCAD SHX Text
20' AND VAR FOR STUYVESANT ST 18' AND VAR FOR TAYLOR ST
AutoCAD SHX Text
PROPOSED 1 " HOT-MIX 12" HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N70
AutoCAD SHX Text 3'
AutoCAD SHX Text
PROPOSED TYPICAL SECTION
AutoCAD SHX Text NO SCALE STUYVESANT STREET (FROM IL RTE 14 TO TAYLOR ST) 2,560 FT TAYLOR STREET (FROM STUYVESANT ST TO BRIDGE) 1,300 FT
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
PROPOSED AGGREGATE SHOULDERS, TY A (WEDGE)
AutoCAD SHX Text
PROPOSED 1 " HOT-MIX 12" HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N70
AutoCAD SHX Text
PROPOSED SCARIFYING, GRADING AND RECOMPACTING ROAD BASE
AutoCAD SHX Text 3'
AutoCAD SHX Text
PROPOSED AGGREGATE SHOULDERS, TY A (WEDGE)
AutoCAD SHX Text
%%USIDE ROAD DETAIL
AutoCAD SHX Text
%%UENTRANCE DETAIL
AutoCAD SHX Text
TYPICAL SIDE ROAD DETAILS
AutoCAD SHX Text
VARIABLE WIDTH
AutoCAD SHX Text
VARIABLE
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
TYPICAL ENTRANCE DETAILS
AutoCAD SHX Text
BUTT JOINT DETAIL
NO SCALE
| Cover Page.pdf |
| missing 1 signature Plans Sheets 2514 Ward Mine Reclamation Project |
| 24142 - 2301 Final Sheet 2-Sheet 2 |
| 24142 - 2301 Final Sheet 3 IDNR-Sheet 3 |
| 24142 - 2301 Final Sheet 4 IDNR-Sheet 4 |
| 24142 - 2301 Final Sheet 5 IDNR-Sheet 5 |
| 24142 - 2301 Final Sheet 6 IDNR-Sheet 6 |
| 24-142 2247 Benton Sheet Details 7-8-Sheet 7 |
| Sheets and Views |
| Sheet 7 |
| 24-142 2247 Benton Sheet Details 7-8-Sheet 8 |
| Sheets and Views |
| Sheet 8 |
| 24142 - 2301 Final Sheet 9 - PlanProf Entrance IDNR-Sheet 9 |
| Sheets and Views |
| Sheet 9 |
| 24142 - 2301 Final Sheet 10 - Erosion Control Plan-Sheet 10 |
| 24142 - 2301 Final Sheet 11 - Planting Plan-Sheet 11 |
| 24142 - 2301 Final Sheet 12-Sheet 12 |
| 24142 - 2301 Final Sheet 13-Sheet 13 |
| Sheets and Views |
| Sheet 13 |
File details come from the government source that posted it. Updated .