Plan Sheets 03-08 (Addendum 2) 1-26-24.pdf

PDF 4 MB Posted

Attached to
Clinton Twp. - Clinton River Rd. Water Main Replacement (17 Mile to Romeo Plank)
Solicitation number
Clinton River Rd. W.M. Replacement (17 Mi. to Romeo Plank)
Issued by
Macomb County, Clifford Village, Michigan

About this file

These construction plan and profile sheets detail a water main replacement project for Clinton Township, Michigan, specifically along Clinton River Road from 17 Mile Road to Romeo Plank Road. The project involves replacing approximately 3,200 linear feet of existing water main using various installation techniques including horizontal directional drilling, open cut trenching, and bore and jack methods. The plans include detailed specifications for 12-inch water main installation using HDPE and PVC pipe, with multiple location-specific components such as fire hydrant assemblies, gate valves, bends, tees, and water service transfers. The estimated quantities include 651 feet of HDPE directional drill water main, 310 feet of PVC trench water main, 75 feet of steel casing pipe, and associated infrastructure like gate valves, hydrant removals, and sidewalk repairs.

The project is being engineered by Anderson, Eckstein and Westrick, Inc., with preliminary plans dated November 2023 and an addendum issued on January 26, 2024. The construction documents indicate multiple bench marks and elevation references along the project corridor, with water main depths ranging between approximately 589.50 and 597.59 feet. The estimated quantities suggest significant infrastructure work, including abandoning existing 12-inch and 8-inch water mains, removing and replacing sidewalks and curbs, and making connections to existing water infrastructure. The plans show careful consideration of existing underground utilities, with multiple caution notes highlighting the presence of underground infrastructure that must be carefully managed during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.M.#855

B.M.#856

10+00

11+00

12+00

13+00 14+00

15+00

16+00

10+00 11+00 12+00 13+00 14+00 15+00 16+00

EX. LEFT EDGE

OF PAVEMENT

EX. LEFT EDGE OF PAVEMENT

M

IL

E

R O

A D

EX. LEFT RIGHT OF WAY

EX. LEFT RIGHT OF WAY

S

TA

. 1 3+

.0

C O

N N

EC

T

TO

E

X

S

TA

5+

.0

(1 2" x6

TE

E)

T /P

IP

E

1.

CAUTION:

EX. UGD. UTIL.

IN THIS AREA

CAUTION:

EX. UGD. UTIL.

IN THIS AREA

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

Water Main, PVC (C-900 DR 14) 12 inch Tr Det G

S

TA

3+

.6

5°

H O

R

IZ

B

EN

D T

/P

IP

E

9.

S

TA

3+

.5

2.

5° H

O R

IZ

B

EN

D

T /P

IP

E

9.

S

TA

3+

.5

(1 2" x8

TE

E)

T /P

IP

E

0.

E X

.4

T/

PI

PE

.6

E X

.1

T/

PI

PE

.6

E X

.5

T/

PI

PE

.4

E X

.4

T/

PI

PE

.1

E X

.6

T/

PI

PE

.1

E X

.5

T/

PI

PE

.1

E X

.1

T/

PI

PE

.0

NOTE:

ALL DUCTILE IRON TRANSITION FITTINGS TO

GATE VALVES AND HYDRANT TEES SHALL BE

INCIDENTAL TO THE "WATER MAIN, HDPE, SDR-11,

12 INCH DIRECTIONAL DRILL" PAY ITEM. ASSUME

COMPACTED SAND BACKFILL IS NEEDED AT ALL

VALVE AND HYDRANT TEE LOCATIONS.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

600 CONSTRUCTION

PLAN AND PROFILE

STA. 10+00 TO STA. 16+50

DBK SJC NOVEMBER 2023

1" = 30'

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

03_CONST--1/24/2024 9:47:49 AM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

EE

T

)16 +5

CLINTON RIVER ROAD(76' WIDE) CLINTON RIVER ROAD

(66' WIDE)

M

IL

E

R O

A D

(1

' W

ID

E)

BENCH MARK NO. 143

ARROW ON HYDRANT,

S. SIDE 17 MILE RD.,

±400' W. OF CLINTON

RIVER RD.

ELEVATION: 600.10

BENCH MARK NO. 855

SET MAG NAIL, E. FACE

OF UTILITY POLE W/

TRANSFORMER, N.W.

QUADRANT OF 17 MILE

RD. & CLINTON RIVER RD.

ELEVATION: 598.32

BENCH MARK NO. 856

SET MAG NAIL, S. FACE

OF UTILITY POLE, E.

SIDE CLINTON RIVER RD.

@ E. ⅊ OF #17828

ELEVATION: 597.43

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

Water Main, Abandon, 12 inch (CAP

AND FILL WITH FLOWABLE FILL)

Water Main Connection, 12 inch

STA. 13+04.00, 33.50' LT.

DIRECTIONAL DRILL PIT

119 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM DRILL PIT TO TEE)

12" X 6" TEE AND THRUST BLOCK

STA. 15+00, 15.87' LT

Fire Hydrant Assembly

STA. 15+00, 22.66' LT

F.G. 596.80

153 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM TEE TO STA. 16+50)

45° BEND AND THRUST BLOCK

STA 13+07.64, 27.83' LT

ESTIMATED QUANTITIES

(THIS SHEET)

1. Water Main, Abandon, 12 inch 336 Ft

2. Fire Hydrant Assembly 1 Ea

3. Gate Valve and Box, 8 inch 1 Ea

4. Water Main, HDPE, SDR-11, 12 inch, Directional Drill 272 Ft

5. Water Main, PVC (C-900 DR 14), 8 inch, Tr Det G 12 Ft

6. Water Main, PVC (C-900 DR 14), 12 inch, Tr Det 69 Ft

7. Gate Well, Abandon 1 Ea

8. Water Serv, Transfer 1 Ea

9. Water Main Connection, 8 inch 1 Ea

10. Water Main Connection, 12 inch 1 Ea

11. Shld. Cl II, 6 inch 60 Syd

12. Water Main, 12 inch, Cut and Plug 1 Ea

Water Serv, Transfer

Water Main Connection, 8 inch

STA. 13+68.00, 18.80' LT.

12" X 8" TEE AND THRUST BLOCK

STA. 13+73.50, 27.87' LT

Gate Valve and Box, 8 inch

13+73.14, 26' LT

RIM 596.70

12 Ft - Water Main, PVC (C-900 DR 14), 8 inch, Tr Det G (FROM TEE TO WM CONNECTION)

7 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM WM CONNECTION TO BEND)

54 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM BEND TO TEE)

8 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM TEE TO DRILL PIT)

Gate Well, Abandon

5' M

IN

TY

P

5' M

IN

TY

P

ADDENDUM 2

Water Main, 12 inch, Cut and Plug

G

1/26/2024

B.M.#857

B.M.#743

B.M.#149

16+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

B.M.#858

17+00 18+00 19+00 20+00 21+00 22+00 23+00

EX. LEFT EDGE OF PAVEMENT

EX. LEFT EDGE OF PAVEMENT

EX. LEFT RIGHT OF WAY

EX. LEFT RIGHT OF WAY

S

TA

0+

.0

(1 2" x6

TE

E)

T /P

IP

E

9.

BOT 12" STM 589.09

TOP 12" WM 587.50

STA 17+38.4 45° BEND

T/PIPE 578.00

STA 18+13.4 45° BEND

T/PIPE 578.00

S

TA

7+

.4

5°

B

EN

D T

/P

IP

E

1.

S

TA

8+

.3

5°

B

EN

D T

/P

IP

E

9.

S

TA

0+

.3

5°

B

EN

D T

/P

IP

E

9.

S

TA

0+

.1

5°

B

EN

D T

/P

IP

E

7.

S

TA

0+

.1

5°

B

EN

D T

/P

IP

E

7.

S

TA

0+

.0

5°

B

EN

D T

/P

IP

E

9.

86Steel Casing Pipe, 24 inch, Jacked in Place

AND Water Main, PVC (C-900 DR 14), 12 inch, Bore

BOT 9'x10' STM 579.97

TOP 12" WM 578.00

E X

.8

T/

PI

PE

.6

E X

.1

T/

PI

PE

.0

E X

.6

T/

PI

PE

.8

E X

.9

T/

PI

PE

.8

E X

.2

T/

PI

PE

.0

E X

.4

T/

PI

PE

.0

E X

.7

T/

PI

PE

.1

E X

.1

T/

PI

PE

.0

E X

.3

T/

PI

PE

.0

E X

.7

T/

PI

PE

.9

E X

.9

T/

PI

PE

.8

E X

.0

T/

PI

PE

.8

E X

.8

T/

PI

PE

.5

E X

.1

T/

PI

PE

.5

E X

.1

T/

PI

PE

.6

ST

A

. 1 7+

.0

T/

PI

PE

.6

G

VW

R

IM

.8

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

Refer to "WATER MAIN LOWERING DETAIL" on sheet 2

ST

A

. 2 0+

.0

T/

PI

PE

.8

G

VW

R

IM

.0

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

NOTE:

ALL DUCTILE IRON TRANSITION FITTINGS TO

GATE VALVES AND HYDRANT TEES SHALL BE

INCIDENTAL TO THE "WATER MAIN, HDPE, SDR-11,

12 INCH DIRECTIONAL DRILL" PAY ITEM. ASSUME

COMPACTED SAND BACKFILL IS NEEDED AT ALL

VALVE AND HYDRANT TEE LOCATIONS. S

TA

8+

.6

1.

° H O

R

IZ

. B

EN

D T

/P

IP

E

9.

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G

S

TA

9+

.7

1.

° H

O R

IZ

. B

EN

D

T /P

IP

E

9.

S

TA

0+

.3

2.

° H

O R

IZ

. B

EN

D

T /P

IP

E

9.

S

TA

0+

.6

2.

° H

O R

IZ

. B

EN

D

T /P

IP

E

9.

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G

600 CONSTRUCTION

PLAN AND PROFILE

STA. 16+50 TO STA. 23+50

DBK SJC NOVEMBER 2023

1" = 30' HORIZ.

1" = 3' VERT.

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

04_CONST--1/24/2024 12:53:33 PM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

ATCH LINE STA.

(SEE SHEET )

16+50

M

AT

CH

L

IN

E

ST

A.

(S

EE

S

HE

ET

)23

CLINTON RIVER ROAD

(66' W

IDE)

CLINTON RIVER ROAD

(66' WIDE)

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

BENCH MARK NO. 743

ARROW ON HYDRANT, W.

SIDE OF CLINTON RIVER

RD. ±450' N. OF 17 MILE RD.

ELEVATION: 599.08

BENCH MARK NO. 857

SET MAG NAIL IN TOP ℄

OF WING WALL CULVERT

FOR KUKUK DRAIN, E.

SIDE CLINTON RIVER RD.

ELEVATION: 595.96

BENCH MARK NO. 149

ARROW ON HYDRANT,

±410' W. OF CEMETERY

ENTRANCE N. SIDE

CLINTON RIVER RD.

ELEVATION: 600.27

BENCH MARK NO. 858

SET MAG NAIL, N. FACE OF

UTILITY POLE, S. SIDE

CLINTON RIVER RD., 2ND

UTILITY POLE W. OF

CEMETERY ENTRANCE

ELEVATION: 594.73

CLINTON CONSOLIDATED NO 1 KUKUK

60 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM STA. 16+50 TO VALVE)

15 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det

G (FROM VALVE TO WM LOWERING BEGINNING)

BORE AND JACK PIT

75 Ft - Steel Casing Pipe, 24 inch, Jacked in Place AND Water Main, PVC (C-900 DR 14), 12 inch

50 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G

(FROM WM LOWERING ENDING TO DRILL PIT )

46 Ft - Water Main, PVC (C-900 DR-14), 12 inch, Tr Det G (FROM BEND TO TEE)

12" X 6" TEE AND THRUST BLOCK

STA. 20+00, 23.50' LT

Fire Hydrant Assembly

STA. 20+00, 21' LT

F.G. 594.75

WM LOWERING

BOT STM. I.E. 589.00±

TOP W.M. I.E. 587.50

238 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM DRILL PIT TO STA. 23+50)

ESTIMATED QUANTITIES

(THIS SHEET)

1. Gate Well, Abandon 2 Ea

2. Hydrant, Rem 2 Ea

3. Water Main, Abandon, 12 inch 734 Ft

4. Fire Hydrant Assembly 1 Ea

5. Water Main, HDPE, SDR-11, 12 inch, Directional Drill 298 Ft

6. Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G 310 Ft

7. Water Main, PVC (C-900 DR 14), 12 inch, Bore 75 Ft

8. Steel Casing Pipe, 24 inch, Jacked in Place 75 Ft

9. Shld. Cl II, 6 inch 280 Syd

10. Gate Valve and Box, 12 inch 2 Ea

11. Sidewalk, Rem 100 Syd

12. Sidewalk, Conc, 4 inch 900 Sft

13. Storm Sewer Remove and Replace 50 Ft

Hydrant, Rem

Hydrant, Rem

Gate Well, Abandon

Gate Well, Abandon

WM LOWERING

BOT STM. I.E. 579.97±

TOP W.M. I.E. 578.00

15 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM VALVE TO BEND)

Gate Valve and Box, 12 inch

STA. 20+10, 23.50' LT

RIM 595.00

29.6'

31.5'

120'

45'

BORE AND JACK PIT

CLINTON CONSOLIDATED #1

KUKUK DRAIN EASEMENT

CLINTON CONSOLIDATED #1

KUKUK DRAIN EASEMENT

DIRECTIONAL DRILL PIT

63 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM BEND TO DRILL PIT)

15 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (FROM BEND TO BEND)

8 Ft - Water Main, PVC (C-900 DR-14), 12 inch, Tr Det G (FROM DRILL PIT TO BEND)

88 Ft - Water Main, PVC (C-900 DR-14), 12 inch, Tr Det G (FROM BEND TO BEND)

11.25 DEG BEND AND THRUST

BLOCK ST. 18+61, 25.3' LT

22.50 DEG BEND AND THRUST

BLOCK ST. 20+25, 20' LT

11.25 DEG BEND AND THRUST

BLOCK ST. 19+50, 24.3' LT

22.50 DEG BEND AND THRUST

BLOCK ST. 20+38, 15' LT

Gate Valve and Box, 12 inch

STA. 17+22, 17.10' LT

RIM 597.10

5' M

IN

TY

P

5' M

IN

TY

P

5' M

IN

TY

P

5' M

IN

TY

P

DATE SUBMITTALS/REVISIONS

ADDENDUM 2

Sidewalk, Rem & Sidewalk, Conc, 4 inch

50 Ft - Storm Sewer Remove and Replace

LEGEND

Sidewalk, Rem & Sidewalk, Conc, 4 inch

Remove & Replace Ex. Storm Sewer

B.M.#859

B.M.#150

24+00 25+00

26+00 27+00

28+00 29+00

30+00

24+00 25+00 26+00 27+00 28+00 29+00 30+00

EX. LEFT EDGE OF PAVEMENT

EX. LEFT EDGE OF PAVEMENT

EX. LEFT RIGHT OF WAY

EX. LEFT RIGHT OF WAY

S

TA

5+

.0

(1 2" x6

TE

E)

T /P

IP

E

2.

S

TA

5+

.9

(1 2" x8

TE

E)

T /P

IP

E

1.

CAUTION:

EX. UGD. UTIL.

IN THIS AREA

S

TA

0+

.0

(1 2" x6

TE

E)

T /P

IP

E

2.

BOT 12" STM 593.49

TOP 12" WM 591.94

ST

A

. 2 6+

.8

T/

PI

PE

.6

G

VW

R

IM

.8

S

TA

7+

.0

D

EF

LE

C

TI

O

N T

/P

IP

E

1.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

E X

.6

T/

PI

PE

.1

E X

.8

T/

PI

PE

.4

E X

.8

T/

PI

PE

.6

E X

.2

T/

PI

PE

.0

E X

.5

T/

PI

PE

.4

E X

.2

T/

PI

PE

.9

E X

.5

T/

PI

PE

.3

E X

.1

T/

PI

PE

.6

E X

.4

T/

PI

PE

.0

E X

.3

T/

PI

PE

.9

E X

.6

T/

PI

PE

.3

E X

.1

T/

PI

PE

.2

E X

.1

T/

PI

PE

.7

E X

.5

T/

PI

PE

.1

E X

.7

T/

PI

PE

.5

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

S

TA

4+

.2

D

EF

LE

C

TI

O

N T

/P

IP

E

3.

NOTE:

ALL DUCTILE IRON TRANSITION FITTINGS TO

GATE VALVES AND HYDRANT TEES SHALL BE

INCIDENTAL TO THE "WATER MAIN, HDPE, SDR-11,

12 INCH DIRECTIONAL DRILL" PAY ITEM. ASSUME

COMPACTED SAND BACKFILL IS NEEDED AT ALL

VALVE AND HYDRANT TEE LOCATIONS.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

EX

. 5

.8

C L.

.6

EX

. 5

.4

C L.

.4

CAUTION:

EX. UGD. UTIL.

IN THIS AREA

Water Main, PVC (C-900 DR 14) 8 inch Tr Det F

ST

A

. 1 0+

.9

T/

PI

PE

.8

G

VW

R

IM

.0

S

TA

0+

.0

5°

B

EN

D T

/P

IP

E

9.

S

TA

0+

.1

5°

B

EN

D T

/P

IP

E

0.

S

TA

0+

.6

5°

B

EN

D T

/P

IP

E

2.

S

TA

0+

.0

5°

B

EN

D T

/P

IP

E

1.

EX.GROUND OVER

WATER MAIN

BOT EX. 12" WM 590.58

TOP 8" WM 589.61

BOT 12" STM 591.11

TOP 8" WM 589.61

S

TA

. 1 0+

.4

C O

N N

EC

T

TO

E

X

Water Main, PVC (C-900 DR 14) 8 inch Tr Det G

CONSTRUCTION

PLAN AND PROFILE

STA. 23+50 TO STA. 30+50

DBK SJC NOVEMBER 2023

1" = 30' HORIZ.

1" = 3' VERT.

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

05_CONST--1/24/2024 1:00:41 PM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

M

ATC

H

LIN

E STA.

(SEE SH

EET )

30+50

CLINTON RIVER ROAD

(66' WIDE)

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

)30

BENCH MARK NO. 859

SET MAG NAIL, N. FACE

OF UTILITY POLE, S. SIDE

CLINTON RIVER RD.,

OPPOSITE ENTRANCE

TO CEMETERY

ELEVATION: 594.44

BENCH MARK NO. 150

ARROW ON HYDRANT,

±200' E. OF CEMETERY

ENTRANCE, N. SIDE

CLINTON RIVER RD.

ELEVATION: 600.98

ESTIMATED QUANTITIES

(THIS SHEET)

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

18.

19.

20.

21.

22.

23.

Water Main, Abandon, 12 inch (CAP

AND FILL WITH FLOWABLE FILL)

Water Main, Abandon, 8 inch (CAP

AND FILL WITH FLOWABLE FILL)

Water Main, 8 inch, Cut and Plug AND Water Main Connection, 8 inch

Gate Well, Abandon

Water Serv, Transfer

12" X 8" TEE AND THRUST BLOCK

HMA Surface, Rem AND HMA, 5EML, 2 inch ON HMA, 4EML, 2 inch ON HMA, 2EML, 4 inch ON Aggregate Base, 6 inch (TYP)

Curb and Gutter, Rem AND Curb and Gutter, Conc, Det F4

386 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM DRILL PIT TO TEE)

50 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM TEE TO STA. 30+50)

Fire Hydrant Assembly

STA. 30+00, 20.44' LT

F.G. 598.85

12" X 6" TEE AND THRUST BLOCK

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G (31

FT - FROM E/P TO TEE / 10 FT FROM TEE TO GV

BOX / 6 FT FROM GV BOX TO E/P REMOVAL LIMIT)

29 FT - Water Main, PVC (C-900 DR 14), 8 inch, Tr Det G (FROM TEE TO GV BOX)

33 FT - Water Main, PVC (C-900 DR 14), 8 inch, Tr Det F (FROM GV BOX TO WM CONNECTION)

12" X 6" TEE AND THRUST BLOCK

64 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM TEE TO DRILL PIT)

151 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM STA. 23+50 TO TEE)

Gate Valve and Box, 8 inch

25+96, 50.65' LT

RIM 597.35

Hydrant, Rem

LEGEND

Driveway, Nonreinf Conc, 6 inch

HMA Approach ON Aggregate Base, 6 inch HMA, 5EML, 2 inch HMA, 4EML, 2 inch HMA, 2EML, 4 inch

Aggregate Surface Cse, 6 inch

Gate Well, Abandon

Gate Valve and Box, 12 inch

STA. 26+05, 21.50' LT

RIM 596.90

Fire Hydrant Assembly

STA. 25+00, 22.00' LT

F.G. 597.65 BOT W.M. I.E. 590.79

TOP STM I.E. 584.00

BOT W.M. I.E. 590.79

TOP STM I.E. 584.00

60" STORM SEWER

DIRECTIONAL DRILL PIT

DIRECTIONAL DRILL PIT

5' M

IN

TY

P

5' M

IN

TY

P

5' M

IN

TY

P

ADDENDUM 2

Aggregate Base, 6 inch 160 Syd Gate Well, Abandon 2 Ea Water Serv, Transfer 1 Ea Hydrant, Rem 1 Ea Curb and Gutter, Rem 61 Ft HMA Surface, Rem 160 Syd HMA, 5EML 25 Ton HMA, 4EML 25 Ton HMA, 2EML 50 Ton Curb and Gutter, Conc, Det F4 61 Ft Water Main, Abandon, 8 inch 51 Ft Water Main, Abandon, 12 inch 694 Ft Fire Hydrant Assembly 2 Ea Gate Valve and Box, 8 inch 1 Ea Gate Valve and Box, 12 inch 1 Ea Water Main, HDPE, SDR-11, 12 inch, Directional Drill 651 Ft Water Main, PVC (C-900 DR 14), 8 inch, Tr Det F 33 Ft Water Main, PVC (C-900 DR 14), 8 inch, Tr Det G 29 Ft Water Main, PVC (C-900 DR 14), 12 inch, Tr Det G 47 Ft Water Main Connection, 8 inch 1 Ea Water Main, 8 inch, Cut and Plug 1 Ea Shld, Cl II, 6 inch 40 Syd

B.M.#860

31+00 32+00 33+00 34+00 35+00 36+00 37+00

31+00 32+00 33+00 34+00 35+00 36+00 37+00

EX. LEFT EDGE OF PAVEMENT

EX. LEFT EDGE OF PAVEMENT

EX. LEFT RIGHT OF WAY

EX. LEFT RIGHT OF WAY

S

TA

5+

.0

(1 2" x6

TE

E)

T /P

IP

E

4.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

E X

.3

T/

PI

PE

.7

E X

.6

T/

PI

PE

.2

E X

.0

T/

PI

PE

.7

E X

.7

T/

PI

PE

.1

E X

.1

T/

PI

PE

.6

E X

.1

T/

PI

PE

.3

E X

.3

T/

PI

PE

.7

E X

.7

T/

PI

PE

.5

E X

.5

T/

PI

PE

.0

E X

.0

T/

PI

PE

.4

E X

.2

T/

PI

PE

.9

E X

.9

T/

PI

PE

.4

E X

.2

T/

PI

PE

.5

E X

.7

T/

PI

PE

.0

E X

.0

T/

PI

PE

.4

ST

A

. 3 3+

.9

T/

PI

PE

.9

12" GVW

RIM 599.22

NOTE:

ALL DUCTILE IRON TRANSITION FITTINGS TO

GATE VALVES AND HYDRANT TEES SHALL BE

INCIDENTAL TO THE "WATER MAIN, HDPE, SDR-11,

12 INCH DIRECTIONAL DRILL" PAY ITEM. ASSUME

COMPACTED SAND BACKFILL IS NEEDED AT ALL

VALVE AND HYDRANT TEE LOCATIONS.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

600 CONSTRUCTION

PLAN AND PROFILE

STA. 30+50 TO STA. 37+50

DBK SJC NOVEMBER 2023

1" = 30' HORIZ.

1" = 3' VERT.

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

06_CONST--1/24/2024 1:18:27 PM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

)37

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

CLINTON RIVER ROAD

(66' WIDE)

CLINTON RIVER ROAD

(66' WIDE)

BENCH MARK NO. 860

SET MAG NAIL, N. FACE

OF UTILITY POLE, S. SIDE

CLINTON RIVER RD., @

EAST END OF FERN HILL

ELEVATION: 600.54

ESTIMATED QUANTITIES

(THIS SHEET)

1. Hydrant, Rem 1 Ea

2. Water Main, Abandon, 12 inch 700 Ft

3. Fire Hydrant Assembly 1 Ea

4. Water Main, HDPE, SDR-11, 12 inch, Directional Drill 700 Ft

5. Gate Valve and Box, 12 inch 1 Ea

6. Shld, Cl II, 6 inch 35 Syd

7. Water Serv, Transfer 3 Ea

12" X 6" TEE AND THRUST BLOCK

300 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM STA. 30+50 TO GV BOX) 250 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM TEE TO STA. 37+50)

Water Main, Abandon, 12 inch (CAP

AND FILL WITH FLOWABLE FILL)

Hydrant, Rem

Fire Hydrant Assembly

STA. 35+00, 25.14' LT

F.G. 600.15

Gate Valve and Box, 12 inch

STA. 33+50, 21.50' LT

RIM 599.25

150 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM GV BOX TO TEE)

DIRECTIONAL DRILL PIT

5' M

IN

TY

P

5' M

IN

TY

P 5' M

IN

TY

P

5' M

IN

TY

P

ADDENDUM 2

Water Serv, Transfer Water Serv, Transfer

Water Serv, Transfer

B.M.#862

B.M.#152

37+00

38+00

39+00 40+00 41+00

42+00 43+00

44+00

38+00 39+00 40+00 41+00 42+00 43+00 44+00

EX. LEFT EDGE OF PAVEMENT

EX. LEFT EDGE OF PAVEMENT

EX. LEFT RIGHT OF WAY

EX. LEFT RIGHT OF WAY

S

TA

0+

.0

(1 2" x6

TE

E)

T /P

IP

E

2.

S

TA

7+

.0

D

EF

LE

C

TI

O

N T

/P

IP

E

3.

S

TA

3+

.3

5°

B

EN

D T

/P

IP

E

1.

S

TA

3+

.7

5°

B

EN

D T

/P

IP

E

9.

S

TA

4+

.0

5°

B

EN

D T

/P

IP

E

9.

S

TA

4+

.2

5°

B

EN

D T

/P

IP

E

2.

BOT 12" WM 591.00

TOP 12" WM 589.50

S

TA

3+

.4

5°

H O

R

IZ

B

EN

D T

/P

IP

E

9.

S

TA

4+

.0

5°

H O

R

IZ

B

EN

D T

/P

IP

E

9.

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

E X

.6

T/

PI

PE

.2

E X

.3

T/

PI

PE

.9

E X

.1

T/

PI

PE

.7

E X

.1

T/

PI

PE

.4

E X

.0

T/

PI

PE

.1

E X

.3

T/

PI

PE

.9

E X

.8

T/

PI

PE

.5

E X

.0

T/

PI

PE

.4

E X

.5

T/

PI

PE

.1

E X

.1

T/

PI

PE

.8

E X

.0

T/

PI

PE

.5

E X

.3

T/

PI

PE

.3

E X

.5

T/

PI

PE

.0

E X

.1

T/

PI

PE

.7

E X

.6

T/

PI

PE

.3

ST

A

. 4 0+

.9

T/

PI

PE

.4

12" GVW

RIM 598.72

NOTE:

ALL DUCTILE IRON TRANSITION FITTINGS TO

GATE VALVES AND HYDRANT TEES SHALL BE

INCIDENTAL TO THE "WATER MAIN, HDPE, SDR-11,

12 INCH DIRECTIONAL DRILL" PAY ITEM. ASSUME

COMPACTED SAND BACKFILL IS NEEDED AT ALL

VALVE AND HYDRANT TEE LOCATIONS.

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F

600 CONSTRUCTION

PLAN AND PROFILE

STA. 37+50 TO STA. 44+50

DBK SJC NOVEMBER 2023

1" = 30' HORIZ.

1" = 3' VERT.

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

07_CONST--1/24/2024 1:20:46 PM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

AT

CH

L

IN

E

ST

A.

(S

EE

S

HE

ET

+5

M

ATC

H

LIN

E STA.

(SEE SH

EET )

44+50

CLINTON RIVER ROAD

(66' WIDE)

CLINTON RIVER ROAD

(66' WIDE)

M

AT

C

H L

IN

E

ST

A.

(S

EE

S H

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

)44

BENCH MARK NO. 152

ARROW ON HYDRANT,

±730' S. OF ROMEO

PLANK, W. SIDE

CLINTON RIVER RD.

ELEVATION: 600.24

BENCH MARK NO. 862

SET MAG NAIL, S.

FACE OF UTILITY

POLE, N. SIDE

CLINTON RIVER RD.,

5 POLES WEST OF

ROMEO PLANK,

OPPOSITE #18600

ELEVATION: 597.86

ESTIMATED QUANTITIES

(THIS SHEET)

1. Sidewalk, Rem 26 Syd

2. Sidewalk, Conc, 4 inch 235 Sft

3. Hydrant, Rem 1 Ea

4. Gate Well, Abandon 1 Ea

5. Water Main, Abandon, 12 inch 680 Ft

6. Fire Hydrant Assembly 1 Ea

7. Gate Valve and Box, 12 inch 1 Ea

8. Water Main, HDPE, SDR-11, 12 inch, Directional Drill 615 Ft

9. Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F 74 Ft

10. Water Serv, Transfer 2 Ea

11. Shld, Cl II, 6 inch 80 Syd

Water Main, Abandon, 12 inch (CAP

AND FILL WITH FLOWABLE FILL)

Hydrant, Rem

Gate Well, Abandon

12" X 6" TEE AND THRUST BLOCK

Fire Hydrant Assembly

STA. 40+00, 22.16' LT

F.G. 598.00

45° BEND AND THRUST BLOCK

STA 43+85.35, 15.20' LT

37 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM STA. 37+50 TO BEND)

238 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM STA. 37+50 TO TEE)

100 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM TEE TO GV BOX)

277 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM GV BOX TO DRILL PIT)

24 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM DRILL PIT TO BEND)

45° BEND AND THRUST BLOCK

STA 44+00.00, 29.14' LT

50 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM BEND TO STA. 44+50)

WM LOWERING

BOT EX. W.M. I.E. 591.00±

TOP PROP. W.M. I.E. 589.50

Water Serv, Transfer

DIRECTIONAL DRILL PIT

Gate Valve and Box, 12 inch

STA. 41+00, 13.10' LT

RIM 598.15

Sidewalk, Rem AND Sidewalk, Conc, 4 inch

DIRECTIONAL DRILL PIT

5'

M

IN

TY

P

5' M

IN

TY

P

5' M

IN

TY

P

5' M

IN

TY

P

ADDENDUM 2

Water Serv, Transfer

B.M.#863

B.M.#153

45+00 46+00 47+00

48+00

45+00 46+00 47+00 48+00 49+00

EX. LEFT EDGE OF PAVEMENT

EX. LEFT RIGHT OF WAY

R O

M

EO

P

LA

N K

R O

A D

S

TA

5+

.0

(1 2" x6

TE

E)

T /P

IP

E

2.

S

TA

. 4 8+

.6

C O

N N

EC

T

TO

E

X A

N D

2.

5° H

O R

IZ

B

EN

D

S

TA

6+

.3

D

EF

LE

C

TI

O

N T

/P

IP

E

1.

S

TA

6+

.1

5°

H O

R

IZ

B

EN

D T

/P

IP

E

1.

Water Main, PVC (C-900 DR 14) 12 inch Tr Det F

Water Main, HDPE, SDR-11, 12 inch, Directional Drill

E X

.5

T/

PI

PE

.1

E X

.0

T/

PI

PE

.7

E X

.3

T/

PI

PE

.4

E X

.2

T/

PI

PE

.1

E X

.6

T/

PI

PE

.3

E X

.3

T/

PI

PE

.9

E X

.4

T/

PI

PE

.4

E X

.2

T/

PI

PE

.7

S

TA

. 4 7+

.4

C O

N N

EC

T

TO

E

X A

N D

2.

5° H

O R

IZ

B

EN

D

S

TA

. 4 7+

.8

C O

N N

EC

T

TO

E

X A

N D

6" x1 6" x1 2"

T

EE

S

TA

6+

.9

5°

H O

R

IZ

B

EN

D T

/P

IP

E

1.

ST

A

. 4 7+

.5

T/

PI

PE

.6

12" GVW

RIM 597.00

Water Main, PVC (C-900 DR 14) 12 inch Tr Det F

S

TA

7+

.1

1.

° H

O R

IZ

B

EN

D

T /P

IP

E

1.

Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F

600 CONSTRUCTION

PLAN AND PROFILE

STA. 44+50 TO STA. 49+85

DBK SJC NOVEMBER 2023

1" = 30'

15 30 60

0242-0353

CLINTON RIVER

ROAD WATER MAIN

REPLACEMENT

CLINTON TOWNSHIP

SHEET TITLE:

COPYRIGHT, 2024, ANDERSON, ECKSTEIN AND WESTRICK, INC.

CHECKED BY:DRAWN BY:

SCALE:

PRELIMINARY

DATE SUBMITTALS/REVISIONS

PROJECT NO.

SHEET NO.

CLIENT:

PROJECT NAME:

CONSTRUCTION RECORD

DATE:

08_CONST--1/24/2024 1:26:15 PM

M:\0242\0242-0353\DWG\CIVIL\01_CONSTPLAN.DWG

Know what's below.

72 hours before you dig.

Call R

Phone 586 726 1234 Fax 586 726 8780

51301 Schoenherr Road Shelby Township Michigan 48315

CIVIL ENGINEERS SURVEYORS ARCHITECTS

ENGINEERING STRONG COMMUNITIES

www.aewinc.com

ANDERSON, ECKSTEIN AND

WESTRICK, INC.

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

CLINTON RIVER ROAD

(66' WIDE)

CLINTON RIVER ROAD

(66' WIDE)

ROMEO PLANK ROAD

(66' WIDE)

BENCH MARK NO. 153

ARROW ON HYDRANT,

N.W. CORNER OF

ROMEO PLANK &

CLINTON RIVER RD.

ELEVATION: 600.78

BENCH MARK NO. 863

SET MAG NAIL, W. FACE OF

UTILITY POLE @ N.E

CORNER OF CLINTON

RIVER RD. & ROMEO PLANK

ELEVATION: 598.64

BENCH MARK NO. 154

ARROW ON HYDRANT,

W. SIDE OF ROMEO

PLANK, ±370' N. OF

CLINTON RIVER RD.

ELEVATION: 600.25

M

AT

C H

L

IN

E

ST

A.

(S

EE

S

H

ESTIMATED QUANTITIES

(THIS SHEET)

1. Sidewalk, Rem 221 Syd

2. Hydrant, Rem 1 Ea

3. Water Main, Abandon, 16 inch 22 Ft

4. Water Main, Abandon, 12 inch 381 Ft

5. Fire Hydrant Assembly 1 Ea

6. Butterfly Valve & Well, 16 inch 1 Ea

7. Gate Valve and Box, 12 inch 1 Ea

8. Water Main, HDPE, SDR-11, 12 inch, Directional Drill 69 Ft

9. Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F 291 Ft

10. Water Main, DI, 16 inch, Tr Det F 11 Ft

11. Water Main Connection, 12 inch 1 Ea

12. Water Main Connection, 16 inch 2 Ea

13. Water Main, 12 inch, Cut and Plug 1 Ea

14. Water Main, 16 inch, Cut and Plug 1 Ea

15. Sidewalk, Conc, 4 inch 1,315 Sft

16. Curb Ramp, Conc, 4 inch 575 Sft

17. Curb Ramp, Conc, 8 inch 100 Sft

18. Detectable Warning Surface 10 Ft

19. Shld, Cl II, 6 inch 40 Syd

20. Gate Well Cover, Clinton Twp 1 Ea

50 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM STA. 44+50 TO TEE)

Hydrant, Rem

Fire Hydrant Assembly

STA. 45+00.00, 29.76' LT

F.G. 597.50

12" X 6" TEE AND THRUST BLOCK

STA. 45+00.00, 27.10' LTWater Main, Abandon, 12 inch (CAP

AND FILL WITH FLOWABLE FILL)

191 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM TEE TO BEND)

Water Main Connection, 12 inch

STA. 48+25.50, 18.35' LT.

Water Main Connection, 16 inch

Butterfly Valve & Well, 16 inch

RIM 597.25

Sidewalk, Rem AND Curb Ramp, Conc, 4 inch AND Curb Ramp, Conc, 8 inch AND Detectable Warning Surface

Gate Well, Abandon

69 Ft - Water Main, HDPE, SDR-11, 12 inch, Directional Drill (FROM DRILL PIT TO DRILL PIT)

45° BEND AND THRUST BLOCK

STA 46+91, 27.10' LT

Water Main, Abandon, 16 inch (CAP

AND FILL WITH FLOWABLE FILL)

Water Main, 12 inch, Cut and Plug

24 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM DRILL PIT TO WM CONNECTION)

6 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM BEND TO BEND)

45° BEND AND THRUST BLOCK

STA 46+95.10, 31.30' LT

11 Ft - Water Main, PVC (C-900 DR 14), 16 inch, Tr Det F (FROM BEND TO WM CONNECTION)

Sidewalk, Rem AND Sidewalk, Conc, 4 inch

Sidewalk, Rem AND Sidewalk, Conc, 4 inch

20 Ft - Water Main, PVC (C-900 DR 14), 12 inch, Tr Det F (FROM DRILL PIT TO WM CONNECTION)

12" X 16" TEE AND THRUST BLOCK

Gate Valve and Box, 12 inch

STA. 47+30.50, 63' LT

RIM 597.00

5' M

IN

TY

P

5' M

IN

TYP

ADDENDUM 2

Water Main Connection, 16 inch

03_CONST
04_CONST
05_CONST
06_CONST
07_CONST
08_CONST

File details come from the government source that posted it. Updated .