This is a plan sheet document from the California Department of Corrections and Rehabilitation (CDCR) Architecture & Engineering Office, detailing electrical work specifications for a correctional facility project. The scope of work encompasses cable installation and routing through mechanical chases, including the provision of Unistrut and clamps, core drilling through concrete walls, fire stopping, and wire management. The project requires field verification of existing circuit quantities, installation of homerun cables using Southwire Armolitie Type MC PVC Jacketed conduit (61-00-59 for three circuits or 61-00-5901 for four circuits), replacement of rusting junction boxes and conduits on the first and second floors, installation of new lighting panels (LP1, LP2, LP3), and LED light fixtures (Lithonia FMLWL 24-840 or equivalent). The work includes careful coordination with existing plumbing lines, fire alarm tubing, and rebar locations, with strict requirements for fire stopping and labeling at electrical room penetrations.
The document establishes general notes requiring replacement of all rusting existing equipment on ground floors except where conduits remain on the ground, field verification and maintenance of the existing lighting control system, and mandatory on-site presence of the California Office of the State Fire Marshal throughout the project. The plan references multiple related drawings (E1.0, E3.0, E4.0, E5.0, E6.0, and E7.0) for elevations, cell and chase outlets, and structural rebar layouts. The work involves compliance with applicable regulations and access requirements, with approval of the plan not authorizing deviations from regulatory standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Product_information_sheet.pdf | ||
| 12_-_FPCM-MCSP-I001145-M001-KR-C.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
G
H
K
L
M
:.I. 4
CABLES FROM lHE OlHER
MECHANICAL CHASES.
------PROVIDE UNISTRUT AND
CLAMPS FOR lHE CABLE.
CELL CHASE@HU
---------CABLES FROM lHE OlHER MECHANICAL CHASES lHRU (E)HOLE ON lHE CHASE
WALL. VERIFY QUANTITY OF
CABLES NEEDED PER PLAN.
PROVIDE SLACK TO
ACCESS lHE PLUMBING
LINES. TYP.
-----PROVIDE BACK-TO-BACK
UNISTRUT AND CLAMPS
FOR lHE CABLE .
.,-:-:,J_~
CORE DRILL (E)WALL AND PROVIDE
(2)2"C WllH WIRES ONLY TO
(E)J-BOX IN
ELEC ROOM. PROVIDE FIRE STOP AND
LABEL. TYP.
@@ 0E)
3 (E)PANEL
E-3 (N PANE
ELEC RM& CHASE
~---------------{----t============l(ifN)ttiU~NISTRUT SUPPORT
FOR CABLES.
~--------------(E)MECHANICAL DUCT
INSIDE lHE CHASE.
VESTIBULE 256
2 3 5 6
(E)MECHANICAL DUCTS.
FJELD VERIFY EXACT
LOCATION. TYP.
II ti lU 11 1:.1. 14
CONTROL BOOTH
FLOOR
1:, 11>
NUMBERED NOTES:
FIELD VERIFY lHE QUANTITY OF (E)CIRCUITS
IN EACH CHASE. INTIERCEPT (E)CIRCUITS
AND PROVIDE HOMERUN lHRU lHE SPACE
ABOVE THE CHASE ALL THE WAY TO THE
PANEL WllH NO SPLICE. USE SOUlHWIRE
ARMOLITIE TYPE MC PVC JACKETIED
61-00-59 FOR 3 CKTS, USE 61-00-5901
FOR 4 CKTS OR USE METALIC FLEXIBLE
CONDUIT WllH PVC JACKET OR APPROVED EQUAL USE lHE (E)OPENING ON lHE
CHASE WALL (USED FOR PLUMBING LINES)
FOR INSTALLING lHE CABLES TO lHE
ELECTRICAL ROOM. IF CHASE WALL OPENING
IS NOT BIG ENOUGH, VERIFY LOCATION OF
lHE (E)REBARS IF IT CAN BE ENLARGED
PRIOR TO CORE DRILLING. PROVIDE SLACK
IN ONE OF lHE CHASES. FIELD VERIFY LOCATION OF lHE FIRE ALARM TUBINGS.
BE CAREFUL NOT TO BREAK lHE TUBINGS.
PROVIDE A SEPARATIE CIRCUIT FOR lHE
CHASE RECEPTACLE OUTLETS (ONLY WHEN
THERE ARE SPARE CIRCUIT BREAKERS IN
THE PANEL). PROVIDE FIRE STOP FOR EUEC
RM WALL ENETRATION, SEE DRAWING E3.0,
DETI. TYP.
PRIOR TO CORE DRIWNG lHE (E)CONCRETIE
WALL, FJELD VERIFY THE EXACT LOCATION
OF lHE (E)REBARS AND (E)DUCTS ABOVE.
FOR REBAR LAYOUT, SEE DRAWING E7.0.
CORE DRILL, CUT OR CHIP THE (E)SHOWER
WALL 258 (MAYBE EASIER) OR VESTIBLE
256 TO SEE IF THERE IS A CEILING INSIDE
THE CHASE. SIZE OF THE HOLE WILL
DEPEND ON THE SIZE OF THE CORE ORILL
OR REBAR DETECTOR. IF THERE IS NO
CEILING IN THE CHASE, VERIFY IF CABLES
CAN BE PULLED TO THE ELEC. RM. 257
WALL. RUN THE CABLES ON TOP OR SIDES
OF (E)DUCTS OR WHEREVER POSSIBLE. IF
THERE IS A CEILING INSIDE lHE CHASE, CORE DRILL THE 6" THICK CEILING FOR
ABOUT 3 INCHES IN DIAMETER. IF NOT
POSSIBLE, CORE DRILL OR JACK HAMMER IN
AN ANGLE BETWIEEN THE WALL AND CEILING
IN SHOWER ROOM 258. SEE DETAIL 3 ON
THIS SHEET. IF THE HOLE IS NOT LARGE,
PROVIDE STAINLESS STIEEL COVER. IF lHE HOLE IS ON lHE SHOWER SIOE, COVER IT
WITH CONCRETIE AFTIER ALL WORK IS DONE.
PROVIDE FIRE STOP AND LABEL ON ELEC.
ROOM PENETRATIONS. TYP.
PROVIDE (N)PANEL 'LP'1, 'LP2', 'LP3' AND
MAKE THE (E)PANELS TO JUNCTION BOXES.
AFTIER ALL CIRCUITS ARE INSTALLED,
REMOVE ALL (E)CONDUITS UNDER lHE
PANELS AND PLUG THE HOLES BELOW THE
PANELS AND ON THE FLOOR.
TRACE ALL THE CIRCUITS FROM THE
(E)LIGHTING CONTROL PANEL AND (E)J-BOX
WITH PANEL ELP2 CIRCUIT IN lHE ELECTRICAL ROOM lHAT HAS THE SAME
RUSTING CONDUITS ON THE FLOOR. IF
POSSIBLE, RUN THE (N)CIRCUITS OVERHEAD.
TYP.
PROVIDE HEATING INSULATION ON THE HOT
WATIER LINES. TYP.
ROTATE, MOVE OR REPLACE THE (E)LIGHT
\YITH 2 FOOT LED. LIGHT SHALL BE
LITHONIA FMLWL 24-840 OR EQUAL. RUN
THE (N)CABLES ABOVE THE CEILING.
PROVIDE (N)J-BOX OR EXTIENSION RING IF
NEEDED FOR THE (N)CABLE. TYPICAL.
FIELD VERIFY IF THE FEEDER CONDUIT
GOING TO THE (E)PANEL IS RUSTING AT
BASE OF lHE FLOOR. IF IT IS RUSTING AT
THE BASE, PUT A TAPE AROUND IT AND
PROVIDE 4" HIGH CONCRETE PAD AROUND
IT (ABOUT 8"LX6"W). TYPICAL.
NOT USED.
TYPICAL DOUBLE CELL (SINGLE WHERE
SHOWIN) BRANCH CIRCUIT DESIGNATIONS.
LP1-1 CELL LIGHTING
LP1-3 CELL TV RECEPTACLE
LP1-5 CELL TOILET RECEPTACLE
LP1- CHASE RECEPTACLE (CONNECT
5 RECEPTACLES MAX PER
CIRCUIT. TIE WIRES IN lHE
(E)J-BOX (PREVIOUS PANEL) IN
THE ELEC ROOM IF POSSIBLE.
FOR FIRST FLOOR WORK IN THE CHASE,
SEE DRAWING E1.0, DETAIL 2. TYP.
GENERAL NOTES:
A. EXCEPT FOR CONDUITS ON lHE GROUND, REPLACE ALL RUSTING (E)JUNCTION BOXES, CONDUITS AND WIRES IN THE FIRST AND
SECOND FLOOR MECHANICAL CHASES AND ADD
GROUND WIRE.
8. FIELD VERIFY AND MAINTAIN LIGHTING CONTROL
SYSTEM FOR THE CELLS. SEE DRAWING E5.0,
DETAIL 6.
C. FOR ELEVATION, SEE DRAWING E4.0, DETAIL 1.
FOR CELL/CHASE OUTLETS, SEE DRAWING E6.0.
FOR REBAR LAYOUT, SEE STRUCTURAL PLANS
E7.0.
15 16
CDCR
CALIFORNIA DEPARTMENT Of
CORRECTIONSANDREHABILITATION
ARCHITECTURE & ENGINEERING
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
CALIFORNIA DEPARTMENT OF
CORRECTIONS AND REHABILITATION
ACCESS COMPLIANCE REVIEW
APPROVAL OF THIS PLAN DOES NOT AUTHORIZE
OR APPROVE ANY OMISSION OR DEVIATION
FROM APPLICABLE REGULATIONS
Cl) ...J
Cl Cl z z ::s a.
...J c3 ii:
w ...J w c::
...J
LIL
Cl z w Cl)
(J
<i c,j
C z (J ui ...J w z fl.
...J u Di:
1-u w ...J w w fl.
w 0::
MCSP
23-013
REVISIONS
REV. DATE DESCRIPTION
DATE: August 29, 2025
SHEET NUMBER
E2.0
OF # SHEETS V1
fmdpsu Highlight
File details come from the government source that posted it. Updated .