Plan_sheet.pdf

PDF 4 MB Posted

Attached to
FPCM-MCSP-I001145-M001-KR-C Jacketed wire
Solicitation number
0000040635
Issued by
California

About this file

This is a plan sheet document from the California Department of Corrections and Rehabilitation (CDCR) Architecture & Engineering Office, detailing electrical work specifications for a correctional facility project. The scope of work encompasses cable installation and routing through mechanical chases, including the provision of Unistrut and clamps, core drilling through concrete walls, fire stopping, and wire management. The project requires field verification of existing circuit quantities, installation of homerun cables using Southwire Armolitie Type MC PVC Jacketed conduit (61-00-59 for three circuits or 61-00-5901 for four circuits), replacement of rusting junction boxes and conduits on the first and second floors, installation of new lighting panels (LP1, LP2, LP3), and LED light fixtures (Lithonia FMLWL 24-840 or equivalent). The work includes careful coordination with existing plumbing lines, fire alarm tubing, and rebar locations, with strict requirements for fire stopping and labeling at electrical room penetrations.

The document establishes general notes requiring replacement of all rusting existing equipment on ground floors except where conduits remain on the ground, field verification and maintenance of the existing lighting control system, and mandatory on-site presence of the California Office of the State Fire Marshal throughout the project. The plan references multiple related drawings (E1.0, E3.0, E4.0, E5.0, E6.0, and E7.0) for elevations, cell and chase outlets, and structural rebar layouts. The work involves compliance with applicable regulations and access requirements, with approval of the plan not authorizing deviations from regulatory standards.

View the file

Other files

File Type Posted
Product_information_sheet.pdf PDF
12_-_FPCM-MCSP-I001145-M001-KR-C.pdf PDF
Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

G

H

K

L

M

:.I. 4

CABLES FROM lHE OlHER

MECHANICAL CHASES.

------PROVIDE UNISTRUT AND

CLAMPS FOR lHE CABLE.

CELL CHASE@HU

---------CABLES FROM lHE OlHER MECHANICAL CHASES lHRU (E)HOLE ON lHE CHASE

WALL. VERIFY QUANTITY OF

CABLES NEEDED PER PLAN.

PROVIDE SLACK TO

ACCESS lHE PLUMBING

LINES. TYP.

-----PROVIDE BACK-TO-BACK

UNISTRUT AND CLAMPS

FOR lHE CABLE .

.,-:-:,J_~

CORE DRILL (E)WALL AND PROVIDE

(2)2"C WllH WIRES ONLY TO

(E)J-BOX IN

ELEC ROOM. PROVIDE FIRE STOP AND

LABEL. TYP.

@@ 0E)

3 (E)PANEL

E-3 (N PANE

ELEC RM& CHASE

~---------------{----t============l(ifN)ttiU~NISTRUT SUPPORT

FOR CABLES.

~--------------(E)MECHANICAL DUCT

INSIDE lHE CHASE.

VESTIBULE 256

2 3 5 6

(E)MECHANICAL DUCTS.

FJELD VERIFY EXACT

LOCATION. TYP.

II ti lU 11 1:.1. 14

CONTROL BOOTH

FLOOR

1:, 11>

NUMBERED NOTES:

FIELD VERIFY lHE QUANTITY OF (E)CIRCUITS

IN EACH CHASE. INTIERCEPT (E)CIRCUITS

AND PROVIDE HOMERUN lHRU lHE SPACE

ABOVE THE CHASE ALL THE WAY TO THE

PANEL WllH NO SPLICE. USE SOUlHWIRE

ARMOLITIE TYPE MC PVC JACKETIED

61-00-59 FOR 3 CKTS, USE 61-00-5901

FOR 4 CKTS OR USE METALIC FLEXIBLE

CONDUIT WllH PVC JACKET OR APPROVED EQUAL USE lHE (E)OPENING ON lHE

CHASE WALL (USED FOR PLUMBING LINES)

FOR INSTALLING lHE CABLES TO lHE

ELECTRICAL ROOM. IF CHASE WALL OPENING

IS NOT BIG ENOUGH, VERIFY LOCATION OF

lHE (E)REBARS IF IT CAN BE ENLARGED

PRIOR TO CORE DRILLING. PROVIDE SLACK

IN ONE OF lHE CHASES. FIELD VERIFY LOCATION OF lHE FIRE ALARM TUBINGS.

BE CAREFUL NOT TO BREAK lHE TUBINGS.

PROVIDE A SEPARATIE CIRCUIT FOR lHE

CHASE RECEPTACLE OUTLETS (ONLY WHEN

THERE ARE SPARE CIRCUIT BREAKERS IN

THE PANEL). PROVIDE FIRE STOP FOR EUEC

RM WALL ENETRATION, SEE DRAWING E3.0,

DETI. TYP.

PRIOR TO CORE DRIWNG lHE (E)CONCRETIE

WALL, FJELD VERIFY THE EXACT LOCATION

OF lHE (E)REBARS AND (E)DUCTS ABOVE.

FOR REBAR LAYOUT, SEE DRAWING E7.0.

CORE DRILL, CUT OR CHIP THE (E)SHOWER

WALL 258 (MAYBE EASIER) OR VESTIBLE

256 TO SEE IF THERE IS A CEILING INSIDE

THE CHASE. SIZE OF THE HOLE WILL

DEPEND ON THE SIZE OF THE CORE ORILL

OR REBAR DETECTOR. IF THERE IS NO

CEILING IN THE CHASE, VERIFY IF CABLES

CAN BE PULLED TO THE ELEC. RM. 257

WALL. RUN THE CABLES ON TOP OR SIDES

OF (E)DUCTS OR WHEREVER POSSIBLE. IF

THERE IS A CEILING INSIDE lHE CHASE, CORE DRILL THE 6" THICK CEILING FOR

ABOUT 3 INCHES IN DIAMETER. IF NOT

POSSIBLE, CORE DRILL OR JACK HAMMER IN

AN ANGLE BETWIEEN THE WALL AND CEILING

IN SHOWER ROOM 258. SEE DETAIL 3 ON

THIS SHEET. IF THE HOLE IS NOT LARGE,

PROVIDE STAINLESS STIEEL COVER. IF lHE HOLE IS ON lHE SHOWER SIOE, COVER IT

WITH CONCRETIE AFTIER ALL WORK IS DONE.

PROVIDE FIRE STOP AND LABEL ON ELEC.

ROOM PENETRATIONS. TYP.

PROVIDE (N)PANEL 'LP'1, 'LP2', 'LP3' AND

MAKE THE (E)PANELS TO JUNCTION BOXES.

AFTIER ALL CIRCUITS ARE INSTALLED,

REMOVE ALL (E)CONDUITS UNDER lHE

PANELS AND PLUG THE HOLES BELOW THE

PANELS AND ON THE FLOOR.

TRACE ALL THE CIRCUITS FROM THE

(E)LIGHTING CONTROL PANEL AND (E)J-BOX

WITH PANEL ELP2 CIRCUIT IN lHE ELECTRICAL ROOM lHAT HAS THE SAME

RUSTING CONDUITS ON THE FLOOR. IF

POSSIBLE, RUN THE (N)CIRCUITS OVERHEAD.

TYP.

PROVIDE HEATING INSULATION ON THE HOT

WATIER LINES. TYP.

ROTATE, MOVE OR REPLACE THE (E)LIGHT

\YITH 2 FOOT LED. LIGHT SHALL BE

LITHONIA FMLWL 24-840 OR EQUAL. RUN

THE (N)CABLES ABOVE THE CEILING.

PROVIDE (N)J-BOX OR EXTIENSION RING IF

NEEDED FOR THE (N)CABLE. TYPICAL.

FIELD VERIFY IF THE FEEDER CONDUIT

GOING TO THE (E)PANEL IS RUSTING AT

BASE OF lHE FLOOR. IF IT IS RUSTING AT

THE BASE, PUT A TAPE AROUND IT AND

PROVIDE 4" HIGH CONCRETE PAD AROUND

IT (ABOUT 8"LX6"W). TYPICAL.

NOT USED.

TYPICAL DOUBLE CELL (SINGLE WHERE

SHOWIN) BRANCH CIRCUIT DESIGNATIONS.

LP1-1 CELL LIGHTING

LP1-3 CELL TV RECEPTACLE

LP1-5 CELL TOILET RECEPTACLE

LP1- CHASE RECEPTACLE (CONNECT

5 RECEPTACLES MAX PER

CIRCUIT. TIE WIRES IN lHE

(E)J-BOX (PREVIOUS PANEL) IN

THE ELEC ROOM IF POSSIBLE.

FOR FIRST FLOOR WORK IN THE CHASE,

SEE DRAWING E1.0, DETAIL 2. TYP.

GENERAL NOTES:

A. EXCEPT FOR CONDUITS ON lHE GROUND, REPLACE ALL RUSTING (E)JUNCTION BOXES, CONDUITS AND WIRES IN THE FIRST AND

SECOND FLOOR MECHANICAL CHASES AND ADD

GROUND WIRE.

8. FIELD VERIFY AND MAINTAIN LIGHTING CONTROL

SYSTEM FOR THE CELLS. SEE DRAWING E5.0,

DETAIL 6.

C. FOR ELEVATION, SEE DRAWING E4.0, DETAIL 1.

FOR CELL/CHASE OUTLETS, SEE DRAWING E6.0.

FOR REBAR LAYOUT, SEE STRUCTURAL PLANS

E7.0.

15 16

CDCR

CALIFORNIA DEPARTMENT Of

CORRECTIONSANDREHABILITATION

ARCHITECTURE & ENGINEERING

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT AUTHORIZE

OR APPROVE ANY OMISSION OR DEVIATION

FROM APPLICABLE REGULATIONS

Cl) ...J

Cl Cl z z ::s a.

...J c3 ii:

w ...J w c::

...J

LIL

Cl z w Cl)

(J

<i c,j

C z (J ui ...J w z fl.

...J u Di:

1-u w ...J w w fl.

w 0::

MCSP

23-013

REVISIONS

REV. DATE DESCRIPTION

DATE: August 29, 2025

SHEET NUMBER

E2.0

OF # SHEETS V1

fmdpsu Highlight