PLA Request for Information_NOLA _Primary Runway.pdf

PDF 105 KB Posted

Attached to
PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT JOINT RESERVE BASE NEW ORLEANS, LOUISIANA.
Solicitation number
Not on record
Issued by

About this file

This document is a Project Labor Agreement (PLA) Request for Information (RFI) for a primary runway and pavement repairs project at Joint Reserve Base New Orleans, Louisiana. The naval facilities engineering command is seeking market research input about potentially implementing a Project Labor Agreement for a construction project estimated between $25M-$100M with an anticipated performance period of 1,110 calendar days. The project involves full-depth pavement reconstruction on multiple runways and taxiways, including asphalt mill and overlay, concrete pavement accommodations, and complete re-striping of Runway 0422. Interested parties are requested to complete a detailed questionnaire addressing labor availability, specialized construction requirements, wage rates, and potential project costs, with responses due by 2:00 PM Eastern time on 6/12/2025 via email to Cynthia McMonigle. The RFI emphasizes that this is not a solicitation and does not guarantee future contract award, but rather seeks industry perspective on implementing a Project Labor Agreement for this federal construction project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Labor Agreement (PLA) Request for Information (RFI) for

Construction Project for Primary Runway and Pavement Repairs in the State of Louisiana

Rev.2 June 3, 2025 1

This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.

Naval Facilities Engineering System Command (NAVFAC) Southeast is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for the Primary Runway and Pavement Repairs located at Joint

Reserve Base (JRB) New Orleans, Louisiana. Construction may include, but is not limited to, full-depth reconstruct pavement sections within the Runway 22 threshold, Runway 0422, Taxiway Alpha, Taxiway

Bravo, and Taxiway Foxtrot. Asphalt pavement mill and overlay and asphalt section full-depth construction is required to accommodate the new concrete pavement. additionally, the entire length of runway 0422 is required to be re-striped, following rubber and paint removal, located in the State of

Louisiana. Project will be design-bid-build. NAICS Code: 237310. The magnitude of construction is anticipated to be $25M – $100M. General period of performance is anticipated to be approximately

1,110 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states:

Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects;

provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR

52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for

Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The

Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.

Responses shall be submitted on the attached questionnaire via email to Cynthia McMonigle at cynthia.a.mcmonigle.civ@us.navy.mil no later than 2:00 PM Eastern time on 6/12/2025.

Project Labor Agreement (PLA) Questionnaire

Questions Responses

1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?

2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.

3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.

Explain in detail.

4) As a qualified contractor for a project of this type, would you be interested in participating in this project?

Would the requirement of a PLA under this project impact your interest in any way? Explain in detail.

5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?

Explain in detail.

6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates mailto:cynthia.a.mcmonigle.civ@us.navy.mil under the Construction Wage Rates Requirements statute (formerly known as the Davis-Bacon Act). Explain in detail.

7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.