PLA Questionnaire.pdf
PDF 84 KB Posted
- Solicitation number
- N6945024R0084
About this file
This document is a Request for Information (RFI) for a Project Labor Agreement (PLA) related to a design-build construction project to replace waterfront transformers and infrastructure at Naval Station Mayport in Florida.
The project will replace the electrical distribution system, lighting, and nine transformers with switchgears, and power & telecommunication igloos infrastructure for six substations. The goal is to meet the full shore power requirements of various naval ships. The magnitude of construction is estimated at $25M - $100M. The general period of performance is four years for the base award and an optional four years after award.
The Navy is soliciting comments from the public on the potential use of a PLA for this construction project. The RFI includes a questionnaire covering topics such as the availability of union and non-union labor, potential impacts of a PLA requirement, and ways a PLA might affect project costs. Responses to the questionnaire are due by June 10, 2024 and will be used for planning purposes only.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev.1 January 26, 2024 1
PLA Questionnaire
Attachment (1)
Questions Responses
1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?
2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.
3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors.
Explain in detail.
4) As a qualified contractor for a project of this type, would you be interested in participating in this project?
Would the requirement of a Project Labor Agreement (PLA) under this project impact your interest in any way? Explain in detail.
5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas?
Explain in detail.
6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute (formerly known as the Davis-Bacon Act). Explain in detail.
7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.
File details come from the government source that posted it. Updated .