This document is Amendment 04 to Solicitation 47PK0124R0017 for the Prince Jonah Kuhio Kalanianaole (PJKK) Courtyard Inflation Reduction Act Waterproofing and Concrete Replacement – Design-Build (DB) Services project. The amendment provides answers to 11 questions submitted by potential offerors, covering requirements for waterproofing, courtyard slope, paver design, the fountain, emergency egress, site visits, as-built drawings, pricing approaches, staffing, and proposal formatting. The solicitation is for a Firm Fixed Price contract estimated between $5-10 million, with a completion date of April 2028. The project involves waterproofing the courtyard, improving drainage and lighting, providing accessible emergency egress, maintaining historic character, and achieving SITES Silver certification. The procurement is full and open, and the project will be partially funded by the Inflation Reduction Act, with low embodied carbon requirements for certain materials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Krista Miller
This Amendment 04 issues Government answers to RFIs, and CAD as-builts.
GSA, PBS R9, Acquisition Management Division Capital Projects Branch, Mega Projects Section, 9PQPM 50 United Nations Plaza, Mailbox 9 San Francisco, CA 94102 USA
47PK0124R0017
11/15/2024
08/23/2024
11/15/2024
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
PJKK Courtyard Inflation Reduction Act Project, Solicitation 47PK0124R0017, Amendment 04
Government answers in red.
Question 1: Is there a requirement to waterproof the whole courtyard?
Answer 1: Yes, new waterproofing is required throughout the plaza including for the fountain, and the design proposal should address how the new waterproofing would tie-in to existing courtyard perimeter boundary. Note that the waterproofing at the planters extending down to the basement will remain as-is.
Question 2: What is the required slope of the new courtyard after construction?
Answer 2: The parking garage is considered "occupied space." Accordingly, as stated in the P-100 the finished slope must be 1/4” = 1’-0”.
Question 3: Does the new paver pattern and color need to match the original installation?
Answer 3: As stated on page 48 of the Statement of Work dated, Aug. 19, 2024, "New courtyard paver design (shape, dimension, and color) must be consistent with the original historic courtyard paver design..."
Question 4: Does the refurbished fountain need to be functional as a fountain after construction?
Answer 4: No, this is not a requirement.
Question 5: Does emergency exit access through the Courtyard need to be maintained during construction?
Answer 5: Yes, Contractor to verify Courthouse and Federal Office Building exit locations that pass through the Courtyard and must maintain emergency egress path during construction.
Question 6: Is it possible for members of our design team to make an additional visit to the courtyard?
Answer 6: Yes, the courtyard is open to the public during regular business hours, after you go through security at the building entrance. No appointment is needed. No escort is provided, however, please provide three business days notice and number of people, so we can alert security guards of your activities.
Question 7: Are the as-builts available in CAD and can these be provided?
Answer 7: Yes, they are included in this Amendment 04. The Government does not guarantee their accuracy, and the Contractor shall field verify.
Question 8: There are a few different options we could propose for the design and construction of this project. How should we qualify the price differences for each option? Should we note in our technical the price effect each option will have?
Answer 8: The technical proposal should include only one design concept proposal, and one price each for the base scope of work and options. Do not provide alternative design or pricing options.
The Government may or may not hold discussions with Offerors after receipt of proposals. The Government may make an award from the initial proposals. The proposal must be clear what the design solution is that is being proposed. Pricing must also be clear to allow for a firm-fixed price award, possibly without discussions.
Question 9: How many on-site individuals are required during construction? The solicitation documents give a list of the required personnel, but states that a single individual can be assigned more than one responsibility. Can one individual serve as the Superintendent, QC Manager, and Safety Officer if they hold all the required certs and have the required experience?
Answer 9: There is no specific minimum number of on-site individuals required during construction.
The Contractor shall staff the project adequately to perform the scope of work and meet the contract requirements. Yes, one individual may serve as the Superintendent, QC Manager, and Safety Officer if they meet all the required qualifications for all of those positions.
Question 10: We do not see anywhere in the solicitation where it describes formatting instructions for our proposal. Things such as font size and page limits are missing. Is there a page limit for our proposal?
Answer 10: There is no page limit for the proposal as a whole, nor individual sections. However, any content provided in a proposal which is not requested by the RFP will be disregarded and not evaluated. Narrative sections shall be formatted as on an 8.5 x 11 inch page, and drawings and graphics shall be formatted as on a 11 x 17 inch page. 12 point font is required. All content submitted shall be legible, and easy to navigate by section. Technical and price proposals shall be submitted as separate documents.
Question 11: Does emergency exit access through the Courtyard need to be maintained during construction?
Answer 11: Yes, Contractor to verify Courthouse and Federal Office Building exit locations that pass through the Courtyard and must maintain emergency egress path during construction.