This document is an amendment to a Request for Proposals (RFP) for a design-build contract for the Prince Jonah Kūhiō Kalanianaʻole (PJKK) Courtyard Inflation Reduction Act Waterproofing and Concrete Replacement project in Honolulu, Hawaii. The amendment provides answers to three RFIs, issues a revised solicitation dated 10/17/2024 with changes highlighted, and includes a model of the existing fountain that was developed. The project requires a complete waterproofing solution to eliminate leaks in the courtyard and basement, as well as improvements to the courtyard's exterior lighting, drainage, and irrigation. The contract will be a Firm Fixed Price (FFP) and includes options for a subsurface infiltration system, playground shade structure, and art restoration. This is a full and open competition, not restricted to small businesses, and the procurement is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. The Inflation Reduction Act requires the use of low embodied carbon materials, and suppliers and manufacturers are invited to submit expressions of interest for providing these materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

GSA, PBS R9, Acquisition Management Division Capital Projects Branch, Mega Projects Section, 9PQPM 50 United Nations Plaza, Mailbox 9 San Francisco, CA 94102 USA

47PK0124R0017

10/17/2024

08/23/2024

10/17/2024

This Amendment is issued to respond to three RFIs received, issue a revised Solicitation dated 10/17/2024 with changes highlighted in yellow, and issue a model of the fountain. Solicitation and model documents available by request in a Google folder.

INSTRUCTIONS (Back Page):

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(g)

(h)

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

(1)

(2)

(3)

(4)

(5)

(6)

STANDARD FORM 30 (REV. 11/2016) BACK

(1) Accounting classification Net increase $

PJKK Courtyard Inflation Reduction Act Project, Solicitation 47PK0124R0017, Amendment 03

Government answers in red.

Question 01: Section V in the Design-Build SOW indicates that a three-dimensional model of the existing fountain was developed by Sam O. Hirota to allow future recasting of the concrete elements. Please provide the model file as this would help develop the cost for potential recasting.

Answer 01: The three-dimensional model is being issued through this Amendment 03, available in the Google Folder for this Solicitation. If you need access to this folder, please email krista.miller@gss.gov with your firm’s UEI number and GACA or gmail address.

Question 02: Generally, design build projects with the GSA are a two-phase project. I do not see any indications of a two-step process, is that correct? To make sure on our side, this single step solicitation includes all of the steps that are within the two steps into one combined solicitation. Is that correct?

Answer 02: This design-build procurement is being conducted in one-step. It includes proposal submittal requirements, such as a concept design, which are typically included in a two-step design-build process. Generally speaking, this one-step design-build procurement condenses the typical aspects of a two-step design-build procurement into one-step.

Question 03: Establishment of EPD’s is still emerging in this market especially site/plant ie Facility specific Type III EPDs. If EPDs from HD&C LLC and Island-Ready Mix Concrete, Inc. are unavailable at the time of construction submittal, will a Product Type III EPDs industry-wide EPD prepared by NRMCA which includes the two plants or other participating Hawaii plants, be accepted? An example of a Product Type III EPD from NRMCA is attached.

Answer 03: Industry-Wide EPD's as documentation of Low Embodied Concrete compliance are not acceptable for this procurement. Product-specific EPD's are required for this project.

mailto:krista.miller@gss.gov

PJKK Courtyard RFP Amendment 03 form
PJKK Courtyard RFP Amendment 03 text
2024-10-17T11:34:33-0700
KRISTA MILLER

File details come from the government source that posted it. Updated .