Piping Diagram.pdf

PDF 99 KB Posted

Attached to
PW-670-210-003 Replace Boiler @ Maryland State Police Barrack W
Solicitation number
BPM023797
Issued by
Garrett County, Maryland

About this file

The document provided is a Piping Diagram related to a state and local contract opportunity to Replace Boiler @ Maryland State Police Barrack W in Garrett County, Maryland. The diagram depicts the existing boiler plant piping configuration as well as two options for a new boiler plant piping layout. The proposed project involves replacing the existing boiler at the Maryland State Police Barrack W facility located in McHenry, Maryland. The document outlines the key equipment and components that would be part of the new boiler plant, including pumps, valves, condensate tanks, and new boiler units.

The contract opportunity is being issued by the State of Maryland and is limited to the jurisdiction of Garrett County. The document does not provide specific details on the response deadlines, award dates, contract term, or renewal options. Pricing terms, funding requirements, and other commercial details are also not included in the information provided.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 |

Existing Boiler Plant Piping Diagram

2 |

Existing Boiler Plant Piping Diagram

B-1

0 BTU/H

0 GPM

180°F 140°F

?°F

P-1

0 GPM

0 FT

P-2

0 GPM

0 FT

AS-1

ET-1

0 GAL

M XV-1 MXV-2 MXV-3 M XV-4 V-1

CKV-1 CKV-2

V-2 V-3

V-4 V-5

3 |

Option 1 New Boiler Plant Piping Diagram

P-1

0 GPM

0 FT

P-2

0 GPM

0 FT

AS-1

M XV-1 MXV-2 MXV-3 M XV-4 V-1

V-2 V-3

V-4 V-5

ET-1

0 GAL

PRV-1

BF P-1

V-6 V-7

V-8

B-1

180°F 140°F ?°F

0 BTU/H

0 GPM

CN-1

V-9

V-10

INDF-1

INDF-2

MPV-1 M PV-2

INDF-3

INDF-4

INDF-5

INDF-6

4 |

Option 2 New Boiler Plant Piping Diagram

P-1

0 GPM

0 FT

P-2

0 GPM

0 FT

M XV-1 MXV-2 MXV-3 M XV-4 V-1

V-2 V-3

V-4 V-5

ET-1

0 GAL

PRV-1

BF P-1

V-6 V-7

V-8

B-1

180°F 140°F ?°F

0 BTU/H

0 GPM

CN-1

V-9

V-10

INDF -1

INDF-2

MPV-1 M PV-2

INDF-3

INDF-4

INDF-5

INDF-6

B-2

180°F 140°F ?°F

0 BTU/H

0 GPM

CN-2

?°F

?°F

?°F

?°F

HS-1

0 GPM

0 FT

P-3

M PV-3 M PV-4

0 GPM

0 FT

P-4

V-11

V-12