Pinon Add1 3 of 3.pdf

PDF 485 KB Posted

Attached to
PMAA, SELA, Pinon Campground Wastewater project
Solicitation number
IFB1 PMAA 2017000191 4
Issued by
Kit Carson County, Colorado Springs City, Colorado

About this file

This document is a specification for the Pinon Campground Lift Station project for Colorado Parks and Wildlife at Lathrop State Park. The project encompasses the design and installation of a wastewater lift station system with associated electrical, control, and monitoring components. The scope of work includes PVC pressure piping (ranging from 3/4" to 12"), system startup and training, pressure and leakage testing of force mains in accordance with AWWA standards, electrical installation and distribution, motor starters for duplex pumping units, low-voltage transformers, enclosed switches and circuit breakers, and a limited SCADA (Supervisory Control and Data Acquisition) monitoring system. The specifications detail comprehensive technical requirements for all mechanical and electrical components, including quality assurance procedures, testing protocols, and performance standards. The contractor is responsible for coordinating with utility companies, obtaining necessary permits and inspections, providing operator training, and conducting system demonstrations to ensure all equipment operates as designed.

The specifications establish detailed performance criteria and acceptance standards for all work, including pressure test requirements maintaining minimum test pressure within 5 psig for two hours, maximum allowable leakage calculations, and electrical system compliance with NFPA 70 (National Electrical Code) and applicable local codes. All materials must be new and listed or labeled by UL or recognized testing laboratories. The contractor must provide a one-year written warranty covering defective materials, equipment, and workmanship, with extended manufacturer warranties documented in operations and maintenance manuals. The contractor assumes all responsibility for field coordination with related trades, utility protection, and compliance with state and federal safety requirements. Shop drawings and submittals require engineer approval prior to material purchase, and the contractor must deliver completed project record documents, operations and maintenance manuals, and test reports upon project completion.

View the file

Other files

File Type Posted
Mandatory Attendance List.pdf PDF
Pinon Add1 2 of 3.pdf PDF
Lathrop Drawings 2 of 3.pdf PDF
Lathrop Drawings 1 of 3.pdf PDF
Lathrop Drawings 3 of 3.pdf PDF
Pinon Add2 2 of 2.pdf PDF
Pinon Add1 1 of 3.pdf PDF
Pinon Add2 1 of 2.pdf PDF
Lathrop WW Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

226.01 01650-1 Colorado Parks and Wildlife Lathrop State Park – Pinon Campground Lift Station

SECTION 01650

STARTING OF SYSTEM

PART I - GENERAL

1.01 DESCRIPTION

A. Work Included: This section covers the initial startup of systems, OWNER training and operations of all systems.

1.02 GENERAL

A. The CONTRACTOR, after initial startup, will operate the system for a period of one day to adjust equipment and demonstrate its readiness for the uses intended.

B. Startup:

1. The CONTRACTOR will schedule with OWNER and ENGINEER the times at which systems are ready for operation as designed.

2. On the date of startup, the CONTRACTOR shall provide a training session for

OWNER's personnel. The training session shall discuss all aspects of the operation and maintenance of facilities and equipment.

a. The training session shall include demonstrations by manufacturer or supplier representatives on at least the following:

- Pumps

- Instrumentation (Flow Meter)

- Control Equipment

b. The training sessions shall include a demonstration of all alarms, if applicable, and operating conditions.

C. One Day Operation and Training Period:

1. After startup, the CONTRACTOR shall operate the system for a period of one day.

2. During the one day period, the CONTRACTOR shall make any minor adjustments necessary in the facilities for the existing conditions.

3. During the period, the OWNER's personnel may attend operational activities with the

CONTRACTOR to further gain an understating of the system.

4. At the end of the one day operational phase, the CONTRACTOR must continue operations while making the necessary corrections until satisfactory demonstration is shown.

5. If operating conditions cannot be successfully demonstrated, the CONTRACTOR must continue operations while making the necessary corrections until satisfactory demonstration is shown.

6. Upon successful completion of this phase, OWNER will assume operational responsibility.

226.01 01650-2 Colorado Parks and Wildlife

END OF SECTION

112.88 01666 - 1 State Parks and Wildlife Lathrop State Park-Pinon Campground Lift Station

SECTION 01666

TESTING WASTEWATER PIPING SYSTEM

PART 1 - GENERAL

This section covers the pressure and leakage testing of force mains, performed in accordance with AWWA Standard C600 or C605.

1.02 REFERENCES

A. American Water Works Association, AWWA C600, AWWA Standard for Installation of Ductile- Iron Water Mains and Their Appurtences.

B. American Water Works Association, AWWA C605, Underground installation of Polyvinyl

Chloride (PVC) Pressure Pipe & Fittings for Water.

1.03 QUALITY ASSURANCE

A. Pressure Test Criteria

1. The minimum test pressure shall not be less than the rated pressure class of the specified pipe. The test pressure shall not exceed the design pressure of the pipe, fittings, valves, or thrust restraints.

2. Once the line is pressurized to the specified test pressure, the line must maintain the test pressure within 5 psig for at least two (2) hours.

B. Leakage Test Criteria

1. A leakage test is to be conducted concurrently with the pressure test.

2. Leakage is the quantity of water that must be added to the section being tested in order to return the section to the test pressure at the conclusion of the pressure test.

3. No pipe installation will be accepted if the leakage is greater than that determined by the following formula;

L = SD (P1/2)

148,000

-- L = Maximum allowable leakage, in gallons per hour.

--- D = Nominal diameter of pipe being tested, in inches.

-- S = Length of pipe tested, in feet.

-- P = Test pressure (psig).

The formula is based on an allowable leakage of 10.5 gpd/mile/in of nominal diameter at a pressure of 150 psi.

4. When testing against metal seated valves, an additional allowance per closed valve of

0.0078 gph/in of nominal valve size shall be allowed.

5. When hydrants are in the test section, the test shall be made against closed hydrant valves.

112.88 01666 - 2 State Parks and Wildlife Lathrop State Park-Pinon Campground Lift Station

1.04 PERFORMANCE

A. Preparation and Testing:

1. Provide equipment, materials and personnel to maintain internal pipe pressure as required and accurately measure leakage from the pipe over a two (2) hour, minimum, test period.

2. Pressure and leakage tests shall take place only after the pipeline is adequately blocked or cast-in-place thrust blocks have had sufficient time to cure (3 day minimum).

3. After pipeline completion, conduct pressure test and leakage test concurrently.

4. When local conditions require that the trenches be backfilled immediately after the pipe has been laid, the testing may be carried out after backfilling has been completed but before placement of permanent surfacing.

4. If not already filled, slowly fill pipe with water.

5. Remove all air.

6. Install corporation cocks at high points to evacuate the air if permanent air vents are not located there. Remove and plug after filling.

7. Leave pipe filled with water for a minimum of 24 hours prior to the hydrostatic pressure test if mortar lined pipe is being tested.

8. No allowance shall be made for pressure reductions accomplished by means of pressure reducing valves or other mechanical means.

9. Record times, leakage readings and pressure over test period.

B. Inspection:

1. Notify ENGINEER at least 48 hours in advance of testing.

2. ENGINEER or representative must be present during testing.

C. Acceptance:

1. Acceptance shall be on the basis of maximum allowable leakage, and ability to maintain target psi for 2 hours.

2. Contractor shall, at his own expense, locate and repair the defects and retest the line until it meets specified test.

3. Repeat tests until the leakage is within the permitted allowance.

4. All visible leaks are to be repaired, regardless of the amount of leakage.

226.01 02622-1 Colorado Parks and Wildlife

SECTION 02622

PVC PRESSURE PIPE

PART 1 – GENERAL

1.01 SCOPE

A. Work Included: This section covers the specifications for PVC pipe and fittings for pressure applications.

1.02 SUBMITTALS

A. Certification: Submit manufacturer's certification that products meet requirements of referenced specifications, in accordance with Section 01340.

B. Shop Drawings: Submit drawings and data showing details of joints, gasket material and pipe length, in accordance with Section 01340.

1.03 PRODUCT DELIVERY, HANDLING AND STORAGE

A. Do not damage the pipe and fittings by impact, bending, compression or abrasion during handling and storage.

B. Store pipe on a flat surface which provides even support for the barrel with bell ends overhanging.

C. Do not stack pipe higher than 5 feet.

D. Do not use pipe and fittings stored in direct sunlight for periods in excess of six months.

E. Ship rubber gaskets in cartons and store in clean area away from grease, oil, ozone producing electric motors, heat, and the direct rays of the sun.

F. Use only nylon protected slings or bands to handle pipe. Do not use hooks or bare cables.

PART 2 – PRODUCTS

2.01 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE (3/4" to 3" inc.)

A.. Joints: Elastomeric Gasket

B. Fittings: Schedule 40 or 80, as indicated on drawings

C. Compression Couplings: PVC

D. Threaded Adapter: Schedule 40 or 80, as indicated on drawings (Mipt x Slip)

2.02 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE ( 4" to 12", inc.)

A. Reference Standard: AWWA C-900

B. Pressure Class: SDR 18 (150psi) unless shown otherwise on the drawings

C. Joints: Bell ends with elastometric gaskets

D. Fittings: Ductile Iron Cement Mortar Lining, ANSI A21.4 (AWWA C-109):

1. Mechanical Joints :

a. Ductile Iron, ANSI A21.53/AWWA 153

b. Gaskets, ANSI A21.11/AWWA 111

2. Flanged Joints:

a. Ductile Iron ANSI A21.10/AWWA C-110

b. Drilling: ASA - B16.1, Class 125

3. Polyethylene Encasement:

226.01 02622-2 Colorado Parks and Wildlife

a. AWWA C-105.

4. Anodes:

a. 17 lb. Magnesium anode to be Cad welded to each fitting

PART 3 – EXECUTION

3.01 INSPECTION

A. Examine the pipe and fittings for cracks, dents, abrasions, or other flaws prior to installation.

B. Mark rejected pipe and remove from site.

3.02 CUTTING THE PIPE

A. Cut the pipe square with saw or pipe cutter designed specifically for the material.

B. Bevel the end in accordance with the manufacturer's recommendations.

3.03 JOINT INSTALLATION FOR PVC PIPE (4" to 12" inc.)

A. Push-On-Joints:

1. Clean the inside of the bell and the outside of the spigot to remove dirt, oil, excess coating, and other foreign matter.

2. Insert the gasket.

3. Apply a thin film of lubricant to either the inside surface of the gasket, the spigot end of the pipe, or both.

4. Do not permit the joint surface to come into contact with the ground.

5. Assure that pipe is marked with a depth mark before assembly to assure the spigot end is inserted the full depth of the joint.

6. Complete the joint making certain the spigot is inserted to the depth mark.

7. Do not use excessive force in joining the pipe.

B. Mechanical Joints:

1. Remove dirt, oil, grit, excess coating, and other foreign matter from the inside of the bell and the outside of the spigot.

2. Apply a thin film of lubricant to the inside of the bell, the outside of the spigot and the gasket.

3. Tighten nuts alternately on opposite sides of the pipe to produce equal pressure on all parts of the gland.

4. Use a torque limiting wrench and do not exceed the following maximum torque values:

Bolt Size Torque (Ft./Lbs.)

5/8" -- 3/4" 60 - 90 1" 70 - 100 1-1/4" 90 - 120

5. Holes in mechanical joint bells shall straddle the top (or side for vertical piping) centerline.

6. Secure tube type polyethylene encasement on all fittings by taping to insert pipe.

C. Flanged Joints:

1. Extend pipe completely through screwed-on flanges.

226.01 02622-3 Colorado Parks and Wildlife

2. Machine finish the pipe and end flange face in a single operation.

3. Eliminate any restraints on the pipe which would prevent uniform gasket compression or cause unnecessary stress in the flanges.

4. Do not assemble mechanical connections until all flanged joints affected thereby have been tightened.

5. Alternately tighten bolts spaced on opposite sides of the pipe to assure uniform gasket compression.

6. Holes in flanges shall straddle the top (or side for vertical piping) centerline.

7. Secure tube type polyethylene encasement on all fittings by taping to insert pipe.

D. Mechanical Couplings:

1. Clean and smooth pipe ends.

2. 1/4 inch to less than one inch space between pipe ends.

3.04 JOINT INSTALLATION FOR PVC PIPE (3/4" to 3" inc.)

A. Remove all dirt and foreign material from the pipe ends with solvent.

B. Apply cement furnished by the pipe manufacturer to the spigot end of the pipe.

C. Insert the spigot to the reference mark, according to manufacturer's recommendations.

D. Do not disturb previously installed joints during jointing operations.

E. Install a compression coupling within 12" of any piece of equipment, valve or meter.

F. Install threaded adapters where necessary to meet threaded connections or valves and equipment.

226.01 16051-1 Colorado Parks and Wildlife

SECTION 16051

COMMON WORK RESULTS FOR ELECTRICAL

1.01 RELATED DOCUMENTS

Drawings and general provisions of the Contract, including General and Supplementary Conditions and Scope of Work with Other Trades, apply to this section.

1.02 SUMMARY

A. This section includes general requirements for all Division 16 work.

B. Work Included.

Furnish all labor and materials and perform all operations necessary for the installation of complete and operating electrical systems subject to the conditions of the contract. The work also includes the completion of such electrical details not mentioned or shown which are necessary for the successful operation of all systems. Prove satisfactory operation of all equipment and controls to the Engineer on request.

C. Work Not Included (Specified elsewhere).

Certain labor and materials may be furnished and/or installed under other divisions of these specifications. Coordinate with all other applicable trades and arrange all electrical work to make the components fit together to provide complete and operational systems.

D. Coordination.

Prior to Construction, the Contractor shall be responsible for full coordination with the Representatives for any underground Municipal, Private, or Local Utility Services within the footprint of this project area (Utility primary service power, local power distribution, storm water, waste water, natural gas, fuel delivery, fiber, communication, cable, security, fire alarm, etc). The Contractor shall setup, coordinate, and pay for all Utility Locate fees. The Contractor shall be responsible for field coordinating the Scope of Work with related trades and the Owner.

1.03 REFERENCE STANDARDS

A. For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. The date of the standard that is in effect at the bid date, or date of Owner/Contractor Agreement when there are no bids, except when a specific date is specified or when the standard is part of an applicable code which includes an edition date.

C. When required by individual Specifications section, obtain copy of standard. Maintain copy at job site during work until Substantial Completion.

1.04 REGULATORY AND CODE REQUIREMENTS

A. Apply for and pay for all permits, fees, licenses and inspections for this Division of work.

226.01 16051-2 Colorado Parks and Wildlife

B. Specific Project Note: prior to construction and the purchase of materials, the Contractor shall be required to perform detailed coordination with the Electrical Utility Company and/or their Designee in terms of utility coordination, power interruptions, utility construction requirements, and related system components, equipment, service needs, or utility requirements. The Contractor shall include the cost of any "Electric Service Application Fee" charged by the Utility Company.

C. Comply with State and Local Code Requirements and Ordinances. Comply with requirements of the Utility Companies. In the case of differences between these requirements and ordinances, the most stringent shall govern. Call for inspections required by Local Building Inspection Authority.

D. Applicable Building Codes and Ordinances: Including but not limited to the following:

International Building Code, Latest Edition

Life Safety Code, Latest Edition

ADA, Latest Edition

International Mechanical Code, Latest Edition

International Fire Code, Latest Edition

Utility Company Requirements

State Department of Labor Requirements

State Department of Health Requirements

National Fire Protection Association Standards

State and Federal Safety and Health Laws

NFPA 70 Latest Edition - National Electrical Code

NFPA 820 Latest Edition - Fire Protection in Wastewater Treatment and Collection

Facilities

Local Planning, Zoning, or Building Codes or Amendments

References: The latest editions of the following standards (including supplements and official interpretations) are minimum requirements.

Underwriter's Laboratories, Inc. (UL)

National Electrical Manufacturers Association (NEMA)

American National Standards Institute (ANSI)

Insulated Cable Engineers Association (ICEA)

National Electrical Safety Code (NESC)

NECA Standard of Installation

226.01 16051-3 Colorado Parks and Wildlife

1.05 DEFINITIONS

A. "Provide" means Contractor is responsible for the furnishing and installation of.

B. "Exposed" means where it can be seen after the building is completed such as in equipment rooms, unfinished areas, accessible tunnels, etc. where conduit/equipment is accessible.

C. "Concealed" means where it cannot be seen after the building is completed such as in spaces as chases, trenches, above ceilings, in walls and buried where conduit/wire is inaccessible when building is completed.

1.06 SUBMITTALS

A. Comply with individual Division 16 Specification sections. Furnish number of (4) sets.

B. Show any changes required in electrical wiring, space allocation, etc. Contractor shall be responsible to make all changes required to accommodate these changes. Coordinate changes required with all Other Trades. If the changes are occasioned by the Contractor, the Contractor shall pay any costs involved.

C. Submit test reports as required in each Division 16 Specification section.

D. Submit certificates of operation as required in each Division 16 Specification section.

E. Where shop drawing submittals are required, do not begin work until (1) copy that has not been rejected or required to be resubmitted again has been returned.

F. Review of shop drawings is for general conformance with the design concept of the project and does not relieve Contractor from the responsibility of furnishing equipment and materials of proper dimension, size, quantity, quality and all performance characteristics to efficiently perform the requirements and intent of the contract documents. Review does not relieve Contractor from responsibility for errors on the shop drawings. Approval of a specific item does not include approval of the assembly of which the item is a component.

1.07 PRODUCT ALTERNATES AND SUBSTITUTIONS

A. Comply with Division 1, individual Division 16 Specification sections and the following:

1. No substitutions will be evaluated or considered before the bid submission process. If the Contractor’s bid deviates from the Construction Documents and Specifications, the Contractor assumes full responsibility for incompatibility for rejected or unwanted components, equipment, or systems by either the Engineer, the Owner, or Other Parties;

the Contractor shall also assume all financial difference liability (i.e. at the Contractor’s own expense) between the rejected products and those products documented within the Construction Documents or Specifications—there shall be no additional financial compensation granted by the Owner or Other Parties for a failure to comply with the intent of the Construction Documents and Specifications.

2. Once the project is awarded, voluntary product substitutions from the Contractor may be considered (but not guaranteed) with prior approval from the Engineer. Contractor will be required to submit the total savings (anticipated savings) to the Engineer and the Owner.

1.08 QUALITY ASSURANCE

226.01 16051-4 Colorado Parks and Wildlife

A. Preparation

1. Base final installation of materials and equipment on actual dimensions and conditions at the project site. Field measure for materials or equipment requiring exact fit. Do not scale from Drawings.

2. Equipment Coordination: coordinate the exact characteristics of equipment and systems with the Related Equipment Suppliers or Vendors prior to rough-in and purchase of major electrical materials. Coordinate the electrical characteristics (voltage, amperage, over current protection, disconnect means, terminal or connection points, wire sizes, control wiring, conduit runs, etc) as well as physical, orientation, and dimensional characteristics of the equipment. Maintain NEC required working clearances for all equipment. Reference Equipment Supplier or Vendor shop drawings for additional information. Coordinate the installation and the phasing of work with Other Trades.

B. Workmanship

1. Provide qualified skilled workmen, licensed as required. Perform Work in accordance with good commercial and industry practices. The appearance of the finished work shall be of equal importance with its electrical operation. The Engineer may reject work if workmanship and appearance are not satisfactory.

B. Supervision

1. Be responsible for and coordinate the Work of all subcontractors working under Division

16.

D. Installation Procedures

1. Confer and cooperate with other trades and coordinate the work in proper relation with theirs. Coordinate ceiling cavity space carefully with other trades. Coordinate conduit runs and wall penetrations carefully with other trades.

E. Materials

1. All electrical materials shall be new unless noted otherwise, and acceptable for installation only if labeled or listed as defined in NFPA 70, Article 100, by UL or by a recognized testing laboratory where standards have been established and acceptable to the Authority Having Jurisdiction. Labeled or listed equipment shall be installed in accordance with any instructions or labeling provided with the equipment.

2. Install equipment and materials in accordance with manufacturers' recommendations unless specifically indicated otherwise, or where Local Codes or Regulations take precedence.

F. Protection

1. Where there are existing facilities, the Contractor shall be responsible for the protection thereof, whether or not such facility is to be removed or relocated. Moving or removing any facility must be done so as not to cause interruption of the work or Owner's operation.

PART 2 – DELIVERY, STORAGE AND HANDLING

2.01 Storage

226.01 16051-5 Colorado Parks and Wildlife

A. Provide for proper storage of all materials and equipment and assume responsibility for losses due to any cause. All storage shall be within the contract limit lines of the building/ construction site.

Off-site storage will be allowed with prior notification. Cover and store all equipment and materials out of elements and off of the ground; any rusted or weather damaged item will not be permitted to be used. Make arrangements with other contractors on the job for introduction into the building of equipment too large to pass through finished openings. The Contractor shall be responsible for the secure storage of all materials, equipment, and supplies (on-site and off-site) during the duration of the project.

B. Acceptance

1. Check and sign for materials to be furnished by others for installation under Division 16 upon delivery. Assume responsibility for the storage and safekeeping of such materials from time of delivery until final acceptance.

PART 3 – COORDINATION

3.01 Examination of Premises

Visit the premises before submitting bid as no extras will be allowed for lack of knowledge of existing conditions.

3.02 Inspection

Inspect Work preceding or interfacing with work of Division 16 sections and report any known or observed defects that affect the Work to the Engineer and Owner. Do not proceed with Work until defects are corrected.

3.03 Coordinate electrical service connections to components furnished by the Utility Companies.

Make arrangements with Utility Companies to obtain permanent services to the project.

3.04 Utility interruptions

Coordinate electrical utility interruptions with the Utility Company and the Owner. Plan work so that duration of the interruption is kept to a minimum.

3.05 Coordinate installation and connection of underground utilities and services, including provisions for electrical-metering components.

3.06 Comply with requirements of Authorities Having Jurisdiction and of utility company providing electrical power and other services.

3.07 Existing Utilities

The plans indicate the location, type and sizes of various utilities within the site where known. These utilities are indicated as accurately as possible. If utilities are encountered during construction which are not shown on the drawings, ask for instructions from the Owner. Any relocation of remodeling required will then be directed. Assume all responsibility for protection of all utilities, shown or not, and repair any damage caused by this construction at no extra charge to the Owner.

3.08 Utility Owners of all underground facilities shall be notified at least three business days prior to excavation so that the owners can locate and mark underground facilities.

3.09 Coordinate chases, slots, inserts, sleeves, and openings with general construction Work and arrange in building structure during progress of construction to facilitate the electrical installations that follow.

226.01 16051-6 Colorado Parks and Wildlife

3.10 Set inserts and sleeves in poured-in-place concrete, masonry work, and other structural components as they are constructed.

3.11 Sequence, coordinate and integrate installing electrical materials and equipment for efficient flow of the Work. Coordinate installing large equipment requiring positioning before closing in the building.

3.12 Where electrical identification devices are applied to field-finished surfaces, coordinate installation of identification devices with completion of finished surface.

3.13 Drawings and Specifications

The Construction Documents (i.e. electrical drawings) are diagrammatic and because of the small scale, it is not possible to indicate every required offset, fitting, etc. Drawings are not to be scaled for dimensions.

Field verify all dimensions from site conditions or certified equipment drawings. Verify all space requirements, coordinating with other trades, and install the systems in the space provided without extra charges to the Owner.

3.14 Examine Drawings and Specifications for other parts of the Work, and for any discrepancies.

Discrepancies between different plans, between plans and specifications, between specifications, or regulations and codes governing this installation shall be brought to the attention of the Engineer in writing before the date of bid opening. In the event such discrepancies exist and the Engineer is not so notified, the adjudication of responsibility shall be solely at the discretion of the Engineer or the Owner. Obtain written instructions for any necessary changes.

PART 4 – WARRANTIES

4.01 All materials and equipment shall be new unless otherwise specified.

A. Provide a (1) year written warranty to the Owner covering the entire electrical work to be free from defective materials, equipment and workmanship for a period of one year unless noted otherwise in individual sections, after Date of Acceptance. During this period provide labor and materials as required to repair or replace defects at no additional cost to the Owner. Provide certificates (include in O & M Manuals) for such materials and equipment, which have warranties in excess of (1) year. Include dates of start and end of the warranty and manufacturer's representative name and telephone number.

PART 5 – CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

5.01 Temporary Lighting and Power

A. Provide all temporary facilities required to supply construction power and light. Install and maintain facilities in a manner that will protect the public and workmen. Comply with all applicable laws and regulations.

B. To avoid conflicts with adjacent properties, set up any temporary construction lighting (that may run off hours) to minimize the light distribution and trespassing of the light off the site.

C. Upon completion of the work, remove all temporary facilities from the site.

PART 6 – PRODUCTS

6.01 Not Applicable

PART 7 – EXECUTION

7.01 INSTALLATION

226.01 16051-7 Colorado Parks and Wildlife

A. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide the maximum possible headroom.

B. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.

C. Equipment: Install to facilitate service, maintenance, and repair or replacements of components.

Connect for ease of disconnection, with minimum interference with other installations.

D. Right of Way: Give to raceways and piping systems installed at a required slope.

E. Fire stopping: Apply fire stopping to both sides of cable and raceway penetrations of fire-rated floor and wall assemblies to achieve fire-resistance rating of the assembly.

F. Electrical Provisions for Roofs: raceways penetrating roofs shall be installed in a manner to preserve the integrity of the roof and not void warranty. Provide flashing and counter flashing for all roof penetrations required for the work.

G. All conduits routed above roofs shall be installed a minimum of twelve inches above the finished roof surface, supported on metal stands installed with flashing and counter flashing, with a maximum spacing of ten feet.

H. Trenching and Backfilling: Dig trenches to the depth required, minimum 24 inches or as specified on the plans. Concrete or sand encase conduits or cables as specified or shown. Backfill with earth in 6 inch layers. Thoroughly tamp each layer and compact to 95 percent density in accordance with Architectural specifications. Remove all rocks, stones, etc., from bottom of trench from backfill material and exercise necessary precautions so as to avoid damage to conduit and/or cable runs. Restore subsurface and surface to original condition where trenching is done in specially treated areas, such as paving, concrete, asphalt, etc. Repair and restore trenches and surface where settlement occurs for a period of one year from date of acceptance of work by Owner. Provide safety barriers in existing areas during all times that trench is open and whenever it will cause a hazard to drivers or pedestrians. Refer to Division 2 for additional requirements.

I. Refer to Section 16130 – Raceways and Boxes for spacing requirements between power and communications conduit and/or cable.

J. Cutting and Patching: cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces required to permit electrical installations. Cutting shall be performed by skilled workmen of trades involved.

K. Penetrations into Hazardous Locations shall conform with NEC Article 501 and shall utilize 40%

Fill, Explosion proof, sealing fittings installed by qualified personnel.

L. Repair and refinish disturbed finish materials and other surfaces to match adjacent undisturbed surfaces. Repair and refinish materials and other surfaces by skilled mechanics of trades involved.

M. Refinishing and Touchup Paint: Clean damaged and disturbed areas and apply primer, intermediate, and finish coats to suit the degree of damage at each location.

N. Follow Paint manufacturer’s written instructions for surface preparation and for timing and application of successive coats.

O. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer.

P. Repair damage to PVC or paint finished with matching touchup coating recommended by manufacturer.

226.01 16051-8 Colorado Parks and Wildlife

Q. Cleaning and Protection: comply with individual requirements of each Trade or Manufacturer, and Division 16 Specification section.

R. On completion of installation, including outlets, fittings and devices, inspect exposed finish.

Remove burrs, dirt, paint spots and construction debris.

S. Protect equipment and installations and maintain conditions to ensure that coatings, finished, and cabinets are without damage or deterioration at time of Substantial Completion.

7.02 FINAL OBSERVATION

A. Prior to notifying the Engineer that the project is ready for the final observation the Contractor must submit the O & M manuals fifteen (15) days prior to the date of final observation or as required in Division 1, and shall verify in writing, that:

1. All systems are complete.

2. All systems have been properly started and are operational.

3. When the Contractor notifies the Engineer that the project is ready for a final observation, the Architect/Engineer will visit the job site and will prepare a final observation list of all the items on the project that shall be finished or corrected before the project can be accepted.

4. When the Contractor notifies the Engineer that all items on the above final observation list have been completed and corrected, the Architect/Engineer will visit the project to ascertain that all the items on the final observation list have been corrected and can be accepted.

5. Engineer fees and expenses for all other successive trips to the project that are made necessary because not all the items in the final observation list were corrected at the time of the second visit described above shall be paid for by the Contractor.

6. The Engineer will charge the trips according to current billing rates, including transportation and subsistence.

7.03 PROJECT RECORD DRAWING

A. File at job site one copy of Drawings, Specifications, Addenda, approved shop drawings, change orders, field orders, test records, other modifications to Contract Documents.

B. Fire alarm/detection and other special system shop drawings shall be in the same drawing size and format, and the same type of medium as the construction document.

C. Do not use Project Record Documents for construction purposes.

D. Legibly mark with red pencil field changes, such as the following, referenced to permanent and accessible features of the site or building as applicable. Do not permanently conceal any work until required information is recorded.

Drawings:

1. Locations of underground Work.

2. Locations of concealed utilities.

3. Field changes of dimension and detail.

4. Changes resulting from change order or field order.

5. Details not on original drawings.

226.01 16051-9 Colorado Parks and Wildlife

6. Approved (should be inclusive of all variations of drawings) circuiting changes, or routing changes.

7. Manufacturer, model number of equipment actually installed.

8. Update all panel schedules with revised circuit numbers and loads.

Shop Drawings

1. Changes made after Engineer's approval.

E. At completion of Work, deliver completed Project Record Documents marked with field changes to Engineer. Project Record Documents shall include any special system (fire alarm, etc.) “project record” shop drawings.

7.04 OPERATION AND MAINTENANCE DATA

A. Submit number as required by Division 1, typed and hard bound copies of Operating and

Maintenance Manuals to Engineer for approval prior to scheduling any system demonstration for the Owner and fifteen (15) days prior to final observation. Books shall be arranged in sequence to match the specification sections.

B. The books shall contain, but not be limited to, the following general items; each item shall be provided with a separate index tab.

C. Instructions (On Contractor's Letterhead Stationery) on who to call for service during guarantee period including name, address, and 24 hour telephone number of company responsible for servicing each piece of equipment or system.

D. Maintenance instructions (On Contractor's Letterhead Stationery) shall include: (can be referenced to manufacturer's manual with appropriate page numbers, etc.)

E. Preventative maintenance schedule for necessary cleaning, lug tightening, system tests, periodic operation of emergency power systems, etc.

F. Manufacturer's manuals for each piece of equipment installed. Manuals shall include the following, as applicable:

Description of unit and component parts:

1. Function, normal operating characteristics and limiting conditions.

2. Complete nomenclature and commercial part number of replaceable parts.

3. Installation instruction sheets.

4. Complete wiring diagrams.

5. Recommended procedures:

6. Start-up, break-in, routine lubrication (if applicable) and operating instructions and cautions.

7. Regulation, control, start/stop, shut-down and emergency instructions.

226.01 16051-10 Colorado Parks and Wildlife

8. Special summer and winter or time of day operating cautions.

Maintenance:

1. Routine care.

2. Guide to trouble shooting.

3. Disassembly, repair and reassembly.

4. List of required lubricants and schedule (if applicable).

5. Parts list, illustrations, assembly drawings and diagrams required for maintenance.

6. Predicted life of parts subject to wear.

G. All warranties provided by the Manufacturer on their equipment that run longer than the one year warranty by the Contractor.

H. All test reports.

I. All certificates of operation.

J. Certificate of final inspection.

7.05 DEMONSTRATIONS

A. Conduct demonstrations only after systems have been through start-up procedures, systems are complete and operating, and operating and maintenance data is complete.

B. Instruct the Owner's representatives on the proper operation and maintenance of the electrical systems.

C. Contractor's representatives shall have a thorough knowledge of the particular installation.

D. Manufacturer's representatives shall have a thorough understanding of each particular piece of equipment.

E. Scheduling: Arrange and schedule demonstration times with Engineer.

F. Location: Conduct demonstrations at project including tours of systems.

G. Operating and Maintenance Data: Arrange for data to be at demonstrations. Include review of data at demonstrations.

H. Time Allotment: Provide demonstrations of adequate time periods, except as noted elsewhere, to ensure proper understanding of systems by Owner's representative.

I. Furnish ladders, tools, etc. as required to provide access to all equipment and controls for demonstrations.

7.06 CONTRACT CLOSEOUT PROCEDURE

A. Approval for final payment will not be given until all contract closeout procedures comply with the Construction Documents, related specifications, discipline specific resolutions to all open Trade and construction items, and acceptance by the Owner.

226.01 16051-11 Colorado Parks and Wildlife

B. Submit Keys for electrical switches, panels, cabinets, enclosures, etc. to the General Contractor or the Owner.

C. Remove all materials, scrap, etc. related to the electrical installation. Leave premises in a clean and orderly condition.

226.01 16120-1 Colorado Parks and Wildlife

SECTION 16120

CONDUCTORS AND CABLES

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification sections, apply to this section.

A. This section includes the following:

1. Building wires and cables rated 600 V and less.

2. Connectors, splices, and terminations rated 600 V and less.

3. Sleeves and sleeve seals for cables.

1.03 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Field quality-control test reports.

1.04 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. Comply with NFPA 70.

2.01 CONDUCTORS AND CABLES

A. All conductors shall be copper: Comply with NEMA WC 70.

B. Conductor Insulation: Comply with NEMA WC 70 for Types THW, THHN-THWN, XHHW.

All insulated conductors shall be used and installed per the manufacturer’s and NEMA requirements and UL Listed for its intended application.

C. Note: On this project, Type AC, MC, NM shall not be permitted for use, except through specific approval from the Engineer. The Contractor shall not use these conductors and cables in Bid or Costing exercises. Type SO and USE cabling shall be limited in Scope and shall require approval from the Engineer.

D. Raceways: all conductors shall be routed and installed within approved raceways or conduits.

2.02 CONNECTORS AND SPLICES

A. Manufacturers: Subject to compliance with requirements, provide products by one of the

226.01 16120-2 Colorado Parks and Wildlife following:

1. AFC Cable Systems, Inc.

2. Hubbell Power Systems, Inc.

3. O-Z/Gedney; EGS Electrical Group LLC.

4. 3M; Electrical Products Division

5. Tyco Electronics Corp.

B. Description: Factory-fabricated connectors and splices of size, ampacity rating, material, type, and class for application and service indicated.

2.03 SLEEVES FOR CABLES

A. Steel Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, galvanized steel, plain ends.

B. Cast-Iron Pipe Sleeves: Cast or fabricated "wall pipe," equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop, unless otherwise indicated.

C. Coordinate sleeve selection and application with selection and application of fire stopping requirements. Electrical room has 1 hr rating which must be upheld. Penetration of conduit into hazardous classified areas must conform to NEC Article 501.

3.01 CONDUCTOR MATERIAL APPLICATIONS

A. Feeders: Copper for all feeders, conductors, and branch circuits. Solid for 10 AWG and smaller;

stranded for 8 AWG and larger.

3.02 CONDUCTOR INSULATION AND MULTICONDUCTOR CABLE APPLICATIONS AND

WIRING METHODS

A. Service Entrance: Type THHN-THWN, single conductors in raceway, Type XHHW, single conductors in raceway.

B. Exposed Feeders: Type THHN-THWN, single conductors in raceway.]

C. Feeders Concealed in Ceilings, Walls, Partitions, and Crawlspaces: Type THHN-THWN, single conductors in raceway.

D. Feeders Concealed in raceways run in Concrete, below Slabs-on-Grade, and Underground:

Type THHN-THWN, single conductors in raceway.

3.03 INSTALLATION OF CONDUCTORS AND CABLES

A. Conceal cables in finished walls, ceilings, and floors, unless otherwise indicated.

B. Use manufacturer-approved pulling compound or lubricant where necessary; compound used must not deteriorate conductor or insulation. Do not exceed manufacturer's recommended maximum pulling tensions and sidewall pressure values.

226.01 16120-3 Colorado Parks and Wildlife

C. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage cables or raceway.

D. Install exposed cables parallel and perpendicular to surfaces of exposed structural members, and follow surface contours where possible.

E. Support cables according to Electrical Supports and Seismic Restraints requirements.

F. Color-code conductors and cables.

G. Tighten electrical connectors and terminals according to manufacturer's published torque-tightening values. If manufacturer's torque values are not indicated, use those specified in UL 486A and UL 486B.

H. Make splices and taps that are compatible with conductor material and that possess equivalent or better mechanical strength and insulation ratings than unspliced conductors.

I. Wiring at Outlets: Install conductor at each outlet, with at least 6 inches (150 mm) of slack.

3.04 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS

A. Coordinate sleeve selection and application with selection and application of fire stopping.

B. Concrete Slabs and Walls: Install sleeves for penetrations unless core-drilled holes or formed openings are used. Install sleeves during erection of slabs and walls.

C. Fire-Rated Assemblies: Install sleeves for penetrations of fire-rated floor and wall assemblies unless openings compatible with fire stop system used are fabricated during construction of floor or wall.

D. Seal space outside of sleeves with grout for penetrations of concrete and masonry and fire separation barriers.

E. Interior Penetrations of Non-Fire-Rated Walls and Floors: Seal annular space between sleeve and cable, using joint sealant appropriate for size, depth, and location of joints.

F. Fire-Rated-Assembly Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at cable penetrations. Install sleeves and seal with fire stop materials.

G. Hazardous Location Penetrations. Maintain Hazardous Location borders by use of 40% fill explosion proof conduit seals rated for transition into Class I Div. II classified location. Follow all penetration as well as conduit and conductor requirements for a Class I hazardous location as defined in NEC Article 501

H. Roof-Penetration Sleeves: Seal penetration of individual cables with flexible boot-type flashing units applied in coordination with roofing work.

3.05 FIELD QUALITY CONTROL

A. Perform tests and inspections and prepare test reports.

B. Testing and Inspections:

1. After installing conductors and cables and before electrical circuitry has been energized, test, perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification. Certify compliance with test parameters.

226.01 16120-4 Colorado Parks and Wildlife

C. Test Reports: Prepare a written report to record the following:

1. Test procedures used.

2. Test results that comply with requirements.

3. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements.

D. Remove and replace malfunctioning units and retest as specified above.

226.01 16410-1 Colorado Parks and Wildlife

SECTION 16410

ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Conditions and other Division 1 Specifications sections, apply to this section.

A. Section includes:

1. Fusible switches

2. Nonfusible switches

3. Receptacle switches

4. Shunt trip switches

5. Molded-case circuit breakers (MCCBs)

6. Enclosures

1.03 DEFINITIONS

A. NC: Normally closed

B. NO: Normally open

C. SPDT: Single pole, double throw

1.04 SUBMITTALS

A. Product Data: For each type of enclosed switch, circuit breaker, accessory, and component indicated.

B. Shop Drawings: For enclosed switches and circuit breakers. Include plans, elevations, sections, details, and attachments to other work.

1. Wiring Diagrams: For power, signal, and control wiring.

1.05 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NFPA 70/NEC.

2.01 FUSIBLE SWITCHES

226.01 16410-2 Colorado Parks and Wildlife

A. Basis-of-Design. Provide the products by one of the following manufacturers:

1. Eaton/Cutler-Hammer Business Unit

2. General Electric Company; GE Consumer & Industrial - Electrical Distribution

3. Square D; Schneider Electric

B. Type GD, General Duty, Single Throw, 240V AC or 600V AC, 800 A and Smaller: UL 98 and

NEMA KS 1, horsepower rated, with cartridge fuse interiors to accommodate fuses, lockable handle with capability to accept two padlocks, and interlocked with cover in closed position.

C. Type HD, Heavy Duty, Single Throw, 240V AC or 600V AC, 1200 A and Smaller: UL 98 and

NEMA KS 1, horsepower rated, with clips or bolt pads to accommodate fuses, lockable handle with capability to accept three padlocks, and interlocked with cover in closed position.

D. Accessories:

1. Equipment Ground Kit: Internally mounted and labeled for copper and aluminum ground conductors.

2. Neutral Kit: Internally mounted; insulated, capable of being grounded and bonded;

labeled for copper and aluminum neutral conductors.

3. Class R Fuse Kit: Provides rejection of other fuse types when Class R fuses are specified.

4. Lugs: Suitable for number, size, and conductor material.

5. Service-Rated Switches: Labeled for use as service equipment.

2.02 NONFUSIBLE SWITCHES

A. Same as Section 2.01.

2.03 SHUNT TRIP SWITCHES

A. Basis-of-Design. Provide the products by one of the following manufacturers:

1. Eaton/Cutler-Hammer Business Unit

2. General Electric Company; GE Consumer & Industrial - Electrical Distribution

3. Square D; Schneider Electric

4. Cooper/Bussman Inc.

5. Ferraz Shawmut, Inc.

6. Littlefuse, Inc.

B. General Requirements: Comply with UL 50, and UL 98, with 200-kA interrupting and short-circuit current rating when fitted with Class J fuses.

C. Switches: Three-pole, horsepower rated, with integral shunt trip mechanism and Class J fuse

226.01 16410-3 Colorado Parks and Wildlife block; lockable handle with capability to accept three padlocks; interlocked with cover in closed position.

D. Control Circuit: 120-V AC; obtained from integral control transformer with enough capacity to operate shunt trip, connected pilot, and indicating and control devices.

E. Accessories:

1. Oiltight key switch for key-to-test function

2. Oiltight ON pilot light

3. Isolated neutral lug

4. Mechanically interlocked auxiliary contacts that change state when switch is opened and closed.

5. Form C alarm contacts that change state when switch is tripped.

6. Three-pole, double-throw, fire-safety and alarm relay; 120 V AC or 24 V DC coil voltage—coordinate with Bill of Materials, Equipment Connections and Controls, and Other Trades.

7. Three-pole, double-throw, fire-alarm voltage monitoring relay complying with NFPA 72.

2.04 MOLDED-CASE CIRCUIT BREAKERS

A. Manufacturers: Same as listed in Section 2.1.

B. General Requirements: Comply with UL 489, NEMA AB 1, and NEMA AB 3, with interrupting capacity to comply with available fault currents.

C. Thermal-Magnetic Circuit Breakers: Inverse time-current element for low-level overloads and instantaneous magnetic trip element for short circuits. Adjustable magnetic trip setting for circuit-breaker frame sizes 250 A and larger.

D. Electronic Trip Circuit Breakers: Field-replaceable rating plug, rms sensing, with the following field-adjustable settings:

1. Instantaneous trip

2. Long- and short-time pickup levels

3. Long- and short-time time adjustments

4. Ground-fault pickup level, time delay, and I2t response.

E. Current-Limiting Circuit Breakers: Frame sizes 400 A and smaller, and let-through ratings less than NEMA FU 1, RK-5.

F. Features and Accessories:

1. Standard frame sizes, trip ratings, and number of poles

2. Lugs: Suitable for number, size, trip ratings, and conductor material

226.01 16410-4 Colorado Parks and Wildlife

3. Application Listing: Appropriate for application; Type SWD for switching fluorescent lighting loads; Type HID for feeding fluorescent and high-intensity discharge lighting circuits.

4. Ground-Fault Protection: Comply with UL 1053; integrally mounted, self-powered type with mechanical ground-fault indicator; relay with adjustable pickup and time-delay settings, push-to-test feature, internal memory, and shunt trip unit; and three-phase, zero-sequence current transformer/sensor.

5. Shunt Trip: Trip coil energized from separate circuit, with coil-clearing contact.

6. Auxiliary Contacts: (1) SPDT switch

7. Alarm Switch: One contact that operates only when circuit breaker has tripped.

2.05 ENCLOSURES

A. Enclosed Switches and Circuit Breakers: NEMA AB 1, NEMA KS 1, NEMA 250, and UL 50, to comply with environmental conditions at installed location.

1. Indoor, Dry and Clean Locations: NEMA 250, NEMA Type 1

2. Outdoor Locations: NEMA 250, NEMA Type 3R or 4X

3. Equipment or Wash Down Areas: NEMA 250, Type 4X

4. Other Wet or Damp, Indoor Locations: NEMA 250, NEMA Type 4X

5. Indoor Locations Subject to Dust, Falling Dirt, and Dripping Noncorrosive Liquids:

NEMA 250, Type 12.

6. Hazardous Areas Indicated on Drawings: NEMA 250, Type 7.

3.01 EXAMINATION

A. Examine elements and surfaces to receive enclosed switches and circuit breakers for compliance with installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.02 INSTALLATION

A. Install individual wall-mounted switches and circuit breakers with tops at uniform height unless otherwise…