Pine View Cemetery_Project Manual_IFB_Part2.pdf

PDF 6 MB Posted

Attached to
Pine View Cemetery Sink Hole Repair
Solicitation number
2135494
Issued by
New York

About this file

This file is a geotechnical assessment letter and prevailing wage schedule documentation prepared by LaBella Associates for the Town of Queensbury, New York, in connection with the Pine View Cemetery Sink Hole Repair project. The project involves removal and replacement of the existing pond embankment at Pine View Cemetery located at 21 Quaker Road in Queensbury, Warren County, New York, including replacement of pond level control structures and reconstruction of the access drive over the embankment. Subsurface exploration was conducted on July 2, 2024, utilizing three test borings (B1, B2, and B3) to characterize in-situ soil conditions and assess the observed sinkhole forming in the embankment. The geotechnical assessment, dated August 7, 2024, provides professional recommendations for embankment repair, including excavation and backfilling of the sinkhole area with low-permeability material and installation of a soil-bentonite core/cutoff wall. Sealed bids are due June 25, 2026, at 2:00 p.m., with substantial completion required by September 30, 2026, and final project readiness by October 31, 2026. A non-mandatory pre-bid conference is scheduled for June 11, 2026, at 2:00 p.m. at the Pine View Cemetery Office, and written questions are due by June 19, 2026.

The award will be made as a single prime contract on a lump-sum basis, with bid prices to exclude sales and compensating use taxes on incorporated materials. The successful bidder must furnish performance and payment bonds each equal to 100% of the bid price and submit bid security of 5% of the bid with the proposal. All workers and subcontractors must be paid the higher of prevailing federal, state, or local wage rates. The prevailing wage schedule effective July 1, 2025, through June 30, 2026 (PRC# 2026014662) applies to Warren County and includes classifications for carpenter, electrician, laborer, ironworker, elevator constructor, glazier, insulator, lineman electrician, and other trades, with specified hourly wages, supplemental benefits, and overtime requirements. Contractors must register with the New York State Department of Labor and provide proof of workers' compensation coverage prior to beginning work. The Town strongly encourages Minority and Women-owned Business Enterprises and Section 3 Firms to submit proposals, though these are preferences rather than formal set-asides. Electronic copies of drawings and specifications are available from LaBella Associates, with sealed bids to be submitted to the Town Purchasing Agent at 742 Bay Road, Queensbury, New York 12804.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

APPENDIX A

SUBSURFACE EXPLORATION INFORMATION

August 7, 2024

Mr. John Strough, Town Supervisor

Town of Queensbury

742 Bay Road

Queensbury, NY 12804

RE: Pine View Cemetery Embankment: Geotechnical Assessment

Town of Queensbury, Warren County, New York

LaBella Project Number: 2240674.29

Dear Mr. Strough:

LaBella Associates, D.P.C. (LaBella) was retained by the Town of Queensbury to prepare a Geotechnical

Assessment Letter. This letter provides our professional opinion regarding the observed sinkhole forming in the embankment at the Pine View Cemetery located at 21 Quaker Road, in the Town of Queensbury, Warren County, hereinafter referred to as the “project site”.

The project site is an embankment that supports an access drive along the eastern edge of the pond within the cemetery. A short concrete headwall is located along the pond edge (western embankment). A few feet west (into the pond) of the concrete headwall, is a morning glory inlet structure. The structure is connected to a culvert that extends, perpendicular to and under the access drive, and outlets into a small stream on the eastern embankment. The normal pool level was estimated to be approximately 3-feet below the roadway elevation and the stream was estimated to be approximately 8-feet below the roadway elevation.

To the north of the culvert, on the western edge of the access drive, a small “sinkhole” was observed. Per discussions with cemetery staff, there are two irrigation valves in the general location, which have leaked in the past.

Subsurface Explorations

On July 2, 2024, three explorations, designated B1, B2 and B3, were advanced along the embankment to characterize the in-situ conditions. Recovered soil samples were visually classified as a basis for rendering our opinion regarding the condition of the embankment. The explorations were performed by LaBella

Environmental LLC utilizing a Geoprobe 6610 drill rig capable of advancing 5-foot-long macro-core sleeves.

Excavated locations are documented on Attachment 1 – Figure 1: Exploration Location Plan.

Explorations were witnessed by a LaBella representative to record subsurface conditions. Soil samples were visually classified in the field in accordance with the Unified Soil Classification System (USCS). Summary logs detailing the observed conditions within each exploration are included as Attachment 2 – Exploration Logs.

Subsurface Stratigraphy

Within the three explorations, Fill material was observed overlying Glaciofluvial Deposits. Based on the recovered soil samples, and the organic material encountered, the original grade was approximately 9-feet below the access drive surface elevation.

Pine View Cemetery

August 7, 2024

The Fill material was predominantly fine grained with visual classifications of Sandy Lean Clay (CL) or Sandy

Silt (ML). This stratum consists of dry to wet, brown clay or silt with some to a trace percentage of fine sand.

Within B2, an increase in the sand percentage was observed, therefore a classification of Silty Sand (SM) was utilized. This substratum consists of moist to wet brown sand with some percentage of silt.

Groundwater Conditions

The groundwater level was identified to be approximately 11- to 13-feet below the access drive elevation based on the visual observations from the recovery soil samples. These depths are considered un-stabilized and will fluctuate with season, precipitation, nearby construction activity and other factors. Wet layers within the fill material, at depths below the normal pool elevation, were also observed.

Assessment and Recommendations

The embankment material is generally uniform with a percentage of sand on the average of 35-percent.

However, within isolated zones of B2, material with over 50-percent sand was observed. In our opinion the amount of sand and historic repairs has created accelerated seepage paths across the width of the embankment. The increase in the movement of water have pulled soil particle with it, resulting in the observed sinkhole. The area around the sinkhole should be excavated and backfilled with an low impermeable material.

To minimize the seepage rate through the embankment, a soil-bentonite core/cutoff wall can be installed.

The core/cut off wall should extend a few feet below the outlet elevation or at minimum to a depth below the pond bottom (if greater). The horizontal extents of the wall should extend approximately 15-feet past the existing headwall limits (north and south).

The soil-bentonite wall will result in a low permeability zone to minimize the potential for migration across the embankment. This material will remain “soft” to allow for a culvert to be reinstalled. An anti-seep collar or filter diaphragm should be installed around the culvert, downstream of the cutoff wall.

Closing

LaBella has prepared this letter for the exclusive use of the Town of Queensbury and their design team.

LaBella’s assessment is based on the findings of our subsurface investigation and visual observations of the project site. This letter was prepared in accordance with generally accepted soil engineering practices. No other warranty, expressed or implied, is made. The nature and extent of variations between these explorations may not become evident until construction. If significant variations appear, it may be necessary to reevaluate the recommendations cited in this letter.

Prepared by, Matthew A. Korn, PE

Senior Geotechnical Engineer

Encl: Attachment 1 – Exploration Location Plan

Attachment 2 – Exploration Logs

DRAWING NUMBER:PROJECT NAME:

DRAWN BY:

ISSUED FOR:

DATE: PROJECT NO.:

8/ 7/

:5

3:

A M

B:

\G

LO

BA

L\ Pr oj ec ts \Q ue en sb ur y, T ow n of \2

.2

- P in e

Vi ew

C em et er y Si nk H ol e

Re pa ir\

_D ra w in gs \G eo te ch ni ca l\E xp lo ra tio n Lo ca tio n Pl an .d w g

PINE VIEW CEMETERY SINK HOLE REPAIR

PINE VIEW CEMETERY

2240674.29

ASSESSMENT LETTER

08/02/2024

DRAWING NAME:

528 Mineral Trace Hoover, AL 35244 205-985-4874 labellapc.com

N

FIG 1

1 SITE PLAN

SCALE: 1" = 250'

FIG 1

EXPLORATION LOCATION PLAN

MT

B1 EXPLORATION LOCATION

LEGEND

B1B2

B3

QUAKER ROAD

Notes:

Rapid Water appears quickly on the specimen surface during shaking.

1. The N-Value is the summation of the second and the third SPT values.

2. Split-spoon refusal is considered 50 blows over six inches.

3. If 50 blows is reached prior to advancing 6-inches, the penetration is reported as 50 over the nearest 1 inch value.

4. 100 is the maximum reported N-Value on the Exploration Logs.

5. Auger, Roller Bit, and/or Casing refusal occurs if the driller is unable to advance the boring.

Few 5 - 10

None No visible change in the specimen.

Trace < 5

Slow Water appears slowly on the specimen surface during shaking.

Mostly > 50

Some 30 - 45

Dilatancy

Little 15 - 25

Term Description

Medium A thread is easy to roll and not much time is required to reach the plastic limit. A lump crumbles when drier than the plastic limit.

< 3", Soil Particle Size Percent

Ranges

High It takes considerable time rolling and kneading to reach the plastic limit.

Quantifier Percent

Sand-Fine #40 - #200

Low A thread can barely be rolled and a lump cannot be formed.

Very 35 - 60

Silt/Clay < #200

Extremely 60 - 90

< 15

Sand-Medium #10 - #40

Non-plastic A 1/8-in. thread cannot be rolled at any water content.

Frequent 15 - 35

Gravel-Fine 3/4" - #4

Field Plasticity

Quantifier Percent

Sand-Coarse #4 - #10

Term Description

OccasionalCobble 12" - 3"

Wet

> 3", Cobble/Boulder Size

Percent Ranges

Gravel-Coarse 3" - 3/4"

Soil Type Particle Size

DryBoulder > 12"

Moist

Description

Moisture Condition

No moisture to touch.

Free water in sample.

Damp but no visible water.

Size Description

Term

Hard > 4.0 >30

> 50 Very Stiff 2.0 to 1.0 16 to 30

31 to 50 Stiff 1.0 to 2.0 9 to 15Dense

Very Dense

11 to 30 Medium Stiff 0.5 to 1.0 5 to 8

0 to 4 Very Soft ≤ 0.25 0 to 2

5 to 10 Soft 0.25 to 0.5 3 to 4

Very Loose

Medium Dense

Loose

HSG - Hydrologic Soil Group N/A - Not Applicable

Consistency of Fine Grained Soils

N Value Soil

Consistency

Unconfined Compressive

Strength, (tsf) N Value

Relative Density of Coarse Grained Soils

Soil Density

N-Value - Standard Penetration Value WOH - Weight of Rods & Hammer

WOR - Weight of Rods ▼ - Observed Groundwater Surface

NWE - No Water Encountered bgs - below ground surface

SOIL GENERAL INFORMATION SHEET

Soil Identification Terms

The exploration logs present observations and the results of tests performed in the field by the Geotechnical Engineers, Geologists, and

Driller as noted. The identification of soils or soil like material is subject to limitations imposed by the field conditions and equipment used.

The following defines some of the terms utilized in the preparation of the exploration logs.

Abbreviations

Soil identifications are visual descriptions on the basis of ASTM D2488. The soil density or consistency is based on the penetration resistance determined by ASTM D1586.

TEST BORING LOG Page 1 of 3

PROJECT:

1 LOCATION:

Phn: (518) 273-0055 CLIENT:

Fax: (518) 273-8391 PROJECT NO.: 20 ft.

Start Date: 2-Jul-2024 Northing: 1.5 in.

Finish Date: 2-Jul-2024 Easting: 13 ft.

El. Datum: Goggle Earth Latitude: 43.33297 NE ft.

G.S. Elevation: 337 Longitude: -73.66959

D e p th F t)

E le v a ti o n F t)

S a m p le N o

S P

T B lo w s

R e c o v e r y (i n

G r o u n d w a te r

G r o u p

S y m b o l

GS-1 29 3" Topsoil

SM 7" Silty Sand (SM): Mostly Sand, some Silt, brown, dry (Fill)

CL Sandy Lean Clay (CL): Mostly Clay, some Silt, some fine Sand, brown, wet

ML Sandy Silt (ML): Mostly Silt, some fine Sand, brown, dry

GS-2 60 ML 14" Sandy Silt (ML): Mostly Silt, some fine Sand, little Clay, brown, dry

ML 18" Sandy Silt (ML): Mostly Silt, some fine Sand, brown, wet

CL 11" Lean Clay (CL): Mostly Clay, some Silt, trace fine Sand, grey, wet

CL 14" Lean Clay (CL): Mostly Clay, some Silt, trace Gravel, grey, moist

Approximate Strata Change

3" Organic material, dark brown

GS-3 60 ML 20" Silt (ML): Mostly Silt, brown, wet (Glaciofluvial Deposits)

10" Mostly Silt with some organics

▼ CL 30" Lean Clay (CL): Mostly Clay, trace gravel, brown and light grey, wet

GS-4 60 ML Sandy Silt (ML): Mostly Silt, some fine Sand, brown, wet

Boring Terminated at 20-feet

Method: DP 0 to 20.0

2. Test Boring Log Page 1: 0 - 20 feet. Each subsequent page: Additional 25 feet. Sample Core

3. Refer to the "Soil General Information Sheet" for additional symbology and abbreviation definitions. SS

ADDITIONAL 3.25

140 lb

30"

4 British American Blvd. Pine View Cemetery Sink Hole Repair

Test Boring No.: B1Latham, NY 12110 Pine View Cemetery

Town of Queensbury

2240674.29 Total Depth:

Driller: Ray Hammond Bedrock Depth:

Inspector: Caroline Farnan Sample Hammer:

Contractor: LaBella Environmental, LLC See Figure

Borehole Dia.:

Drill Rig: Geoprobe 6610DT Water Depth:

3 334

4 333

5 332

Stratum Descriptions: Field Notes, Comments:

1 336

2 335

9 328

10 327

11 326

6 331

7 330

8 329

15 322

16 321

17 320

12 325

13 324

14 323

METHODS: HA- Hollow Stem Auger, RWH- Rotary Wash, SSA- Solid Stem Auger, DC-Diamond Core, DP-Direct Push DRILLING INFORMATION

SAMPLE TYPES: SS-Split Spoon, RC-Bedrock Core, GS-Geoprobe Sleeve, ST-Shelby Tube

STANDARD 1. Samples classified in accordance with ASTM D-2488 unless otherwise noted.

NOTES:

18 319

19 318

20 317

Type

Int Diam.

NOTES: Weight

Fall

ML/

OL

TEST BORING LOG Page 2 of 3

1 LOCATION:

Phn: (518) 273-0055 CLIENT:

Fax: (518) 273-8391 PROJECT NO.: 20 ft.

Start Date: 2-Jul-2024 Northing: 1.5 in.

Finish Date: 2-Jul-2024 Easting: 11 ft.

El. Datum: Goggle Earth Latitude: 43.33294 NE ft.

G.S. Elevation: 337 Longitude: -73.66968

D e p th F t)

E le v a ti o n F t)

S a m p le N o

S P

T B lo w s

R e c o v e r y (i n

G r o u n d w a te r

G r o u p

S y m b o l

GS-1 43 4" Topsoil

CL

SM 2" Silty Sand (SM): Mostly Sand, some Silt, moist

GS-2 60 SM 16" Silty Sand (SM): Mostly Sand, some Silt, little Clay, brown, wet

SM 22" Silty Sand (SM): Mostly Sand, some Silt, brown, wet

Approximate Strata Change

OL 9" Organic Material

ML 9" Silt (ML): Mostly Silt, some Clay, grey, moist (Glaciofluvial Deposits)

GS-3 60 SM 12" Silty Sand (SM): Mostly Sand, some Silt, dark brown, wet

OL 7" Organic Materials

CL 33" Lean Clay (CL): Mostly Clay, some Silt, trace Sand, light grey, wet

ML 8" Sandy Silt (ML): Mostly Silt, some Sand, grey, moist

GS-4 60 ML 48" Sandy Silt (ML): Mostly Silt, some Sand, grey, wet

ML 12" Sandy Silt (ML): Mostly Silt, some Sand, grey, wet

Boring Terminated at 20-feet

Method: DP 0 to 20.0

2. Test Boring Log Page 1: 0 - 20 feet. Each subsequent page: Additional 25 feet. Sample Core

3. Refer to the "Soil General Information Sheet" for additional symbology and abbreviation definitions. SS

ADDITIONAL 3.25

140 lb

30"

Type

Int Diam.

NOTES: Weight

Fall

METHODS: HA- Hollow Stem Auger, RWH- Rotary Wash, SSA- Solid Stem Auger, DC-Diamond Core, DP-Direct Push DRILLING INFORMATION

SAMPLE TYPES: SS-Split Spoon, RC-Bedrock Core, GS-Geoprobe Sleeve, ST-Shelby Tube

STANDARD 1. Samples classified in accordance with ASTM D-2488 unless otherwise noted.

NOTES:

18 319

19 318

20 317

15 322

16 321

17 320

12 325

13 324

14 323

9 328

10 327

11 326

6 331

7 330

8 329

3 334

4 333

5 332

Stratum Descriptions: Field Notes, Comments:

1 336

2 335

37" Gravelly Lean Clay (CL): Mostly Clay, some Gravel, some Silt, brown, moist (Fill)

Driller: Ray Hammond Bedrock Depth:

Inspector: Caroline Farnan Sample Hammer:

Contractor: LaBella Environmental, LLC See Figure

Borehole Dia.:

Drill Rig: Geoprobe 6610DT Water Depth:

4 British American Blvd. Pine View Cemetery Sink Hole Repair

Test Boring No.: B2Latham, NY 12110 Pine View Cemetery

2240674.29 Total Depth:

TEST BORING LOG Page 3 of 3

1 LOCATION:

Phn: (518) 273-0055 CLIENT:

Fax: (518) 273-8391 PROJECT NO.: 20 ft.

Start Date: 2-Jul-2024 Northing: 1.5 in.

Finish Date: 2-Jul-2024 Easting: 12 ft.

El. Datum: Goggle Earth Latitude: 43.33185 NE ft.

G.S. Elevation: 336 Longitude: -73.66959

D e p th F t)

E le v a ti o n F t)

S a m p le N o

S P

T B lo w s

R e c o v e r y (i n

G r o u n d w a te r

G r o u p

S y m b o l

GS-1 39 10" Topsoil

CL 15" Sandy Lean Clay (CL): Mostly Clay, some Sand, some Silt, grey, dry (Fill)

CL 14" Sandy Lean Clay (CL): Mostly Clay, some Sand, some Silt, brown, moist

GS-2 60 CL

GS-3 60 ML 15" Sandy Silt (ML): Mostly Silt, some Sand, brown, wet

Approximate Strata Change

15" Mostly Silt with some organics (Glaciofluvial Deposits)

SM 20" Silty Sand (SM): Mostly Sand, some Silt, grey, wet

CL 10" Sandy Lean Clay (CL): Mostly Clay, some Sand, some Silt, brown, wet

GS-4 60 SM

CL 40" Lean Clay (CL): Mostly Clay, some Silt, brown, wet

SM 11" Silty Sand (SM): Mostly Sand, some Silt, brown/grey, moist

Boring Terminated at 20-feet

Method: DP 0 to 20.0

2. Test Boring Log Page 1: 0 - 20 feet. Each subsequent page: Additional 25 feet. Sample Core

3. Refer to the "Soil General Information Sheet" for additional symbology and abbreviation definitions. SS

ADDITIONAL 3.25

140 lb

30"

Sandy Lean Clay (CL): Mostly Clay, some Sand, some Silt, orange & brown, wet

ML/

OL

9" Silty Sand w/ Gravel (SM): Mostly Sand, some Silt, some Gravel, little Clay, grey, wet

Type

Int Diam.

NOTES: Weight

Fall

METHODS: HA- Hollow Stem Auger, RWH- Rotary Wash, SSA- Solid Stem Auger, DC-Diamond Core, DP-Direct Push DRILLING INFORMATION

SAMPLE TYPES: SS-Split Spoon, RC-Bedrock Core, GS-Geoprobe Sleeve, ST-Shelby Tube

STANDARD 1. Samples classified in accordance with ASTM D-2488 unless otherwise noted.

NOTES:

18 318

19 317

20 316

15 321

16 320

17 319

12 324

13 323

14 322

9 327

10 326

11 325

6 330

7 329

8 328

3 333

4 332

5 331

Stratum Descriptions: Field Notes, Comments:

1 335

2 334

Driller: Ray Hammond Bedrock Depth:

Inspector: Caroline Farnan Sample Hammer:

Contractor: LaBella Environmental, LLC See Figure

Borehole Dia.:

Drill Rig: Geoprobe 6610DT Water Depth:

4 British American Blvd. Pine View Cemetery Sink Hole Repair

Test Boring No.: B3Latham, NY 12110 Pine View Cemetery

2240674.29 Total Depth:

APPENDIX B

APPENDIX B

US ARMY CORPS OF ENGINEERS PERMIT

APPENDIX C

APPENDIX C

NYS DEPARTMENT OF ENVIRONMENTAL

CONSERVATION PERMIT

APPENDIX D

APPENDIX D

NYS DEPARTMENT OF LABOR PREVAILING

WAGE RATES

PREVAILING WAGE SCHEDULE FOR ARTICLE 8 PUBLIC WORK PROJECT

Attached is the current schedule(s) of the prevailing wage rates and prevailing hourly supplements for the project referenced above. A unique Prevailing Rate Case Number (PRC#) has been assigned to the schedule(s) for your project.

The schedule is effective from July 2025 through June 2026. All updates, corrections, posted on the 1st business day of each month, and future copies of the annual determination are available on the Department's website www.labor.ny.gov. Updated PDF copies of your schedule can be accessed by entering your assigned PRC# at the proper location on the website.

It is the responsibility of the contracting agency or its agent to annex and make part, the attached schedule, to the specifications for this project, when it is advertised for bids and /or to forward said schedules to the successful bidder(s), immediately upon receipt, in order to insure the proper payment of wages.

Please refer to the "General Provisions of Laws Covering Workers on Public Work Contracts" provided with this schedule, for the specific details relating to other responsibilities of the Department of Jurisdiction.

Upon completion or cancellation of this project, enter the required information and mail OR fax this form to the office shown at the bottom of this notice, OR fill out the electronic version via the NYSDOL website.

NOTICE OF COMPLETION / CANCELLATION OF PROJECT

Date Completed: Date Cancelled:

Name & Title of Representative:

Phone: (518) 457-5589 Fax: (518) 485-1870 W. Averell Harriman State Office Campus, Bldg. 12, Room 130, Albany, NY 12240 www.labor.ny.gov. PW 200 Ask.PWAsk@labor.ny.gov

Kathy Hochul, Governor Roberta Reardon, Commissioner

Town of Queensbury

Paul Guillet 20 Elm Street, Suite 110 Glens Falls NY 12801

Schedule Year 2025 through 2026 Date Requested 05/21/2026

PRC# 2026014662

Location Pine View Cemetery Project ID# Project Type Removal and replacement of the existing pond embankment located in the Pine View Cemetery, including replacement of the pond level control structures, and reconstruction of the access drive over the https://www.labor.ny.gov/home/ https://www.labor.ny.gov/home/

General Provisions of Laws Covering Workers on Article 8 Public Work Contracts

Introduction

The Labor Law requires public work contractors and subcontractors to pay laborers, workers, or mechanics employed in the performance of a public work contract not less than the prevailing rate of wage and supplements (fringe benefits) in the locality where the work is performed.

Contractor Registry

Effective December 30, 2024 all contractors and subcontractors submitting bids or performing construction work on public work projects, or private projects covered by Article 8 of the Labor Law, are required to register with the New York State Department of Labor (NYSDOL) under Labor Law Section 220-i. To register, contractors and subcontractors must submit an application through NYSDOL’s Contractor Registry portal which is available through the agency’s Management System for Protecting Worker Rights (MPWR) https://mpwr-public.labor.ny.gov/en/login.

For additional information, please visit online.

Responsibilities of the Department of Jurisdiction

A Department of Jurisdiction (Contracting Agency) includes a state department, agency, board or commission: a county, city, town or village; a school district, board of education or board of cooperative educational services; a sewer, water, fire, improvement and other district corporation; a public benefit corporation; and a public authority awarding a public work contract.

The Department of Jurisdiction (Contracting Agency) awarding a public work contract MUST obtain a Prevailing Rate Schedule listing the hourly rates of wages and supplements due the workers to be employed on a public work project.

This schedule may be obtained by completing and forwarding a "Request for wage and Supplement Information" form (PW

39) to the Bureau of Public Work. The Prevailing Rate Schedule MUST be included in the specifications for the contract to be awarded and is deemed part of the public work contract.

Upon the awarding of the contract, the law requires that the Department of Jurisdiction (Contracting Agency) furnish the following information to the Bureau: the name and address of the contractor, the date the contract was let and the approximate dollar value of the contract. To facilitate compliance with this provision of the Labor Law, a copy of the Department's "Notice of Contract Award" form (PW 16) is provided with the original Prevailing Rate Schedule.

The Department of Jurisdiction (Contracting Agency) is required to notify the Bureau of the completion or cancellation of any public work project. The Department's PW 200 form is provided for that purpose.

Both the PW 16 and PW 200 forms are available for completion online.

Hours

No laborer, worker, or mechanic in the employ of a contractor or subcontractor engaged in the performance of any public work project shall be permitted to work more than eight hours in any day or more than five days in any week, except in cases of extraordinary emergency. The contractor and the Department of Jurisdiction (Contracting Agency) may apply to the Bureau of Public Work for a dispensation permitting workers to work additional hours or days per week on a particular public work project.

Wages and Supplements

The wages and supplements to be paid and/or provided to laborers, workers, and mechanics employed on a public work project shall be not less than those listed in the current Prevailing Rate Schedule for the locality where the work is performed. If a prime contractor on a public work project has not been provided with a Prevailing Rate Schedule, the contractor must notify the Department of Jurisdiction (Contracting Agency) who in turn must request an original Prevailing Rate Schedule form the Bureau of Public Work. Requests may be submitted by: mail to NYSDOL, Bureau of Public Work, State Office Bldg. Campus, Bldg. 12, Rm. 130, Albany, NY 12226; Fax to Bureau of Public Work (518) 485-1870; or electronically at the NYSDOL website www.labor.ny.gov.

Upon receiving the original schedule, the Department of Jurisdiction (Contracting Agency) is REQUIRED to provide complete copies to all prime contractors who in turn MUST, by law, provide copies of all applicable county schedules to each subcontractor and obtain from each subcontractor, an affidavit certifying such schedules were received. If the original schedule expired, the contractor may obtain a copy of the new annual determination from the NYSDOL website www.labor.ny.gov.

The Commissioner of Labor makes an annual determination of the prevailing rates. This determination is in effect from July 1st through June 30th of the following year. The annual determination is available on the NYSDOL website https://mpwr-public.labor.ny.gov/en/login https://dol.ny.gov/public-work-contractor-and-subcontractor-registry-landing https://apps.labor.ny.gov/wpp/showFindProject.do?method=showIt https://dol.ny.gov/public-work-and-prevailing-wage www.labor.ny.gov.

Payrolls and Payroll Records

Every contractor and subcontractor MUST keep original payrolls or transcripts subscribed and affirmed as true under penalty of perjury. As per Article 6 of the Labor law, contractors and subcontractors are required to establish, maintain, and preserve for not less than six (6) years, contemperaneous, true, and accurate payroll records. At a minimum, payrolls must show the following information for each person employed on a public work project: Name, Address, Last 4 Digits of Social Security Number, Classification(s) in which the worker was employed, Hourly wage rate(s) paid, Supplements paid or provided, and Daily and weekly number of hours worked in each classification.

The filing of payrolls to the Department of Jurisdiction is a condition of payment.Every contractor and subcontractor shall submit to the Department of Jurisdiction (Contracting Agency), within thirty (30) days after issuance of its first payroll and every thirty (30) days thereafter, a transcript of the original payrolls, subscribed and affirmed as true under penalty of perjury. The Department of Jurisdiction (Contracting Agency) shall collect, review for facial validity, and maintain such payrolls.

In addition, the Commissioner of Labor may require contractors to furnish, with ten (10) days of a request, payroll records sworn to as their validity and accuracy for public work and private work. Payroll records include, but are not limited to time cards, work description sheets, proof that supplements were provided, cancelled payroll checks and payrolls. Failure to provide the requested information within the allotted ten (10) days will result in the withholding of up to 25% of the contract, not to exceed $100,000.00. If the contractor or subcontractor does not maintain a place of business in New York State and the amount of the contract exceeds $25,000.00, payroll records and certifications must be kept on the project worksite.

The prime contractor is responsible for any underpayments of prevailing wages or supplements by any subcontractor.

All contractors or their subcontractors shall provide to their subcontractors a copy of the Prevailing Rate Schedule specified in the public work contract as well as any subsequently issued schedules. A failure to provide these schedules by a contractor or subcontractor is a violation of Article 8, Section 220-a of the Labor Law.

All subcontractors engaged by a public work project contractor or its subcontractor, upon receipt of the original schedule and any subsequently issued schedules, shall provide to such contractor a verified statement attesting that the subcontractor has received the Prevailing Rate Schedule and will pay or provide the applicable rates of wages and supplements specified therein. (See NYS Labor Laws, Article 8 . Section 220-a).

Determination of Prevailing Wage and Supplement Rate Updates Applicable to All Counties

The wages and supplements contained in the annual determination become effective July 1st whether or not the new determination has been received by a given contractor. Care should be taken to review the rates for obvious errors. Any corrections should be brought to the Department's attention immediately. It is the responsibility of the public work contractor to use the proper rates. If there is a question on the proper classification to be used, please call the district office located nearest the project. Any errors in the annual determination will be corrected and posted to the NYSDOL website on the first business day of each month. Contractors are responsible for paying these updated rates as well, retroactive to July 1st.

When you review the schedule for a particular occupation, your attention should be directed to the dates above the column of rates. These are the dates for which a given set of rates is effective. To the extent possible, the Department posts rates in its possession that cover periods of time beyond the July 1st to June 30th time frame covered by a particular annual determination. Rates that extend beyond that instant time period are informational ONLY and may be updated in future annual determinations that actually cover the then appropriate July 1st to June 30th time period.

Withholding of Payments

When a complaint is filed with the Commissioner of Labor alleging the failure of a contractor or subcontractor to pay or provide the prevailing wages or supplements, or when the Commissioner of Labor believes that unpaid wages or supplements may be due, payments on the public work contract shall be withheld from the prime contractor in a sufficient amount to satisfy the alleged unpaid wages and supplements, including interest and civil penalty, pending a final determination.

When the Bureau of Public Work finds that a contractor or subcontractor on a public work project failed to pay or provide the requisite prevailing wages or supplements, the Bureau is authorized by Sections 220-b and 235.2 of the Labor Law to so notify the financial officer of the Department of Jurisdiction (Contracting Agency) that awarded the public work contract.

Such officer MUST then withhold or cause to be withheld from any payment due the prime contractor on account of such contract the amount indicated by the Bureau as sufficient to satisfy the unpaid wages and supplements, including interest and any civil penalty that may be assessed by the Commissioner of Labor. The withholding continues until there is a final determination of the underpayment by the Commissioner of Labor or by the court in the event a legal proceeding is instituted for review of the determination of the Commissioner of Labor.

The Department of Jurisdiction (Contracting Agency) shall comply with this order of the Commissioner of Labor or of the court with respect to the release of the funds so withheld.

Summary of Notice Posting Requirements

The current Prevailing Rate Schedule must be posted in a prominent and accessible place on the site of the public work project. The prevailing wage schedule must be encased in, or constructed of, materials capable of withstanding adverse weather conditions and be titled "PREVAILING RATE OF WAGES" in letters no smaller than two (2) inches by two (2) inches.

The "Public Work Project" notice must be posted at the beginning of the performance of every public work contract, on each job site.

Every employer providing workers. compensation insurance and disability benefits must post notices of such coverage in the format prescribed by the Workers. Compensation Board in a conspicuous place on the jobsite.

Every employer subject to the NYS Human Rights Law must conspicuously post at its offices, places of employment, or employment training centers, notices furnished by the State Division of Human Rights.

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite notices furnished by the NYS Department of Labor.

Apprentices

Employees cannot be paid apprentice rates unless they are individually registered in a program registered with the NYS Commissioner of Labor. The allowable ratio of apprentices to journeyworkers in any craft classification can be no greater than the statewide building trade ratios promulgated by the Department of Labor and included with the Prevailing Rate Schedule. An employee listed on a payroll as an apprentice who is not registered as above or is performing work outside the classification of work for which the apprentice is indentured, must be paid the prevailing journeyworker's wage rate for the classification of work the employee is actually performing.

NYSDOL Labor Law, Article 8, Section 220-3, require that only apprentices individually registered with the NYS Department of Labor may be paid apprenticeship rates on a public work project. No other Federal or State Agency of office registers apprentices in New York State.

Persons wishing to verify the apprentice registration of any person must do so in writing by mail, to the NYSDOL Office of Employability Development / Apprenticeship Training, State Office Bldg. Campus, Bldg. 12, Albany, NY 12226 or by Fax to NYSDOL Apprenticeship Training (518) 457-7154. All requests for verification must include the name and social security number of the person for whom the information is requested.

The only conclusive proof of individual apprentice registration is written verification from the NYSDOL Apprenticeship Training Albany Central office. Neither Federal nor State Apprenticeship Training offices outside of Albany can provide conclusive registration information.

It should be noted that the existence of a registered apprenticeship program is not conclusive proof that any person is registered in that program. Furthermore, the existence or possession of wallet cards, identification cards, or copies of state forms is not conclusive proof of the registration of any person as an apprentice.

Interest and Penalties

In the event that an underpayment of wages and/or supplements is found:

- Interest shall be assessed at the rate then in effect as prescribed by the Superintendent of Banks pursuant to section 14-a of the Banking Law, per annum from the date of underpayment to the date restitution is made.

- A Civil Penalty may also be assessed, not to exceed 25% of the total of wages, supplements, and interest due.

Debarment

Any contractor or subcontractor and/or its successor shall be ineligible to submit a bid on or be awarded any public work contract or subcontract with any state, municipal corporation or public body for a period of five (5) years when:

- Two (2) willful determinations have been rendered against that contractor or subcontractor and/or its successor within any consecutive six (6) year period.

- There is any willful determination that involves the falsification of payroll records or the kickback of wages or supplements.

Criminal Sanctions

Willful violations of the Prevailing Wage Law (Article 8 of the Labor Law) may be a felony punishable by fine or imprisonment of up to 15 years, or both.

https://dol.ny.gov/public-work-and-prevailing-wage-forms

Discrimination

No employee or applicant for employment may be discriminated against on account of age, race, creed, color, national origin, sex, disability or marital status.

No contractor, subcontractor nor any person acting on its behalf, shall by reason of race, creed, color, disability, sex or national origin discriminate against any citizen of the State of New York who is qualified and available to perform the work to which the employment relates (NYS Labor Law, Article 8, Section 220-e(a)).

No contractor, subcontractor, nor any person acting on its behalf, shall in any manner, discriminate against or intimidate any employee on account of race, creed, color, disability, sex, or national origin (NYS Labor Law, Article 8, Section 220-e(b) ).

The Human Rights Law also prohibits discrimination in employment because of age, marital status, or religion.

There may be deducted from the amount payable to the contractor under the contract a penalty of $50.00 for each calendar day during which such person was discriminated against or intimidated in violation of the provision of the contract (NYS Labor Law, Article 8, Section 220-e(c) ).

The contract may be cancelled or terminated by the State or municipality. All monies due or to become due thereunder may be forfeited for a second or any subsequent violation of the terms or conditions of the anti-discrimination sections of the contract (NYS Labor Law, Article 8, Section 220-e(d) ).

Every employer subject to the New York State Human Rights Law must conspicuously post at its offices, places of employment, or employment training centers notices furnished by the State Division of Human Rights.

Workers' Compensation

In accordance with Section 142 of the State Finance Law, the contractor shall maintain coverage during the life of the contract for the benefit of such employees as required by the provisions of the New York State Workers' Compensation Law.

A contractor who is awarded a public work contract must provide proof of workers' compensation coverage prior to being allowed to begin work.

The insurance policy must be issued by a company authorized to provide workers' compensation coverage in New York State. Proof of coverage must be on form C-105.2 (Certificate of Workers' Compensation Insurance) and must name this agency as a certificate holder.

If New York State coverage is added to an existing out-of-state policy, it can only be added to a policy from a company authorized to write workers' compensation coverage in this state. The coverage must be listed under item 3A of the information page.

The contractor must maintain proof that subcontractors doing work covered under this contract secured and maintained a workers' compensation policy for all employees working in New York State.

Every employer providing worker's compensation insurance and disability benefits must post notices of such coverage in the format prescribed by the Workers' Compensation Board in a conspicuous place on the jobsite.

Unemployment Insurance

Employers liable for contributions under the Unemployment Insurance Law must conspicuously post on the jobsite notices furnished by the New York State Department of Labor.

Notice of Contract Award

New York State Labor Law, Article 8, Section 220.3a requires that certain information regarding the awarding of public work contracts, be furnished to the Commissioner of Labor.

One "Notice of Contract Award" (PW 16, which may be photocopied), MUST be completed for EACH prime contractor on the above referenced project.

Upon notifying the successful bidder(s) of this contract, enter the required information and mail OR fax this form to the office shown at the bottom of this notice, OR fill out the electronic version via the NYSDOL website.

Contractor Information All information must be supplied

Federal Employer Identification Number:

Name:

Address:

aaa

City: State: Zip:

Contract Type:

[ ] (01) General Construction [ ] (02) Heating/Ventilation [ ] (03) Electrical [ ] (04) Plumbing [ ] (05) Other :

Amount of Contract: $

Approximate Starting Date: - - - - /- - - - /

Approximate Completion Date: - - - - /- - - - /

Phone: (518) 457-5589 Fax: (518) 485-1870 W. Averell Harriman State Office Campus, Bldg. 12, Room 130, Albany, NY 12226 www.labor.ny.gov. PW 16 Ask.PWAsk@labor.ny.gov

Kathy Hochul, Governor Roberta Reardon, Commissioner

Town of Queensbury

Paul Guillet 20 Elm Street, Suite 110 Glens Falls NY 12801

Schedule Year 2025 through 2026 Date Requested 05/21/2026

PRC# 2026014662

Location Pine View Cemetery Project ID# Project Type Removal and replacement of the existing pond embankment located in the Pine View Cemetery, including replacement of the pond level control structures, and reconstruction of the access drive over the

Social Security Numbers on Certified Payrolls:

The Department of Labor is cognizant of the concerns of the potential for misuse or inadvertent disclosure of social security numbers. Identity theft is a growing problem and we are sympathetic to contractors' concern regarding inclusion of this information on payrolls if another identifier will suffice.

For these reasons, the substitution of the use of the last four digits of the social security number on certified payrolls submitted to contracting agencies on public work projects is now acceptable to the Department of Labor. This change does not affect the Department's ability to request and receive the entire social security number from employers during its public work/ prevailing wage investigations.

Construction Industry Fair Play Act: Required Posting for Labor Law Article 25-B § 861-d

Construction industry employers must post the "Construction Industry Fair Play Act" notice in a prominent and accessible place on the job site. Failure to post the notice can result in penalties of up to $1,500 for a first offense and up to $5,000 for a second offense. The posting is included as part of this wage schedule. Additional copies may be obtained from the NYS DOL website, https://dol.ny.gov/public-work-and-prevailing-wage If you have any questions concerning the Fair Play Act, please call the State Labor Department toll-free at 1-866-435-1499 or email us at: dol.misclassified@labor.ny.gov .

Worker Notification: (Labor Law §220, paragraph a of subdivision 3-a)

Effective June 23, 2020

This provision is an addition to the existing wage rate law, Labor Law §220, paragraph a of subdivision 3-a. It requires contractors and subcontractors to provide written notice to all laborers, workers or mechanics of the prevailing wage and supplement rate for their particular job classification on each pay stub*. It also requires contractors and subcontractors to post a notice at the beginning of the performance of every public work contract on each job site that includes the telephone number and address for the Department of Labor and a statement informing laborers, workers or mechanics of their right to contact the Department of Labor if he/she is not receiving the proper prevailing rate of wages and/or supplements for his/her job classification. The required notification will be provided with each wage schedule, may be downloaded from our website www.labor.ny.gov or be made available upon request by contacting the Bureau of Public Work at 518-457-5589. *In the event the required information will not fit on the pay stub, an accompanying sheet or attachment of the information will suffice.

(12.20)

To all State Departments, Agency Heads and Public Benefit Corporations

IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

Budget Policy & Reporting Manual

B-610

Public Work Enforcement Fund effective date December 7, 2005

1. Purpose and Scope:

This Item describes the Public Work Enforcement Fund (the Fund, PWEF) and its relevance to State agencies and public benefit corporations engaged in construction or reconstruction contracts, maintenance and repair, and announces the recently-enacted increase to the percentage of the dollar value of such contracts that must be deposited into the Fund. This item also describes the roles of the following entities with respect to the Fund:

- New York State Department of Labor (DOL),

- The Office of the State of Comptroller (OSC), and

- State agencies and public benefit corporations.

2. Background and Statutory References:

DOL uses the Fund to enforce the State's Labor Law as it relates to contracts for construction or reconstruction, maintenance and repair, as defined in subdivision two of Section 220 of the Labor Law. State agencies and public benefit corporations participating in such contracts are required to make payments to the Fund.

Chapter 511 of the Laws of 1995 (as amended by Chapter 513 of the Laws of 1997, Chapter 655 of the Laws of 1999, Chapter 376 of the Laws of 2003 and Chapter 407 of the Laws of 2005) established the Fund.

3. Procedures and Agency Responsibilities:

The Fund is supported by transfers and deposits based on the value of contracts for construction and reconstruction, maintenance and repair, as defined in subdivision two of Section 220 of the Labor Law, into which all State agencies and public benefit corporations enter.

Chapter 407 of the Laws of 2005 increased the amount required to be provided to this fund to .10 of one-percent of the total cost of each such contract, to be calculated at the time agencies or public benefit corporations enter into a new contract or if a contract is amended.

The provisions of this bill became effective August 2, 2005.

To all State Departments, Agency Heads and Public Benefit Corporations

IMPORTANT NOTICE REGARDING PUBLIC WORK ENFORCEMENT FUND

OSC will report to DOL on all construction-related ("D") contracts approved during the month, including contract amendments, and then DOL will bill agencies the appropriate assessment monthly. An agency may then make a determination if any of the billed contracts are exempt and so note on the bill submitted back to DOL. For any instance where an agency is unsure if a contract is or is not exempt, they can call the Bureau of Public Work at the number noted below for a determination. Payment by check or journal voucher is due to DOL within thirty days from the date of the billing. DOL will verify the amounts and forward them to OSC for processing.

For those contracts which are not approved or administered by the Comptroller, monthly reports and payments for deposit into the Public Work Enforcement Fund must be provided to the Administrative Finance Bureau at the DOL within 30 days of the end of each month or on a payment schedule mutually agreed upon with DOL.

Reports should contain the following information:

- Name and billing address of State agency or public benefit corporation;

- State agency or public benefit corporation contact and phone number;

- Name and address of contractor receiving the award;

- Contract number and effective dates;

- Contract amount and PWEF assessment charge (if contract amount has been amended, reflect increase or decrease to original contract and the adjustment in the PWEF charge); and

- Brief description of the work to be performed under each contract.

Checks and Journal Vouchers, payable to the "New York State Department of Labor" should be sent to:

Department of Labor

Administrative Finance Bureau-PWEF Unit Building 12, Room 464

State Office Campus Albany, NY 12226

Any questions regarding billing should be directed to NYSDOL's Administrative Finance Bureau-PWEF Unit at (518) 457-3624 and any questions regarding Public Work Contracts should be directed to the Bureau of Public Work at (518) 457-5589.

Required Notice under Article 25-B of the Labor Law

Attention All Employees, Contractors and Subcontractors:

You are Covered by the Construction Industry Fair Play Act

The law says that you are an employee unless:

• You are free from direction and control in performing your job, and

• You perform work that is not part of the usual work done by the business that hired you, and

• You have an independently established business.

Your employer cannot consider you to be an independent contractor unless all three of these facts apply to your work.

It is against the law for an employer to misclassify employees as independent contractors or pay employees off the books.

Employee Rights: If you are an employee, you are entitled to state and federal worker protections.

These include:

• Unemployment Insurance benefits, if you are unemployed through no fault of your own, able to work, and otherwise qualified,

• Workers’ compensation benefits for on-the-job injuries,

• Payment for wages earned, minimum wage, and overtime (under certain conditions),

• Prevailing wages on public work projects,

• The provisions of the National Labor Relations Act, and

• A safe work environment.

It is a violation of this law for employers to retaliate against anyone who asserts their rights under the law. Retaliation subjects an employer to civil penalties, a private lawsuit or both.

Independent Contractors: If you are an independent contractor, you must pay all taxes and Unemployment Insurance contributions required by New York State and Federal Law.

Penalties for paying workers off the books or improperly treating employees as independent contractors:

• Civil Penalty First offense: Up to $2,500 per employee

Subsequent offense(s): Up to $5,000 per employee

• Criminal Penalty First offense: Misdemeanor - up to 30 days in jail, up to a $25,000 fine and debarment from performing public work for up to one year.

Subsequent offense(s): Misdemeanor - up to 60 days in jail or up to a $50,000 fine and debarment from performing public work for up to 5 years.

If you have questions about your employment status or believe that your employer may have violated your rights and you want to file a complaint, call the Department of Labor at

(866) 435-1499 or send an email to dol.misclassified@labor.ny.gov. All complaints of fraud and violations are taken seriously. You can remain anonymous.

Employer Name:

IA 999 (09/16)

New York State Department of Labor Bureau of Public Work

Attention Employees

THIS IS A: PUBLIC WORK

PROJECT

If you are employed on this project as a worker, laborer, or mechanic you are entitled to receive the prevailing wage and supplements rate for the classification at which you are working.

Your pay stub and wage notice received upon hire must clearly state your wage rate and supplement rate.

Chapter 629 of the Labor Laws of 2007:

These wages are set by law and must be posted at the work site. They can also be found at:

https://dol.ny.gov/bureau-public-work

If you feel that you have not received proper wages or benefits, please call our nearest office.*

Albany Binghamton Buffalo Garden City New York City Newburgh

(518) 457-2744

(607) 721-8005

(716) 847-7159

(516) 228-3915

(212) 932-2419

(845) 568-5287

Patchogue Rochester Syracuse Utica White Plains

(631) 687-4882

(585) 258-4505

(315) 428-4056

(315) 793-2314

(914) 997-9507

* For New York City government agency construction projects, please contact the Office of the NYC Comptroller at (212) 669-4443, or www.comptroller.nyc.gov – click on Bureau of Labor Law.

Contractor Name:

Project Location:

PW 101 (08/23)

Requirements for OSHA 10 Compliance

Article 8 §220-h requires that when the advertised specifications, for every contract for public work, is $250,000.00 or more the contract must contain a provision requiring that every worker employed in the performance of a public work contract shall be certified as having completed an OSHA 10 safety training course. The clear intent of this provision is to require that all employees of public work contractors, required to be paid prevailing rates, receive such training “prior to the performing any work on the project.”

The Bureau will enforce the statute as follows:

All contractors and sub contractors must attach a copy of proof of completion of the OSHA 10 course to the first certified payroll submitted to the contracting agency and on each succeeding payroll where any new or additional employee is first listed.

Proof of completion may include but is not limited to:

• Copies of bona fide course completion card (Note: Completion cards do not have an expiration date.)

• Training roster, attendance record of other documentation from the certified trainer pending the issuance of the card.

• Other valid proof

**A certification by the employer attesting that all employees have completed such a course is not sufficient proof that the course has been completed.

Any questions regarding this statute may be directed to the New York State Department of Labor, Bureau of Public Work at 518- 457-5589.

WICKS

Public work projects are subject to the Wicks Law requiring separate specifications and bidding for the plumbing, heating and electrical work, when the total project's threshold is $3 million in Bronx, Kings, New York, Queens and, Richmond counties; $1.5 million in Nassau, Suffolk and Westchester counties; and $500,000 in all other counties.

For projects below the monetary threshold, bidders must submit a sealed list naming each subcontractor for the plumbing, HVAC and electrical and the amount to be paid to each.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .