PIE_PAVE_STRAWBERRY_LOT_BID_TAB(reference_Only).xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Pave Strawberry Parking Lot (PID 004570A) - St. Pete-Clearwater International Airport STEP 2
- Solicitation number
- 23-0593-ITB-C STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The document is a bid tabulation spreadsheet for the St. Pete-Clearwater International Airport Strawberry Parking Lot Project (Project No. STP-23-00002) located in Pinellas County, Florida. The project involves reconstructing and expanding the Strawberry Parking Lot and South Overflow parking lot, transforming a previously temporary lot into a permanent facility. The base bid and alternate bid include comprehensive construction services such as site preparation, pavement demolition, excavation, drainage improvements, asphalt and concrete pavement installation, electrical infrastructure, fencing, landscaping, utility connections, signage, parking equipment installation, security system integration, and associated site work. The bid includes 65 line items for the base bid and 16 additional items for the alternate bid, covering everything from mobilization to specialized parking and security equipment.
The total base bid is $218,000, with key specialized items including a $35,000 allocation for security equipment, $105,000 for parking equipment installation and integration, and $15,000 for fiber and communications infrastructure. Additional allowances include $8,000 for permitting fees, $5,000 for utility work, and a $50,000 contingency for unforeseen circumstances. The alternate bid for the South Overflow Lot totals $25,000, with a $25,000 contingency for unexpected issues. The project appears to be fully funded and requires complex technical integration with existing airport systems, involving coordination with the airport's security and parking system vendors. The comprehensive scope suggests a substantial infrastructure improvement project aimed at enhancing parking capacity and technological capabilities at the St. Pete-Clearwater International Airport.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID
| St. Pete Clearwater International Airport |
| Pave Strawberry Lot |
| Pinellas County Project No. STP-23-00002 |
| MH #: 4625000-221000.01 |
| Item No. | Spec. | Description | Unit of Issue | Quantity | Unit Price | Extended Price |
| BASE BID-PAVE STRAWBERRY LOT | ||||||
| 1 | 101-1 | Mobilization, Cleanup, and Demobilization | LS | 1 | $ - 0 | |
| 2 | 102-1 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 3 | 104-1 | Installation and Removal of Silt Fence, Type B | LF | 2,500 | $ - 0 | |
| 4 | 104-2 | Floating Turbidity Barrier | LF | 450 | $ - 0 | |
| 5 | 104-3 | Inlet Protection | EA | 7 | $ - 0 | |
| 6 | 110-1 | Clearing and Grubbing | AC | 7.6 | $ - 0 | |
| 7 | 327-1 | Asphalt Millings Removal | SY | 26,500 | $ - 0 | |
| 8 | 327-2 | Asphalt Pavement Demolition | SY | 570 | $ - 0 | |
| 9 | 110-1 | Miscellaneous Demolition (Concrete, Rip-Rap, Fence, Drainage Pipe & Structures) | LS | 1 | $ - 0 | |
| 10 | 110-2 | Remove and Stockpile Existing Wheel Stop | EA | 774 | $ - 0 | |
| 11 | 120-1 | Unclassified Excavation (Hauled and Placed at Designated Airport Location) | CY | 9,500 | $ - 0 | |
| 12 | 120-6 | Embankment (From On-Site Excavation) | CY | 10,000 | $ - 0 | |
| 13 | 160-1 | Stabilized Subbase | SY | 47,000 | $ - 0 | |
| 14 | 285-1 | Optional Base Group 04 (6" Limerock or Equivalent) | SY | 47,000 | $ - 0 | |
| 15 | 334-1 | 2" FDOT Superpave Asphalt Pavement | Tons | 5,500 | $ - 0 | |
| 16 | 334-2 | Bituminous Prime Coat | Gal | 11,800 | $ - 0 | |
| 17 | 350-1 | 6" Concrete Pavement (Driveways, Islands, Pads) | SY | 260 | $ - 0 | |
| 18 | 350-2 | 4" Concrete Sidewalk Pavement | SY | 50 | $ - 0 | |
| 19 | 425-1 | 14"x123" Mitered End Section | EA | 6 | $ - 0 | |
| 20 | 425-3 | Raise Existing Drainage Manhole | EA | 1 | $ - 0 | |
| 21 | 425-4 | Covert Existing Drainage Inlet to Drainage Manhole | EA | 1 | $ - 0 | |
| 22 | 425-5 | Raise Existing Air Release Valve Manhole | EA | 1 | $ - 0 | |
| 23 | 430-1 | 14"x23" Elliptical Reinforced Concrete Pipe | LF | 232 | $ - 0 | |
| 24 | 524-1 | Concrete Rip Rap | SY | 725 | $ - 0 | |
| 25 | 570-1 | Sodding | SY | 13,500 | $ - 0 | |
| 26 | 700-1 | Stop Sign (R1-1) 30"X30" and Post | EA | 2 | $ - 0 | |
| 27 | 700-2 | ADA Parking Sign Assembly (FTP-21-06 & FTP-2206) and Posts (4 total panels per sign location) | EA | 12 | $ - 0 | |
| 28 | 700-3 | No Parking Signs (R7-1 & Sign Type F) 12"x18" and Post | EA | 17 | $ - 0 | |
| 29 | 700-4 | Do Not Enter (R5-1) 30"x30" and Post | EA | 3 | $ - 0 | |
| 30 | 700-5 | No Right Turn (R3-1) 24"x24" and Post | EA | 1 | $ - 0 | |
| 31 | 700-6 | Exit Signs (18"x24") Panel Only | EA | 27 | $ - 0 | |
| 32 | 700-7 | Shuttle Bus Enter/Exit Only (Panel Only) | EA | 3 | $ - 0 | |
| 33 | 700-8 | Shuttle Pick-Up (2'x2') Panel Only) | EA | 13 | $ - 0 | |
| 34 | 700-9 | Shuttle Pick Up at Shelters Only (48"x36") including 2 posts | EA | 1 | $ - 0 | |
| 35 | 700-10 | Parking Lot Row Numbering Signs (24" diameter) including posts (2 panels per sign location) | EA | 37 | $ - 0 | |
| 36 | 700-11 | Special Directional Sign (120"x96") including 4 posts | EA | 2 | $ - 0 | |
| 37 | 700-12 | Daily Rate Sign Assembly (72" x 66" total) including 2 posts | EA | 1 | $ - 0 | |
| 38 | 710-1 | Pavement Markings | SF | 25,000 | $ - 0 | |
| 39 | 704-1 | Tubular traffic delineator | EA | 15 | $ - 0 | |
| 40 | 705-1 | Traffic Bollards | EA | 32 | $ - 0 | |
| 41 | 107316-1 | 29' x 73' pre-engineered ticketing plaza canopy, complete and in-place including lighting, foundations, signage, completion of stamped-permitted drawings and all associated work. | LS | 1 | $ - 0 | |
| 42 | 107343-1 | Shuttle bus shelter including concrete pad, structure, mounting, completion of stamped-permitted drawings and all associated work- complete in place | EA | 4 | $ - 0 | |
| 43 | 107343-2 | Pre-engineered Toll Booth including restroom, plumbing, electrical, mechanical systems, completion of stamped-permitted drawings , and all associated work | LS | 1 | $ - 0 | |
| 44 | 260502-1 | Electrical distribution system including service from existing transformer to meter, panel and rack, service to new light poles, toll plaza, toll booth, and bus entrance/exit lane equipment including all associated cable, conduit, and connections | LS | 1 | $ - 0 | |
| 45 | 265600-1 | 20' tall aluminum light pole and fixture installed on new concrete base including all wiring, connections, and associated work | EA | 32 | $ - 0 | |
| 46 | 265600-2 | New handhole for future light pole | EA | 7 | $ - 0 | |
| 47 | 260543-1 | 12 Count Blue OM3 Multimode Fiber installed in new or existing duct/interduct | LF | 3,000 | $ - 0 | |
| 48 | 323119-1 | New 5' High Ornamental Fence (Fence Type 3) | LF | 1,015 | $ - 0 | |
| 49 | 323119-2 | New 5' Wide Ornamental Man Gate | EA | 1 | $ - 0 | |
| 50 | 323119-3 | New 16' Manual Ornamental Cantilever Slide Gate (1-16' Leaf) | EA | 1 | $ - 0 | |
| 51 | 329000-1 | Landscaping | LS | 1 | $ - 0 | |
| 52 | 331400-1 | New 3/4" PVC Waterline installed in trench | LF | 1,200 | $ - 0 | |
| 53 | 331400-2 | New 3/4" PVC Waterline installed via directional boring | LF | 75 | $ - 0 | |
| 54 | 331400-3 | Connect new 3/4" waterline to existing 8" waterline including all valves, boxes, and associated appurtenances | LS | 1 | $ - 0 | |
| 55 | 333000-1 | New 6" Sanitary Sewer Gravity Line | LF | 80 | $ - 0 | |
| 56 | 333000-2 | Connect new sanitary sewer Line to existing manhole including new interior drop connection | EA | 1 | $ - 0 | |
| 57 | 333000-3 | Raise top of existing sanitary sewer air release valve manhole | EA | 1 | $ - 0 | |
| 58 | F-162-1 | New 8' High Chain Link Fence with 3 strands of barbed wire (Fence Type 1) | LF | 1,020 | $ - 0 | |
| 59 | F-162-2 | New Barricade Fence Installed on Asphalt (Fence Type 2) | LF | 450 | $ - 0 | |
| 60 | 9990000-1 | Unspecified work item No 1. |
Security Equipment, Installation and Integration:
| Unspecified work for the purchase, delivery and installation of two new network switches; two new transceiver modules; all patch cables; 7 surge protectors; required enclosures; two multilens cameras; two H5SL cameras; four camera mounts; required camera covers; adapters and arms; two controllers; two proximity/keypad card readers readers; two pedestals; two card reader housings; all required fiber and ethernet cabling; four camera licenses; all installation; programming and miscellaneous equipment and materials. All security items are required to be compatible with the Airports Security System and must be integrated by the Airports Security Vendor. | AL | 1 | $ 35,000.00 | $ 35,000.00 |
| 61 | 9990000-2 | Unspecified work item No 2. |
Jupiter Parking Equipment, Installation and Integration:
Unspecified work for the main entrance/exit plaza and shuttle bus entrance/exit equipment including:
| Main Entrance, purchase, delivery, and installation of two Jupiter exit stations and all related components; one magnetic barrier gate arm; two LED signs and posts; two in-pavement detector loops. Main Exit, purchase, delivery, and installation of two Jupiter entry stations and all related components; cashier station and all related components; one magnetic barrier gate arm; three relays and sockets; one JBL controller; one wireless bridge; one 8 port switch; two in-pavement detector loops. Shuttle Entrance, purchase, delivery, and installation of; one lane controller; one AVI reader, mounting bracket and converter; one AVI mounting pole; one wireless bridge; one 8 port switch. Shuttle Exit, purchase, delivery, and installation of; one lane controller; one AVI reader, mounting bracket and converter; one AVI mounting pole; one magnetic barrier gate armone wireless bridge; one 8 port switch; two in-pavement detector loops. Purchase, delivery and installation of all required misc. parts and hardware; annual licensing and annual fees. All parking equipment items are required to be compatible with the Airports existing parking system and must be integrated by the Airports Parking Vendor. | AL | 1 | $ 105,000.00 | $ 105,000.00 |
| 62 | 9990000-3 | Unspecified work item No 3. |
Main Fiber Feed Connections & Equipment:
| Unspecified work for installation of equipment and terminations in the entry/exit attendant booth and Terminal Building (MDF) including the purchase, delivery, and installation of one new communications enclosure; required converters; one new tripplite; one new UPS and required LIU's; connectors, etc.; Including fiberoptic connections and ethernet conversions required in the toll booth for both the parking system equipment and security equipment and fiberoptic connections and ethernet conversions at the head end system in Terminal Building (MDF) for both parking system equipment and security equipment | AL | 1 | $ 15,000.00 | $ 15,000.00 | |
| 63 | 9990000-4 | Unspecified work item No 4. | |||
| Unspecified work for reimbursable costs associated with Pinellas County Water and City of Largo Sewer permitting and impact fees | AL | 1 | $ 8,000.00 | $ 8,000.00 | |
| 64 | 9990000-5 | Unspecified work item No 5. | |||
| Unspecified work for reimbursable costs associated with Duke Energy provided work | AL | 1 | $ 5,000.00 | $ 5,000.00 | |
| 65 | 9990000-6 | Unspecified work item No 6. | |||
| Unspecified work for unforeseen circumstances for the Strawberry Parking Lot | AL | 1 | $ 50,000.00 | $ 50,000.00 | |
| BASE BID TOTAL | $ 218,000.00 |
ALT 1
| St. Pete Clearwater International Airport |
| Pave Strawberry Lot |
| Pinellas County Project No. STP-23-00002 |
| MH #: 4625000-221000.01 |
| Item No. | Spec. | Description | Unit of Issue | Quantity | Unit Price | Extended Price | |
| BID ALTERNATE 1- PAVE SOUTH OVERFLOW LOT | |||||||
| 1 | 104-1 | Installation and Removal of Silt Fence, Type B | LF | 2,020 | $ - 0 | ||
| 2 | 104-2 | Inlet Protection | EA | 2 | $ - 0 | ||
| 3 | 110-1 | Miscellaneous Demolition (Bus Shelter, Structures) | LS | 1 | $ - 0 | ||
| 4 | 110-2 | Remove and Stockpile Existing Wheel Stop | EA | 416 | $ - 0 | ||
| 5 | 120-2 | Unclassified Excavation | CY | 400 | $ - 0 | ||
| 6 | 283-1 | In-place recycling of existing asphalt millings and subgrade- includes reworking of material and grade adjustments | SY | 15,600 | $ - 0 | ||
| 7 | 327-1 | Asphalt Millings Removal | SY | 1,600 | $ - 0 | ||
| 8 | 334-1 | 2" FDOT Superpave Asphalt Pavement | Tons | 1,900 | $ - 0 | ||
| 9 | 334-2 | Bituminous Prime Coat | Gal | 4,100 | $ - 0 | ||
| 10 | 570-2 | Sodding | SY | 2,500 | $ - 0 | ||
| 11 | 700-1 | ADA Parking Sign Assembly (FTP-21-06 & FTP-2206) and Posts (2 total panels per sign location) | EA | 9 | $ - 0 | ||
| 12 | 710-1 | Pavement Markings | SF | 8,000 | $ - 0 | ||
| 13 | 705-1 | Traffic Bollards | EA | 4 | $ - 0 | ||
| 14 | 107343-1 | Shuttle bus shelter including concrete pad, structure, mounting, completion of stamped-permitted drawings and all associated work- complete in place | EA | 1 | $ - 0 | ||
| 15 | F-162-3 | Remove and replace existing fence using existing fabric | LF | 220 | $ - 0 | ||
| 16 | 9990000-7 | Unspecified work item No. 7 | |||||
| Unspecified work for unforeseen circumstances for the Overflow Parking Lot | AL | 1 | $ 25,000.00 | $ 25,000.00 | |||
| BID ALTERNATE 1 TOTAL | $ 25,000.00 |
File details come from the government source that posted it. Updated .