This document is a webinar presentation on the FY 2024 Natural Gas Distribution Infrastructure Safety and Modernization (NGDISM) Grant Program Notice of Funding Opportunity (NOFO) from the Department of Transportation Pipeline and Hazardous Materials Safety Administration (PHMSA).

The webinar covers FY 2023 program updates, the application process, key NOFO changes, eligible projects, a new NOFO checklist, and common application mistakes. The FY 2024 NOFO makes $196 million available for grants to municipality-owned, community-owned, or federally recognized tribal utilities to repair, rehabilitate, or replace high-risk, leak-prone natural gas distribution pipelines, or acquire related equipment. Eligible projects include construction, equipment-only, and miscellaneous projects. The application must include a cover letter, project summary, detailed project description, project prioritization table, projected outputs and objectives, budget narrative, and documentation for underserved communities. The NOFO has a Catalog of Federal Domestic Assistance (CFDA) number of 20.708.

PHMSA FY 2024 NGDISM Grant Program NOFO Webinar 5-7-24

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHMSA: Your Safety is Our MissionPHMSA: Your Safety is Our Mission

Natural Gas Distribution Infrastructure Safety and Modernization Grant Program

FY 2024 NOTICE OF FUNDING OPPORTUNITY WEBINAR

May 7, 2024

Webinar Overview

Today, we will discuss:

1. FY 2023 Program Updates

2. How to Apply

3. Key NOFO Changes

4. Eligibility of Projects

5. New NOFO Checklist

6. Common Application Mistakes

FY 2023 Program Updates

1. FY 2023 Status Letters for applicants who have received funding for at least one project are still in the process of being distributed.

2. The FY 2024 NOFO is still pending final approval. PHMSA anticipates that the NOFO will be released some time this week.

3. Roadshow events for those selected to receive an award is still ongoing. Not all recipients will receive a media invited event. If you have not been contacted to participate in an event, please be patient and we will reach out to you to schedule an event over the next two months.

Applying for a Grant

Required Registration: Sam.gov

Register with SAM.GOV

• Unique Entity Identifier (UEI). New entities can get their Unique Entity ID at www.SAM.gov and, if required, complete an entity registration. Registration information must be confirmed each year for registration to remain valid.

• Designate a point of contact (SAM POC). This person is responsible for maintaining the accuracy and timeliness of the information in SAM's registry. Upon a successful registration, the SAM POC will receive a PIN Number that will enable you to update your organization’s SAM information, as necessary.

SAM Customer Service:

Federal Service Desk URL: www.fsd.gov Hours: 8am – 8pm (Eastern) Phone: 866-606-8220

Required Registration Grants.gov Register with GRANTS.GOV

• New users will go to www.grants.gov and select “Register.”

New user registrations can take up to two weeks to complete the approval process.

• Add an organization applicant profile to begin application process.

FY 2024 Notice of Funding Opportunity is located on www.Grants.gov

Search By

• Opportunity Number: 693JK323NF0014

• Grant Program: NGDISM

• CFDA: 20.708

Required Registration: Technical Support

Grants.gov Support Desk Phone: 1-800-518-4726 (U.S.)

Email: support@grants.gov

SAM.gov Federal Service Desk Phone: 866-606-8220 Create a ticket: https://www.fsd.gov/gsafsd_sp

FedConnect Phone: 1-800-899-6665, option 2 Email: fcsupport@unisonglobal.com

Eligibility, Eligible Projects & NOFO Updates

Eligibility and Purpose

Purpose: To repair, rehabilitate, or replace high-risk, leak prone natural gas distribution pipelines, or to acquire equipment to:

1. Reduce natural gas pipeline incidents and fatalities

2. Avoid economic loss from leaks

Eligibility: Municipality-owned utilities, community-owned utilities, or Federally recognized tribal governments owning and operating a natural gas distribution system. Not Eligible: For-profit entities or any pipeline asset(s) owned by a for-profit entity.

FY 2024 NOFO Updates

• The FY 2024 NOFO makes $196M available for award.

• Projects should be bundled as much as possible. Breaking down projects by streets is unnecessary.

• Projects should be numerically ranked in the order of priority

• Two maps available for identifying both transportation disadvantaged communities and underserved communities.

Examples of Eligible Projects

Construction Project: A proposal to replace 5 miles of actively leaking cast-iron pipe. Note: Equipment necessary to complete the project should be included in the project budget.

Equipment Only Project: A proposal to acquire handheld laser leak detection devices.

Miscellaneous Project (projects with no miles associated): A proposal to replace an obsolete regulator station.

Examples of Low Priority Projects

• A proposal to replace pipe where no notable safety issue is present with references to the infrastructure potentially leaking in the future.

• A proposal to install high-cost advanced metering infrastructure

• A proposal to acquire construction equipment without an associated construction project.

Examples of Out-of-Scope Projects

• A proposal to relocate pipe solely due to another construction project without a primary safety concern.

• A proposal to conduct a system-wide risk assessment.

• A proposal to repair or replace a transmission line.

FY 2024 NOFO Checklist

Cover Letter

Project Summary

Detailed Project Description

Project Prioritization Table

Projected Outputs and Objectives

Budget Narrative

Underserved Communities

Key Documents for the Technical Evaluation Panel

Standard Forms

Required Statements

Cover Letter

Does the letter include the natural gas system’s name, key organizational and capacity information, and sufficient contact information for the project representative and the authorized representative?

It is important for entities to identify a programmatic point of contact.

If using a grant writer, information about the grant writer is not necessary unless that entity will be supporting the administrative tasks of the grant.

Project Summary

Does the application include a project summary that provides a high-level overview of project(s)?

Applicants should bundle projects to the greatest extent possible. It is unnecessary to breakdown projects by street names if located in the same general area.

The project summaries should be no more than 2-3 sentences per project. More detailed information will be captured in the Detailed Project Description Section and the Project Prioritization Table.

Project Prioritization Table

Priority Number

Project Type Project Name Existing Pipe

Material (if applicable)

Miles Replaced

Age Estimated Reduction in

Annual Methane Emissions (kg/year)4

Estimated number of jobs (if applicable)

Total Project Cost (all costs must equal the federal funding requested in the

SF-424)

1 Construction Southeast Cast-Iron

Replacement Project

Cast-iron 9.0 1920s 25,637 100 $9,500,000

2 Equipment Leak Detection

Equipment

N/A 0.0 1920s 7,121 40 $2,300,000

3 Other – Regulator Station

Regulator Replacement

Project

Bare steel 0.0 1970s 0.0 N/A $850,000

Total $12,650,000.00

SF-424

Federal Funding

Requested

$12,650,000.00

Project Prioritization

• Each project should be ranked numerically by priority.

• Ensure that the dollar amounts of all projects align with the amounts on either the SF-424A or SF-424C total federal funding request.

• Breaking down projects by street is unnecessary as they will likely all receive the same grant and technical scores.

• Equipment necessary to complete construction projects should not be broken out into separate projects. Those costs typically are found under the construction line item on the SF-424C.

Detailed Project Description

Does the description include the project location, milestones to completion, and a thorough explanation describing why funding is needed?

Does the description include the condition of the existing infrastructure? (leak-prone, actively leaking, or another condition) Does the description include whether there is an immediate safety risk that poses danger to the community and/or environment?

Have there been past incidents on the line?

Does the need for the project align with the most recent DIMP and GDAR?

Detailed Project Description, continued

If funded, how will the project mitigate identified risks?

What safety benefits will the project bring to the community?

Include photographs or diagrams of project locations.

Include information regarding access to or use of the right-of-way needed for the project, if applicable.

Would partial funding be accepted?

What is the minimum level of funding needed?

Was the project in process prior to the posting of the NOFO?

Would the grant expedite the project?

Projected Outputs and Objectives

Does the application provide quantifiable and measurable outputs planned for the grant’s period of performance?

• the quantity (e.g., mileage, age, and diameter) of pipeline affected;

• if applicable, cost of equipment purchased for the project;

• an estimate of the number of jobs the project may create;

• an estimate of the project’s potential for benefiting disadvantaged rural and urban communities;

• an estimate of the economic impact or growth over the length of the project; and,

• an estimate of the reduction in methane emissions attributable to the project, including the method of calculation.

Budget Narrative

Is the budget narrative consistent with costs fully explained?

Does it align with the SF-424A (Equipment only) or SF- 424C (Construction projects) line items?

Do costs total the amount of federal funding requested on the SF-424?

Are the contingency costs at or below 10 percent?

Does your budget include quotes or invoices (Current or Past) to justify costs?

Did you consider NEPA support, and Grants Administration costs in your budget?

Budget Narrative, continued

Items in the budget narrative should correspond with the costs listed on the SF- 424A or SF-424C. The budget narrative should provide an explanation and a breakout or itemization of project costs for each applicable line-item category. PHMSA requires more than just numbers for this section.

• Detail each budget item that supports the cost of the project

• Explain how costs are calculated.

• Include quotes, invoices or receipts.

• Round all costs to the nearest dollar

Equipment Costs should include reasonable explanation(s) of equipment cost(s) and include quotes. Please explain any benefits of purchasing versus leasing high-cost items.

Contingency Costs must be limited to 10%. This can be used for unexpected project costs.

Equipment less than $10,000 should be categorized as Miscellaneous or Supplies depending on the form you use.

SF-424C

(Construction applications with or without equipment)

SF-424A

(Equipment-only applications)

Costs to consider when formulating your budget:

• Pre-award costs: Permitting, Licenses, Grants Management

Training, Grant Consultants

• NEPA/Environmental Consultant costs

• Site restoration costs: Asphalt, Grass, Concrete, etc.

• Single audit costs

• Inflation

• Grants management training

• Administrative staff support to manage the grant

Indirect Costs

Indirect costs

• Indirect costs are costs that are not readily chargeable to a particular program or function, but benefit all programs and functions operated by the non-Federal entity.

• Generally, these kinds of costs are identified, pooled, and charged against individual programs or funding sources using a rate designed to recover the costs.

• For construction grant projects, there will be minimal costs after applying the Modified Total Direct Cost (MTDC) calculation. These costs will be mostly limited to the Administrative Costs line item.

• Once elected, the 15% de minimis rate must be used consistently for all Federal awards received by the non-Federal entity.

• If applicants choose to claim indirect costs, they must be calculated using the Modified Total Direct Cost (MTDC).The MTDC is defined in the Code of Federal Regulations (CFR) at 2 CFR 200.1

2 CFR 200 Changes NEW!

• Equipment threshold changed from $5K to $10K

• Audit Threshold changed from $750K to $1M

• De minimis rate increased from 10% to 15%

Underserved Communities NEW TOOL!

Applicants should use the Climate and Economic Justice Screening Tool (CEJST) to identify disadvantaged communities as the primary tool:

https://screeningtool.geoplatform.gov/

• Climate change

• Energy

• Health

• Housing

• Legacy pollution

• Transportation

• Water and wastewater

• Workforce development

Underserved Communities

• Applicants are also encouraged to use the DOT Equitable Transportation Community (ETC) Tool to understand how their community or project area is experiencing disadvantage and address how their project will reduce, reverse or mitigate the burdens of disadvantage:

https://experience.arcgis.com/experience/0920984aa80a4362b8778d779 b090723/page/ETC-Explorer---National-Results/

• To respect Tribal sovereignty and self-government and to fulfill Federal trust and treaty responsibilities to Tribal Nations, land within the boundaries of Federally Recognized Tribes are designated as disadvantaged.

Key Documents for the Technical Evaluation Panel

Most recent Gas Distribution Annual Report (GDAR) (PHMSA Form 7100.1-1) Most recent Distribution Integrity Management Plan (entire document) Any pictures that may support the need for funding.

Standard Forms

The Authorized Representative (AR) is the person with legal authority to sign documents. The AR must sign all Standard Forms.

1. Standard Form (SF) 424 – Application for Assistance

• Two points of contact are required.

• Person named/contact information in Section 8f must not be the same person named as the Authorized Representative (AR) in Section 21.

2. Equipment-only (non-construction projects):

• SF-424A - Budget Information - Non-Construction Programs

• SF-424B - Assurances - Non-Construction Programs

OR

3. Construction improvements with or without equipment:

• SF-424C - Budget Information - Construction Programs

Standard Forms, continued

5. SF-424D - Assurances - Construction Programs

6. Grants.gov Lobbying Form; and Disclosure of Lobbying Activities form (SF-LLL), if applicable.

7. USDOT Standard Title VI/Non-Discrimination Assurances (non-USDOT Standard Title VI/Non- Discrimination Assurances forms are not acceptable)

Required Statements

Statement of Authority and Pipeline Infrastructure Safety and Modernization Capabilities (verify eligibility and confirm the entity has legal authority and capability to perform pipeline infrastructure repairs)

Statement certifying compliance with Executive Order 13985 (Equity Requirement).

Statement certifying compliance with Domestic Preference/Buy America

Attachments

1. Project Narrative

2. Budget Narrative

3. Indirect cost rate agreement (if applicable)

4. Most current Distribution Integrity Management Plan (DIMP) (entire

DIMP)

5. Most current USDOT/PHMSA Gas Distribution System Annual

Report (GDAR) (Form PHMSA F 7100)

6. Additional optional attachments per applicant’s discretion (maps, pictures, charts, etc.)

Common Errors

• Not establishing a safety risk profile for the project.

• Discrepancies between the GDAR/DIMP and the application.

• Engineering reports used in lieu of a project narrative.

• Not including photos, maps, diagrams, reports, or narratives to support the project benefits or system challenges.

• The total project costs not aligning with the budget narrative and the SF424-C.

Contact Information

PHMSAPipelineBILGrant@dot.gov

202-366-7652

PHMSA will collect questions by email or phone and respond via grants.gov.

Resources

Introduction to Grants.gov Video Series https://www.youtube.com/playlist?list=PLNSNGxQE7NWlPcYxV...

NGDISM Website https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants

File details come from the government source that posted it. Updated .