Pertinent Questions Answers Clarifications from 127EAU26Q0047.pdf

PDF 224 KB Posted

Attached to
Rental of Prime Generator, San Bernardino National Forest Supervisor's Office
Solicitation number
127EAU26Q0062
Issued by

About this file

This document contains pertinent questions, answers, and clarifications from the original solicitation for a temporary generator installation project at a Forest Service facility.

The project involves installing a rental generator as prime power while maintaining the existing generator as backup, with the critical requirement of bypassing the existing 4160V switchboard to allow its demolition and replacement without interrupting temporary building power. The rental generator and automatic transfer switch (ATS) will be positioned near the current generator location, with approximately 500 feet of cable routed from the ATS through the building's back to front, dropping through a metal grate near the entrance and into the basement electrical room—the only viable entry point confirmed by the Government. The recommended approach ties the generator into the 480V side of the outside step-up transformer and connects the 4160V output directly to the 4160V cable feeding the building, temporarily eliminating dependence on the outside 4160V switchboard gear. The contractor bears sole responsibility for obtaining all permits (AQMD, CARB PERP, and local building/electrical permits) and associated costs, with the Government providing no assistance or permitting coordination and confirming no known constraints or pre-approved conditions exist. Invoicing is accepted in 30-day increments. The Government's Contracting Officer's Representative (COR) or Local Point of Contact coordinates with building occupants and facility personnel regarding outages, while the contractor schedules outages and any after-hours or weekend work in coordination with the COR or Local POC, with outage duration unrestricted within reason provided disruptions are mitigated due to the facility's 24/7 power requirement. A separate contractor will handle the existing switchgear replacement, the rental generator placement is flexible on any pavement but cannot block switchgear work, both buildings are Forest Service owned, the current switchgear is oversized, and power interruption is expected during active switchgear removal and installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pertinent Questions, Answers and Clarifications from original solicitation for this project

Question 1) For the temporary setup, our understanding is that you want to bring in a rental generator as prime power and to keep the existing generator as back up power. In order to do that, it appears we would need to bypass the existing 4160V switchboard area completely so that it can be demolished and replaced without affecting the temporary building feed.

Answer 1) That is correct and that approach to eliminating any dependence on the existing 4160V switchboard outside is the preferred approach for this project.

Question 2) The rental generator and ATS would sit next to the current panel (near the current generator) and the cable going from the ATS would have to go all the way from the back of the building to the front dropping down through the metal grate in the ground near the front entrance then going into the basement substation room. This run is approximately 500’. Unless you know of another way we can feed the cable into the substation room, this look like the only way to run the cable. Please confirm

Answer 2) Confirmed, there is no other known way into the basement electrical room, for this approach.

Question 3) How often is invoicing allowed?

Answer 3) Invoices will be accepted in 30 day increments.

Question and Answer set 4) The Statement of Work indicates that the contractor is responsible for obtaining permits including AQMD, CARB PERP, and local building/electrical permits.

Please answer the following:

- Will the Government provide any assistance or coordination with permitting agencies?

No

- Is the contractor solely responsible for all permitting, associated costs, and approvals?

Yes

- Are there any known permitting constraints or pre-approved conditions for this site?

No known permitting constraints or pre-approved conditions for the site.

Question and Answer set 5) Installation and tie-in of the generator and transfer switch will require planned shutdowns/outages. Please clarify who is responsible for:

- Coordination with building occupants and facility personnel

The government Contracting Officer’s Representative (COR) or Local POC will coordinate with building occupants and facility personnel.

- Scheduling of outages

Contractor to coordinate scheduled outages with the COR or Local POC.

- Requirements for after-hours or weekend work

Contractor to coordinate after-hours or weekend work with the COR or Local POC.

- Any restrictions on allowable outage durations

No restriction within reason and as along as the contractor coordinates with the COR or Local POC. Note: Any disruption length has to be mitigated, as the facility requires power 24 hours a day/7 days a week.

Question 6) Should the temporary generator connect at 4160V, or should it be configured at 480V with step-up/step-down to match the building distribution?

Question 7) Is the tie-in point on the medium-voltage side or low-voltage side within the substation?

Answer 6 and 7) There are multiple ways to provide prime power to meet our project intent, please refer to the below single line diagram to help clarify an approach we see as feasible.

Here is an option for an approach: Provide prime generator power by tying into the 480V side of the outside step-up transformer (same location the current generator is tied into).

Now, in order to meet the intent of answer 1 (eliminating any dependence on the existing 4160V switchboard outside), this project would take the 4160V output of the outside step-up transformer and connect directly to the 4160V cable that goes into the building, thereby temporarily eliminating the outside 4160V switchboard gear (utility service). The follow-on repair project will then address reconnecting the utility service.

Other general notes:

1) Existing switchgear change out will be handled by a separate contractor. The plan for actual fix is full switchgear replacement and that solicitation for that project will be out very soon.

2) The rental generator can be placed anywhere on pavement but cannot block work on switchgear.

3) Both buildings on the gated compound are forest service owned.

4) The current switchgear is oversized.

5) We understand and expect to have an interruption in power while switchgear is actively being removed/installed.

File details come from the government source that posted it. Updated .