PERMITDEPexp203112220404845001EI46FishHavens2022.pdf

PDF 2 MB Posted

Attached to
Okaloosa Artificial Reef Deployment
Solicitation number
CC202607-01
Issued by
Okaloosa County, Florida

About this file

This is an Environmental Resource Permit and Sovereignty Submerged Lands Authorization issued by the Florida Department of Environmental Protection (FDEP) Northwest District to the Okaloosa County Board of County Commissioners for the construction of three artificial reef sites (Fish Havens 20, 21, and 22) in the Gulf of Mexico offshore of Okaloosa County, Florida. The permit authorizes the construction of three artificial reefs, each approximately one square nautical mile and 847.5 acres, totaling three square nautical miles and 2,544.6 acres within a Class III Florida Waterbody and Unclassified Shellfish Harvesting Area. The authorized reef materials consist of clean concrete, rock, steel boat hulls, heavy gauge steel products with a minimum thickness of 1/4 inch, prefabricated concrete and steel structures, and other approved materials free of contaminants. Fish Haven 20 is located approximately 1.74 nautical miles offshore west of East Pass; Fish Haven 21 is approximately 8.14 nautical miles offshore south of East Pass; and Fish Haven 22 is approximately 2.20 nautical miles offshore east of East Pass. The permit was issued December 22, 2021, with a construction phase expiration date of December 22, 2031. Taylor Engineering, Inc., is designated as the authorized agent. The permittee must comply with specific construction conditions including perimeter buoy marking, material quality verification, diver surveys prior to deployment, and minimum 250-foot buffers between deployment sites and permitted reef boundaries.

The permit requires the permittee to submit a Construction Commencement Notice at least 48 hours prior to beginning work and an As-Built Certification within 30 days of construction completion. The permittee must maintain evidence of sufficient upland interest and must indemnify and defend the Board of Trustees and the State of Florida from all claims arising from the authorization to use sovereignty submerged lands. A separate U.S. Army Corps of Engineers permit is required, and a Florida Artificial Reef Materials Cargo Manifest must be submitted to the Florida Fish and Wildlife Conservation Commission at least seven days before material deployment. Within 30 days of reef placement, precise location coordinates and a placement report must be submitted to NOAA and FWC. The permit constitutes a water quality certification under Section 401 of the Clean Water Act and a coastal zone management consistency finding. The activity is funded through the Coastal Corridor Project, a state-funded initiative implemented by the Fish & Wildlife Foundation of Florida with direct appropriation by the Florida Legislature and administered via grant contract with FWC. The deployment involves secondary-use concrete culvert materials staged at 765 County Highway 83A E, Freeport, Florida, with up to 1,500 tons (3,000,000 lbs.) authorized for deployment.

View the file

Other files

File Type Posted
ITAITBCC20260701.pdf PDF
ITB_CC20260701Bid_Tabulation.xls XLS spreadsheet
PERMITACEexp20330414SAJ202101854FishHavens2022.pdf PDF
FWC-25118_CoastalCorridorGrant_EXECUTED.pdf PDF
ITB_CC20260701Okaloosa.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.dep.state.fl.us

FLORIDA DEPARTMENT OF

Environmental Protection

Northwest District

160 W. Government Street, Suite 308

Pensacola, Florida 32502-5740

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton

Secretary

Permittee/Authorized Entity:

Okaloosa County Board of County Commissioners c/o Alexander Fogg

1250 North Eglin Parkway

Suite 100

Shalimar, Florida 32579, Okaloosa County afogg@myokaloosa.com

Fish Havens 20, 21, & 22

Authorized Agent:

Taylor Engineering, Inc.

c/o Duncan Greer

4300 Legendary Drive

Destin, Florida 32541 dgreer@taylorengineering.com

Environmental Resource Permit

State-owned Submerged Lands Authorization – Granted

U.S. Army Corps of Engineers Authorization – Separate Corps Authorization

Required

Okaloosa County

Permit No.: 0404845-001-EI/46

Permit Issuance Date: December 22, 2021

Permit Construction Phase Expiration Date: December 22, 2031 mailto:afogg@myokaloosa.com mailto:dgreer@taylorengineering.com

Permittee: Okaloosa County Board of County Commissioners

Consolidated Environmental Resource Permit and Sovereignty Submerged

Lands Authorization

Permittee/Grantee: Okaloosa County Board of County Commissioners

Permit No: 0404845-001-EI/46

PROJECT LOCATION

The activities authorized by this permit and sovereignty submerged lands authorization are located at three locations offshore of Okaloosa County, Florida. Fish Haven 20 is located approximately 1.74 nautical miles offshore, west of the East Pass at 30.3664 N, 86.6378 W. Fish

Haven 21 is located approximately 8.14 nautical miles offshore, south of the East Pass at

30.2455 N, 86.5089 W. Fish Haven 22 is located approximately 2.20 nautical miles offshore, east of the East Pass at 30.3464 N, 86.4391 W. Exact location coordinates are depicted in the attached project drawings.

PROJECT DESCRIPTION

The permittee is authorized to construct three artificial reefs, each approximately one square nautical mile and 847.5 acres, totaling three square nautical miles and 2544.6 acres, within the

Gulf of Mexico, a Class III Florida Waterbody, Unclassified Shellfish Harvesting Area.

Authorized activities are depicted on the attached exhibits.

AUTHORIZATIONS

Fish Havens 20, 21, & 22

Environmental Resource Permit

The Department has determined that the activity qualifies for an Environmental Resource Permit.

Therefore, the Environmental Resource Permit is hereby granted, pursuant to Part IV of Chapter

373, Florida Statutes (F.S.), and Chapter 62-330, Florida Administrative Code (F.A.C.).

Sovereignty Submerged Lands Authorization

The activity is located on sovereignty submerged lands owned by the State of Florida. It therefore also requires authorization from the Board of Trustees of the Internal Improvement

Trust Fund (Board of Trustees), pursuant to Article X, Section 11 of the Florida Constitution, and Section 253.77, F.S. As staff to the Board of Trustees of the Internal Improvement Trust

Fund (Board of Trustees) under Sections 253.002, F.S., the Department has determined that the activity qualifies for and requires a Letter of Consent, as long as the work performed is located within the boundaries as described and is consistent with the terms and conditions herein.

During the term of this Letter of Consent you shall maintain satisfactory evidence of sufficient upland interest as required by paragraph 18-21.004(3)(b), F.A.C. If such interest is terminated or the Board of Trustees determines that such interest did not exist on the date of issuance of this

Letter of Consent, this Letter of Consent may be terminated by the Board of Trustees at its sole option. If the Board of Trustees terminates this Letter of Consent, you agree not to assert a claim or defense against the Board of Trustees arising out of this Letter of Consent.

Federal Authorization

Your proposed activity as outlined in your application and attached drawings does not qualify for Federal authorization pursuant to the State Programmatic General Permit VI-R1.

SEPARATE permit(s) or authorization will be required from the U.S. Army Corps of

Engineers (USACOE).

Authority for review - an agreement with the USACOE entitled “Coordination Agreement

Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General

Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water

Act.

Coastal Zone Management

Issuance of this authorization also constitutes a finding of consistency with Florida’s Coastal

Zone Management Program, as required by Section 307 of the Coastal Zone Management Act.

Water Quality Certification

This permit also constitutes a water quality certification under Section 401 of the Clean Water

Act, 33 U.S.C. 1341.

Other Authorizations

You are advised that authorizations or permits for this activity may be required by other federal, state, regional, or local entities including but not limited to local governments or municipalities.

This permit does not relieve you from the requirements to obtain all other required permits or authorizations.

The activity described may be conducted only in accordance with the terms, conditions and attachments contained in this document. Issuance and granting of the permit and authorizations herein do not infer, nor guarantee, nor imply that future permits, authorizations, or modifications will be granted by the Department.

PERMIT / SOVEREIGNTY SUBMERGED LANDS CONDITIONS

The activities described must be conducted in accordance with:

• The Specific Conditions

• The General Conditions

• The Special Consent Conditions

• The General Conditions for Sovereignty Submerged Lands Authorization

• The limits, conditions and locations of work shown in the attached drawings

• The term limits of this authorization

You are advised to read and understand these conditions and drawings prior to beginning the authorized activities, and to ensure the work is conducted in conformance with all the terms, conditions, and drawings herein. If you are using a contractor, the contractor also should read and understand these conditions and drawings prior to beginning any activity. Failure to comply with these conditions, including any mitigation requirements, shall be grounds for the

Department to revoke the permit and authorization and to take appropriate enforcement action.

Operation of the facility is not authorized except when determined to be in conformance with all applicable rules and this permit and sovereignty submerged lands authorization, as described.

SPECIFIC CONDITIONS – ADMINISTRATIVE/EMERGENCIES

1. The construction phase expires at 11:59 p.m. on the date indicated on the cover page of this permit.

2. For emergencies involving a serious threat to the public health, safety, welfare, or environment, the emergency telephone contact number is (800) 320-0519 (State Warning Point).

The Department telephone number for reporting nonthreatening problems or system malfunctions is (850) 595-0663, day or night.

3. The mailing address for submittal of forms for the “Construction Commencement Notice”, “As-Built Certification …”, “Request for Conversion of Stormwater Management Permit

Construction Phase to Operation and Maintenance Phase”, or other correspondence is FDEP, SLERP, 160 West Government Street, Suite 308, Pensacola, Florida 32502.

SPECIFIC CONDITIONS – CONSTRUCTION ACTIVITIES

4. Construction equipment shall not be repaired or refueled in wetlands or elsewhere within waters of the state.

5. Any damage to wetlands outside of the authorized impact areas as a result of construction shall be immediately reported to the Department at (850)595-8300 and repaired by reestablishing the pre-construction elevations and replanting vegetation of the same species, size, and density as that in the adjacent areas. The restoration shall be completed within 30 days of completion of construction, and the Department shall be notified of its completion within that same 30-day period.

6. The material to be used shall be clean concrete or rock, clean steel boat hulls, other clean, heavy gauge steel products with a thickness of 1/4 inch or greater, and prefabricated structures that are a mixture of clean concrete and heavy gauge steel.

7. The material shall be free of soils, oils and greases, debris, litter, putrescible substances or other pollutants.

8. The material shall be firmly anchored to the bottom and shall not be indiscriminately dumped.

9. The substrate on which the activities occur shall not consist of submerged grassbed communities, shellfish or other hardbottom communities, or corals.

10. There shall be no “white goods” (inoperative and discarded refrigerators, freezers, ranges, water heaters, washers, and other similar domestic and commercial appliances), asphalt material, tires, or other polluting materials used in construction of the reef.

11. Deployment of any vessel as artificial reef material is prohibited unless written authorization has first been obtained from the USACOE. The Permittee must first submit a project-specific deployment plan to the USACOE to request such authorization to deploy vessels, and the plan must include the following information:

a. Detailed description of the proposed deployment including vessel material type, deployment depth, intended orientation of the vessel (e.g., upright, on its side, upside down), navigational clearance with the material in all orientations, and the weight and dimensions of the selected vessel;

b. Stability analysis of the proposed vessel at the depth and location proposed for deployment;

c. A pre-deployment preparation plan describing how compliance with the EPA and

MARAD “National Guidance: Best Management Practices for Preparing Vessels

Intended to Create Artificial Reefs” has been followed. This document is available at:

https://www.epa.gov/sites/production/files/2015-

09/documents/artificialreefguidance.pdf;

d. Tow and anchoring plan describing how the vessel will be towed to and anchored at the deployment site;

e. Sink Plan describing the methods used to deploy the vessel. If the use of explosives is requested, a detailed explosive and detonation plan including justification documenting the need for the use of explosives as the only deployment alternative, and a marine mammal monitoring and vessel security plan must be provided;

f. A monitoring plan describing on-water and pre-deployment monitoring, immediate post-deployment monitoring, and annual monitoring activities to document that the vessel is deployed/located within the permitted area including coordinates, orientation of vessel (e.g., upright, side, upside down), structural integrity status (i.e., is the vessel in one piece, are pieces being disassociated from the structure), and documentation that the vessel meets USCG navigational requirements;

g. A copy of the proposed project budget, and documentation that the permittee has approved funding adequate to procure, clean, deploy, and conduct monitoring of the selected vessel once it has been deployed.

12. The site shall be marked with perimeter buoys during construction to ensure that no material is deposited outside of the site.

13. The artificial reef site shall not be established within any shipping lanes or navigation safety fairways.

14. There shall be a minimum of 250-feet buffer between the deployment site and the outer boundary of the permitted reef site.

https://www.epa.gov/sites/production/files/2015-09/documents/artificialreefguidance.pdf https://www.epa.gov/sites/production/files/2015-09/documents/artificialreefguidance.pdf

SPECIFIC CONDITIONS – OTHER LISTED SPECIES

15. This permit does not authorize the permittee to cause any adverse impact to or “take” of state listed species and other regulated species of fish and wildlife. Compliance with state laws regulating the take of fish and wildlife is the responsibility of the owner or applicant associated with this project. Please refer to Chapter 68A-27 of the Florida Administrative Code for definitions of “take” and a list of fish and wildlife species. If listed species are observed onsite, FWC staff are available to provide decision support information or assist in obtaining the appropriate FWC permits. Most marine endangered and threatened species are statutorily protected and a “take” permit cannot be issued. Requests for further information or review can be sent to FWCConservationPlanningServices@MyFWC.com.

SPECIFIC CONDITIONS – CONSTRUCTION COMPLETION

16. Following deployment of reef materials, please provide the depth to the top of the reef (i.e.

using a depth finder) to ensure the minimum clearance requirements are met.

SPECIFIC CONDITIONS – OPERATION AND MAINTENANCE ACTIVITIES

17. The material shall be placed so that the top of the reef does not exceed 1/2 the distance from the bottom to the surface of the water unless a greater distance from the surface is required for safe navigation. At no time shall the distance between the top of the reef and the surface of the water be less than 6 feet.

SPECIFIC CONDITIONS – CARGO MANIFEST

18. Pursuant to Section 379.249, F.S., the transport and deployment of all artificial reef materials off Florida require a cargo manifest. The Permittee shall fill out a “Florida

Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification” form and maintain the cargo manifest onboard the vessel listing the materials onboard, during the transport and deployment of artificial reef materials. The completed form shall be submitted to the FWC Artificial Reef Program at least 7 days prior to the anticipated deployment via email at artificialreefdeployments@myfwc.com. The form is available online at:

http://myfwc.com/media/131594/FWCArtificialReefCargoManifest.pdf.

SPECIFIC CONDITIONS – PLACEMENT AND POST-DEPLOYMENT

19. The permittee shall notify the National Ocean Service, National Oceanic and Atmospheric

Administration, U.S. Department of Commerce, Rockville, Maryland, and the Florida Fish and Wildlife Conservation Commission (FWC), Division of Marine Fisheries Management, via e-mail at artificialreefdeployments@myfwc.com of the precise location of the reef within 30 days of placement of the reef material.

20. The permittee shall fill out a “Florida Artificial Reef Materials Placement Report and Post-

Deployment notification form and submit it to the FWC within 30 days of completion for each date of deployment or separate deployment location. The completed form shall be submitted to the FWC Artificial Reef Program via email at artificialreefdeployments@myfwc.com. The form is available online at:

http://myfwc.com/media/131597/FWCArtificialReefMaterialPlacementReport.pdf.

mailto:FWCConservationPlanningServices@MyFWC.com mailto:artificialreefdeployments@myfwc.com http://myfwc.com/media/131594/FWCArtificialReefCargoManifest.pdf mailto:artificialreefdeployments@myfwc.com mailto:artificialreefdeployments@myfwc.com http://myfwc.com/media/131597/FWCArtificialReefMaterialPlacementReport.pdf

GENERAL CONDITIONS FOR INDIVIDUAL PERMITS

The following general conditions are binding on all individual permits issued under chapter 62-

330, F.A.C., except where the conditions are not applicable to the authorized activity, or where the conditions must be modified to accommodate project-specific conditions.

1. All activities shall be implemented following the plans, specifications and performance criteria approved by this permit. Any deviations must be authorized in a permit modification in accordance with Rule 62-330.315, F.A.C. Any deviations that are not so authorized may subject the permittee to enforcement action and revocation of the permit under Chapter 373, F.S.

2. A complete copy of this permit shall be kept at the work site of the permitted activity during the construction phase, and shall be available for review at the work site upon request by the

Agency staff. The permittee shall require the contractor to review the complete permit prior to beginning construction.

3. Activities shall be conducted in a manner that does not cause or contribute to violations of state water quality standards. Performance-based erosion and sediment control best management practices shall be installed immediately prior to, and be maintained during and after construction as needed, to prevent adverse impacts to the water resources and adjacent lands. Such practices shall be in accordance with the State of Florida Erosion and Sediment Control Designer and

Reviewer Manual (Florida Department of Environmental Protection and Florida Department of

Transportation June 2007), and the Florida Stormwater Erosion and Sedimentation Control

Inspector’s Manual (Florida Department of Environmental Protection, Nonpoint Source

Management Section, Tallahassee, Florida, July 2008), which are both incorporated by reference in subparagraph 62-330.050(9)(b)5., F.A.C., unless a project-specific erosion and sediment control plan is approved or other water quality control measures are required as part of the permit.

4. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to the

Agency a fully executed Form 62-330.350(1), “Construction Commencement Notice,” [October

1, 2013], which is incorporated by reference in paragraph 62-330.350(1)(d), F.A.C., indicating the expected start and completion dates. A copy of this form may be obtained from the Agency, as described in subsection 62-330.010(5), F.A.C. If available, an Agency website that fulfills this notification requirement may be used in lieu of the form.

5. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an operating entity under Rule 62-330.310, F.A.C., the permittee is liable to comply with the plans, terms and conditions of the permit for the life of the project or activity.

6. Within 30 days after completing construction of the entire project, or any independent portion of the project, the permittee shall provide the following to the Agency, as applicable:

a. For an individual, private single-family residential dwelling unit, duplex, triplex, or quadruplex ‒ “Construction Completion and Inspection Certification for Activities

Associated With a Private Single-Family Dwelling Unit” [Form 62-330.310(3)]; or

b. For all other activities ‒ “As-Built Certification and Request for Conversion to Operational

Phase” [Form 62-330.310(1)].

file:///C:/Users/minick_a/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/IZVK7T5J/in

c. If available, an Agency website that fulfills this certification requirement may be used in lieu of the form.

7. If the final operation and maintenance entity is a third party:

a. Prior to sales of any lot or unit served by the activity and within one year of permit issuance, or within 30 days of as- built certification, whichever comes first, the permittee shall submit, as applicable, a copy of the operation and maintenance documents (see sections 12.3 thru

12.3.3 of Volume I) as filed with the Department of State, Division of Corporations and a copy of any easement, plat, or deed restriction needed to operate or maintain the project, as recorded with the Clerk of the Court in the County in which the activity is located.

b. Within 30 days of submittal of the as- built certification, the permittee shall submit

“Request for Transfer of Environmental Resource Permit to the Perpetual Operation

Entity” [Form 62-330.310(2)] to transfer the permit to the operation and maintenance entity, along with the documentation requested in the form. If available, an Agency website that fulfills this transfer requirement may be used in lieu of the form.

8. The permittee shall notify the Agency in writing of changes required by any other regulatory agency that require changes to the permitted activity, and any required modification of this permit must be obtained prior to implementing the changes.

9. This permit does not:

a. Convey to the permittee any property rights or privileges, or any other rights or privileges other than those specified herein or in Chapter 62-330, F.A.C.;

b. Convey to the permittee or create in the permittee any interest in real property;

c. Relieve the permittee from the need to obtain and comply with any other required federal, state, and local authorization, law, rule, or ordinance; or

d. Authorize any entrance upon or work on property that is not owned, held in easement, or controlled by the permittee.

10. Prior to conducting any activities on state-owned submerged lands or other lands of the state, title to which is vested in the Board of Trustees of the Internal Improvement Trust Fund, the permittee must receive all necessary approvals and authorizations under Chapters 253 and 258, F.S.

Written authorization that requires formal execution by the Board of Trustees of the Internal

Improvement Trust Fund shall not be considered received until it has been fully executed.

11. The permittee shall hold and save the Agency harmless from any and all damages, claims, or liabilities that may arise by reason of the construction, alteration, operation, maintenance, removal, abandonment or use of any project authorized by the permit.

12. The permittee shall notify the Agency in writing:

a. Immediately if any previously submitted information is discovered to be inaccurate; and

b. Within 30 days of any conveyance or division of ownership or control of the property or the system, other than conveyance via a long-term lease, and the new owner shall request transfer of the permit in accordance with Rule 62-330.340, F.A.C. This does not apply to the sale of lots or units in residential or commercial subdivisions or condominiums where the stormwater management system has been completed and converted to the operation phase.

13. Upon reasonable notice to the permittee, Agency staff with proper identification shall have permission to enter, inspect, sample and test the project or activities to ensure conformity with the plans and specifications authorized in the permit.

14. If any prehistoric or historic artifacts, such as pottery or ceramics, stone tools or metal implements, dugout canoes, or any other physical remains that could be associated with Native

American cultures, or early colonial or American settlement are encountered at any time within the project site area, work involving subsurface disturbance in the immediate vicinity of such discoveries shall cease. The permittee or other designee shall contact the Florida Department of

State, Division of Historical Resources, Compliance and Review Section, at (850) 245-6333 or

(800) 847-7278, as well as the appropriate permitting agency office. Such subsurface work shall not resume without verbal or written authorization from the Division of Historical Resources. If unmarked human remains are encountered, all work shall stop immediately and notification shall be provided in accordance with Section 872.05, F.S.

15. Any delineation of the extent of a wetland or other surface water submitted as part of the permit application, including plans or other supporting documentation, shall not be considered binding unless a specific condition of this permit or a formal determination under Rule 62-

330.201, F.A.C., provides otherwise.

16. The permittee shall provide routine maintenance of all components of the stormwater management system to remove trapped sediments and debris. Removed materials shall be disposed of in a landfill or other uplands in a manner that does not require a permit under

Chapter 62-330, F.A.C., or cause violations of state water quality standards.

17. This permit is issued based on the applicant’s submitted information that reasonably demonstrates that adverse water resource-related impacts will not be caused by the completed permit activity. If any adverse impacts result, the Agency will require the permittee to eliminate the cause, obtain any necessary permit modification, and take any necessary corrective actions to resolve the adverse impacts.

18. A Recorded Notice of Environmental Resource Permit may be recorded in the county public records in accordance with subsection 62-330.090(7), F.A.C. Such notice is not an encumbrance upon the property.

SPECIAL CONSENT CONDITIONS

1. The applicant agrees to indemnify, defend and hold harmless the Board of Trustees and the

State of Florida from all claims, actions, lawsuits and demands in any form arising out of the authorization to use sovereignty submerged lands or the applicant’s use and construction of structures on sovereignty submerged lands. This duty to indemnify and hold harmless will include any and all liabilities that are associated with the structure or activity including special assessments or taxes that are now or in the future assessed against the structure or activity during the period of the authorization.

2. Failure by the Board of Trustees to enforce any violation of a provision of the authorization or waiver by the Board of Trustees of any provision of the authorization will not invalidate the provision not enforced or waived, nor will the failure to enforce or a waiver prevent the Board of

Trustees from enforcing the unenforced or waived provision in the event of a violation of that provision.

3. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with the provisions and conditions of the authorization, the authorization may be terminated by the Board of Trustees after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the applicant or its successors or assigns will have thirty

(30) days in which to correct the violations. Failure to correct the violations within this period will result in the automatic revocation of this authorization.

4. All costs incurred by the Board of Trustees in enforcing the terms and conditions of the authorization will be paid by the applicant. Any notice required by law will be made by certified mail at the address shown on page one of the authorization. The applicant will notify the Board of Trustees in writing of any change of address at least ten days before the change becomes effective.

5. This authorization does not allow any activity prohibited in a conservation easement or restrictive covenant that prohibits the activity.

GENERAL CONDITIONS FOR SOVEREIGNTY SUBMERGED LANDS

AUTHORIZATION

Any use of sovereignty submerged lands is subject to the following general conditions, which are binding upon the applicant and are enforceable under Chapter 253, F.S.

1. Sovereignty submerged lands may be used only for the specified activity or use. Any unauthorized deviation from the specified activity or use and the conditions for undertaking that activity or use will constitute a violation. Violation of the authorization will result in suspension or revocation of the applicant’s use of the sovereignty submerged lands unless cured to the satisfaction of the Board of Trustees.

2. Authorization under Rule 18-21.005, F.A.C., conveys no title to sovereignty submerged lands or water column, nor does it constitute recognition or acknowledgment of any other person’s title to such land or water.

3. Authorizations under Rule 18-21.005, F.A.C., may be modified, suspended or revoked in accordance with its terms or the remedies provided in Sections 253.04, F.S. and Chapter 18-14, F.A.C.

4. Structures or activities will be constructed and used to avoid or minimize adverse impacts to resources.

5. Construction, use, or operation of the structure or activity will not adversely affect any species which is endangered, threatened or of special concern, as listed in Rules 68A-27.003, 68A-27.004, and 68A-27.005, F.A.C.

6. Structures or activities will not unreasonably interfere with riparian rights. When a court of competent jurisdiction determines that riparian rights have been unlawfully affected, the structure or activity will be modified in accordance with the court’s decision.

7. Structures or activities will not create a navigational hazard.

8. Structures will be maintained in a functional condition and will be repaired or removed if they become dilapidated to such an extent that they are no longer functional.

9. Structures or activities will be constructed, operated, and maintained solely for water dependent purposes.

10. The applicant agrees to indemnify, defend and hold harmless the Board of Trustees and the

State of Florida from all claims, actions, lawsuits and demands in any form arising out of the authorization to use sovereignty submerged lands or the applicant’s use and construction of structures on sovereignty submerged lands. This duty to indemnify and hold harmless will include any and all liabilities that are associated with the structure or activity including special assessments or taxes that are now or in the future assessed against the structure or activity during the period of the authorization.

11. Failure by the Board of Trustees to enforce any violation of a provision of the authorization or waiver by the Board of Trustees of any provision of the authorization will not invalidate the provision not enforced or waived, nor will the failure to enforce or a waiver prevent the Board of

Trustees from enforcing the unenforced or waived provision in the event of a violation of that provision.

12. Applicant binds itself and its successors and assigns to abide by the provisions and conditions set forth in the authorization. If the applicant or its successors or assigns fails or refuses to comply with the provisions and conditions of the authorization, the authorization may be terminated by the Board of Trustees after written notice to the applicant or its successors or assigns. Upon receipt of such notice, the applicant or its successors or assigns will have thirty

(30) days in which to correct the violations. Failure to correct the violations within this period will result in the automatic revocation of this authorization.

13. All costs incurred by the Board of Trustees in enforcing the terms and conditions of the authorization will be paid by the applicant. Any notice required by law will be made by certified mail at the address shown on page one of the authorization. The applicant will notify the Board of Trustees in writing of any change of address at least ten days before the change becomes effective.

14. This authorization does not allow any activity prohibited in a conservation easement or restrictive covenant that prohibits the activity.

NOTICE OF RIGHTS

This action is final and effective on the date filed with the Clerk of the Department unless a petition for an administrative hearing is timely filed under Sections 120.569 and 120.57, F.S., before the deadline for filing a petition. On the filing of a timely and sufficient petition, this action will not be final and effective until a subsequent order of the Department. Because the administrative hearing process is designed to formulate final agency action, the subsequent order may modify or take a different position than this action.

Petition for Administrative Hearing

A person whose substantial interests are affected by the Department’s action may petition for an administrative proceeding (hearing) under Sections 120.569 and 120.57, F.S. Pursuant to Rules

28-106.201 and 28-106.301, F.A.C., a petition for an administrative hearing must contain the following information:

(a) The name and address of each agency affected and each agency’s file or identification number, if known;

(b) The name, address, and telephone number of the petitioner; the name, address, and telephone number of the petitioner’s representative, if any, which shall be the address for service purposes during the course of the proceeding; and an explanation of how the petitioner’s substantial interests are or will be affected by the agency determination;

(c) A statement of when and how the petitioner received notice of the agency decision;

(d) A statement of all disputed issues of material fact. If there are none, the petition must so indicate;

(e) A concise statement of the ultimate facts alleged, including the specific facts that the petitioner contends warrant reversal or modification of the agency’s proposed action;

(f) A statement of the specific rules or statutes that the petitioner contends require reversal or modification of the agency’s proposed action, including an explanation of how the alleged facts relate to the specific rules or statutes; and

(g) A statement of the relief sought by the petitioner, stating precisely the action that the petitioner wishes the agency to take with respect to the agency’s proposed action.

The petition must be filed (received by the Clerk) in the Office of General Counsel of the

Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-

3000, or via electronic correspondence at Agency_Clerk@FloridaDEP.gov. Also, a copy of the petition shall be mailed to the applicant at the address indicated above at the time of filing.

Time Period for Filing a Petition

In accordance with Rule 62-110.106(3), F.A.C., petitions for an administrative hearing by the applicant and persons entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of receipt of this written notice. Petitions filed by any persons other than the applicant, and other than those entitled to written notice under Section 120.60(3), F.S., must be filed within 14 days of publication of the notice or within 14 days of receipt of the written notice, whichever occurs first. You cannot justifiably rely on the finality of this decision unless notice of this decision and the right of substantially affected persons to challenge this decision has been duly published or otherwise provided to all persons substantially affected by the decision. While you are not required to publish notice of this action, you may elect to do so pursuant to Rule 62-

110.106(10)(a).

The failure to file a petition within the appropriate time period shall constitute a waiver of that person's right to request an administrative determination (hearing) under Sections 120.569 and

120.57, F.S., or to intervene in this proceeding and participate as a party to it. Any subsequent intervention (in a proceeding initiated by another party) will be only at the discretion of the http://web2.westlaw.com/find/default.wl?ordoc=I0C7293C0912311DB8F8F8100D79B57CF&rp=%2ffind%2fdefault.wl&DB=1000006&DocName=FLSTS120%2E569&FindType=L&AP=&rs=WLW9.08&ifm=NotSet&fn=_top&sv=Split&mt=Florida&utid=4&vr=2.0&pbc=38B33E51 presiding officer upon the filing of a motion in compliance with Rule 28-106.205, F.A.C. If you do not publish notice of this action, this waiver will not apply to persons who have not received written notice of this action.

Extension of Time

Under Rule 62-110.106(4), F.A.C., a person whose substantial interests are affected by the

Department’s action may also request an extension of time to file a petition for an administrative hearing. The Department may, for good cause shown, grant the request for an extension of time.

Requests for extension of time must be filed with the Office of General Counsel of the

Department at 3900 Commonwealth Boulevard, Mail Station 35, Tallahassee, Florida 32399-

3000, or via electronic correspondence at Agency_Clerk@FloridaDEP.gov, before the deadline for filing a petition for an administrative hearing. A timely request for extension of time shall toll the running of the time period for filing a petition until the request is acted upon.

Mediation

Mediation is not available in this proceeding.

FLAWAC Review

The applicant, or any party within the meaning of Section 373.114(1)(a) or 373.4275, F.S., may also seek appellate review of this order before the Land and Water Adjudicatory Commission under Section 373.114(1) or 373.4275, F.S. Requests for review before the Land and Water

Adjudicatory Commission must be filed with the Secretary of the Commission and served on the

Department within 20 days from the date when this order is filed with the Clerk of the

Department.

Judicial Review

Once this decision becomes final, any party to this action has the right to seek judicial review pursuant to Section 120.68, F.S. by filing a Notice of Appeal pursuant to Florida Rules of

Appellate Procedure 9.110 and 9.190 with the Clerk of the Department in the Office of General

Counsel (Station #35, 3900 Commonwealth Boulevard, Tallahassee, Florida 32399-3000) and by filing a copy of the Notice of Appeal accompanied by the applicable filing fees with the appropriate district court of appeal. The notice must be filed within 30 days from the date this action is filed with the Clerk of the Department.

Thank you for applying to the Submerged Lands and Environmental Resource Permit Program.

If you have any questions regarding this matter, please contact Joseph Winston at the letterhead address, at (850)595-0559, or at Joseph.Winston@FloridaDEP.gov.

EXECUTION AND CLERKING

Executed in Orlando, Florida.

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

For Kimberly R. Allen

Permitting Program Administrator

KRA:jbw

Attachments:

Standard Manatee Construction Conditions 2011, 2 pages

Project Drawings and Design Specs., 6 pages

Copies of 62-330 forms may be obtained at: https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource

CERTIFICATE OF SERVICE

The undersigned duly designated deputy clerk hereby certifies that this document and all attachments were sent on the filing date below to the following listed persons:

Kimberly R. Allen, DEP, Kim.Allen@FloridaDEP.gov

Jennifer Waltrip, DEP, Jennifer.Waltrip@FloridaDEP.gov

Blake Chapman, DEP, Blake.A.Chapman@FloridaDEP.gov

Okaloosa County, mmartinez@co.okaloosa.fl.us, jautrey@co.okaloosa.fl.us, sbitterman@co.okaloosa.fl.us

Kierstin Masse, Agent, kmasse@taylorengineering.com

FILING AND ACKNOWLEDGMENT

FILED, on this date, pursuant to Section 120.52, F.S., with the designated Department Clerk, receipt of which is hereby acknowledged.

December 22, 2021

Clerk Date mailto:Joseph.Winston@FloridaDEP.gov https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/forms-environmental-resource mailto:Kim.Allen@FloridaDEP.gov mailto:Jennifer.Waltrip@FloridaDEP.gov mailto:Blake.A.Chapman@FloridaDEP.gov mailto:mmartinez@co.okaloosa.fl.us mailto:jautrey@co.okaloosa.fl.us mailto:sbitterman@co.okaloosa.fl.us mailto:kmasse@taylorengineering.com

CHOCTAWHATCHEE BAY

OKALOOSA COUNTY

GULF OF MEXICO

~4.27 NM

~6.65 NM

~2.62 NM

~3.52 NM

~1.74 NM

~2.20 NM

CRYSTAL BEACH

SNORKEL REEF

~1.54 NM

~6.60 NM

FISH HAVEN #21

FISH HAVEN #20

FISH HAVEN #22

SAFETY FAIRWAY

EAST PASS

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 1

LOCATION MAP

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

LO

C

AT

IO

N .D

W G

0/

/2

4:

:2

PM

OKALOOSA COUNTY,

FLORIDA

N

0 12,000' 24,000'

SCALE: 1" = 12,000'

file:///X:/Support/Web/PE.htm

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

FH20-1

FH20-1-14

FH20-15

FH20-28

FH20-29

FH20-42

FH20-43

FH20-2

FH20-13

FH20-16

FH20-27

FH20-30

FH20-41

FH20-44

FH20-3

FH20-12

FH20-17

FH20-26

FH20-31

FH20-40

FH20-45

FH20-4

FH20-11

FH20-18

FH20-25

FH20-32

FH20-39

FH20-46

FH20-5

FH20-10

FH20-19

FH20-24

FH20-33

FH20-38

FH20-47

FH20-6

FH20-9

FH20-20

FH20-23

FH20-34

FH20-37

FH20-48

FH20-7

FH20-8

FH20-21

FH20-22

FH20-35

FH20-36

FH20-49

20-A 20-B

20-C20-D

20-E

6075'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

20-A

20-B

20-C

20-D

20-E

LAT

(DD)

N30.3748

N30.3748

N30.3581

N30.3581

N30.3664

LONG

(DD)

W86.6474

W86.6281

W86.6281

W86.6474

W86.6378

NORTHING

506,356

506,242

500,163

500,277

503,259

EASTING

1,291,371

1,297,443

1,297,329

1,291,256

1,294,350

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 2

FISH HAVEN 20

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

N

0 1,200' 2,400'

SCALE: 1" = 1,200'

FH21-1

FH21-1-14

FH21-15

FH21-28

FH21-29

FH21-42

FH21-43

FH21-2

FH21-13

FH21-16

FH21-27

FH21-30

FH21-41

FH21-44

FH21-3

FH21-12

FH21-17

FH21-26

FH21-31

FH21-40

FH21-45

FH21-4

FH21-11

FH21-18

FH21-25

FH21-32

FH21-39

FH21-46

FH21-5

FH21-10

FH21-19

FH21-24

FH21-33

FH21-38

FH21-47

FH21-6

FH21-9

FH21-20

FH21-23

FH21-34

FH21-37

FH21-48

FH21-7

FH21-8

FH21-21

FH21-22

FH21-35

FH21-36

FH21-49

21-A 21-B

21-C21-D

21-E

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

6081'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

21-A

21-B

21-C

21-D

21-E

LAT

(DD)

N30.2539

N30.2539

N30.2372

N30.2372

N30.2455

LONG

(DD)

W86.5185

W86.4993

W86.4993

W86.5185

W86.5089

NORTHING

461,643

461,535

455,456

455,564

458,550

EASTING

1,331,218

1,337,297

1,337,190

1,331,109

1,334,204

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 3

FISH HAVEN 21

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

FH22-1

FH22-1-14

FH22-15

FH22-28

FH22-29

FH22-42

FH22-43

FH22-2

FH22-13

FH22-16

FH22-27

FH22-30

FH22-41

FH22-44

FH22-3

FH22-12

FH22-17

FH22-26

FH22-31

FH22-40

FH22-45

FH22-4

FH22-11

FH22-18

FH22-25

FH22-32

FH22-39

FH22-46

FH22-5

FH22-10

FH22-19

FH22-24

FH22-33

FH22-38

FH22-47

FH22-6

FH22-9

FH22-20

FH22-23

FH22-34

FH22-37

FH22-48

FH22-7

FH22-8

FH22-21

FH22-22

FH22-35

FH22-36

FH22-49

22-A 22-B

22-C22-D

22-E

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

6075'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

22-A

22-B

22-C

22-D

22-E

LAT

(DD)

N30.3548

N30.3548

N30.3380

N30.3380

N30.3464

LONG

(DD)

W86.4488

W86.4295

W86.4295

W86.4488

W86.4391

NORTHING

497,941

497,837

491,758

491,861

494,849

EASTING

1,353,870

1,359,944

1,359,841

1,353,766

1,356,855

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 4

FISH HAVEN 22

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

PROPOSED PATCH REEF SITE.

REEF MATERIALS TO CONSIST OF RE-PURPOSED OR PRE-FABRICATED

CLEAN CONCRETE OR ROCK, CLEAN STEEL, BOAT HULLS, OR OTHER CLEAN,

HEAVY GAUGE STEEL PRODUCTS HAVING A THICKNESS OF 1/4" OR

GREATER, A MIXTURE OF CLEAN CONCRETE AND HEAVY GAUGE STEEL, OR

OTHER MATERIALS AS DEFINED UNDER F.A.C. 62-300.600. THE MATERIAL

SHALL BE OF SUFFICIENT SIZE AND WEIGHT TO REMAIN STABLE.

MAX REEF HEIGHT WILL

BE LESS THAN HALF THE

DISTANCE FROM THE BOTTOM

TO THE WATER SURFACE

TEMPORARY CONSTRUCTION BUOY (TYP)

GULF OF MEXICO BOTTOM

NOTES:

1. MARKER BUOYS WILL BE SECURED ALONG THE PERIMETER OF THE

PATCH REEF SITES PRIOR TO MATERIAL PLACEMENT TO DEFINE THE

DROP AREA AND TO ENSURE ACCURATE PLACEMENT WITHIN THE

APPROVED SITE.

2. QUALITY CONTROL DIVES SHALL BE PERFORMED AS NECESSARY TO

ENSURE PROPER MATERIAL PLACEMENT AND RELIEF.

NOT TO SCALE

XX-XX

TYPICAL PATCH REEF SITE SECTION

V-SCALE: 1" = X'

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 5

TYPICAL PATCH REEF SITE SECTION

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

TY

PI

C

AL

S

EC

TI

O

N .D

W G

0/

/2

4:

:4

REEF POINT SUMMARY

POINT ID

20-A

20-B

20-C

20-D

20-E

21-A

21-B

21-C

21-D

21-E

22-A

22-B

22-C

22-D

22-E

NORTHING

506,356

506,242

500,163

500,277

503,259

461,643

461,535

455,456

455,564

458,550

497,941

497,837

491,758

491,861

494,849

EASTING

1,291,371

1,297,443

1,297,329

1,291,256

1,294,350

1,331,218

1,337,297

1,337,190

1,331,109

1,334,204

1,353,870

1,359,944

1,359,841

1,353,766

1,356,855

LAT

(DD)

N30.3748

N30.3748

N30.3581

N30.3581

N30.3664

N30.2539

N30.2539

N30.2372

N30.2372

N30.2455

N30.3548

N30.3548

N30.3380

N30.3380

N30.3464

LONG

(DD)

W86.6474

W86.6281

W86.6281

W86.6474

W86.6378

W86.5185

W86.4993

W86.4993

W86.5185

W86.5089

W86.4488

W86.4295

W86.4295

W86.4488

W86.4391

LAT

(DDM)

N030°22.4881'

N030°22.4880'

N030°21.4850'

N030°21.4850'

N030°21.9865'

N030°15.2329'

N030°15.2327'

N030°14.2297'

N030°14.2298'

N030°14.7313'

N030°21.2852'

N030°21.2852'

N030°20.2821'

N030°20.2821'

N030°20.7837'

LONG

(DDM)

W086°38.8436'

W086°37.6880'

W086°37.6881'

W086°38.8437'

W086°38.2658'

W086°31.1125'

W086°29.9570'

W086°29.9572'

W086°31.1127'

W086°30.5348'

W086°26.9263'

W086°25.7708'

W086°25.7708'

W086°26.9263'

W086°26.3485'

LAT

(DMS)

N030°22'29"

N030°22'29"

N030°21'29"

N030°21'29"

N030°21'59"

N030°15'14"

N030°15'14"

N030°14'14"

N030°14'14"

N030°14'44"

N030°21'17"

N030°21'17"

N030°20'17"

N030°20'17"

N030°20'47"

LONG

(DMS)

W086°38'51"

W086°37'41"

W086°37'41"

W086°38'51"

W086°38'16"

W086°31'07"

W086°29'57"

W086°29'57"

W086°31'07"

W086°30'32"

W086°26'56"

W086°25'46"

W086°25'46"

W086°26'56"

W086°26'21"

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 6

REEF POINT SUMMARY TABLE

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:4

File details come from the government source that posted it. Updated .