PERMITACEexp20330414SAJ202101854FishHavens2022.pdf

PDF 12 MB Posted

Attached to
Okaloosa Artificial Reef Deployment
Solicitation number
CC202607-01
Issued by
Okaloosa County, Florida

About this file

Summary

This file comprises two related documents: a Department of the Army Permit (SAJ-2021-01854) issued by the U.S. Army Engineer District, Jacksonville, and a consolidated Environmental Resource Permit (0404845-001-EI/46) issued by the Florida Department of Environmental Protection. The permits authorize Okaloosa County to establish three artificial reef deployment sites—Fish Haven 20, 21, and 22—in the Gulf of Mexico off Okaloosa County, Florida. The project involves deployment of clean concrete, rock, steel products, and prefabricated structures across approximately three square nautical miles (2,544.6 acres) in waters south of Okaloosa Island and East Pass. Reef materials will consist of individual patch reefs within each site, with deployment limited to daylight hours and subject to strict specifications regarding material composition, weight (minimum 500 pounds per piece), height restrictions, and buffer zones. The Army Corps permit expires April 14, 2033, while the Florida Department of Environmental Protection construction phase expires December 22, 2031. Pre-deployment notifications must be submitted at least 14 days prior to material placement, and post-deployment placement reports with as-built drawings must be submitted within 30 days of deployment completion.

The permits impose extensive environmental and operational conditions including annual monitoring requirements, protection of seagrass beds and coral colonies through 200- to 1,500-foot buffer zones, compliance with vessel strike avoidance measures, manatee protection standards, and strict adherence to a National Marine Fisheries Service Biological Opinion (SERO-2022-01316) with mandatory terms regarding sea turtle protection and entanglement prevention. The permittee assumes full liability and maintenance responsibility for all deployed materials and must maintain a copy of the permit aboard deployment vessels. No explosives are authorized for deployment. The related state and local contract opportunity seeks a qualified contractor for offshore deployment of up to 1,500 tons of secondary-use concrete culvert materials, staged at Freeport, Florida, with funding provided through the Coastal Corridor Project via the Fish & Wildlife Foundation of Florida and the Florida Fish and Wildlife Conservation Commission.

View the file

Other files

File Type Posted
ITAITBCC20260701.pdf PDF
ITB_CC20260701Bid_Tabulation.xls XLS spreadsheet
PERMITDEPexp203112220404845001EI46FishHavens2022.pdf PDF
FWC-25118_CoastalCorridorGrant_EXECUTED.pdf PDF
ITB_CC20260701Okaloosa.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY PERMIT

Permittee: OKALOOSA COUNTY Attn: Alex Fogg, Coastal Resource Manager 1250 North Eglin Parkway, Suite 100 Shalimar, Florida 32579

Permit No: SAJ-2021-01854

Issuing Office: U.S. Army Engineer District, Jacksonville

NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The term "this office" refers to the appropriate district or division office of the U.S. Army Corps of Engineers (Corps) having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer.

You are authorized to perform work in accordance with the terms and conditions specified below.

Project Description: Establishment of three artificial reef deployment sites, referred to as Fish Haven 20, Fish Haven 21, and Fish Haven 22. Numerous individual patch reefs will be created at each of the three sites. Each deployment site will be approximately one (1) square nautical mile. A minimum 250-foot buffer will be maintained between reef materials and the boundary of each site to ensure deployed materials remain within the permitted areas. Reef materials will consist of clean concrete or rock, heavy gauged ferrous and steel products (1/4-inch thickness or greater), clean ferrous and steel metal hulled vessels and barges, and prefabricated structures made of heavy gauge steel and/or concrete. Material deployed will have a maximum profile height of no more than half the distance from the seafloor to the elevation of Mean Lower Low Water (MLLW).

Reef materials will be transported to the sites by barge and deployment will occur only during daylight hours. Buoys will be temporarily installed along the perimeter of individual patch reefs prior to placement of materials to ensure accurate placement at each site.

The work described above is to be completed in accordance with the six (6) pages of drawings (Attachment 1) and eight attachments affixed at the end of this permit instrument.

Project Location: The three artificial reef deployment sites are located within the Gulf of Mexico, south of Okaloosa County, Florida. The center point of Fish Haven 20 is approximately 1.74 nautical miles south of Okaloosa Island and approximately 6.65 nautical miles southwest of East Pass in Destin, Florida. The center point of Fish Haven 21 is approximately 8.14 nautical miles due south of East Pass and

PERMIT NUMBER: SAJ-2021-01854

PERMITTEE: Okaloosa County approximately 1.54 nautical miles south of the East-West Safety Fairway. The center point of Fish Haven 22 is approximately 2.20 nautical miles south of Okaloosa Island and approximately 4.27 nautical miles southeast of East Pass.

Directions to site: The three sites are located within the Gulf of Mexico, off the coast of Okaloosa County, Florida, and are accessible by water.

Project Coordinates:

Table 1 – Fish Haven 20 Location

Fish Haven 20 Latitude Longitude Latitude Longitude

Degrees, Decimal, Minutes

Degrees, Decimal, Minutes Decimal Degrees Decimal Degrees

Northwest Corner 30°22.4881' -86°38.8436' 30.3748° -86.6474° Northeast Corner 30°22.4880' -86°37.6880' 30.3748° -86.6281° Southeast Corner 30°21.4850' -86°37.6881' 30.3581° -86.6281° Southwest Corner 30°21.4850' -86°38.8437' 30.3581° -86.6474°

Center Point 30°21.9865' -86°38.2658' 30.3664° -86.6378°

Table 2 – Fish Haven 21 Location

Fish Haven 21 Latitude Longitude Latitude Longitude

Degrees, Decimal, Minutes

Degrees, Decimal, Minutes Decimal Degrees Decimal Degrees

Northwest Corner 30°15.2329' -86°31.1125' 30.2539° -86.5185° Northeast Corner 30°15.2327' -86°29.9570' 30.2539° -86.4993° Southeast Corner 30°14.2297' -86°29.9572' 30.2372° -86.4993° Southwest Corner 30°14.2298' -86°31.1127' 30.2372° -86.5185°

Center Point 30°14.7313' -86°30.5348' 30.2455° -86.5089°

Table 3 – Fish Haven 22 Location

Fish Haven 22 Latitude Longitude Latitude Longitude

Degrees, Decimal, Minutes

Degrees, Decimal, Minutes Decimal Degrees Decimal Degrees

Northwest Corner 30°21.2852' -86°26.9263' 30.3548° -86.4488° Northeast Corner 30°21.2852' -86°25.7708' 30.3548° -86.4295° Southeast Corner 30°20.2821' -86°25.7708' 30.3380° -86.4295° Southwest Corner 30°20.2821' -86°26.9263' 30.3380° -86.4488°

Center Point 30°20.7837' -86°26.3485' 30.3464° -86.4391°

Permit Conditions

General Conditions:

1. The time limit for completing the work authorized ends on April 14, 2033. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached.

2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.

3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and State coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.

4. If you sell the property associated with this permit, you must obtain the signature and the mailing address of the new owner in the space provided and forward a copy of the permit to this office to validate the transfer of this authorization.

5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions (Attachment 2).

6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.

Special Conditions:

1. Reporting Addresses: The Permittee shall reference this permit number, SAJ- 2021-01854, on all correspondence. Unless specifically notified to the contrary, the Permittee shall use the following addresses for transmitting correspondence to the referenced agencies:

a. U.S. Army Corps of Engineers

For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).

For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.

b. National Oceanic and Atmospheric Administration

Marine Chart Division Office of Coast Survey, N/CS26, Sta. 7317 1315 East-West Highway Silver Springs, MD 20910-3282 or email (preferred) at: ocs.ndb@noaa.gov

c. Commander, U.S. Coast Guard (USCG)

Eighth Coast Guard District Hale Boggs Federal Building 500 Poydras Street New Orleans, LA 70130

d. Florida Fish and Wildlife Conservation Commission

Artificial Reef Program 1875 Orange Avenue East Tallahassee, FL 32311

Or email at: artificialreefdeployments@MyFWC.com

2. Initial Agency Notification: The Permittee shall provide to the U.S. Army Corps of Engineers (Corps), National Oceanic and Atmospheric Administration (NOAA), and U.S. Coast Guard (USCG) written notification of the planned deployment start date at least 2 weeks prior to the initial deployment on the authorized artificial reef site.

3. Permit Availability: The Permittee shall provide all contractors associated with construction of the authorized activities a copy of the permit, drawings, and attachments. A copy of the permit shall be available on the work vessels and at the construction site at all times.

4. Authorized Reef Materials: No reef materials or module will weigh less than 500 pounds. Reef materials shall be clean and free from asphalt, petroleum, other hydrocarbons and toxic residues, loose free-floating material or other deleterious substances. All artificial reef materials and/or structures will be selected, designed, constructed, and deployed to create stable and durable marine habitat. The Permittee shall deploy only the following authorized reef materials:

a. Prefabricated artificial reef modules composed of ferrous and/or steel metals, ¼ inch or more in thickness, concrete, rock, or a combination of these materials.

b. Natural rock boulders and other pre-cast concrete material such as culverts, stormwater junction boxes, power poles, railroad ties, jersey barriers, or other similar concrete material.

c. Clean steel and concrete bridge or large building demolition materials such as slabs or pilings with all steel reinforcement rods cut at the base of the concrete so no rebar or metal protrudes from the concrete.

d. Heavy gauge ferrous and steel metal material components or structures, ¼ inch or more in thickness, such as utility poles, antenna towers and chicken transport devices.

e. Heavy gauge ferrous and/or steel metal hulled vessels which equal or exceed 60 feet hull length prepared and deployed in accordance with all applicable U.S. Coast Guard, U.S. Environmental Protection Agency, Florida Fish and Wildlife Conservation Commission, or other applicable state or federal agency regulations or policies. The vessel shall not be deployed until all necessary inspections and clearances have been obtained or waived and a stability analysis has been completed demonstrating the vessel will be stable during a 50-year storm event based on vessel and deployment site characteristics. The Permittee shall follow the national guidance regarding preparation of vessels for deployment as artificial reefs which are available at http://www.epa.gov/owow/oceans/habitat/artificialreefs/index.html. The Permittee shall provide a record of all inspections, clearances or waivers to the Corps along with the pre-deployment notification.

5. Reef Construction: Reef structures, materials, and installation methods shall be designed and deployed to prevent entanglement and entrapment of listed species. Open-bottom prefabricated reef modules may not be used unless the module also has a top opening sufficiently large to allow a turtle to escape.

Approved open-bottom modules include:

a. Triangular (pyramidal) and square (cube/cuboid) modules where each side of the top opening is at least 48 inches in length along its edge.

b. Modules with a round or oval opening with a diameter of at least 48 inches. For oval openings, the diameter of the shortest part of the oval must be at least 48 inches.

c. Modules that are approved by the Florida Fish & Wildlife Conservation

Commission Artificial Reef Program as being turtle friendly.

d. No open-bottom modules are allowed that include additional modules, discs, or other materials stacked or placed on or immediately adjacent to the top opening, as they may prevent turtles from easily escaping.

e. Any deviations from the above must comply with the parameters described in the Entanglement Prevention construction condition in Section 2.1.2 of NMFS’ Biological Opinion, SERO-2022-01316, dated March 10, 2023.

f. Open-bottom fabricated artificial reef modules shall not include any additional sub-components or other material within the interior or obstructing the top opening that could impair the egress of a sea turtle.

6. Explosives: Use of explosives to construct projects or to deploy reef materials are not authorized.

7. Reef Parameters: The Permittee shall deploy all reef materials within the established limits and 250-foot deployment buffers of the Fish Havens 20, 21, and 22 artificial reef sites, as defined on the attached permit drawings, sheets 2, 3, and 4 of 6. Minimum clearances from the top of the deployed reef materials relative to Mean Lower Low Water (MLLW) at the three reef sites shall be maintained, as follows:

a. Fish Haven 20. Reported depths range from -60 feet to -66 feet, relative to MLLW. Clearance between reef materials and MLLW shall be no less than 30 feet within Fish Haven 20 and the height of reef material shall not exceed 50% of the distance between the seafloor and MLLW.

b. Fish Haven 21. Reported depths range from -72 feet to -96 feet, relative than 36 feet within Fish Haven 21 and the height of reef material shall not exceed 50% of the distance between the seafloor and MLLW.

c. Fish Haven 22. Reported depths range from -69 feet to -75 feet, relative than 34.5 feet within Fish Haven 22 and the height of reef material shall not exceed 50% of the distance between the seafloor and MLLW.

8. Emergency Reef Parameters Notification: In the event reef material is deployed in a location or manner contrary to the Reef Parameters Special Condition, the Permittee shall immediately notify the USCG Station and provide information as requested by the station. The Permittee shall notify NOAA, USCG and Corps in writing within 24 hours of the occurrence. The written notification shall include but is not limited to a timeline of events leading to the unanticipated deployment, a description of the material, a description of the vessel traffic in the area, the deployment location in nautical miles at compass bearing from obvious landmarks, the location of the unauthorized material in latitude and longitude coordinates (degree, minute, decimal minute format to the third decimal place), and the water depth above the material relative to MLLW. The document will list the information provided by telephone to the USCG as noted above and include the time of the call and the name of the USCG personnel receiving the information.

9. Protection of Existing Resources: The Permittee shall not deploy artificial reef materials until an assessment of the bottom conditions have been accomplished by diver, submersible video camera, fathometer, depth/bottom sounder (e.g. “fish finder”), or side-scan sonar. The inspection of the deployment area may occur at the time of deployment, but no more than 1 year prior to deployment.

a. The Permittee shall maintain a deployment buffer of at least 200 feet from any submerged beds of seagrasses, coral reefs, live bottom, areas supporting growth of sponges, sea fans, soft corals, and other sessile macroinvertebrates generally associated with rock outcrops, oyster reefs, scallop beds, clam beds, or areas where there are unique or unusual concentrations of bottom-dwelling marine organisms.

b. Siting of any vessel, aircraft, or large and high-relief material (e.g., bridge spans) may not occur within 1,500 feet of any documented coral colonies.

c. Any vessel used in the deployment of an artificial reef may not anchor or moor within 1,500 feet of any documented coral colonies.

d. Should the assessment find any evidence of cultural/archaeological resources such as sunken vessels, ballast, historic refuse piles, or careenage areas, the Permittee shall also maintain a deployment buffer of at least 200 feet from any of these resources.

e. No artificial reef material will be deployed in any area within 1,100 feet off any identified sea turtle nesting beach that predominantly consists of sandy benthic habitat.

The Permittee shall provide of the information obtained from the assessment to the Corps no less than 14 days prior to deployment of material on an artificial reef in conjunction with the pre-deployment notification.

10. Pre-Deployment Notification: No less than 14 days prior to deployment of material on an artificial reef, the Permittee shall transmit by electronic mail (“email”) a complete and signed “Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification” form (Attachment 3), to the Corps and Florida Fish and Wildlife Conservation Commission (FWC) to allow inspection of the proposed reef materials, as deemed necessary by the agencies. Inspection is allowable at the staging area. By signing the Pre-Deployment Notification the Permittee certifies all materials are free from asphalt, petroleum, other hydrocarbons and toxic residues. The Permittee shall not deploy material if notified by the Corps or FWC that the material is questionable. The material needs to be evaluated before it is released for deployment. Any material deemed unacceptable for reef material will be disposed in an approved upland disposal site.

Deployment of the material shall not occur until after the end of the 14-day inspection period. The Permittee shall ensure both a copy of this permit and the signed “Florida Artificial Reef Materials Cargo Manifest and Pre-Deployment Notification” form are maintained aboard the deployment vessel at all times during loading, transit, and deployment.

11. Post-Deployment Placement Report/As-Built Drawing: Within 30 days after deployment of materials, the Permittee shall transmit by email to the Corps, FWC, and NOAA a complete and signed “Florida Artificial Reef Materials Placement Report and Post-Deployment Notification” form (Attachment 4).

Please note, the Corps requires the latitude and longitude to be accurate within 5 meters horizontal distance on the post-deployment report. The report shall include an as-built drawing containing the approximate deployment configurations and the height of the material after placement. Depth shall be verified utilizing fathometer, depth sounder, or similar device accurate to within 1 meter. Also, include information on the condition of the material at the time of deployment. The report and drawing shall be limited to a few pages per deployment. Representative photographs and/or video, if available, should be submitted.

12. Ownership/Maintenance/Liability: By signing this permit, the Permittee certifies and acknowledges ownership of all artificial reef materials deployed on the reef, accepts responsibility for maintenance of the artificial reef, and possesses the ability to assume liability for all damages that may arise with respect to the artificial reef.

13. Biological Opinion: This permit does not authorize the Permittee to take an endangered species, in particular the green sea turtle (North Atlantic DPS and South Atlantic DPS), Kemp’s ridley sea turtle, leatherback sea turtle, and loggerhead sea turtle. In order to legally take a listed species, the Permittee must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a BO under ESA Section 7, with “incidental take” provisions with which you must comply). The enclosed Biological Opinion (BO) from the National Marine Fisheries Service, tracking number SERO-2022-01316, dated April 10, 2023 (Attachment 5), contains mandatory terms and conditions to implement the reasonable and prudent measures that are associated with the incidental take statement set forth in the BO. Authorization under this permit is conditional upon compliance with all of the mandatory terms and conditions and reasonable and prudent measures associated with the incidental take statement in the enclosed BO, which are incorporated by reference in this permit. Failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in the BO, would constitute noncompliance with this permit. In addition, failure to comply with the terms and conditions and reasonable and prudent measures associated with the incidental take statement set forth in of the BO, where a take of the listed species occurs, would constitute an unauthorized take. The National Marine Fisheries Service is the appropriate authority to determine compliance with the terms and conditions of its BO, and with the ESA.

14. Protected Species Construction Conditions: The Permittee shall comply with National Marine Fisheries Service’s “Protected Species Construction Conditions, NOAA Fisheries Southeast Regional Office” dated May 2021 (Attachment 6).

15. Vessel Strike Avoidance Measures: The Permittee shall comply with the

“Vessel Strike Avoidance Measures and Reporting for Mariners”, revised May 2021 (Attachment 7), for marine turtles and marine mammals.

16. Daylight Hours: All activities must be completed during daylight hours.

17. Manatee Conditions: The Permittee shall comply with the “Standard Manatee

Conditions for In-Water Work – 2011” (Attachment 8). The most recent version of the Manatee Conditions must be utilized.

18. Monitoring: The Permittee shall conduct yearly monitoring on the artificial reefs deployed during the previous 12 months to verify material location and condition and compare to the location specified in the Post-Deployment Report to distinguish changes in either. The monitoring report shall be submitted to the Corps annually and include a spreadsheet representation of the site inspected and data gained with a written narrative and submitted in accordance with Special Condition 1. The Permittee is responsible for maintenance associated with the site, including the removal of entanglement hazards and other such assessments to ensure safe operation.

19. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.

20. Agency Changes/Approvals: Should any other agency require and/or approve changes to the work authorized or obligated by this permit, the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes. It is the Permittee’s responsibility to request a modification of this permit from the Pensacola Permits Section. The Corps reserves the right to fully evaluate, amend, and approve or deny the request for modification of this permit.

21. Cultural Resources/Historic Properties:

a. No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the NRHP.

b. If, during permitted activities, items that may have historic or archaeological origin are observed the Permittee shall immediately cease all activities adjacent to the discovery that may result in the destruction of these resources and shall prevent his/her employees from further removing, or otherwise damaging, such resources. The applicant shall notify both the choose an item and the Corps, of the observations within the same business day (8 hours). Examples of submerged historical, archaeological or cultural resources include shipwrecks, shipwreck debris fields (such as steam engine parts, or wood planks and beams), anchors, ballast rock, concreted iron objects, concentrations of coal, prehistoric watercraft (such as log "dugouts"), and other evidence of human activity.

The materials may be deeply buried in sediment, resting in shallow sediments or above them, or protruding into water. The Corps shall coordinate with the choose an item State Historic Preservation Officer Choose an item to assess the significance of the discovery and devise appropriate actions. Project activities shall not resume without verbal and/or written authorization from the Corps.

c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition ; and if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.

d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the State Archeologist and from the Corps.

Further Information:

1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:

(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)

(X) Section 404 of the Clean Water Act (33 U.S.C. 1344)

( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413)

( ) Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. 408)

2. Limits of this authorization.

a. This permit does not obviate the need to obtain other Federal, State, or local authorizations required by law.

b. This permit does not grant any property rights or exclusive privileges.

c. This permit does not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federal projects.

3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following:

a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.

b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation of this permit.

4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.

5. Reevaluation of Permit Decision: This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the following:

a. You fail to comply with the terms and conditions of this permit.

b. The information provided by you in support of your permit application proves to have been false, incomplete, or inaccurate (see 4 above).

c. Significant new information surfaces which this office did not consider in reaching the original public interest decision.

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

6. Extensions: General Condition 1 establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit.

14 April 2023 for

Permit Transfer Request

When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.

(TRANSFEREE-SIGNATURE) (DATE)

(NAME-PRINTED)

(ADDRESS)

(CITY, STATE, AND ZIP CODE)

Attachments to Department of the Army Permit Number SAJ-2021-01854

1. PERMIT DRAWINGS: Drawings by Taylor Engineering, Inc., dated October 2021. 6 pages.

2. WATER QUALITY CERTIFICATION: Specific Conditions of the water quality permit/certification in accordance with General Condition number 5 on page 2 of this DA permit. FDEP permit 0404845-001-EI/46 issued on December 22, 2021.

16 pages.

3. FLORIDA ARTIFICIAL REEF MATERIALS CARGO MANIFEST AND PRE-

DEPLOYMENT NOTIFICATION. 2 pages.

4. FLORIDA ARTIFICIAL REEF MATERIALS PLACEMENT REPORT AND POST-

DEPLOYMENT NOTIFICATION. 2 pages.

5. BIOLOGICAL OPINION: National Marine Fisheries Service Biological Opinion, SERO-2022-01316, dated March 10, 2023. 106 pages.

6. PROTECTED SPECIES CONSTRUCTION CONDITIONS, NOAA FISHERIES

SOUTHEAST REGIONAL OFFICE. 2 pages.

7. VESSEL STRIKE AVOIDANCE MEASURES: Vessel Strike Avoidance Measures, NOAA Fisheries Southeast Regional Office, revised May 2021.

3 pages.

8. MANATEE CONDITIONS: Standard Manatee Conditions for In-Water Work, 2011. 2 pages.

CHOCTAWHATCHEE BAY

OKALOOSA COUNTY

GULF OF MEXICO

~4.27 NM

~6.65 NM

~2.62 NM

~3.52 NM

~1.74 NM

~2.20 NM

CRYSTAL BEACH

SNORKEL REEF

~1.54 NM

~6.60 NM

FISH HAVEN #21

FISH HAVEN #20

FISH HAVEN #22

SAFETY FAIRWAY

EAST PASS

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 1

LOCATION MAP

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

LO

C

AT

IO

N .D

W G

0/

/2

4:

:2

PM

OKALOOSA COUNTY,

FLORIDA

N

0 12,000' 24,000'

SCALE: 1" = 12,000'

file:///X:/Support/Web/PE.htm

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

FH20-1

FH20-1-14

FH20-15

FH20-28

FH20-29

FH20-42

FH20-43

FH20-2

FH20-13

FH20-16

FH20-27

FH20-30

FH20-41

FH20-44

FH20-3

FH20-12

FH20-17

FH20-26

FH20-31

FH20-40

FH20-45

FH20-4

FH20-11

FH20-18

FH20-25

FH20-32

FH20-39

FH20-46

FH20-5

FH20-10

FH20-19

FH20-24

FH20-33

FH20-38

FH20-47

FH20-6

FH20-9

FH20-20

FH20-23

FH20-34

FH20-37

FH20-48

FH20-7

FH20-8

FH20-21

FH20-22

FH20-35

FH20-36

FH20-49

20-A 20-B

20-C20-D

20-E

6075'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

20-A

20-B

20-C

20-D

20-E

LAT

(DD)

N30.3748

N30.3748

N30.3581

N30.3581

N30.3664

LONG

(DD)

W86.6474

W86.6281

W86.6281

W86.6474

W86.6378

NORTHING

506,356

506,242

500,163

500,277

503,259

EASTING

1,291,371

1,297,443

1,297,329

1,291,256

1,294,350

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 2

FISH HAVEN 20

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

N

0 1,200' 2,400'

SCALE: 1" = 1,200'

FH21-1

FH21-1-14

FH21-15

FH21-28

FH21-29

FH21-42

FH21-43

FH21-2

FH21-13

FH21-16

FH21-27

FH21-30

FH21-41

FH21-44

FH21-3

FH21-12

FH21-17

FH21-26

FH21-31

FH21-40

FH21-45

FH21-4

FH21-11

FH21-18

FH21-25

FH21-32

FH21-39

FH21-46

FH21-5

FH21-10

FH21-19

FH21-24

FH21-33

FH21-38

FH21-47

FH21-6

FH21-9

FH21-20

FH21-23

FH21-34

FH21-37

FH21-48

FH21-7

FH21-8

FH21-21

FH21-22

FH21-35

FH21-36

FH21-49

21-A 21-B

21-C21-D

21-E

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

6081'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

21-A

21-B

21-C

21-D

21-E

LAT

(DD)

N30.2539

N30.2539

N30.2372

N30.2372

N30.2455

LONG

(DD)

W86.5185

W86.4993

W86.4993

W86.5185

W86.5089

NORTHING

461,643

461,535

455,456

455,564

458,550

EASTING

1,331,218

1,337,297

1,337,190

1,331,109

1,334,204

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 3

FISH HAVEN 21

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

FH22-1

FH22-1-14

FH22-15

FH22-28

FH22-29

FH22-42

FH22-43

FH22-2

FH22-13

FH22-16

FH22-27

FH22-30

FH22-41

FH22-44

FH22-3

FH22-12

FH22-17

FH22-26

FH22-31

FH22-40

FH22-45

FH22-4

FH22-11

FH22-18

FH22-25

FH22-32

FH22-39

FH22-46

FH22-5

FH22-10

FH22-19

FH22-24

FH22-33

FH22-38

FH22-47

FH22-6

FH22-9

FH22-20

FH22-23

FH22-34

FH22-37

FH22-48

FH22-7

FH22-8

FH22-21

FH22-22

FH22-35

FH22-36

FH22-49

22-A 22-B

22-C22-D

22-E

250-FT BUFFER (TYP)

PERMITTED REEF AREA (FISH HAVEN) LIMITS

PATCH REEF SITE LIMITS (TYP)

PATCH REEF ID (TYP)

250-FT BUFFER (TYP)

6075'

400' (TYP)

0'

(T

YP

462' (TYP)

3'

(T

YP

PROPOSED REEF LIMITS

POINT ID

22-A

22-B

22-C

22-D

22-E

LAT

(DD)

N30.3548

N30.3548

N30.3380

N30.3380

N30.3464

LONG

(DD)

W86.4488

W86.4295

W86.4295

W86.4488

W86.4391

NORTHING

497,941

497,837

491,758

491,861

494,849

EASTING

1,353,870

1,359,944

1,359,841

1,353,766

1,356,855

NOTES:

1. REEF AREA REFERS TO THE ENTIRE PERMITTED BOUNDARY OF

THE PROPOSED FISH HAVEN.

2. PATCH REEF/PATCH REEF SITE REFERS TO INDIVIDUAL

DEPLOYMENTS OF ARTIFICIAL REEF MATERIAL WITHIN THE

PERMITTED REEF AREA.

3. ALL PATCH REEF SITES WILL BE INSPECTED BY DIVER SURVEY

PRIOR TO DEPLOYMENT OF ARTIFICIAL REEF MATERIALS AND

ANY NATURAL OR HISTORIC RESOURCES WILL BE AVOIDED BY A

MINIMUM 150' BUFFER.

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 4

FISH HAVEN 22

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:3

PROPOSED PATCH REEF SITE.

REEF MATERIALS TO CONSIST OF RE-PURPOSED OR PRE-FABRICATED

CLEAN CONCRETE OR ROCK, CLEAN STEEL, BOAT HULLS, OR OTHER CLEAN,

HEAVY GAUGE STEEL PRODUCTS HAVING A THICKNESS OF 1/4" OR

GREATER, A MIXTURE OF CLEAN CONCRETE AND HEAVY GAUGE STEEL, OR

OTHER MATERIALS AS DEFINED UNDER F.A.C. 62-300.600. THE MATERIAL

SHALL BE OF SUFFICIENT SIZE AND WEIGHT TO REMAIN STABLE.

MAX REEF HEIGHT WILL

BE LESS THAN HALF THE

DISTANCE FROM THE BOTTOM

TO THE WATER SURFACE

TEMPORARY CONSTRUCTION BUOY (TYP)

GULF OF MEXICO BOTTOM

NOTES:

1. MARKER BUOYS WILL BE SECURED ALONG THE PERIMETER OF THE

PATCH REEF SITES PRIOR TO MATERIAL PLACEMENT TO DEFINE THE

DROP AREA AND TO ENSURE ACCURATE PLACEMENT WITHIN THE

APPROVED SITE.

2. QUALITY CONTROL DIVES SHALL BE PERFORMED AS NECESSARY TO

ENSURE PROPER MATERIAL PLACEMENT AND RELIEF.

NOT TO SCALE

XX-XX

TYPICAL PATCH REEF SITE SECTION

V-SCALE: 1" = X'

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 5

TYPICAL PATCH REEF SITE SECTION

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

TY

PI

C

AL

S

EC

TI

O

N .D

W G

0/

/2

4:

:4

REEF POINT SUMMARY

POINT ID

20-A

20-B

20-C

20-D

20-E

21-A

21-B

21-C

21-D

21-E

22-A

22-B

22-C

22-D

22-E

NORTHING

506,356

506,242

500,163

500,277

503,259

461,643

461,535

455,456

455,564

458,550

497,941

497,837

491,758

491,861

494,849

EASTING

1,291,371

1,297,443

1,297,329

1,291,256

1,294,350

1,331,218

1,337,297

1,337,190

1,331,109

1,334,204

1,353,870

1,359,944

1,359,841

1,353,766

1,356,855

LAT

(DD)

N30.3748

N30.3748

N30.3581

N30.3581

N30.3664

N30.2539

N30.2539

N30.2372

N30.2372

N30.2455

N30.3548

N30.3548

N30.3380

N30.3380

N30.3464

LONG

(DD)

W86.6474

W86.6281

W86.6281

W86.6474

W86.6378

W86.5185

W86.4993

W86.4993

W86.5185

W86.5089

W86.4488

W86.4295

W86.4295

W86.4488

W86.4391

LAT

(DDM)

N030°22.4881'

N030°22.4880'

N030°21.4850'

N030°21.4850'

N030°21.9865'

N030°15.2329'

N030°15.2327'

N030°14.2297'

N030°14.2298'

N030°14.7313'

N030°21.2852'

N030°21.2852'

N030°20.2821'

N030°20.2821'

N030°20.7837'

LONG

(DDM)

W086°38.8436'

W086°37.6880'

W086°37.6881'

W086°38.8437'

W086°38.2658'

W086°31.1125'

W086°29.9570'

W086°29.9572'

W086°31.1127'

W086°30.5348'

W086°26.9263'

W086°25.7708'

W086°25.7708'

W086°26.9263'

W086°26.3485'

LAT

(DMS)

N030°22'29"

N030°22'29"

N030°21'29"

N030°21'29"

N030°21'59"

N030°15'14"

N030°15'14"

N030°14'14"

N030°14'14"

N030°14'44"

N030°21'17"

N030°21'17"

N030°20'17"

N030°20'17"

N030°20'47"

LONG

(DMS)

W086°38'51"

W086°37'41"

W086°37'41"

W086°38'51"

W086°38'16"

W086°31'07"

W086°29'57"

W086°29'57"

W086°31'07"

W086°30'32"

W086°26'56"

W086°25'46"

W086°25'46"

W086°26'56"

W086°26'21"

SHEET

DATE

PROJECT

DRAWN BY

PRELIMINARY DRAWINGS: THESE DRAWINGS ARE NOT IN FINAL FORM, BUT ARE BEING TRANSMITTED FOR AGENCY REVIEW.

SEAL

DATE

C2014-004-03

CAS

OCT 2021 DUNCAN GREER P.E. #83306

FIGURE 6

REEF POINT SUMMARY TABLE

OKALOOSA COUNTY ARTIFICIAL REEFS FH20, FH21, AND FH22

OKALOOSA COUNTY, FLORIDA

TAYLOR ENGINEERING INC.

4300 LEGENDARY DRIVE

SUITE C246

DESTIN, FLORIDA 32541

REGISTRY # 4815

C

AT

H Y

SH

EL

L X:

\S

YS

\P R

O

JE

C

TS

\C

-0

-0

O

K R

EE

F

FH

-2 2\

PE

R

M

IT

\C

-0

-0

3- P-

R

EE

F

PL

AN

S.

D W

G

0/

/2

4:

:4 www.dep.state.fl.us

FLORIDA DEPARTMENT OF

Environmental Protection

Northwest District

160 W. Government Street, Suite 308

Pensacola, Florida 32502-5740

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton

Secretary

Permittee/Authorized Entity:

Okaloosa County Board of County Commissioners c/o Alexander Fogg

1250 North Eglin Parkway Suite 100

Shalimar, Florida 32579, Okaloosa County afogg@myokaloosa.com

Fish Havens 20, 21, & 22

Authorized Agent:

Taylor Engineering, Inc.

c/o Duncan Greer 4300 Legendary Drive Destin, Florida 32541 dgreer@taylorengineering.com

Environmental Resource Permit State-owned Submerged Lands Authorization – Granted

U.S. Army Corps of Engineers Authorization – Separate Corps Authorization

Required

Okaloosa County Permit No.: 0404845-001-EI/46

Permit Issuance Date: December 22, 2021 Permit Construction Phase Expiration Date: December 22, 2031 mailto:afogg@myokaloosa.com mailto:dgreer@taylorengineering.com

Permittee: Okaloosa County Board of County Commissioners

Consolidated Environmental Resource Permit and Sovereignty Submerged Lands Authorization

Permittee/Grantee: Okaloosa County Board of County Commissioners

Permit No: 0404845-001-EI/46

PROJECT LOCATION

The activities authorized by this permit and sovereignty submerged lands authorization are located at three locations offshore of Okaloosa County, Florida. Fish Haven 20 is located approximately 1.74 nautical miles offshore, west of the East Pass at 30.3664 N, 86.6378 W. Fish Haven 21 is located approximately 8.14 nautical miles offshore, south of the East Pass at

30.2455 N, 86.5089 W. Fish Haven 22 is located approximately 2.20 nautical miles offshore, east of the East Pass at 30.3464 N, 86.4391 W. Exact location coordinates are depicted in the attached project drawings.

PROJECT DESCRIPTION

The permittee is authorized to construct three artificial reefs, each approximately one square nautical mile and 847.5 acres, totaling three square nautical miles and 2544.6 acres, within the Gulf of Mexico, a Class III Florida Waterbody, Unclassified Shellfish Harvesting Area.

Authorized activities are depicted on the attached exhibits.

AUTHORIZATIONS

Fish Havens 20, 21, & 22

Environmental Resource Permit The Department has determined that the activity qualifies for an Environmental Resource Permit.

Therefore, the Environmental Resource Permit is hereby granted, pursuant to Part IV of Chapter 373, Florida Statutes (F.S.), and Chapter 62-330, Florida Administrative Code (F.A.C.).

Sovereignty Submerged Lands Authorization The activity is located on sovereignty submerged lands owned by the State of Florida. It therefore also requires authorization from the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees), pursuant to Article X, Section 11 of the Florida Constitution, and Section 253.77, F.S. As staff to the Board of Trustees of the Internal Improvement Trust Fund (Board of Trustees) under Sections 253.002, F.S., the Department has determined that the activity qualifies for and requires a Letter of Consent, as long as the work performed is located within the boundaries as described and is consistent with the terms and conditions herein.

During the term of this Letter of Consent you shall maintain satisfactory evidence of sufficient upland interest as required by paragraph 18-21.004(3)(b), F.A.C. If such interest is terminated or the Board of Trustees determines that such interest did not exist on the date of issuance of this Letter of Consent, this Letter of Consent may be terminated by the Board of Trustees at its sole option. If the Board of Trustees terminates this Letter of Consent, you agree not to assert a claim or defense against the Board of Trustees arising out of this Letter of Consent.

Federal Authorization Your proposed activity as outlined in your application and attached drawings does not qualify for Federal authorization pursuant to the State Programmatic General Permit VI-R1.

SEPARATE permit(s) or authorization will be required from the U.S. Army Corps of Engineers (USACOE).

Authority for review - an agreement with the USACOE entitled “Coordination Agreement Between the U. S. Army Corps of Engineers (Jacksonville District) and the Florida Department of Environmental Protection (or Duly Authorized Designee), State Programmatic General Permit”, Section 10 of the Rivers and Harbor Act of 1899, and Section 404 of the Clean Water Act.

Coastal Zone Management Issuance of this authorization also constitutes a finding of consistency with Florida’s Coastal Zone Management Program, as required by Section 307 of the Coastal Zone Management Act.

Water Quality Certification This permit also constitutes a water quality certification under Section 401 of the Clean Water Act, 33 U.S.C. 1341.

Other Authorizations You are advised that authorizations or permits for this activity may be required by other federal, state, regional, or local entities including but not limited to local governments or municipalities.

This permit does not relieve you from the requirements to obtain all other required permits or authorizations.

The activity described may be conducted only in accordance with the terms, conditions and attachments contained in this document. Issuance and granting of the permit and authorizations herein do not infer, nor guarantee, nor imply that future permits, authorizations, or modifications will be granted by the Department.

PERMIT / SOVEREIGNTY SUBMERGED LANDS CONDITIONS

The activities described must be conducted in accordance with:

• The Specific Conditions

• The General Conditions

• The Special Consent Conditions

• The General Conditions for Sovereignty Submerged Lands Authorization

• The limits, conditions and locations of work shown in the attached drawings

• The term limits of this authorization

You are advised to read and understand these conditions and drawings prior to beginning the authorized activities, and to ensure the work is conducted in conformance with all the terms, conditions, and drawings herein. If you are using a contractor, the contractor also should read and understand these conditions and drawings prior to beginning any activity. Failure to comply with these conditions, including any mitigation requirements, shall be grounds for the

Department to revoke the permit and authorization and to take appropriate enforcement action.

Operation of the facility is not authorized except when determined to be in conformance with all applicable rules and this permit and sovereignty submerged lands authorization, as described.

SPECIFIC CONDITIONS – ADMINISTRATIVE/EMERGENCIES

1. The construction phase expires at 11:59 p.m. on the date indicated on the cover page of this permit.

2. For emergencies involving a serious threat to the public health, safety, welfare, or environment, the emergency telephone contact number is (800) 320-0519 (State Warning Point).

The Department telephone number for reporting nonthreatening problems or system malfunctions is (850) 595-0663, day or night.

3. The mailing address for submittal of forms for the “Construction Commencement Notice”, “As-Built Certification …”, “Request for Conversion of Stormwater Management Permit Construction Phase to Operation and Maintenance Phase”, or other correspondence is FDEP, SLERP, 160 West Government Street, Suite 308, Pensacola, Florida 32502.

SPECIFIC CONDITIONS – CONSTRUCTION ACTIVITIES

4. Construction equipment shall not be repaired or refueled in wetlands or elsewhere within waters of the state.

5. Any damage to wetlands outside of the authorized impact areas as a result of construction shall be immediately reported to the Department at (850)595-8300 and repaired by reestablishing the pre-construction elevations and replanting vegetation of the same species, size, and density as that in the adjacent areas. The restoration shall be completed within 30 days of completion of construction, and the Department shall be notified of its completion within that same 30-day period.

6. The material to be used shall be clean concrete or rock, clean steel boat hulls, other clean, heavy gauge steel products with a thickness of 1/4 inch or greater, and prefabricated structures that are a mixture of clean concrete and heavy gauge steel.

7. The material shall be free of soils, oils and greases, debris, litter, putrescible substances or other pollutants.

8. The material shall be firmly anchored to the bottom and shall not be indiscriminately dumped.

9. The substrate on which the activities occur shall not consist of submerged grassbed communities, shellfish or other hardbottom communities, or corals.

10. There shall be no “white goods” (inoperative and discarded refrigerators, freezers, ranges, water heaters, washers, and other similar domestic and commercial appliances), asphalt material, tires, or other polluting materials used in construction of the reef.

11. Deployment of any vessel as artificial reef material is prohibited unless written authorization has first been obtained from the USACOE. The Permittee must first submit a project-specific deployment plan to the USACOE to request such authorization to deploy vessels, and the plan must include the following information:

a. Detailed description of the proposed deployment including vessel material type, deployment depth, intended orientation of the vessel (e.g., upright, on its side, upside down), navigational clearance with the material in all orientations, and the weight and dimensions of the selected vessel;

b. Stability analysis of the proposed vessel at the depth and location proposed for deployment;

c. A pre-deployment preparation plan describing how compliance with the EPA and MARAD “National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs” has been followed. This document is available at:

https://www.epa.gov/sites/production/files/2015- 09/documents/artificialreefguidance.pdf;

d. Tow and anchoring plan describing how the vessel will be towed to and anchored at the deployment site;

e. Sink Plan describing the methods used to deploy the vessel. If the use of explosives is requested, a detailed explosive and detonation plan including justification documenting the need for the use of explosives as the only deployment alternative, and a marine mammal monitoring and vessel security plan must be provided;

f. A monitoring plan describing on-water and pre-deployment monitoring, immediate post-deployment monitoring, and annual monitoring activities to document that the vessel is deployed/located within the permitted area including coordinates, orientation of vessel (e.g., upright, side, upside down), structural integrity status (i.e., is the vessel in one piece, are pieces being disassociated from the structure), and documentation that the vessel meets USCG navigational requirements;

g. A copy of the proposed project budget, and documentation that the permittee has approved funding adequate to procure, clean, deploy, and conduct monitoring of the selected vessel once it has been deployed.

12. The site shall be marked with perimeter buoys during construction to ensure that no material is deposited outside of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .