Permit_#_2023003997-MDCTD_approved_(3)_Original_Plans.docx

DOCX document 159 KB Posted

Attached to
Widening of NW 66th Street Roadway from NW 102nd Avenue to NW 97th Avenue
Solicitation number
2026-03
Issued by
Miami-Dade County, Florida

About this file

This is an approved permit document from the Miami-Dade County Department of Transportation and Public Works (MDCTD) for the City of Doral's NW 66th Street roadway widening project extending from NW 102nd Avenue to NW 97th Avenue. The document contains the original construction plans for the project, presented in image format showing the detailed engineering drawings and specifications for the roadway widening work. The permit approval indicates that the project has met all technical and regulatory requirements necessary to proceed with construction activities.

The approved plans serve as the binding technical documentation for contractors bidding on the project, establishing the scope of work, design standards, and construction specifications that must be followed. These original plans form the basis for bid preparation and will govern all construction execution, ensuring consistency between the design intent and field implementation for the roadway improvement initiative in Doral.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

image1.png

File details come from the government source that posted it. Updated .