PERFORMANCE WORK STATEMENT- REDACTED.pdf
PDF 125 KB Posted
- Attached to
- CALIBRATION/MAINTENANCE OF INDUSTRIAL HYGIENE & OCCUPATIONAL HEALTH EQUIPMENT YOKOSUKA JAPAN
- Solicitation number
- HT941023N0058
- Issued by
-
Defense Health Agency
About this file
This performance work statement outlines calibration and maintenance services for industrial hygiene and occupational health equipment at various Navy Medicine facilities in Japan. The contractor shall annually calibrate equipment listed in an attached spreadsheet according to manufacturers' specifications. Additional requirements include corrective maintenance when needed to complete calibration, developing field service reports upon completion, and shipping equipment directly to listed points of contact at Navy Medicine facilities in Yokosuka, Atsugi, Iwakuni, and Sasebo. The performance period is from 30 September 2023 through 29 September 2025 with an option to extend through 29 September 2026. The contractor must be ISO/IEC 17025 and ANSI Z540.3 accredited and only allow certified personnel to perform the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLE SOURCE JUSTIFICATION signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
CALIBRATION/MAINTENANCE OF INDUSTRIAL HYGIENE & OCCUPATIONAL HEALTH EQUIPMENT
AT Navy Medicine Readiness & Training Command (NMRTC) YOKOSUKA, JAPAN
1. BACKGROUND
Navy Medicine Readiness & Training Command (NMRTC) YOKOSUKA, Japan has responsibility to manage, administer and carry out the Navy Industrial Hygiene Program on mainland Japan and additional supported areas. We use a variety of industrial hygiene sampling equipment that requires annual calibration from an accredited lab. The following Performance Work Statement (PWS) details the effort that must be undertaken to support the operations and maintenance of the equipment required to provide the services described above.
2. SCOPE
The scope of work performed under these specifications includes the annual calibration of all listed equipment. The Contractor shall maintain the equipment within the original equipment manufacturer (OEM) specification, in accordance with the Federal, State, and Local law regulations, US Navy regulations, instructions, and the Joint Commission requirement. U.S. Navy regulations and instructions will be made available upon request. When product recalls or upgrades are necessary to maintain the equipment in service within the original manufacturer’s specification, the Contractor shall obtain and install same. The contractor shall be ISO 17025/ ANSI Z540.3 accredited and only allow certified repair personnel to provide calibration/maintenance services on the equipment.
3. DETAILED WORK REQUIREMENTS
The contractor shall provide the following support.
3.1. EQUIPMENT CALIBRATION:
Provide equipment calibration for equipment on attached spreadsheet.
Calibration shall be IAW the manufacturer’s OEM specifications.
3.2. CORRECTIVE MAINTENANCE:
The contractor shall provide corrective maintenance as necessary to complete the required calibration IAW the manufacturer's specifications.
3.3. FIELD SERVICE REPORTS:
The contractor shall develop and submit to the Government an itemized list of all corrective maintenance work and calibration certification upon completion of the service. The report shall be submitted to:
Navy Medicine Readiness & Training Comman (NMRTC) Yokosuka, Japan Industrial Hygiene Dept.
Attn: Mr. Akihiro Endo
PSC 475 BOX 1
DSN: 243-2645 / Local (OCONUS): 046-816-2645 / Commercial: 011-81-468-16-2645
Email: akihiro.endo.In@health.mil
3.4. Upon completion of Calibration/Corrective maintenance, contractor shall send back equipment to each location directly.
NMRTC Yokosuka:
Navy Medicine Readiness & Training Command Yokosuka, Japan
MATERIALS MANAGEMENT DEPT. BLDG E-18
1-CHOME HON-CHO YOKOSUKA
KANAGAWA 238-0041 JAPAN
POC Name: Mr. Akihiro Endo DSN: 243-2645 / Local (OCONUS): 046-816-2645 / Commercial: 011-81-468-16-2645 Email: akihiro.endo.In@health.mil mailto:akihiro.endo.In@health.mil mailto:akihiro.endo.In@health.mil
BHC Atsugi:
Navy Medicine Readiness & Training Unit Branch Health Clinic Atsugi, Japan
INDUSTRIAL HYGIENE DEPT. BLDG #984
FUKAYAOOGAMI AYASE, KANAGAWA PREFECTURE 252-1101 Japan POC Name: Ms. Hoko Baba DSN: 315-264-4683 / Local (OCONUS): 0467-63-4683 / Commercial: 011-81-467-63-4683 Email: takehito.nakagawa.mil@heath.mil
BHC Iwakuni:
Navy Medicine Readiness & Training Unit Branch Health Clinic Iwakuni, Japan
INDUSTRIAL HYGIENE DEPT. BLDG #110
MISUMI-MACHI, IWAKUNI-SHI, YAMAGUCHI-KEN, 740-0025 Japan POC Name: Mr. Ryo Kuramoto DSN: 315-255-8416 / Local (OCONUS): 08-2794-8416 / Commercial: 011-81-827-94-8416 Email: ryo.kuramoto.ln@health.mil
BHC Sasebo:
Navy Medicine Readiness & Training Unit Branch Health Clinic Sasebo, Japan Occupational Health Dept.
Hirase-Cho, Sasebo City, Nagasaki 857-0056 Japan POC: Mr. Hirotaka Fuji DSN: 0956-50-2080 / Local (OCONUS): 0956-50-2080 / Commercial: 011-81-956-50-2080 Email: hirotaka.fuji.ln@health.mil
4. SPECIAL CONTRACT REQUIREMENTS
4.1. Contractor Performance Evaluation
If performance does not meet the specifications stated in this PWS the contractor shall be notified of the lack of performance. The contractor shall be given a specified amount of time to correct the deficiencies. If deficiencies are not corrected, appropriate action will be taken in conformance with laws and regulation.
4.2. Delays
NMRTC Yokosuka TR/Technical Representative will review any contractor delay or failure to perform to determine if the delay is caused by technical factors beyond the contractor’s control and without fault or negligence by the contractor. If the review indicates performance deficiency is not the result of factors beyond the contractor’s control, the contractor will be notified. The contractor shall respond within 24 hours of receipt of notification with remedies to correct the deficiencies.
5. DOCUMENTATION AND PERFORMANCE
5.1. Contractor shall include the maintenance and calibration certificate with the equipment shipment.
5.2. All written documentation is written in a skilled business style. The documentation conforms to standards for documentation.
5.3. All work is completed within the established and agreed upon time frames.
5.4. The quality of the work and the content of deliverables shall be highly professional.
6. GOVERNMENT RESPONSIBILITIES
Government personnel will not perform calibration/maintenance or attempt repairs to the equipment while the equipment is covered under this maintenance contract.
7. CONTRACTOR’S RESPONSIBILITIES
7.1. In all instances where government property or equipment is damaged by the contractor’s employees, a full report of the facts and the extent of the damage shall be submitted to the TR within 24 hours following the occurrences. The TR shall then forward the report to the Contracting Officer within 24 hours of receipt.
mailto:takehito.nakagawa.mil@heath.mil mailto:ryo.kuramoto.ln@health.mil mailto:hirotaka.fuji.ln@health.mil
7.2. The contractor shall resolve all manufacturer recalls and other mandatory updates within thirty
(30) calendar days of the original equipment manufacturers notification for all equipment covered under this contract.
8. PERIOD OF PERFORMANCE/POP
Basic Year: 30 September 2023 – 29 September 2024 Option Year I: 30 September 2024 – 29 September 2025
END OF PERFORMANCE WORK STATEMENT
File details come from the government source that posted it. Updated .