This Performance Work Statement (PWS) details slope mowing services for the Natchez National Cemetery in Natchez, Mississippi. The contract requires a contractor to perform comprehensive cemetery slope maintenance, including mowing slopes up to 42 degrees, trimming, debris removal, and maintaining a professional, well-manicured appearance. Key objectives include managing slope maintenance to preserve the cemetery as a national shrine, with mowing required weekly during the growing season (March through November) and grass maintained at a recommended height of three inches.
The solicitation is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a base period of twelve months and four potential one-year option periods. The anticipated contract will be a firm, fixed-price, indefinite-delivery, indefinite-quantity (IDIQ) services contract. Evaluation will consider technical qualifications, past performance, and price, with technical documents and past performance weighted more heavily than price. A site visit is scheduled for April 2-3, 2025, quotations are due by 3pm EST on April 18, 2025, and the incumbent contractor was Sanford Federal, Inc. The solicitation number is 36C78625R50177, and the contracting agency is the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78625R50177 Questions and Answers.docx | DOCX document | |
| 36C78625R50177 A00001.docx | DOCX document | |
| 36C78625R50177 Solicitation Provisions.docx | DOCX document | |
| 36C78625R50177 Contract Clauses.docx | DOCX document | |
| 36C78625R50177 Price Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
1. GENERAL INFORMATION
0. This is a performance-based contract for cemetery slope mowing services at Natchez National Cemetery, Natchez, Mississippi and hereafter referred to as Natchez or “Cemetery.” The Contractor is responsible to plan, coordinate, organize, and perform the activities of mowing and trimming, and associated services described herein required to maintain a healthy and aesthetic appearance of the Cemetery slope areas. The Cemetery is located at 41 Cemetery Road, Natchez, Mississippi, 39120.
0. This Performance Work Statement describes the basic objectives of the Natchez National Cemetery Grounds Maintenance Program. The Performance Based Service Contract provides potential Offerors the flexibility to develop cost effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the Offeror’s understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained on the Statement of Work that the Government traditionally provides to prospective Offerors. Minimum acceptable levels of performance to meet the minimum requirements are outlined in the “Performance Requirements Summary” contained in Attachment 1.
0. The National Cemetery Administration Mission.
2. The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance, and operational procedures performed by the Contractor have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, the Contractor’s strict adherence to the Integrated Pest Management at VA National Cemeteries, Turfgrass Maintenance in VA National Cemeteries, Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential.
0. Background.
3. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans.
3. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation’s freedom and way of life.
1. DESCRIPTION OF CONTRACT OBJECTIVES
1. The Contractor shall furnish all labor, supervision, professional expertise, vehicles, tools, equipment, materials, and services necessary to ensure that slope maintenance is performed in a safe manner that shall meet or exceed the requirements to maintain healthy turf grass and that presents a clean, neat, professional, and aesthetic slopes appearance throughout the Cemetery. The Contractor’s performance will be based on the Contracting Officer’s (CO) and Contracting Officer’s Representative (COR) evaluation and of the results required by the Performance Requirements Summary (PRS) and not the method of performance. It is at the Contractor’s discretion to determine the methods to attain the level of service at the best value, however whatever method must meet safety standards. The evaluation of results will be based on COR performance assessment, tenant satisfaction, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, local laws, and commercial standards.
1. The Contractor shall also be responsible for training and safety precautions for Contractor employees performing work under these specifications. OSHA standards shall be observed by the Contractor in all work performed. Contractor shall ensure that appropriate safety equipment is used by Contractor personnel and shall be used as prescribed by OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices.
1. Services include, but are not limited to, mowing, trimming, and removal of trash (generated by the Contractor), as well as sweeping or blowing off grass from sidewalks, roads and headstones. Scheduling of services shall be coordinated with the COR to avoid disruption of ongoing Cemetery operations. All work shall be done during normal Federal workdays during Cemetery workday hours. The exception is Memorial Day, which may be a workday for Federal employees, but not for the Contractor. No work shall be allowed during special weekend activities.
1. The Contractor shall be responsible for complying with the standards of the facility’s grounds maintenance services described herein. The Government’s objectives are described in the NCA’s “Operational Standards and Measures”, the Performance Work Statement (PWS), and other requirements identified herein, as they are applicable to the services required in the Pricing Schedule. The Contractor shall develop a “Performance Work Plan” that contains solutions to accomplish the Government’s objectives. The Contractor may use whatever method it chooses to meet the objectives, as long as the end result satisfies the minimum acceptable levels of performance as defined in Performance Requirements Summary (PRS).
1. Contract Objectives.
4. To use an innovative and creative technical approach to manage the Cemetery slopes maintenance operation at the Natchez National Cemetery in order to maintain the high standards of appearance as a National Shrine, in accordance with best commercial practices and the requirements identified in this solicitation. This would include new/existing technology that would make mowing slopes up to 42 angles safe for employees and visitors.
4. To have the Contractor perform to its Technical Performance Work Plan focused on criteria designed to maintain healthy grass and a clean, neat, and professional grounds appearance overall.
4. The minimum life of the contract is planned for one base period with up to four (4) one- year options individually exercised at the VA’s discretion and dependent on the availability of funds.
1. Basis of Performance Requirements
5. National Cemetery Administration (NCA) Operational Standards & Measures: Provides standards for performance in the key cemetery operational areas of interments, grounds maintenance, headstones, markers, and equipment & facilities maintenance. A copy of NCA Operational Standards will be provided to the Contractor by the COR.
5. NCA Turf & Landscape Handbook 3420: An excerpt from Handbook 3420 is provided in Attachment 9. Only the “Mowing/Trimming/Edging” portions indicated in the handbook shall apply to this contract.
1. DESCRIPTION OF SERVICES:
2. CLIN 001: Slopes Grounds Mowing. The Contractor shall mow all Slope Areas (approximately 25 to 42 to look well-manicured, with a neat and professional appearance at all times. Slope Areas are visually prominent and medium visual impact areas (see Attachment 6, Definitions). All Slope Areas shall be maintained in the same manner as a high-quality residential lawn under contract from a professional lawn maintenance service. This generally requires a complete mow/trim cycle every week during the growing season (March through November) but may be more or less frequent dependent upon weather conditions. Mowed areas shall be uniform in appearance, free of skips, gaps, scalping, rutting, bruising, and uneven and rough cutting.
0. The Contractor shall maintain grass height within one (1) inch (+/-) of that which is professionally recommended for the predominant grass type at the Cemetery (St. Augustine) or as recommended by the COR. The recommended grass height is three inches (3”) adjusted up to three and a half inches (3.5”) for stressful conditions or seasonal needs. Optimally, the height should be no more than one-half an inch (½”) above the recommended range for the type of turf at the Cemetery as recommended by the COR. The Contractor’s Performance Work Plan shall address any adjustment required depending on weather conditions and approved by the District Agronomist.
0. In general, some slopes are up to 42 degrees in some areas.
0. The Contractor shall be required to pick up, collect and dispose of debris and trash (see Attachment 6, Definitions), natural and manmade, prior to and after mowing/trimming any area.
0. The Contractor shall identify, move, and replace all floral or commemorative items placed on gravesites in burial sections, etc. to their original locations (i.e. specific gravesites) as necessary while performing mowing/trimming services.
0. The Contractor shall keep all headstones, flat markers, monuments, roadways, walkways (inside and out), flagpole bases, public visitor areas including at the Committal Shelter, or other non-turf areas free of clipping or deposits. Clippings shall be mechanically blown or swept onto nearby turf areas when possible, or collected and disposed of on the same day as the mowing, trimming, or edging event that produced them. At no time is freshly mowed grass to be blown onto headstones per the rules of behavior in Attachment 8, Employee Statement of Compliance and Attachment 9, NCA Handbook 3420.
0. The Contractor shall immediately remove and dispose of, or mulch clearly visible clumps of grass clippings on top of the turf to prevent the appearance of windrows.
0. The Contractor shall use commercial grade rear-discharge mowers or commercial grade mowers with mulching decks only, capable of mowing sloped hills up to 42. The Contractor shall use properly maintained and adjusted cutting equipment to prevent streaks or irregularities, uneven cutting, plowing, or gouging of the soil. Cutting blades on mowing and trimming equipment must be kept sharp so that grass tips are cleanly cut and not torn or damaged. Riding mowers may be used if they are not operated within six (6) inches of markers, monuments, tree trunks or other vertical surfaces.
0. All mowing equipment shall be cleaned before unloading or mowing at the Cemetery to reduce the risk of introducing contaminant weed seeds into the Cemetery turf. No equipment shall be cleaned on Cemetery property.
0. The Contractor shall be familiar with and utilize different mowing patterns and shall change direction, change patterns, and vary mower wheel width patterns after each mowing thereby reducing turf wear, prevent wheel rutting, and provide a neater appearance. All mowing around trees will be accomplished in a manner that prevents a “ringing pattern” around the tree and associated damage to turf.
0. The Contractor shall exercise caution to avoid contact with headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc. or any other structure than can be damaged by contact with the trimming device’s cutting instrument.
0. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. The COR has the authority to pause work if weather conditions are such that work that day will do more damage than good to the Cemetery grounds. During these periods, the Contractor shall be expected to ensure the grass is cut in less than seven calendar days once grass is suitable for mowing.
2. CLIN 001: Trimming. The Contractor shall trim grass and vegetation around vertical surfaces or any other structure or area (e.g., all signage, stairs, steps, and trees) that cannot be maintained by traditional mowing equipment to match surrounding area grass height within Slope Areas. Streaks or irregularities, uneven cutting, plowing, or gouging of the soil is unacceptable.
1. The Contractor shall trim all areas concurrent with mowing. Trimming operations of all non-mowed turf areas shall be considered a part of mowing. The Contractor shall mow first, followed by trimming. The finished height of the trimmed grass will exactly match the height of the mowed grass.
1. The Contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.
1. The Contractor shall exercise caution to avoid contact with headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc. or any other structure than can be damaged by contact with the trimming device’s cutting instrument.
1. PERFORMANCE REQUIREMENTS SUMMARY (PRS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The PRS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. During the initial 30 days of the contract, two additional errors on each performance objective shall be allowed in an effort to identify normal “phase-in” problems.
3. Quality Control. The Contractor shall develop, submit for Contracting Officer acceptance, and maintain a Quality Control program to ensure slope maintenance services are performed in accordance with the requirements of this contract.
0. The Contractor shall submit a Quality Control Plan (QCP) for Contracting Officer acceptance within fourteen (14) calendar days after contract award. Any changes thereafter must also be provided to Contracting Officer.
0. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop Quality Control procedures addressing the areas identified in Paragraph 3, Description of Services. The Contractor shall provide at least one (1) full time person dedicated to Quality Control.
0. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:
2. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections.
2. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.
2. Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract.
2. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting intermediate supervisory responsibilities and overall management responsibilities for ensuring total acceptable performance.
2. On-site records identifying the character, physical capabilities, certifications and ongoing training of each employee performing services under this contract.
2. A log to account for all requests for immediate service. The log shall indicate the date and time of services, and description of results and completion of these services.
2. On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract.
3. Quality Assurance. The COR will evaluate the Contractor’s performance through on-site inspections, evaluation of the Contractor's quality control program and receipt of complaints from Cemetery personnel in accordance with the attached Quality Assurance Surveillance Plan (QASP), Attachment 7.
1. The COR will inspect each task as completed. The COR may recommend to the CO to increase the number of Quality Assurance inspections if called for by repeated failures discovered during inspections or repeated customer complaints. Likewise, the COR may recommend decreasing the number of Quality Assurance inspections if performance dictates.
1. The COR will also receive and investigate complaints from various customers visiting the Cemetery. The Contractor shall be responsible for initialing validated visitor complaints. The COR will make final determination of the validity of visitor complaint(s).
3. Supervision.
2. Prime Contractor Superintendent: The Contractor shall provide a competent and experienced supervisor who speaks and writes fluent English on site for at least four (4) hours a day whenever work is being performed, other than trash and debris pick-up.
2. The Prime Contractor Superintendent must have not less than five (5) years’ experience as a direct supervisor of grounds maintenance operations that included mowing, trimming, edging, and cleanup in industrial, commercial or public sites.
2. The Prime Contractor Superintendent shall ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained.
2. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action shall be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor shall not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the CO.
2. In the absence of the Superintendent, the Contractor shall appoint an English-speaking crew foreman or an employee who shall be responsible to ensure that the work is being accomplished in an expeditious manner, is performed in accordance with the contract specifications and that the work will progress without undue delay.
3. Inspection.
3. The Contractor shall perform a weekly inspection. During this inspection the appearance of the Cemetery shall be observed, and any deficiencies noted within the scope of the contract shall be corrected as soon as practicable. Items that need correcting outside the scope of the contract shall be reported to the COR or his/her representative.
3. The Contractor shall be required to submit inspection reports and work accomplished to the COR weekly. The inspection forms will be provided to the Contractor. (See “Work Summary and Progress Report”, Attachment 3)
3. Reporting and Record Keeping.
4. The Contractor Superintendent shall report on a daily basis to the COR at the Maintenance Building of the Cemetery and log in on days when work is being performed. This DAILY check-in is mandatory and shall be at a time agreed upon by the COR and the Contractor Superintendent. The purpose of the DAILY meeting is to coordinate and establish the daily work schedule to ensure that no work is being performed at the immediate site of a scheduled interment or ceremony, and to submit the required written reports to the COR. These Daily meetings are for the Contractor Superintendent to ask questions and ensure he/she understands the off-limit areas, which may vary depending on the event. The Contractor Superintendent can thus assign tasks accordingly throughout the rest of the Cemetery so that productive use of labor and equipment is assured, and downtime is avoided. If the Contractor Superintendent fails to re-direct employees away from an event in a timely fashion, the COR may then assist in doing so.
4. The Contractor Superintendent shall provide WEEKLY and DAILY work schedules to the COR. The Contractor is required to schedule all required services and is further required to comply with his schedule except for delays beyond his control. Such delays shall be coordinated through the COR. The work schedule shall include deficient work identified by Contractor's quality control inspections and not yet corrected.
4. The Contractor shall submit the WEEKLY schedule every Friday by 3:00 P.M. indicating the work to be performed during the following week and the DAILY schedule shall be submitted on a daily basis by 8:00 A.M. indicating work being performed on that day.
4. The Contractor Superintendent shall provide WEEKLY an accurate written report identifying all work that took place within the previous seven (7) calendar days. The Contractor shall document services performed, indicate the location where work was to be performed, and provide information to the COR as required.
4. A list of scheduled ceremonies will be provided to the Contractor Superintendent the week prior to the scheduled events, and a list of scheduled funerals will be provided daily. The Contractor Superintendent shall be solely responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised. The Contractor shall be solely responsible for staying abreast of all such upcoming events and when in doubt, he/she must ask the COR.
4. The Contractor’s performance and progress on this contract shall be measured weekly based on how timely, accurately, and adequately he/she accomplishes and completes the weekly work scheduled and as needed to systematically accomplish the contract work over the duration of the project. In instances where the COR determines that the work is behind schedule, he will notify the Contracting Officer and the Contractor shall increase workforce and/or hours of operation at no additional cost to the Government in order to achieve completion of the contract work within the specified timeframe.
4. SUBMITTALS - The Contractor shall submit the following documents or information in accordance with the table below.
Table 4.5. Submittal Schedule
| Submittal |
| Frequency |
| Submittal Schedule |
| Work Plan/Staffing Plan |
| As Revised |
| With Proposal |
| Type of Mowing Equipment |
| As Revised |
| With Proposal |
| Quality Control Plan |
| As Revised |
| Within 14 calendar days after award |
| Fire Safety Plan |
| As Revised |
| Within 14 calendar days after award |
| Emergency Contacts |
| As Revised |
| Within 14 calendar days after award |
| Licenses, Permits, Insurance on Vehicles, Liability, Workman’s Compensation Insurance, etc. |
| As Revised |
| Per Contracting Officer direction |
| Proposed Weekly Work Schedule |
| Weekly |
| Preceding Friday by 3:00 p.m. |
| Daily Work Schedule |
| Daily |
| By 8:00 a.m. |
| Weekly Report and Rework List |
| Weekly |
| Following Monday or next business day |
3. Performance Evaluation Meeting.
5. The issuance of a Contract Discrepancy Report (CDR) found at Attachment 4 may be cause for the scheduling of a meeting among the Contractor, CO, and the COR. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, CO, and the COR will sign minutes of the meeting(s).
5. Should the Contractor not concur with the minutes, they shall so state their objections in writing to the Contracting Officer, within ten (10) calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written. The Contracting Officer will notify the Contractor of the decision in writing within ten (10) calendar days of submission of any objections.
3. Actions.
6. Normally, the COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
6. If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
6. When the Contractor is not meeting the acceptable limits of satisfactory performance, a CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as work performance is less than satisfactory.
6. When a CDR is issued for a service, the CO and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.
6. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered, to include a determination on whether continued performance by the Contractor is feasible.
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Attachment 1 through Attachment 9
Attachment 1 Performance Requirements Summary
Attachment 2 Cemetery Maps
Attachment 3 Work Summary & Progress Report
Attachment 4 Contract Discrepancy Report (CDR)
Attachment 5 General Conditions
Attachment 6 Definitions
Attachment 7 Quality Assurance Surveillance Plan (QASP)
Attachment 8 Employee Statement of Compliance
Attachment 9 Excerpt from NCA Handbook 3420
ATTACHMENT 1
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
1. The purpose of this exhibit is to:
1. List the contract requirements considered most critical to acceptable contract performance.
1. Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory.
1. Define the procedure the Government shall use in reducing the Contractor’s monthly payment if satisfactory performance is not rendered.
2. The Government's quality assurance procedures are based on actual performance of the contract and all areas will be reviewed periodically, (e.g. weekly, monthly, quarterly, and semi-annually).
3. The criteria for acceptable and unacceptable performance are as follows:
1. Contract requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
1. If the quality of work does not comply with the contract requirements the COR will initiate and the Contractor shall be required to complete a Contract Discrepancy Report (CDR).
1. The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The Contractor will not be paid for services not rendered in accordance with the standards set forth in this contract.
1. It the level of performance is deemed unacceptable to the Government, payment may be reduced for unsatisfactory performance by the percentage as shown in the chart below:
| Required Services |
| PWS REF |
| Acceptable Quality Level, AQL (Performance Standard) |
| Surveillance Method |
| Remedies and Incentives (Positive or Negative) |
| 1) Mowing of Turfgrass |
| Para 3.1 |
| 95% of the turfgrass area is maintained to the following requirements: |
Turf is maintained within one inch (1”) of the recommended mowing height.
| Periodic sampling and verified customer complaints |
| Reperformance of nonconforming work within 1 workday of the notification from the COR at no increase in contract price. If reperformance is not possible or still does not meet the AQL within the CLIN Period the percentage of the nonconforming work for that period’s payment will be deducted. Document performance (positive or negative in CPARS. |
2) Trimming of all other areas inaccessible to lawn mowers
| Para 3.1, 3-2 |
| 98% of all un-mowed turfgrass in all other areas of the Cemetery inaccessible to lawn mowers are trimmed to match the exact height of adjacent mowed turfgrass. Turfgrass does not extend over the edge of walks, drives, curbs, site structures, and site fixtures. |
| Periodic sampling and verified customer complaints |
| Reperformance of nonconforming work within 1 workday of the notification from the COR at no increase in contract price. If reperformance is not possible or still does not meet the AQL within the CLIN Period the percentage of the nonconforming work for that period’s payment will be deducted. Document performance (positive or negative in CPARS. |
| 3) Mow and trim operations completed without damage to cemetery infrastructure. |
| Para 3.1.10; 3.2.3 |
| No damage inflicted by mow or trim operations to cemetery headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc. or any other structure than can be damaged by contact with the trimming device’s cutting instrument. |
| Periodic sampling and verified customer complaints |
| Replacement or repair. At no increase in contract price. Document performance (positive or negative) in CPARS. |
| 4) Mow and trim operations completed without damage to turfgrass. |
| Para 3.1.7; 3.1.9 |
| 95% of mow and trim operations completed without plowing or gouging of soil, torn grass blades, wheel rutting, or ringing patterns. |
| Periodic sampling and verified customer complaints |
| Replacement or repair. At no increase in contract price. Document performance (positive or negative) in CPARS. |
| 5) Report Submittals |
| Para 3.7; Table 3.7 |
| Turns in all required submittals 95% of the time. |
| Random sampling |
| Document performance (positive or negative) in CPARS. |
| 6) Safety Maintained during operations |
| General Conditions Attachment 5 |
| No accidents or incidents due to Contractor’s failure to take safety precautions. |
| Random sampling |
| Document performance (positive or negative) in CPARS. |
ATTACHMENT 2
CEMETERY MAPS
SLOPE AREAS WITH DIMENSIONS
Outlined Slope Area in Image for Reference Only Image is not a substitute for onsite visit
ATTACHMENT 3
| WORK SUMMARY & PROGRESS REPORT |
| Period Covered: |
| From: |
To:
| Cemetery Location: |
| Contractor Information: |
Natchez National Cemetery
Project Title:
Slope Maintenance Services
Contract No:
| Inspection / Acceptance: The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test some or all of the services that have been tendered for acceptance. The Government may require re-performance of nonconforming services at no increase in contract price. The Government shall exercise its post-acceptance rights: |
| 1. Within a reasonable time after the defect was discovered or should have been discovered; and |
| 2. Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item. |
WORK COMPLETED & SUBMITTED FOR ACCEPTANCE
(This form is not to be used as an Invoice)
| 1 |
| Mowing and String Trimming of Slope Turf (including removal and disposal of grass clippings, trash and debris) |
| Quantity / Unit |
| SQFT |
Date Completed:
Report below any circumstances which may have adversely affected work progress such as weather, strikes, delays by the Government, etc.
| Signature of Contractor: |
| Date Signed |
| Signature of Cemetery Director / COR |
| Date Signed |
Note: Contractor shall sign confirming that services indicated have been completed. Government shall also sign in acknowledgment of receipt of the Progress Report.
Duplicate Form as Necessary
ATTACHMENT 4
Contract Discrepancy Report
Contract Number:
Report No. for this Discrepancy:
To: (Contractor/Manager’s Name)
From: (Name of COR)
5. Dates
5a. Prepared:
5b. Returned by Contractor:
5c. Action Complete:
Discrepancy or Problem: (Describe in detail. Include reference to PWS Directive; attach additional sheet if necessary.)
Signature of Contracting Officer or COR:
8a. To: (Contracting Officer and/or COR)
8b. From: (Contractor)
9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence: (attach additional sheet if necessary.)
10a. Signature of Contractor Representative:
10b. Date:
11. Government Evaluation: (Acceptance, partial acceptance, reflection; attach additional sheet if necessary.)
12. Government Actions: (Reduced payment, cure notice, show cause, other)
13. Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
b. COR
c. CO
ATTACHMENT 5
GENERAL CONDITIONS
NATCHEZ NATIONAL CEMETERY
SLOPE MAINTENANCE
1. WORK ENVIRONMENT AND WEATHER CONDITIONS:
1. All work under this service contract will be performed primarily out-of-doors and personnel performing these services will be exposed to wind, heat, sun, cold, dampness, frost, fog and rain. These conditions, may, at times, be extreme. The Contractor shall take all necessary precautions to protect his/her employees from the elements to the maximum practicable extent. Weather will not be considered an excusable delay in meeting specifications or project schedule. The Contractor understands that it may be necessary to work throughout all weather conditions and to apply additional labor and equipment as necessary to meet deadlines, at no additional cost to the Government. If weather conditions are such the work performed on that day may cause more damage to the Cemetery grounds than good, the COR has the authority to stop work until conditions improve and he/she extends a commence work order.
1. Due to the sensitive mission of the Cemetery, the work could occasionally involve contact with and/or exposure to grieving individuals. Contractor personnel shall exercise and exhibit absolute decorum, composure and stability at all times and refer such individuals to Cemetery Staff.
1. SAFETY AND ENVIRONMENTAL PROTECTION:
1. The Contractor shall be responsible to ensure all work shall be done in a manner that safeguards all VA visitors, employees, and public. The Contractor shall be solely responsible for any and all actions initiated and/or completed by his/her employees. Furthermore, the Contractor and his/her employees shall have a clear understanding of, and be sensitive to, such environmental issues as ground water contamination, wetlands, etc., and be consistent and fully compliant with all applicable Federal, State, County and City laws, ordinances, Right-to-Know laws, EPA guidelines, and regulations.
1. Matters related to safety, and any actions of the Contractor shall meet all safety requirements, Department of Veterans Affairs, OSHA, and the State. It is incumbent upon the Contractor to be familiar with these requirements.
1. Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be provided by the Contractor at all work sites to eliminate hazards and for the protection, safety, and warning of all public visitors, pedestrians, Cemetery employees, and vehicular traffic within the area.
1. Spill Prevention, Containment, and Clean-up: The Contractor shall contain, clean up, and report all spills on Government property in a manner that complies with all applicable Federal, State, and Local laws and regulations or otherwise stated herein, and the installation spill control plan at no cost to the Government.
1. The Contractor shall be responsible for training and safety precautions for Contractor employees performing work under these specifications. OSHA standards shall be observed by the Contractor in all work performed. Contractor shall ensure that appropriate safety equipment is used by Contractor personnel and shall be used as prescribed by OSHA standards, including hard hats, safety shoes, safety glasses, and hearing protection devices. The following OSHA and NFPA standards and codes are to be adhered to:
1. Occupational Safety and Health Administration (OSHA) 29 CFR 1910 Safety and Health Regulations for Personal Protection, Safety Color Codes, Portable Power Tools, Electrical Safety and Portable Electric Equipment.
1. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926.
1. Means of Egress: Do not block exits for occupied buildings, including paths from exits to roads. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
1. Situate temporary facilities, such as trailers, storage sheds, and dumpsters, away from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
1. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.
1. Flammable and Combustible Liquids: No flammable and combustible liquids shall be stored within the Cemetery property. [Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.]
1. Smoking: Smoking is prohibited except in designated smoking rest areas approved by the COR.
1. USE OF CEMETERY FACILITIES:
1. The Government shall not be responsible for any loss, damage, or theft of Contractor items. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Cemetery facilities used by Contractor's employees.
1. The Government will not furnish a storage building at the Cemetery site for use by the Contractor to store supplies and equipment. However, the Government will provide an area designated for the Contractor’s use. The Contractor can establish facilities to include but not limited to office site, covered storage, portable toilet facilities, etc. on or in the designated area after such facilities are approved by the COR and Contracting Officer (CO). All utilities to this area are the responsibility of the Contractor. The Government will not be responsible for any damage to or loss of the Contractor's equipment and supplies stored on the Government's premises. The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment.
1. The Contractor shall be responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, etc. in accordance with manufacturers recommendations. A Safety Data Sheet (SDS) is required for all chemicals, pesticides, herbicides and cleaning solutions.
1. Electricity and phone service will NOT be furnished by the Government for the Contractor’s work area.
1. OPERATIONS AND STORAGE AREAS:
1. Working space and space available for storing materials will only be available at the approval of the COR or Contracting Officer. If approved, the location is to be where approved by the COR. It is understood the VA will not be held responsible for any damage to the Contractor’s equipment, materials, supplies or the like which may result from vandalism, theft etc. while on site. Contractor shall base operations out of this staging area, using it for materials and equipment storage, administration, employee toilets, trash dumpster area, employee parking, employee lunch/break area, etc.
1. “Contractor Staging Area” fencing: Before work operations begin, Contractor shall provide a chain link fence, six (6) feet minimum height, around the “Contractor Staging Area”. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 15 inches. Bottom of fences shall extend to one inch above grade. After completion of project work, Contractor shall remove fencing and restore area back to original condition.
1. “Contractor Staging Area” facilities: Temporary buildings (e.g., storage sheds, shops, offices) may be erected by the Contractor within the approved “Contractor Staging Area” with the approval of the COR or Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work.
1. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR or Contracting Officer. Do not store materials and equipment in other than approved areas. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
1. The Contractor shall, under regulations prescribed by the Contracting Officer or COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR or Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
1. Execute work in such a manner as to interfere as little as possible with work being done by others. To minimize grounds maintenance activity interference with flow of Cemetery traffic, keep roads, walks and entrances to grounds, parking and occupied areas of buildings clear of materials, debris and standing equipment/vehicles at all times. At least one lane must be open to traffic at all times.
1. Coordination of work with COR or authorized designee: The burial activities at a National Cemetery will take precedence over slope maintenance activities. The Contractor shall cooperate and coordinate with the COR or authorized designee, in arranging schedule to cause the least possible interference with Cemetery activities in actual burial areas. Work noise during the interment services shall not disturb the service. Trucks and workmen shall not pass through the service area during this period.
1. TEMPORARY TOILETS:
The Contractor shall provide portable chemical toilets for use by workmen as necessary to comply with applicable OSHA requirements. These portable toilet facilities shall be kept clean and free of excessive odors, insects, etc. Locate portable toilet facilities in the COR approved “Contractor Staging Area” only. It will not be permissible to locate portable toilet facilities in any other locations throughout the Cemetery. Use of the permanent cemetery toilet facilities by workmen is strictly prohibited throughout the duration of this contract. All connections and appliances connected therewith shall be removed prior to completion of contract, and premises left perfectly clean.
1. AVAILABILITY AND USE OF UTILITY SERVICES:
1. WATER: Water will only be made available via Contractor connection to existing Cemetery water system in existing locations where connection is available, and for purposes of this contract only. The Contractor at Contractor's expense and in a workmanlike manner satisfactory to the COR shall be responsible for installing and maintaining temporary connections to the Cemetery water supply in accordance with regulations. Contractor shall not obstruct normal traffic flow on adjacent roads while water is being obtained. In locations where Cemetery water system is not readily available, the Contractor shall provide and utilize portable water tanks and/or water trucks as necessary to transport water to areas where needed in order to complete the work required by this contract.
1. ELECTRICITY: In case the Contractor requires electricity while in performance of this contract, the Contractor shall provide and utilize portable generators as necessary to complete the work.
1. PARKING AND VA REGULATIONS:
1. Contractor employees may park privately owned vehicles in the area designated for parking by the COR. It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. The Cemetery shall not validate or make reimbursement for parking violations of the Contractor’s employees under any conditions.
1. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations 38 CFR 1.218 may result in citation/summons answerable in the United States (Federal) District Court, or other appropriate jurisdiction/agency. Offenders may be subject to a fine, removal from the premises, or arrest. Examples of prohibited items include but are not limited to:
0. Firearms (either openly or concealed), explosives or other dangerous or deadly weapons of any kind;
0. Explosive materials such as blasting caps or similar items;
0. All forms of illegal drugs;
1. DISPOSAL AND RETENTION:
1. Contractors shall be responsible for cleaning Cemetery structures, headstones/flat makers, monuments, and roadways that are soiled or stained as a result of Contractor’s performance. The Contractor shall wash-down with water all soiled or stained structures headstones/flat markers, and monuments at the end of each workday. Roadways shall be kept clean and free of tracked dirt and mud resulting from the Contractor’s operations. No hazardous chemicals are to be used at any time on Government property with the exception of herbicide treatments. The Contractor shall bear all costs associated with washing and cleaning. Any such washing/cleaning shall be brought to the immediate attention of the COR prior to washing/cleaning.
1. At the end of each day the Contractor shall remove all debris resulting from the contract work from the Cemetery site. The Contractor shall ensure at all times that rubbish and trash generated by the Contractor is kept clear of vehicular and pedestrian traffic throughout the site.
1. The Government will not provide receptacle(s) for disposal of debris related to this contract. The Contractor shall provide his/her own REFUSE FACILITIES, and these shall only be located in the COR approved “Contractor Staging Area”. Do not place dumpsters or refuse facilities in any other location at the Cemetery other than the approved “Contractor Staging Area”. The Contractor shall dispose of all debris and other waste materials generated by his/her work at a licensed off-site landfill unless otherwise directed by the COR.
1. The Contractor shall dispose of all hazardous waste in accordance with the Resource Conservation and Recovery Act (RCRA) and all other applicable Federal, State, and Local law and regulations. No on-Cemetery storage or disposal of hazardous waste is allowed.
1. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS:
1. The Contractor shall take the utmost care not to damage headstones, markers, floral or commemorative items, structures, survey monuments, and irrigation equipment while performing mowing, and trimming services.
1. Damage to Government property: The Contractor (including his or her employees, subcontractors, consultants or the like) shall be responsible for repair or replacement of any Contractor damaged Cemetery structure, to include: turf, curb, road pavement, headstones or markers, valve boxes, grid monument control markers, trees, plant beds, etc, which are chipped, marred, damaged and/or ruined at the fault of the Contractor. The Contractor shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the COR prior to repair, replacement, or installation.
1. Contractor mowing, and trimming operations shall not damage headstones, markers, floral or commemorative items, structures, survey monuments, irrigation equipment, etc.
1. The Contractor shall move and replace all floral or commemorative items, etc. to their proper place as necessary while performing mowing/trimming services. The Contractor shall repair or replace all damaged items caused by the Contractor as directed by the COR at no additional cost to the Cemetery.
1. The Contractor is responsible for removal and replacement of all lawn, shrubs and trees due to damage by the Contractor. Contractor shall provide replacement plants and shall be of the same type and size. The Cemetery is responsible for plants damaged by the Cemetery or third parties, storms, flood or frost damage and trees beyond their normal life span.
1. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site that are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so by the COR, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and remove and properly dispose of from the site as defined herein.
1. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor.