Performance Work Statement - DRAFT.pdf

PDF 169 KB Posted

Attached to
Notice of Intent to Award Sole Source - Incineration of SAP IT Equipment
Solicitation number
F2QF346187AW01
Issued by

About this file

This is a Performance Work Statement for SAP IT Equipment Destruction services at Joint Base San Antonio (JBSA) Randolph, Texas. The contractor must provide all management, tools, supplies, equipment, and labor necessary for the incineration of Special Access Programs (SAP) IT equipment in accordance with the Department of the Air Force SAP IT Sanitization Standard Operating Procedure (SOP) 2021. Key service requirements include on-site coordination of staging and deliveries of drums containing equipment, allowing AETC Advanced Programs Division personnel to physically witness the incineration process from start to finish, determining appropriate on-site delivery locations and handling methods, ensuring work complies with applicable sanitization procedures for incineration temperature and resulting particle size, following all safety and security guidelines, and maintaining means of egress within the work area to comply with fire codes. The contractor must develop and maintain a Quality Control Plan (QCP) that addresses the identified performance requirements, and the government will appoint a Contracting Officer Representative (COR) to monitor performance via a Quality Assurance Surveillance Plan (QASP). Operations are conducted during standard business hours of 0700–1700 central time, Monday through Friday, excluding 11 federal holidays. Contractor personnel must be certified by appropriate federal and state regulatory agencies for incineration operations. Special security requirements mandate that no classified material be handled without Air Force personnel present, and all government-provided resources must be surrendered upon contract termination. The contractor must report all labor hours to HQ AETC Advanced Programs via a secure data collection site by October 31 each fiscal year. Level 1 Antiterrorism Awareness Training must be offered to all contractor and subcontractor personnel. The estimated workload includes unloading and loading five barrels of equipment onto the incendiary dock and transporting five barrels throughout the facility as needed. Invoice payment is based on completion of incineration procedures and submission of an Inspection/Acceptance Checklist and documentation of completed punch list items.

View the file

Other files

File Type Posted
Determination and Finding - Sole Source_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

SAP IT EQUIPMENT DESTRUCTION

1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide for the incineration of SAP IT Equipment at Joint Base San Antonio (JBSA) Randolph, Texas, IAW

Department of the Air Force (DAF) Special Access Programs (SAP) I.T. Sanitization Standard

Operating Procedure (SOP) 2021.

1.1. DESCRIPTION OF SERVICES. The contractor shall perform the following tasks:

• Once delivered by AETC Advanced Programs Division personnel, the contractor shall be responsible for on-site coordination of all staging and deliveries of drums containing equipment to the incinerator.

• The contractor shall allow AETC Advanced Programs Division personnel to physically witness the incendiary process from start to finish per the customer’s physical security requirements, policies, and governance.

• The contractor shall be responsible for the determination of the appropriate on-site delivery location, method, and handling.

• Work shall comply with applicable sanitization procedures for temperature for incineration and resulting particle size IAW DAF SAP IT Sanitization SOP 2021.

• The contractor shall be responsible for following all safety and security guidelines within the work performance area, including securing any contractor-owned tools or equipment, and any on-site storage.

• The contractor shall maintain a means of egress within the designated work area to comply with fire codes.

1.2. GENERAL INFORMATION.

1.3. QUALITY CONTROL. The contractor shall be responsible for quality control for all work accomplished during the performance of the task. The contractor shall provide and maintain a

Quality Control Plan (QCP) which ensures the requirements in this PWS are met. The QCP will be considered acceptable and approved unless the contractor is notified by the Contracting

Officer (CO) prior to award. The QCP shall be included in the technical proposal for evaluation and acceptance. As a minimum, the contractor shall develop quality control procedures that address the areas identified in section 2, Service Delivery Summary.

1.3.1. QUALITY ASSURANCE. The government will periodically evaluate the contractor's performance by appointing a Contracting Officer Representative (COR)(s) to monitor performance to ensure services are received. The COR will evaluate the contractor's performance in accordance with the Quality Assurance Surveillance Plan (QASP) for this requirement.

1.3.2. HOURS OF OPERATION. 0700-1700 (7 a.m. – 5 p.m. central time)

1.3.3. HOLIDAYS OBSERVED.

• New Year's Day (January 1)

• Martin Luther King, Jr.'s Birthday (Third Monday in January)

• Washington's Birthday (Third Monday in February)

• Memorial Day (Last Monday in May)

• Juneteenth National Independence Day (June 19)

• Independence Day (July 4)

• Labor Day (First Monday in September)

• Columbus Day (Second Monday in October)

• Veterans Day (November 11)

• Thanksgiving Day (Fourth Thursday in November)

• Christmas Day (December 25)

1.3.4. SECURITY REQUIREMENTS. The contractor shall not handle any classified material without an Air Force personnel present. Additionally, all resources (e.g. maps, publication/instructions, photos) provided by the government to assist the contractor in the performance of their contract will be surrendered upon termination of employment or the end of the contract performance. Any personnel who were involved in this project and has access to privacy information shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 522a and applicable agency rules and regulations.

1.3.5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE

NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT

COMMANDER. N/A

1.3.6. SPECIAL QUALIFICATIONS. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements for incineration.

1.3.7. RECORDS MANAGEMENT. The Contractor shall manage all data created for

Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF records management procedures in Air Force

Instruction (AFI) 33 - 322, Records Management Program, paragraph 10, Air Force Manual

(AFMAN) 37-123,paragraph 7.4, Air Force Manual (AFMAN) 37-138, paragraph 2.13, and the

Air Force Records Disposition Schedule (AF RDS) located at https://afrims.amc.af.mil/rds_series.cfm or http://www.amc.af.mil/shared/media/document/AF

D-060803-003.pdf “ https://www.google.com/url?q=https%3A%2F%2Fafrims.amc.af.mil%2Frds_series.cfm https://www.google.com/url?q=http%3A%2F%2Fwww.amc.af.mil%2Fshared%2Fmedia%2Fdocument%2FAFD-060803-003.pdf https://www.google.com/url?q=http%3A%2F%2Fwww.amc.af.mil%2Fshared%2Fmedia%2Fdocument%2FAFD-060803-003.pdf

1.3.8. AIR FORCE ANTITERRORISM (AT) PROGRAM

The AT program seeks to deter or limit the effects of terrorist acts against the AF by giving guidance on collecting and disseminating timely threat information, providing training to all AF members, developing comprehensive plans to deter and counter terrorist incidents, allocating funds and personnel and implementing AT measures. In accordance with AFI 10-245 paragraphs

2.18 and paragraph 2.25, DOD contractors and sub-contracts personnel shall be offered Level 1

AT Awareness Training. Compliance with the training will be monitored by the contracting officer representatives.

1.3.9. CONTRACTOR FULL-TIME EQUIVALENT REPORTING.

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the HQ AETC Advanced

Programs via a secure data collection site. The contractor is required to completely fill in all required data fields at https://afcmra.hqda.pentagon.mil/login.aspx.

Reporting inputs will be for the labor executed during the period of performance for each

Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army

CMRA link at http://www.ecmra.mil.

2. SERVICE DELIVERY SUMMARY.

Performance Objective PWS Paragraph Performance Threshold

Complete incineration of all

SAP IT equipment provided by

AETC Advanced Programs

Division

1.1

Validation between the contractor and the government

POC/PM that all products have been incinerated IAW SOP. A post-incineration walkthrough shall be conducted.

https://www.google.com/url?q=https%3A%2F%2Fafcmra.hqda.pentagon.mil%2Flogin.aspx https://www.google.com/url?q=http%3A%2F%2Fwww.ecmra.mil

Submit final invoice and supporting documentation upon completion.

1.3.1

Invoice payment will be based on completion of incineration procedures. Upon completion of all contract requirements, the contractor shall submit to the government POC/PM an

Inspection/Acceptance

Checklist and documentation of completed punch list items.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will provide drums of sanitized SAP IT equipment of destruction.

4. APPENDICES.

A. Estimated Workload Data

APPENDIX A

ESTIMATED WORKLOAD DATA

NAME ESTIMATED QUANTITY

1. Unload from vehicle(s) and load barrels onto incendiary dock/platform 5

2. Transportation of barrels throughout the facility (if needed) 5

File details come from the government source that posted it. Updated .