Performance Work Statement.pdf
PDF 231 KB Posted
- Solicitation number
- 14974
About this file
This Performance Work Statement (PWS) details an Intrusion Detection Systems (IDS) Upgrade for Building 2721, Bay D at Hill Air Force Base. The project requires removing the current IDS equipment and installing new hardware from specific manufacturers: 1 Honeywell V5 Vindicator IDS, 28 Optex Ceiling Mounted Motion Sensors, and 8 Magnasphere Battery Management System (BMS) Sensors. The contractor must provide design drawings within 14 calendar days after contract award, deliver hardware at least three days prior to installation, and complete the entire project within 60 Days After Receipt of Order (ARO).
Key requirements include installing the equipment according to manufacturer guidelines, ensuring all components are listed on the Air Force Non-Nuclear Configuration Management Database (CMD) Equipment Approval List, and conducting a 72-hour performance verification with the 309 Software Engineering Groups (SWEG) security team. The project aims to upgrade Building 2721, Bay D to meet Classified Processing Area (CPA) standards in compliance with Intelligence Community Directive (ICD) requirements. The contractor must be a U.S. registered company employing U.S. citizens, follow specific on-base safety and operational protocols, and be a certified installer for Honeywell, Optex, and Magnasphere hardware.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| single_source_justification_S.pdf | ||
| Simplified MRR_Under SAT.pdf | ||
| 1. Equipment List 14974.pdf | ||
| Sole Source Notice of Intent.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
Intrusion Detection Systems Upgrade
Building 2721, Bay D
1 SCOPE
The scope of work includes removal of previously installed Intrusion Detection System (IDS) hardware, installation of new IDS hardware, and a 72-hour performance verification by the 309
Software Engineering Groups (SWEG) security team.
Building 2721, Bay D needs to be rated as a Classified Processing Area (CPA). The IDS currently installed needs to be updated to meet the mandatory standards set by the Intelligence
Community Directive (ICD) using new parts from the Configuration Management Database
(CMD) Equipment Approval List. The contractor shall ensure the IDS system for Bay D will bring it up to CPA standards and allow the IDS to be monitored by base security forces.
2 REQUIREMENTS
2.1 General
The Contractor shall provide to the 309 Software Engineering Group’s (SWEG) Government
Point of Contact (GPOC) the date of Removal, Installation, and Performance Verification within five (5) business days of delivery. The Contractor shall be responsible for ensuring all services, parts and components provided under this contract are in accordance with (IAW) the terms and conditions outlined in this PWS.
2.2 Item Description
309 SWEG/MXDXS requires the removal of current IDS equipment, purchase and install of new hardware, and hardware testing by SWEGs security team. All hardware being purchased must be listed on the CMD Equipment Approval List. Hardware must be brand name, brand new, and not refurbished. The items needed are as follows:
The following items are being purchased:
1) Manufacturer: Honeywell
Description: V5 Vindicator IDS
Qty: 1
2) Manufacturer: Optex
Description: Ceiling Mounted Motion Sensors
Qty: 28
3) Manufacturer: Magnasphere
Description: Battery Management System (BMS) Sensors
Qty: 8
• The contractor shall provide the design drawings for the IDS systems to the GPOC for approval no later than 14 calendar days after contract award.
• The contractor shall deliver all hardware no less than three days prior to installation.
• The contractor shall provide removal and installation of hardware. Installation of IDS
(server, badge readers, software, etc.) shall be in accordance with manufacturer’s guidelines.
• System components for the IDS shall be listed on the Air Force Non-Nuclear CMD
Equipment Approval List.
• The contractor shall provide Performance Verification-Acceptable Testing of all installed systems. Contractor shall verify functionality prior to formal acceptance test by Hill AFB
Alarm Shop.
Delivery time frame: 60 Days After Receipt of Order (ARO).
Delivery address: 7750 Georgia Street, Bldg 2721, Bay D, Hill AFB, UT 84056.
Delivery DODAAC: FP8212.
2.3 Contractor Requirements
• The contractor shall provide Delivery, Removal, Installation, and a 72-hour Performance
Verification with SWEG security.
• The Contractor shall make all necessary adjustments to the hardware until the items are fully operational IAW the Original Equipment Manufacturer (OEM) specifications and to what is stated in this Performance Work Statement (PWS). The contractor shall provide a plan for corrective action if system fails to pass acceptance test within 72 business hours.
• The Contractor shall be a U.S. registered company employing U.S. citizens to conduct all work-related requirements.
2.4 Installation
• 2.4.1
The Contractor shall be responsible for equipment delivery to 7750 Georgia Ave Building 2721, Bay D at Hill AFB, UT. The Contractor shall be responsible for offloading and moving equipment to the installation area in Building 2721, Bay D.
• The government will provide power in the areas of removal and installation.
• The contractor shall be responsible for the removal and disposal of the current Intrusion
Detection System, Ceiling Mounted Motion Sensors, and BMS Sensors.
• The contractor shall leave the work area broom clean.
• The contractor shall install items in place according to GPOC instructions and diagrams.
• The contractor shall be responsible for ensuring all IDS components and cabling connects to all door hardware to operate doors, where applicable.
• The contractor shall be responsible for removing, modifying, and/or changing any door hardware required to install and connect the IDS components.
2.4.2 The government will provide power for one (1) Honeywell V5 IDS, twenty-eight
(28) Optex Ceiling Mounted Motion Sensors, and eight (8) Magnasphere BMS Sensors.
Equipment power shall be connected by the contractor. The contractor is responsible for final connections of equipment to government supplied utilities. Utility connections needed shall be established at time of award. The contractor shall be responsible for modifications needed to ensure systems are properly installed. Modifications include, but are not limited to, door penetrations, additional conduit, and gaps between components.
All modifications shall be made in accordance with Hill AFB standards.
2.5 Special Qualifications
• The contactor shall be qualified to install V5 IDS, Ceiling Mounted Motion Sensors, and
BMS Sensors and follow the Hill AFB Design Standard. The contractor shall use each manufacturer’s instructions and standards and be a certified installer of Honeywell, Optex, and Magnasphere hardware.
2.6 Performance Verification/Acceptance Testing
After installation, the contractor shall demonstrate that all hardware meets or exceeds OEM specifications and the requirements listed in sections 2.2 and 2.3 of this PWS. The contractor shall be present for entirety of acceptance testing. The length of time for Acceptance testing shall not exceed three (3) days.
2.6.1 Hours of Operation: The Contractor shall perform the work required under this contract during the times: Monday through Friday, 0600 -1600. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the Contracting Officer (CO). Upon approval from the CO, the selected GPOC will always escort Contractor personnel.
2.6.2 These dates and hours listed exclude Federal Holidays, base closures due to inclement weather, and furlough days
3 ON BASE REQUIREMENTS
3.1 Housekeeping
Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR
1910.141. CLEAN AS YOU GO will be enforced. Refuse, trash, and debris will be collected daily and not left on site.
3.2 PEDESTRIAN CROSSWALKS
All contractor personnel are required to use the closest crosswalk, or traffic-controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
3.3 Tool Control and Accountability: N/A
3.4 ELECTRICAL
The contractor shall comply with the standards in 29 CFR 1910 Subpart S, 29 CFR 1926
Subpart K, DAFMAN 91-203 Air Force Occupational Safety, Fire and Health Standards, 12
May 2025, Chap 8, Electrical Safety and NFPA 70/70E. All electrical wiring must be IAW
National Electrical Codes (NEC) 70/70E. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:
- Selection and use of work practices
- Training (basic electrical safety knowledge)
- Use of equipment (handling, visual inspection, rating of equipment)
- GFCI Protection for outside contractor drops and wet/damp areas
- Arc Flash
3.5 Privately Owned Motor Vehicles (POV)
Contractor personnel shall comply with the directives pertaining to operation of Privately
Owned Vehicles (POV) on Hill AFB per AFMAN 31-116, in its entirety, “Motor Vehicle
Traffic Supervision.” The Contractor shall comply with Hill AFBI 24-302, in its entirety, “Management, Operation and Use of Transportation Vehicles,” for the operation of POVs within Hill AFB.
3.6 Visitors Pass
The Contractor shall contact the Government POC seven (7) business days before arriving at
Hill AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at the West Gate Visitors Center, 1299 E 650 N Hill AFB. The Contractor shall provide two (2) forms of identification. A picture ID, vehicle registration, and proof of insurance shall be provided to the 75th ABW. The 75th ABW will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
3.7 Foreign Nationals
The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US
Government facility.
3.8 Safety and Health on Government Installations
While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated
Occupational Safety Instruction”, as established by this contract and Appendix C. The
Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, GPOC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.
http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915
3.9 Emergency Procedures
Contractor personnel shall follow the direction of Government personnel in regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency situations. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees responding to emergencies. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
File details come from the government source that posted it. Updated .