About this file
This Performance Work Statement (PWS) details a marquee sign upgrade project for Luke Air Force Base (AFB) in Arizona. The project involves replacing three Electronic Message Center (EMC) signs at different base locations: Lightning Gate, Club 56, and South Gate. Each sign will be a 3' x 9' 10mm display with broadband communication, cloud-based software, and a minimum 5-year warranty. The contractor is required to provide all labor, equipment, and materials for sign replacement, including electrical work such as wire replacement, circuit breaker installation, and final voltage checks.
The solicitation (FA488725Q0022) is a Request for Quote (RFQ) with key dates including a pre-proposal site visit on 6/24/2025, a Request for Information deadline of 6/25/2025, and a quote submission deadline of 7/3/2025. The contract will be awarded to the lowest evaluated price meeting acceptability standards. The project is managed by the 56th Fighter Wing Public Affairs, with Capt Charis Bryan as the Project Manager. Notably, the government indicates that funds are not currently available, and they reserve the right to cancel the solicitation. The total project timeline for purchase and installation is 180 days from contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Marquee Signs - RFI Log.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA488725Q00220002 SF 30.pdf | ||
| Solicitation Amendment FA488725Q00220001 SF 30.pdf | ||
| Solicitation - FA488725Q0022.pdf | ||
| Club 5 6 Marquee - Back.jpg | JPG image | |
| Marquees - RFI Log - BLANK.xlsx | XLSX spreadsheet | |
| Lightning Gate Marquee.jpg | JPG image | |
| Luke AFB Environmental Guide for Contractors.pdf | ||
| Club 5 6 Marquee - Front.jpg | JPG image | |
| South Gate Marquee.jpg | JPG image | |
| Anti-Terrorism Pamphlet.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
MARQUEE INSTALLATION
LUKE AFB, ARIZONA
25 July 2024
INSTALLATION AND LOCATION
Luke Air Force Base (AFB), Arizona. The base marquees are located at bldg. 896 (near South Gate), bldg. 15161 (near Club Five Six, and bldg. 11146 (near Lightning Gate).
USER
56th Fighter Wing Public Affairs. The Project Manager is Capt Charis Bryan.
SUMMARY OF SERVICES
Replacement for three EMC’s on existing monument signs. All EMC’s to be 3’ x 9’ 10mm signs with broadband communication included. Software to be cloud based. Cost includes installation of new software, advanced training of software, at least a 5-year warranty and adequate electric brought to sign with final connections.
DESCRIPTION OF SERVICES
Contractor shall provide all labor, equipment and materials to perform the following tasks to complete this performance of work statement.
Replacement of 3 EMC’s with specifications as follows at each location defined:
1. Lightning Gate - 3' x 9' D/F 10mm. Two (2) panels to create one D/F sign.
2. Club 56 - 3' x 9' S/F 10mm. One (1) panel to create one S/F sign.
3. South Gate - 3' x 9' D/F 10mm. Two (2) panels to create one D/F sign.
Electrical contractor will make safe to demo electrical for sign removal – provide/install miscellaneous electrical materials to extend to new sign. Also remove existing wire and replace with #8 wire from circuit source to new signs at bldg. 896 and 11146. Provide/install new means of disconnect for new signs. Provide/install new 40 amp circuit breaker. Provide final connection and voltage check.
SCHEDULE
Purchase and installation of marquees to be performed within 180 days.
ITEMS AND DATA TO BE FURNISHED BY THE GOVERNMENT
Sufficient power to operate signs safely and efficiently.
DEVIATION FROM SERVICES
The contractor shall not depart from nor perform work outside of this Performance Work Statement and criteria on which it is based without written direction of the Contracting Officer. If the contractor performs such work without written approval, it does so at its own risk. Any changes to this Performance Work Statement will be coordinated with the project manager and CO.
ACCEPTANCE OF SERVICES
The project manager and CO shall approve and accept all work.
OTHER REQUIREMENTS
SUBCONTRACTORS: The contractor shall not enter into any subcontracts that are not identified in its original proposal without prior written approval of the CO.
RELEASE OF DATA: All data, reports, and materials relative to this Performance Work Statement are the property of the Government and will not be released by the Contractor without written approval of the CO.