Performance Work Statement.docx
DOCX document 140 KB Posted
- Solicitation number
- FA460024Q0054
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide certified STI SP001 inspections of 50 aboveground storage tanks (ASTs) at Offutt Air Force Base in Nebraska. The contractor shall perform formal external and internal inspections, leak tests, and provide a 5-year inspection plan and repair recommendations in compliance with Nebraska regulations, CFR 40 Part 112, and UFC 3-460-03. The contract is a firm-fixed price with a 4-month period of performance. The contractor must have an STI certified inspector and capability for confined space entry. Quality control, security, and key personnel requirements are detailed. A related federal contract opportunity solicitation is referenced with a due date of August 23, 2024.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
| Table of Contents | 1 | |
| 1. | General: | 2 |
| 1.1 | Description of Services/Introduction: | 2 |
| 1.2 | Background: | 2 |
| 1.3 | Objectives: | 2 |
| 1.4 | Scope: | 2 |
| 1.5 Period of Performance: | 3 | |
| 2 | General Information: | 3 |
| 2.1 | Quality Control Program: | 3 |
| 2.2 | Quality Assurance Surveillance Plan: | 4 |
| 2.3 | Recognized Holidays: | 4 |
| 2.4 | Hours of Operation: | 4 |
| 2.5 | Place of Performance: | 4 |
| 2.6 | Type of Contract: | 5 |
| 2.7 | Security Requirements: | 5 |
| 2.8 | Special Qualifications: | 6 |
| 2.9 | Post Award Conference/Periodic Progress Meetings: | 6 |
| 2.10 | Contracting Officer Representative: | 6 |
| 2.11 | Key Personnel: | 6 |
| 2.12 | Identification of Contractor Employees: | 7 |
| 2.13 | Data Rights: | 7 |
| 2.14 | Organizational Conflict of Interest: | 7 |
| 2.15 Government Furnished Property: | 7 | |
| 3 | Definitions and Acronyms: | 8 |
| 3.1. | Definitions: | 8 |
| 3.2 | Acronyms: | 9 |
| 4 | Performance Requirements Summary: | 10 |
| 5 | Deliverables Schedule: | 10 |
| 6 | Estimated Workload Data: | 11 |
Statement of Work (SOW)
Petroleum, Oil, and Lubricant (POL) Aboveground Storage Tank Testing
General:
This is a non-personal service contract to provide Aboveground Storage Tank (AST) certified STI inspections. The government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn is responsible to the government.
1.1 Description of Services/Introduction:
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform AST inspections as defined in this PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background:
Offutt Air Force Base, NE (OAFB), located near Bellevue, Nebraska, is home of the 55th Wing. The Base manages hundreds of facilities and real property items that all need fuel and petroleum products, stored on site and remote sites. This requires aboveground storage tanks that need certified inspections per STI SP001 protocol and the requirements of NE Title 158 and the intent of CFR Title 40 Part 112.
1.3 Objectives:
Provide a certified STI inspection and report the findings for the fifty (50) ASTs and associated piping/pumps, listed below. Determine and provide tank inspection intervals for fifty (50) AST’s.
1.4Scope:
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to complete certified STI inspections for fifty (50) of the ASTs at OAFB in compliance with Nebraska Law (NE Title 158), which also meet the requirements and intent of the Code of Federal Regulation (CFR) 40 Part 112, Oil Pollution Prevention and Oil Pollution Prevention and Unified Facilities Criteria (UFC) 3-460-03, Petroleum Fuels Systems Maintenance. The Contractor shall provide reports (A0001) in compliance with all regulations for all inspections performed, in whole or in part. Contractor shall verify tank types, categories, and classifications and abide by the appropriate inspection types and frequencies unless directed more conservatively by the Government in this Contract. Contractor shall determine best inspection practices for each tank and shall submit plans for approval before work begins (A0002).
Within the of performance the following is required: For all tanks with a capacity of 0-1,100 gallons, the contractor shall perform a Formal External Inspection and a Leak Test. For all tanks with a capacity of 1,101-50,000 gallons, the contractor shall perform a Formal External Inspection and a Formal Internal Inspection. After all inspections are complete the contractor shall provide a consolidated report with a recommended future inspection schedule based on any changes in tank data or classification and based upon any adverse findings from the inspections.(A0003) For subsequent years the tanks shall follow a contractor recommended and government confirmed schedule for Periodic, Formal External, Formal Internal, and Leak inspections and tests based on the confirmed tank category classification, tank size, and STI SP001 inspection schedule requirements (A0004). The contract shall have the capability of adding additional tanks, with inspection criteria starting as described for those specific tanks and intervals to be defined in future years. The contract shall also have the capability to remove tanks as determined by the Government.
Payment will be withheld until all report/s (A0001, A0003, A0004, A0005) are accepted by the Government.
1.4.1 Inspection Intervals:
Contractor shall provide a list of tank inspection intervals as determined by Contractor. (A0003) It is acceptable to add a column for inspection interval on workload data estimate provided in appendices below. Contractor shall compile tank inspection interval data to determine tank requiring inspection in the next five (5) years. (A0004) Contractor shall provide a list of tanks to be inspected over the next five (5) years by listing facility name and tank capacity with the Calander year requiring inspection.
1.4.2 Recommendations:
Following Contractor’s inspection, a report must be compiled of all discrepancies with a recommendation for repairs. (A0005)
1.5 Period of Performance:
The period of performance (PoP) shall be for four (4) months. This will include one set of inspections and a report for each tank to be completed within four (4) months of contract award for every tank and its associated equipment listed in the appendix below.
| 2 | General Information: |
| 2.1 | Quality Control Program: |
The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with (IAW) this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is how they assure themselves that their work complies with the requirement of the contract. This shall be delivered to the Contracting Officer (CO) and/or Contracting Officer’s Representative (COR) within thirty (30) calendar days after contract award. One (1) copy of a comprehensive written QCP shall be submitted to the CO and/or COR within five (5) calendar days when any changes are made thereafter for review and acceptance by the CO and/or COR. After acceptance of the QCP changes, the contractor will receive, in writing, acceptance or denial of any proposed changes from the contractor’s QCP.
2.2 Quality Assurance Surveillance Plan:
The government shall evaluate the contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the government must do to ensure that the contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rates.
2.3 Recognized Holidays:
Contractor is not required to work on any of the following federal holidays.
New Year’s Day – 1 January Martin Luther King Day – 3rd Monday in January Washington’s Birthday – 3rd Monday in February Memorial Day – last Monday in May Juneteenth – 19 June Independence Day – 4 July Labor Day – 1st Monday in September Columbus Day – 2nd Monday in October Veteran’s Day – 11 November Thanksgiving Day – 4th Thursday in November Christmas Day – 25 December
2.4 Hours of Operation:
The contractor is responsible for conducting business, between the hours of 7:30am to 4:30pm, local time, Monday thru Friday, except federal holidays mentioned above, or when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
2.5 Place of Performance:
The work to be performed under this contract will be performed at Offutt Air Force Base, NE and satellite facilities at Elkhorn, NE and Scribner, NE.
2.6 Type of Contract:
The government will award a firm fixed price contract.
2.7 Security Requirements:
Contractor personnel performing work under this contract must be able to obtain access to OAFB, by having favorable clearance at time of the contract award.
2.7.1 Physical Security:
The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
2.7.2 Key Control:
The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the contractor by the government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the CO and/or COR.
In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the CO, re-key or replace the affected lock or locks; however, the government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the next payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the next payment due the contractor.
The contractor shall prohibit the use of government issued keys/key cards by any persons other than by contractor employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.
2.7.3 Lock Combinations:
The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
2.8 Special Qualifications:
Contractors’ inspection team must include an STI certified inspection per SP001 requirements. The inspection team must have and be trained in a confined space program per OSHA standards for all internal tank inspections.
2.9 Post Award Conference/Periodic Progress Meetings:
The contractor agrees to attend any post award conference(s) convened by the contracting activity or contract administration office IAW the Federal Acquisition Regulation (FAR), Subpart 42.5. The CO, COR, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the CO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the government of problems, if any are being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
2.10 Contracting Officer Representative:
The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions:
· Assure the contractor performs the technical requirements of the contract.
· Performs inspections necessary in connection with contract performance.
· Maintains written and oral communications with the contractor concerning technical aspects of the contract.
· Issues written interpretations of technical requirements, including government drawings, designs, and specifications.
· Monitors contractor's performance and notifies both the CO and contractor of any deficiencies.
· Coordinates availability of government furnished property.
· Provides site entry (or escort) for contractor personnel.
A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
2.11 Key Personnel:
The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of all work performed by the contractor. The name and contact information for this person, and an alternate, who shall have the ability to act on behalf of the contractor when the manager is absent shall be designated in writing to the CO and/or COR. The contract manager or alternate shall have full authority to act on behalf of the contractor on all contract matters relating to daily operation of this contract. The contract manager, or alternate, shall be available between 7:30am and 4:30pm, local time, Monday thru Friday, except federal holidays listed above, or when the government facility is closed for administrative or other reasons.
2.12 Identification of Contractor Employees:
All contractor personnel attending meetings, answering government telephones, and working in other situations where their contractor’s status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
2.13 Data Rights:
The government has unlimited rights to all documents and material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned, and are the property of the government, with all rights and privileges of ownership and copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO. All materials must be turned over to the government, and shall be the sole property of the government, and may not be used for any other purpose. This right does not repeal, or do away with, any other government rights.
2.14 Organizational Conflict of Interest:
Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR, Subpart 9.5. The contractor shall notify the CO and/or COR immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO and/or COR to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO, and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.15 Government Furnished Property:
None
DEFINITIONS & ACRONYMS
3 Definitions and Acronyms:
3.1. Definitions:
Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer: A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer’s Representative: A government employee appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing, shall state the scope of authority, and limitations. This individual has the authority to provide technical direction to the contractor if that direction is within the scope of the contract, and does not constitute a change, and has no funding implications. This individual does not have authority to change the terms and conditions of the contract.
Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable: Anything that can be physically delivered but may include non-manufactured items such as meeting minutes and/or reports.
Key Personnel: Contractor personnel that are required to be used in the performance of a contract by the Key Personnel listed in the Performance Work Statement.
Physical Security: Actions that prevent the loss or damage of government property.
Quality Assurance: The government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control: All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime contractor. The government does not have privity of contract with the subcontractor.
Workday: The number of hours per day the contractor provides services in accordance with the contract.
Workweek: Monday through Friday, unless specified otherwise.
| 3.2 | Acronyms: | |
| AAFES | Army & Air Force Exchange Service | |
| AFJAM | Air Force Joint Manual | |
| AGE | Air Ground Support Equipment | |
| CFR | Code of Federal Regulations | |
| CO | Contracting Officer | |
| COMM | Communications | |
| COR | Contracting Officer Representative | |
| EPA | Environmental Protection Agency | |
| FAR | Federal Acquisition Regulation | |
| HQ | Headquarters (Bldg. 500) | |
| OCI | Organizational Conflict of Interest | |
| OAFB | Offutt Air Force Base | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| POL | Petroleum, Oil, and Lubricant | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QASP | Quality Assurance Surveillance Plan | |
| QCP | Quality Control Program | |
| TE | Technical Exhibit | |
| UST | Underground Storage Tank |
Performance Requirements Summary:
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
| Performance Objective |
| Standard |
| Performance Threshold |
| Method of Surveillance |
| The contractor shall provide inspections for each tank listed in Estimated Workload Data. |
| The contractor must follow STI SP001, NE Title 158, and CFR 40, Part 112. |
| Zero (0) missed tanks per delivery period. |
| Periodic inspections. |
5 Deliverables Schedule:
Deliverable
Frequency
| # of Copies |
| Medium/Format |
Submit To
A0001 Inspection report Para 1.4.
| Within ten (10) business day of inspection completion. |
| One (1) copy per tank inspected. |
| Microsoft Office format compatible. |
or PDF CO and/or COR identified at post award conference.
| A0002 Inspection Plan Para 1.4 |
| Two (2) weeks prior to start of work. |
| One (1) copy per tank Inspection. |
| Microsoft Office format compatible |
or PDF CO and/or COR identified at post award conference.
| A0003 Five (5) Year Inspection Plan |
| 15 business days before the Period of Performance ends |
| One (1) copy |
| Microsoft Office format compatible |
| CO and/or COR identified at post award conference |
| A0004 Tank Inspection Intervals |
| 15 business days before the Period of Performance ends |
| One (1) copy |
| Microsoft Office format compatible. |
CO and/or COR identified at post award conference
A0005 Repair Recommendations
| 15 business days before the Period of Performance ends |
| One (1) copy |
| Microsoft Office format compatible. |
CO and/or COR identified at post award conference
Estimated Workload Data:
7 Leak Test Criteria:
8 Formal External Inspection Criteria:
The guidelines are for reference use and must be used in conjunction with the STI standard SP001.
9 Formal Internal Inspection Criteria:
10 Annual Periodic Inspection Criteria:
This checklist is for reference use and must be used in conjunction with the STI standard SP001.
image1.emf inventory list for service contract.xlsx Sheet1
Tank ID Owner Facility Name Gallons Product Belly-Day-Store API = Fld Erect Year Install Cat 1, 2, 3 Last External Last Internal Insulation present Y/N Internal inspection needed? Description / Notes
STI = Shop Fab Date Date
28-1 CEOFP Base Weather 76 Diesel Belly STI 2017 Cat 3 N No
51 CEOFP Pass & ID 550 Diesel Belly STI 2005 Cat 3 N No
75-1 CEOFP ILS 80 Diesel Belly STI 2014 Cat 3 N No Localizer 12 end
76-1 CEOFP TACAN 80 Diesel Belly STI 2014 Cat 3 N No
144-1 CEOFP Glide Slope 74 Diesel Belly STI 2016 Cat 3 N No Glide Scope 12 end
200-6 CEOFP Elkhorn 200 Diesel Day STI 2018 Cat 3 N No Elkhorn GHFCS Transmit
260 POL POL 20,000 Diesel Storage STI 2021 Cat 1 N Yes Should be real property tank # 360
262 POL POL 20,000 Diesel Storage STI 2022 Cat 1 N Yes
263 POL POL 20,000 Diesel Storage STI 2022 Cat 1 N Yes
280-3 Firestone Firestone 250 Used Oil Storage STI 2005? Cat 3 N No
288-1 CEOFP Fire Station 6,000 Diesel Storage STI 2005 Cat 3 N Yes at Main Base Firestation
288-2 FSS AeroClub 8,000 AVGAS Storage STI 1990 Cat 3 Y Yes At south edge of TXY Golf. Insulation is in interstitial space
288-3 CEOFP Fire Station 500 Diesel Storage STI 2017 Cat 3 N No used to be installed at B455 comand post - moved to 288 Feb 2022
301-1 CEOFP EOC 340 Diesel Belly STI 2015 Cat 3 N No
Fire Pump 1 Cat 3 N No
304-2 CEOFP Fire Pump 2 550 Diesel Storage STI 1995 Cat 3 N No
315-1 CEOFP 557 SATCOM 800 Diesel Storage STI 1989 Cat 3 N No
319-1 CEOFP 557 SATCOM 400 Diesel Storage STI 1989 Cat 3 N No
321-1 CEOFP Mobility 131 Diesel Belly/Mob STI 2019 Cat 3 N No Belly tank on mobile generator
324-1 CEOFP Din Fac 200 Diesel Belly/Mob STI 2018 Cat 3 N No Belly tank on mobile generator
332-1 MXMG AGE 240 Gasoline Storage STI ? Cat 3 No
336-1A CEOFP Lighting Vault 200 Diesel Day STI 2009 Cat 3 N No
336-2 CEOFP Lighting Vault 4,000 Diesel Storage STI 2009 Cat 3 N Yes
343-1 CEOFP GATR 200 Diesel Belly STI 2006 Cat 3 N No
399-1 CEOFP Water Pump 445 Diesel Belly STI 2003 Cat 3 N No fire suppression water supply
441-1 CEOFP POL Hydrants 300 Diesel Belly STI 2016 Cat 3 N No
457-9 AGE AGE 240 Used Oil Storage STI 2019 Cat 3 No
457-10 AGE AGE 240 Off-Spec Storage STI 2019 Cat 3 No
457ST CEOFP CEOFP 500 Diesel Storage STI 2020 Cat 3 N No
457BT CEOFP Generator 358 Diesel Belly STI 2021 Cat 3 N No
486 CEOFP Fuel POL 136 Diesel Belly/Mob STI 2019 Cat 3 N No fuel POL to B518 power plant
488-1 CEOFP MPA Lighting 1,000 Diesel Storage STI 2011 Cat 3 N No
488-2 CEOFP MPA Lighting 366 Diesel Storage STI 2020 Cat 3 N No
492-1 CEOFP Fire Pump 360 Diesel Storage STI 1997 Cat 3 N No
492-2 CEOFP Fire Pump 360 Diesel Storage STI 1997 Cat 3 N No
492-3 CEOFP Fire Pump 360 Diesel Storage STI 1997 Cat 3 N No
495-1 CEOFP Lift Station 74 Diesel Belly STI 2021 Cat 3 N No Need update after construction
496-2 MXS Poly 550 Diesel Storage STI 1995 Cat 3 No
500-4 J43 PGS EQ 175 Diesel Day STI 2014 Cat 3 No PGS equipment
500-5 J43 PGS EQ 175 Diesel Day STI 2014 Cat 3 No PGS equipment
500-6 CEOFP ? EMP 350 Diesel Belly STI 2022 Cat 3 No Install 2022, Operational Feb 2023
518-3 CEOES PowerPlant 1,323 Oil Storage STI 1996 Cat 3 N Yes Pegasus - CEOF owns the equipment
518-4 CEOES PowerPlant 1,323 Oil Storage STI 1996 Cat 3 N Yes Pegasus - CEOF owns the equipment
518-5 CEOES PowerPlant 294 Used Oil Storage STI 1972 Cat 3 N No Pegasus - CEOF owns the equipment
518-6 CEOES PowerPlant 294 Used Oil Storage STI 1972 Cat 3 N No Pegasus - CEOF owns the equipment
518-8 CEOES PowerPlant 900 Diesel Day STI 1982 Cat 3 N No Pegasus - CEOF owns the equipment
518-9 CEOES PowerPlant 900 Diesel Day STI 1982 Cat 3 N No Pegasus - CEOF owns the equipment
518-10 CEOES PowerPlant 1,000 Oil Day STI 1994 Cat 3 N No Pegasus - CEOF owns the equipment
518-12 CEOES PowerPlant 1,250 Diesel Day STI 1994 Cat 3 N Yes Serial# 858477. Pegasus - CEOF owns the equipment
518-13 CEOES PowerPlant 1,200 Diesel Day STI 1994 Cat 3 N Yes Pegasus - CEOF owns the equipment
565-3D CEOFP NAOC Aircraft Alert 75 Diesel Day STI 2009 Cat 3 N No
583-1 CEOFP Control Tower 3,000 Diesel Storage STI 2007 Cat 3 N Yes
706-2 CEOFP Scribner 100 Diesel Day STI 2000 Cat 3 N No Scribner GHFCS receiver
1004-1 CEOFP STRATCOM 1,750 Diesel Belly STI 2018 Cat 3 N Yes
1004-2 CEOFP STRATCOM 1,750 Diesel Belly STI 2018 Cat 3 N Yes
1004-3 CEOFP STRATCOM 1,750 Diesel Belly STI 2018 Cat 3 N Yes
1004-4 CEOFP STRATCOM 1,750 Diesel Belly STI 2018 Cat 3 N Yes
1004-5 CEOFP STRATCOM 1,750 Diesel Belly STI 2018 Cat 3 N Yes
1022-H1 CEOFP STRATCOM 400 Diesel Day STI 2018 Cat 3 N No
1022-H2 CEOFP STRATCOM 400 Diesel Day STI 2018 Cat 3 N No
1022-H3 CEOFP STRATCOM 400 Diesel Day STI 2018 Cat 3 N No
2108 CEOFP Capehart Fire 631 Diesel Belly STI 2020 Cat 3 N No
4000 J&J WW SVX Clinic 145 Diesel Belly STI 2018 Cat 3 No New Contractor begins 1 Apr 23
9944-1 FSS GC Maint 500 Diesel Storage STI 1997 Cat 3 No
9944-2 FSS GC Maint 500 Gasoline Storage STI 2007 Cat 3 No
9948-1 FSS GC Fieldhouse 500 Gasoline Storage STI 1997 Cat 3 No
HVAC Portable 1 CEOIH Diesel Day STI Cat 3 N No on Gov vehicle, for tansporting fuel
HVAC Portable 2 CEOIH 1000 Diesel Storage STI 2022 Cat 3 N No serves new portable boiler image2.emf
SP001 6th ed Leak Test Criteria.docx Leak Testing Methods (LTM)
1.1 Shop Fabricated AST leak testing procedure
1.1.1 Consult the Steel Tank institute Recommended Practice R912, Installation Instructions for Shop Fabricated Stationary Aboveground Storage Tanks for Flammable, Combustible Liquids. Air shall not be used for a pressure test; an inert gas shall be used instead. The introduction of a gas containing oxygen (such as air) to a tank that has previously held petroleum liquid can pose an explosion hazard.
1.1.2 Vacuum testing of the interstice of double-wall or double-bottom tanks is an option. Refer to the Steel Tank Institute Recommended Practice R912, Installation Instructions for Shop Fabricated Stationary Aboveground Storage Tanks for Flammable, Combustible Liquids.
1.1.3 Leak testing of CE-ASTs that are listed and labeled as UL2085 shall be performed in accordance with the specific requirements (or the testing manual) of the manufacturer. The testing, which includes brand-specific vacuum and hydrostatic testing, shall be performed by a properly trained professional.
1.2 Portable containers leak testing procedure – Refer to DOT Sections 49 CFR 173.28 (Reuse, reconditioning and remanufacturing of packagings – mainly for drums) and Part 178 – 49 CFR Subpart O – Testing of IBC’s [Intermediate Bulk Container] (section 178.803 Testing and certification of IBC’s) and 49 CFR 180.605, (Requirements for periodic testing, inspection and repair of portable tank), or equivalent, for portable container testing and recertification. Electronic versions of these documents are available online.
1.2.1 See the definition of Leak Testing Methods (LTM) for more information:
· A point-in-time test method to determine if an AST is liquid-tight. Leak testing is not preventative; it provides an indication only of whether the AST’s integrity has already been breached. Therefore, it may only be used as a tank integrity measure or as a supplement to other inspection procedures. LTMs may include the following technologies:
· Gas pressure decay (includes vacuum decay)
· Gas pressure soap bubble testing
· Gas tracers (e.g., helium tracer)
· Soil tracers (chemical Marker)
· Mass measurement
· Level Measurement
· Hydrostatic test image3.emf
SP001 6th ed Formal External Checklist.docx
1 FORMAL EXTERNAL INSPECTION (FEI) GUIDELINES – FOR REFERENCE
1.1 General
1.1.1 FEI are to be performed by Certified Inspectors.
1.1.2 The following paragraphs describe minimum inspection guidelines. There are numerous AST configurations and components and it is the responsibility of the Certified Inspector to identify and properly inspect them to conform to the owner’s requirements, industry standards and regulatory requirements, as applicable. The inspector or the inspection company shall develop detailed checklists that identify, record, and document all aspects of each inspection.
1.1.3 Review prior formal and periodic inspections, repair alteration data, and records of functionality testing of alarms and equipment, before each inspection.
1.1.4 Record AST nameplate data, if available, and check the information included for accuracy against actual conditions. Verify that the properties of the contents of the AST conform to the standard to which it was built. Record AST data, inspection findings, and problems identified.
1.1.5 Inspect the fabrication of the AST against applicable industry standards.
1.1.6 Inspect the AST foundations for indications of settlement, cracking, exposed rebar, or general disrepair. Inspect for areas of wash-out and voids under the AST. Confirm that the ground is sloped away from the AST and that there is no soil resting against the side of the AST, covering parts of the shell or bottom extension. Inspect for standing water against the AST or the indication of drainage problems.
1.1.7 Visually inspect the condition of the AST’s supports. Severe cracking or spalling of concrete supports shall be noted and evaluated. If there are pad plates between the supports and the shell, inspect their condition. Inspect the supports to be sure that they are sitting securely on the foundation or grade. If the supports are welded to the shell, inspect the welds for visible signs of stress or deterioration.
1.1.8 Identify and record the type and condition of the secondary containment, spill control, and CRDM, if present.
1.1.8.1 Visually inspect the general condition of the containment area to ensure that it is in good condition and that there is not a breach in the containment structure. Note changes from the original design and installation information if available.
1.1.8.2 Inspect for foreign materials in the containment area. Inspect for liquid in the containment system and CRDM. If liquid is present, find the source and report findings. Record other ASTs or containers within the same containment area.
1.1.8.3 Verify that the drain valves are operable and in good condition. Report penetrations through the secondary containment that may compromise the integrity of the containment area. Report penetrations that are likely to lead to failure of the secondary containment should the liquid level of water or liquid rise to these penetrations.
1.1.9 Inspect and verify the operability of ancillary equipment, including the following items:
1.1.9.1 Visually inspect accessible piping, piping supports and piping connections for signs of stress or leakage, due to severe corrosion, rusted bolted connections, or other severe degradation.
1.1.9.2 Inspect normal and emergency vents and pressure/vacuum devices. Verify that the devices are of adequate size and capacity, operable, and in good condition. Refer to the device manufacturer’s literature, typical industry venting requirements, and other appropriate resources. Record the types and locations of these devices.
1.1.9.3 Inspect primary tank level gauge and secondary tank interstitial gauge for free movement and determine if the floats, guides, and attachments are in working order. Verify the liquid level gauge length is sized correctly for the tank diameter.
1.1.9.4 Inspect the secondary tank interstitial monitoring equipment where present. Where possible verify free movement of floats and attachments and external alarms. Note that prior to triggering any alarm, proper warnings need to be made to the tank owner.
1.1.9.5 Verify and inspect tank overfill prevention devices including high level alarms and high level shut off valves. It may not be possible to verify operability of all devices, but where possible verify equipment is functional and calibrated to the appropriate liquid levels within the tank.
1.1.10 Inspect the bonding and grounding system of the AST, if present. (Refer to NFPA 780 Standard for the Installation of Lightning Protection Systems, NFPA 77 Standard Practice on Static Electricity or other applicable standard.)
1.1.11 Inspect stairways, handrails, and platforms for broken welds, bent members, and corrosion.
1.1.12 Inspect the coating on the AST shell, and supports for coating failure.
1.2 Determine the original shell thickness of the AST. Suggested methods are:
1.2.1 Review the original tank documentation, such as drawings and packing lists.
1.2.2 Consult the tank manufacturer.
1.2.3 Examine the tank labels for evidence of a widely accepted tank standard, such as Underwriters Laboratories Standard UL 142, etc. Consult the referenced standard to determine the minimum design shell thickness.
1.2.4 Measure the tank thickness of several areas of the tank that have no visible corrosion or pitting. The average of these measurements will result in a shell thickness measurement that can be used as the original shell thickness measurement.
1.3 Horizontal AST Requirements - in addition to the applicable items in 1.1:
1.3.1 Inspect shell plates and welds for indications of exterior corrosion, buckling, or distortion, as well as for cracking, pinholes, or mechanical damage. Inspect the shell of the AST and the ancillary equipment for signs of distortion and stress.
1.3.1.1 Take and record UTT readings and the location of the reading of each plate or shell course in areas accessible without entering the AST. Readings must be concentrated in areas where corrosion is likely to occur. If significant internal corrosion is detected, further investigation using UTS is required. If applicable, include areas marked from previous readings. Refer to Section 10.0 of STI SP001.
1.3.1.2 Existence of external corrosion may require the use of a pit depth measurement device in addition to the UTT to determine the remaining wall thickness.
1.3.2 Inspect shell attachments for changes made after the AST was fabricated. Refer to previous drawings or make new sketches that show all the appurtenances, attachments, and nozzle locations on the AST shell and heads or roof. Record repads (reinforcing plates) and/or insert plates. Inspect attachment welds for signs of stress and corrosion.
1.4 Vertical or Rectangular AST Requirements - in addition to the applicable items in 1.1:
1.4.1 Shell surface – Refer to 1.3.1 and 1.3.2
| 1.4.2 | Shell attachments – Refer to 1.3.2 |
| 1.4.3 | Vertical AST roof - Inspect for low areas on the roof and standing water that may corrode the roof areas. Inspect for coating failure, holes, and corrosion. Take UTT readings on the roof and record results. If possible, |
measure thicknesses in previously measured areas for corrosion rate determination. If significant corrosion is detected, further investigation using ultrasonic testing scans (UTS) is required. Refer to Section 10.0 of STI SP001.
1.5 Double-wall and Double-bottom AST Requirements - in addition to the applicable items in 1.1:
1.5.1 Verify that the leak detection equipment or method is operating, if the tank is so equipped.
1.5.2 Check for leaks or the presence of liquid in the interstice. When liquid is present in the interstitial space of the AST, thickness measurements should be taken on the secondary tank. UTT and UTS shall be of sufficient quantity and location to verify adequate containment integrity of the secondary tank. If product is found in interstitial space, perform a leak test to determine if primary tank is tight.
1.5.3 Double-bottom ASTs require UTT readings of areas that are single-wall as described in paragraph 1.3.1.1 above. Double-wall ASTs do not require UTT readings for the primary tank. In addition, if corrosion is evident on the outside surface of the secondary tank, UTT readings are required.
1.6 Steel Diked AST Requirements - in addition to the applicable items in 1.1 to 1.4:
1.6.1 For open-top dikes, inspect the condition of the dike and determine if liquid is present. For closed-top dikes that are fitted with an access port, inspect the condition of the inside of the enclosed diked area and determine if liquid is present. AST modifications may be needed in order to provide access for additional assessment. If liquid has entered the space or conditions indicate corrosion could be causing a problem, further evaluation is required.
1.6.2 Ultrasonic thickness measurements shall be taken on the tank shell wherever accessible, such as above the rain shields and by removing rain shields to gain access within the dike area where possible.
1.6.3 Ensure tank systems are operated with spill and overfill protection controls. Ensure an emergency vent is present and functions for closed-top containment structures.
1.7 Insulated AST Requirements - in addition to the applicable items in 7.1 through 7.4, except as modified below:
1.7.1 Inspect the insulation material and outer jacket for indications of damage where water may be allowed to wick into the insulating layer. Specifically inspect for areas where water may be trapped behind or within the insulation. If any of the following conditions are identified, then remove sections of the insulation to check for corrosion:
· Evidence that the tank may be compromised,
· Evidence that the base of the tank is consistently in contact with standing water, or
· Insulation is significantly compromised and has not been repaired or replaced in a timely manner
1.7.2 If corrosion under the insulation is suspected, remove sections of the insulation to check for corrosion. Damage done to the insulation for the purpose of inspection shall be repaired.
1.7.3 Take UTT readings of the shell where accessible and where insulation is removed per 1.7.1 and record results. In addition, include, if applicable, areas marked from previous readings. If significant internal corrosion is detected, further investigation using ultrasonic testing scans (UTS) is required. Refer to Section 10.0 of STI SP001.
1.8 Concrete Exterior ASTs (CE-ASTs) Requirements - in addition to the applicable items in 1.1:
1.8.1 Follow the tank manufacturer’s instructions for inspection and maintenance.
1.8.2 Inspect concrete exterior body of the tank for cleanliness, need of coating, or rust staining.
1.8.3 Inspect the entire exterior of the tank for cracks in concrete.
· Cracks larger than 1/16 of an inch in thickness require repair.
· If cracks greater than 1/16 of an inch are present on all four top chamfer edges, then the tank shall be further evaluated and repaired in consultation with the tank manufacturer, due to the possibility of damage or over-pressurization of the secondary containment.
1.8.4 Check for leaks or the presence of liquid in the interstice. If liquid is found, then further investigation is needed to determine the cause.
1.8.5 Check the seal between the pipe nipples (and other tank top appurtenances) and concrete.
1.8.6 CE-ASTs with joints or seams in the concrete exterior require inspection of the joint seal for deterioration, holes, tears, and cracks.
1.9 Additional requirements for field-erected ASTs are included in Appendix B of STI SP001.
1.10 In the final report, include field data, measurements, pictures, drawings, tables, and an inspection summary. In the summary, identify unacceptable conditions and recommended and/or mandatory corrective actions. Determine the suitability for continued service of the AST per Section 10.0 of STI SP001 and document this in the final report. Include the date of the next scheduled FEI or FII, as applicable. Include the inspector’s name and certification number in the report.
image4.emf
SP001 6th ed Formal Internal Checklist.docx Formal Internal Inspection Guidelines
1.1 General
1.1.1 FII are to be performed by Certified Inspectors per STI SP001 requirements.
1.1.2 The following paragraphs describe bare minimum inspection guidelines. There are numerous AST configurations and components; it is the responsibility of the Certified Inspector to identify and properly inspect them to conform to the owner’s requirements and/or industry standards. The inspector or the inspection company shall develop detailed checklists that identify, record, and document all aspects of each inspection.
1.1.3 An FII includes the requirements of an FEI with the addition of the requirements described below.
1.1.4 For elevated ASTs where all external surfaces are accessible, the internal inspection requirements may be satisfied with an examination from the exterior by using such methods as UTS. For all other situations, entry into the interior of the AST is necessary to assess the condition of all surfaces.
1.2 Horizontal AST Internal Inspection
1.2.1 Identify, measure, inspect, and record all AST internal appurtenances. Inspect for mechanical damage, corrosion, cracking, ect. Inspect for deteriorating or corroding internal attachments or piping. Take thickness readings of internal structures and record the readings.
1.2.2 Inspect the welds for cracking by visual inspection or, if necessary, by magnetic particle (MT) inspection or equivalent method.
1.2.3 Internal NDT Inspection
1.2.3.1 Ultrasonic testing equipment that is capable of scanning the tank (UTS) rather than measuring only individual points (UTT), is the preferred method of testing. Personnel performing UTS are to be qualified per STI SP001 requirements. If ultrasonic testing equipment that is capable of scanning the tank is not practical, use equipment that tests individual points. In this case, take UTT measurements of at least 15 points per each 12”x12” (0.3x0.3 meters) square area of the shell that is in contact with the ground. Any questionable areas are to be assessed by UTS.
1.2.3.2 Perform a vacuum box (VB) examination of questionable welds to check for leaks.
1.2.3.3 Refer to STI SP001 criteria for suitability for continued service.
1.3 Vertical and Rectangular AST Internal Inspection
1.3.1 Identify, record, inspect, and measure all AST internal surfaces and appurtenances. Inspect AST internals to check for mechanical damage, corrosion, cracking, ect. Check for deteriorating or corroding internal attachments and piping. Take thickness readings of internal structures and record the readings.
1.3.2 Inspect the welds for cracking, corrosion, or incomplete fusion which may result in a leak by visual inspection. If additional investigation is needed, the weld may be tested using vacuum box (VB) or if necessary magnetic particle (MT) or liquid dye penetrant (DPT) inspection or equivalent method.
1.3.3 Internal NDT Inspection
1.3.3.1 AST floor thickness assessments is required as follows:
Complete coverage of the AST floor is recommended, due to random corrosion characteristics of metal in contact with the ground. Inspection of the AST floor is recommended using inspection methods capable of determining the underside floor condition, such as UTS, MFL followed by UTS of questionable areas, or other equivalent methods.
If ultrasonic testing equipment that is capable of scanning the tank is not practical, use equipment that tests individual points. In this case, take UTT measurements of at least 15 points per each 12”x12” (0.3x0.3 meters) square area of the shell that is in contact with the ground. Any questionable areas are to be assessed by UTS.
1.3.3.2 Perform a vacuum box (VB) examination of questionable welds to check for leaks.
1.3.4 Refer to STI SP001 criteria for suitability for continued service.
1.4 Additional requirements for field-erected ATSs are included in Appendix B.
1.5 Report – in the final report; include field data, measurements, pictures, drawings, tables, and an inspection summary. Identify in the summary unacceptable conditions and recommended and/or mandatory corrective actions. Determine the suitability for continued service of the AST per Section 10.0 and document this in the final report. Include the date of the next scheduled Formal External and or FII, as applicable. Include the inspector’s name and certification number in the report.
image5.emf
SP001 6th ed Annual Periodic Checklist.docx STI SP001 Annual Inspection Checklist
General Inspection Information:
Inspection Date: __________________
Prior Inspection Date: _________________
Retain until date: __________________
Inspector Name (print):________________________________________________________________
Title: _____________________________
Inspector’s Signature: ___________________________________________________________________________
Tank(s) inspected ID ___________________________________________________________________
Regulatory facility name and ID number (if applicable) ____________________________________________________________________
Inspection Guidance:
· This checklist is intended as a model. Locally developed checklists are acceptable as long as they are substantially equivalent (as applicable).
· For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
· The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified Inspector. It shall be performed by an owner’s inspector per paragraph 4.1.2 of the standard.
· Remove promptly standing water or liquid discovered in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
· In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility should regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).
· Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
· Retain the completed checklists for at least 36 months.
· Complete this checklist on an annual basis, supplemental to the owner monthly-performed inspection checklists.
· Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.
ITEM
STATUS
COMMENTS / DATE CORRECTED
Tank Foundation/Supports
Free of tank settlement or foundation washout?
□Yes □No
Concrete pad or ring wall free of cracking and spalling?
□Yes □No □N/A
Annual Checklist Page 1 of 4
Tank supports in satisfactory condition?
□Yes □No □N/A
Is water able to drain away from tank if tank is resting on a foundation or on the ground?
□Yes □No □N/A
Is the grounding strap between the tank and foundation/supports in good condition?
□Yes □No □N/A
Tank Shell, Heads and Roof
Free of visible signs of coating failure?
□Yes □No
Free of noticeable distortions, buckling, denting, or bulging?
□Yes □No
Free of standing water on roof?
□Yes □No □N/A
Are all labels and tags intact and legible?
□Yes □No
Tank Manways, Piping, and Equipment
Flanged connection bolts tight and fully engaged with no sign of wear or corrosion?
□Yes □No □N/A
Tank Equipment
Normal and emergency vents free of obstructions?
□Yes □No
Normal vent on tanks storing gasoline equipped with pressure/vacuum vent?
□Yes □No □N/A
Are flame arrestors free of corrosion and are air passages free of blockage?
□Yes □No □N/A
Is the emergency vent in good working condition and functional, as required by manufacturer? Consult manufacturer’s requirements. Verify that components are moving freely (including long-bolt manways).
□Yes □No □N/A
Is interstitial leak detection equipment in good condition? Are windows on sight gauges clear? Are wire connections intact? If equipment has a test function, does it activate to confirm operation?”
□Yes □No □N/A
Annual Checklist Page 2 of 4
Are all valves free of leaks, corrosion and other damage? Follow manufacturers’ instructions for regular maintenance of these items. Check the following and verify (as applicable):
□ Anti-siphon valve
□ Check valve
□ Gate valve
□ Pressure regulator valve
□ Expansion relief valve
□ Solenoid valve
□ Fire valve
□ Shear valve
□Yes □No □N/A
□Yes □No □N/A
□Yes □No □N/A
□Yes □No □N/A
□Yes □No □N/A
□Yes □No □N/A
□Yes □No □N/A
Are strainers and filters clean and in good condition?
□Yes □No □N/A
Insulated Tanks
Free of missing insulation?
Insulation free of visible signs of damage?
Insulation adequately protected from water intrusion?
□Yes □No □N/A
Insulation free of noticeable areas of moisture?
□Yes □No □N/A
Insulation free of mold?
□Yes □No □N/A
Free of visible signs of coating failure?
□Yes □No □N/A
Tank / Piping Release Detection
Is inventory control being performed and documented if required?
□Yes □No □N/A
Is release detection being performed and documented if required?
□Yes □No □N/A
Other Equipment
Are electrical wiring and boxes in good condition?
□Yes □No □N/A
Has the cathodic protection system on the tank been tested as required by…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .