PERFORMANCE WORK STATEMENT.docx

DOCX document 36 KB Posted

Attached to
Household Managment (HHM) Federal contract opportunity
Solicitation number
M00264-24-R-0002
Issued by
United States Marine Corps

About this file

This performance work statement outlines a four-phase household management training course for the Marine Corps Enlisted Aide Program. The annual course will include an initial online self-paced training phase, followed by an in-person practical application phase lasting four weeks. Participants will then engage in monthly coaching sessions over six months to develop individual household management manuals, and a final three months of monthly sessions to maintain the manuals. The United States Marine Corps requires estimated 48 participants per year to complete all phases of the course conducted between September and August at the Marine Barracks Washington or within 25 miles. Acceptable quality levels for phases range from 90 to 95% completion with minimum passing scores. The contractor must submit required reports within seven days of completing each phase to the Contracting Officer Representative.

View the file

Other files for this federal contract opportunity

Other files attached to Household Managment (HHM), newest first.
File Type Posted
DRAFT M0026424R0002.pdf PDF
DRAFT M0026424R0002.pdf PDF
DRAFT M0026424R0002.pdf PDF
Manual Quarters Operating System Index Attachment 002.docx DOCX document
Participant Survey on Instructor Performance Attachment 001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1.0 Background:

Marine Barracks Washington requires a comprehensive Household Management (HHM) Training Course, structured in three distinct phases. This course will educate members of the Marine Corps Enlisted Aide Program (MCEAP) on industry best practices for formal household services protocol, operations management, effective communication, and customs.

2.0 Objectives:

The HHM Training Course aims to:

2.1 Introduce participants to key subjects via virtual or self-paced training.
2.2 Deliver in-depth training on those subjects during an onsite phase.
2.3 Coach participants through the creation of a comprehensive HHM manual over a period of

six months.

2.4 Enhance understanding of formal household protocols for diverse guests in a variety of diverse global locations.

2.5 Educate on facility mechanical, electrical, and security systems.
2.6 Uphold professionalism, ethics, and effective communication in household management.

3.0 Course Details:

3.1 Schedule: Training must occur annually between the months of September 20XX to September 20XX, excluding June through August (Summer months).

3.2 Training Requirements: Training will be divided into four phases. Phase one through through three are envisioned to be in tandom on a single task order. Phase four is envisioned to potential, potentially on the same task order or as a stand alone supporting different participants.

3.2.1 Phase One - Online Training (Introduction to/Preliminary study):
•Estimated 20 hours of self-paced/virtual instructor-led study (or a mix) per participant

for an estimated 48 participants.

•Topics include Tea/Coffee Service, Wine Management, Event Management, and more.
•Successful participants receive a completion certificate.
3.2.2 Phase Two - In-Person Training (Practical Application):
•Estimated 48 participants, Estimating 180 hours of practical application per participant

for no more than 4 continuous weeks, Monday to Saturday, 0800-1700, at a designated government facility.

•Topics include Household Management Foundations, Personal Security, and more.
•Successful participants receive a completion certificate.

3.2.3 Phase Three - Household Management Manual Creation:

• Estimated 48 participants participate in one-hour monthly coaching sessions (delivered by means most economical, Example virtual/phone/in person, if practical and at Contractor’s own risk) over a period of six months.

•Focus on integrating all previously learned concepts to develop a personal HHM manual.
•These sessions result in the creation of an individualized HHM manual by the end of the

six months.

• Sessions guide the development of the manual in accordance with Attachment 002 Index.

3.2.4 Phase Four- Household Management Manual Maintenance:
•Estimated 48 participants participate in one-hour monthly coaching sessions (delivered

by means most economical. Example virtual/phone/in person, if practical and at Contractor’s own risk) over a period of three months.

•Sessions guided in accordance with Attachment 002 Index.
•Sessions result in, after three months, an updated Household Management Manual.

4.0 General:

4.1 Access: Contractor personnel will undergo the DBIDS system, including site visits.

Form 5512/5518 will be provided.

4.2 Parking: Provided by the Government. Contractor must submit vehicle details seven days before training.

4.3 Support: The Government will supply food, beverages, seating, and multimedia connections for on-site training.

5.0 Performance Location for on-site training:

Marine Barracks Washington, 8th & I Streets SE, Washington, DC 20390 (or other desiganted Government location determined on issued task order; radius of location, using Washington DC as center, will not exceed 25 miles).

6.0 Performance Requirements Summaries (PRSs):

PRS 1: Phase One - Online Training

• Performance Standard: Delivery of a 20-hour self-paced study course for an estimated 48 participants on topics including Tea/Coffee Service, Wine Management, Event Management, and more.

• Participants were grouped (where applicable) in accordance with the Task Order.

Example no other parties were not allowed to participate that were not associated with the Task Order except for the Contracting Officer Representative (COR) (Observer) and Contracting Officer (Observer).

• Acceptable Quality Level (AQL): 95% of participants complete the online training with a minimum passing score (to be defined by the course criteria).

• Monitoring Method: Review of online completion reports and participant feedback forms.

Method: Provide an electronic report by email, per task order, that identifies participants by name, score, and hours trained. Submission of report to include surveys (Attachment 001) that were disseminated and returned.

Due: Seven days after phase one is completed

Who to send: Contracting Officer Representative (COR)

PRS 2: Phase Two - In-Person Training

• Performance Standard: Execution of 140 hours of practical training over 4 weeks, Monday to Saturday, 0800-1700, for an estimated 48 participants annually at the designated government facility.

•Participants were grouped (where applicable) in accordance with the Task Order. Example no other parties were allowed to participate that were not associated with the Task Order except for the COR (Observer) and Contracting Officer (Observer).
•AQL: 95% of participants complete the in-person training with a minimum passing score (to be defined by the course criteria) and receive a completion certificate.
•Monitoring Method: Attendance logs, participant feedback/surveys (Attachment 001), and post-training evaluation.

Method: Provide an electronic report by email, per task order, that identifies participants by name, score, and hours trained. Submission of report to include surveys that were disseminated and returned. Submission of participants’ daily attendance record.

Due: Seven days after phase two is completed

Who to send: Contracting Officer Representative (COR)

PRS 3: Phase Three - Household Management Manual Creation

•Performance Standard: Delivery of one-hour monthly coaching sessions over a six-month period for an estimated 80 participants annually, leading to the creation of an individualized HHM manual (at a minimum meeting attachment 002).
•Participants were grouped (where applicable) in accordance with the Task Order. Example no other parties were allowed to participate that were not associated with the Task Order except for the COR (Observer) and Contracting Officer (Observer).
•AQL: 90% of participants produce a satisfactory HHM manual by the end of six months.
•Monitoring Method: Monthly progress reports, participant feedback/surveys (Attachment 001), and final manual review (at a minimum meeting attachment 002).

Method: Provide an electronic report by email, per task order, that identifies participants by name, attendance to coaching, and hours trained. Submission of report to include surveys that were disseminated and returned. Submission to include a coordinated manual.

Due: Seven days after phase three is completed

Who to send: Contracting Officer Representative (COR)

PRS 4: Phase Four - Household Management Manual Maintenance

•Performance Standard: Delivery of one-hour monthly coaching sessions over a three-month period for an estimated 80 participants annually, leading to the creation of
an individualized HHM manual (at a minimum meeting attachment 002).

· Participants were grouped (where applicable) in accordance with the Task Order.

Example no other parties were allowed to participate that were not associated with the Task Order except for the COR (Observer) and Contracting Officer (Observer).

· AQL: 90% of participants produce a satisfactory HHM manual by the end of three months.

· Monitoring Method: Monthly progress reports, participant feedback/surveys (Attachment 001), and final manual review (at a minimum meeting attachment 002).

Method: Provide an electronic report by email, per task order, that identifies participants by name, attendance to coaching, and hours trained. Submission of report to include surveys that were disseminated and returned. Submission to include a coordinated manual.

Due: Seven days after phase three is completed

Who to send: Contracting Officer Representative (COR)

File details come from the government source that posted it. Updated .