PER VHA DIRECTIVE 7715.docx

VHA Directive DOCX document 15 KB Posted

Attached to
Y1DA--NRM: 640A0-21-909 --Replace Deaerator Tank heater NCO 21 MACC Group 1 Opportunity
Solicitation number
36C26121R0023
Issued by

View the file

Other versions and copies of VHA Directive 7715

File Revision Posted Attached to
EMR RATE VHA DIRECTIVE 7715.docx Revision not stated Replacement of existing cooling tower: VA Northern California Health Care System (VANCHS) Martinez campus 150 Muir Road, Martinez, CA 94553
PER VHA DIRECTIVE 7715 EMR.docx Revision not stated CANCELLED Menlo Park Replace Nurse Call Bldg. 331 and 360
PER VHA DIRECTIVE 7715.docx Revision not stated J061--Fiber Optics Replacement
PER VHA DIRECTIVE 7715 EMR.docx Revision not stated Menlo Park Replace Nurse Call Bldg. 331 and 360
PER VHA DIRECTIVE 7715 EMR.docx Revision not stated Menlo Park Replace Nurse Call Bldg. 331 and 360
PER VHA DIRECTIVE 7715.pdf Revision not stated Z1DA -- 654-23-011 Isolation Room Mitigation
PER VHA DIRECTIVE 7715.docx Revision not stated Pharmacy Replacement Flooring due to Flooding
PER VHA DIRECTIVE 7715 EMR.pdf Revision not stated VA Palo Alto Health Care System: B710 VMU – Install Removable Guard Rails at Edge of Loading Dock
VHA Directive 7715 Safety and Health During Construction.pdf Revision not stated K063--Correct Physical Security Issues Construction | Project # 595-17-101 ALTOONA & LEBANON MATOC HOLDERS ONLY
Attachment H - VHA Directive 7715--Safety and Health During Construction.pdf Revision not stated Y1DA--Construct Primary Care at VANCHCS, Mather Campus
VHA Directive 7715_D_2017-04-06.pdf Revision not stated Z2NZ--Upgrade Sanitary System on East Side Campus | 662-17-005
VHA Directive 7715_D_2017-04-06.pdf Revision not stated J099--640-19-101 - PAD B5 Elevator Modernization
Show all 12

Who attaches VHA Directive 7715

Other files

File Type Posted
DA drawing.pdf PDF
Wage Determination CA20190018 11.15.19.pdf PDF
01 35 26 SAFETY REQUIREMENTS.docx DOCX document
01 33 23 SHOP DRAWINGS PRDUCT DATA AND SAMPLES.docx DOCX document
01 91 00 GENERAL COMMISSIONING REQUIREMENTS.docx DOCX document
01 32 16 PROJECT SCHEDULES.docx DOCX document
01 42 19 REFERENCE STANDARDS.docx DOCX document
36C26121R0023.docx DOCX document
01 45 00 QUALITY CONTROL.docx DOCX document
RulesOfTheStation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PER VHA DIRECTIVE 7715 (06 April 2017) - SAFETY & ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE (EMR):

Contractor Certification Regarding Project:

To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.

All Offerors shall submit the following information pertaining to their past Safety & Environmental Record and EMR with their offer.

1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

2. EMR: All Offerors shall submit information regarding their current EMR. This information shall be obtained from the Offerors’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror shall submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

2017
2018
2019

Number of serious, willful, or repeat violations from OSHA within the last 3 years. Please attach explanation for any violations. (Four serious, one repeat, or one willful disqualifies the contractor.)

Number of violations from EPA within the last 3 years. Please attach explanation for any violations.

Company’s Current Insurance Experience Modification Rate (EMR) = (Note: Contractor must support the EMR with a signed letter from Insurance Carrier on their letterhead.)

Signature:

Print Name:

File details come from the government source that posted it. Updated .