This is a concept estimate document prepared for the Oregon Department of Transportation (ODOT) for a new facility project in Lincoln County, Oregon. The project consists of construction of seven buildings totaling 41,368 gross square feet, including a shared administrative building (4,755 SF), fueling station (2,817 SF), ODOT storage building (14,450 SF), ODOT primary maintenance building (17,320 SF), pre-mix containment building (798 SF), and de-icer containment building (1,228 SF), along with associated sitework. The estimate was prepared as of February 2018 with pricing escalated to third quarter 2019. The estimate includes detailed line-item costs broken down by Uniformat Level 2 and Level 3 classifications, covering foundations, superstructure, exterior enclosure, roofing, interior construction and finishes, plumbing, HVAC, fire protection, electrical systems, equipment, furnishings, and site improvements including on-site and off-site work.
The estimated total project cost is $25,976,699, with an estimated net cost of $17,224,316 before margins and adjustments. Margins and adjustments included in the estimate total $8,752,383 and comprise location factor (3.0% or $516,730), general conditions (8.0% or $1,419,284), bonds and insurance (3.5% or $670,611), overhead and profit (4.5% or $892,393), design contingency (15.0% or $3,108,500), and escalation to third quarter 2019 (9.0% or $2,144,865). The estimate assumes construction during normal working hours with prevailing wage rates applicable to the contractor. Specific exclusions include items marked as excluded in the estimate, shiftwork or overtime, rock or concrete excavation, underground services encountered during excavation, fireproofing steel, loose furniture and equipment, construction management fees, owner's contingency, and development soft costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OregonBuys Vendor Quote How To Guide~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Concept Rev2
ODOT Lincoln County
ODOT Lincoln County
Our Reference: PDX21223-3
Prepared For: Oregon Department of Transportation Attn: Mike Schweizer
1.00 Estimate Summaries
2.00 Basis of Estimate
3.00 Estimate Detail
CONTENTS
Lincoln County, OR
Concept Estimate
1.00 Estimate Summaries
. Cost summary with Margins and Adjustments Distributed
. Cost summary with Margins and Adjustments Undistributed
. Uniformat Level 2 Summary
. Uniformat Level 3 Summary
Total CostCost/SFGFA SFLocation
GFA: Gross Floor Area Rates Current At February 2018Location Summary
BUILDINGSA
1,891,607397.814,755SHARED ADMIN BUILDINGA1
908,330322.452,817FUELING STATIONA2
2,967,843205.3914,450ODOT STORAGE BUILDINGA3
4,607,846266.0417,320ODOT PRIMARY MAINTENANCE BUILDINGA4
134,599168.67798ODOT PRE-MIX CONTAINMENT BUILDINGA6
305,709248.951,228ODOT DE-ICER CONTAINMENT BUILDINGA7
$10,815,934$261.4641,368A - BUILDINGS
SITEWORKB
10,940,477ON-SITEB1
2,075,423OFF-SITEB2
$13,015,900B - SITEWORK
$23,831,834$576.0941,368ESTIMATED NET COST
MARGINS & ADJUSTMENTS
$2,144,8659.0 %Escalation to 3Q2019
$25,976,699$627.9441,368ESTIMATED TOTAL COST
Page 1 of 1PDX21223-3 Printed 26 February 2018 3:51 PM 4
Total CostCost/SFGFA SFLocation
GFA: Gross Floor Area Rates Current At February 2018Location Summary
BUILDINGSA
1,367,148287.524,755SHARED ADMIN BUILDINGA1
656,489233.052,817FUELING STATIONA2
2,144,991148.4414,450ODOT STORAGE BUILDINGA3
3,330,294192.2817,320ODOT PRIMARY MAINTENANCE BUILDINGA4
97,281121.91798ODOT PRE-MIX CONTAINMENT BUILDINGA6
220,950179.931,228ODOT DE-ICER CONTAINMENT BUILDINGA7
$7,817,153$188.9741,368A - BUILDINGS
SITEWORKB
7,907,163ON-SITEB1
1,500,000OFF-SITEB2
$9,407,163B - SITEWORK
$17,224,316$416.3741,368ESTIMATED NET COST
MARGINS & ADJUSTMENTS
$516,7303.0 %Location Factor
$1,419,2848.0 %General Conditions
$670,6113.5 %Bonds & Insurance
$892,3934.5 %Overhead & Profit
$3,108,50015.0 %Design Contingency
$2,144,8659.0 %Escalation to 3Q2019
$25,976,699$627.9441,368ESTIMATED TOTAL COST
Page 1 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 5
Total CostCost/SFDescription
Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 2 Summary
$896,523$21.67FoundationsA10
$2,265,390$54.76SuperstructureB10
$1,077,205$26.04Exterior EnclosureB20
$398,636$9.64RoofingB30
$323,403$7.82Interior ConstructionC10
Excl.StairsC20
$224,112$5.42Interior FinishesC30
$478,088$11.56PlumbingD20
$266,213$6.44HVACD30
$105,421$2.55Fire ProtectionD40
$1,099,707$26.58ElectricalD50
$181,635$4.39EquipmentE10
$28,530$0.69FurnishingsE20
$3,689,000$89.18Site PreparationsG10
$4,224,395$102.12Site ImprovementsG20
$1,404,038$33.94Site Civil/Mechanical UtilitiesG30
$562,020$13.59Site Electrical UtilitiesG40
$17,224,316$416.37ESTIMATED NET COST
MARGINS & ADJUSTMENTS
$516,7303.0 %Location Factor
$1,419,2848.0 %General Conditions
$670,6113.5 %Bonds & Insurance
$892,3934.5 %Overhead & Profit
$3,108,50015.0 %Design Contingency
$2,144,8659.0 %Escalation to 3Q2019
$25,976,699$627.94ESTIMATED TOTAL COST
Page 2 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 6
Total CostCost/SFDescription
Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 3 Summary
$543,160$13.13Standard FoundationsA1010
Excl.Special FoundationsA1020
$353,363$8.54Slab on GradeA1030
$2,265,390$54.76Roof ConstructionB1020
$444,223$10.74Exterior WallsB2010
$226,100$5.47Exterior WindowsB2020
$406,882$9.84Exterior DoorsB2030
$398,636$9.64Roof CoveringsB3010
$125,576$3.04PartitionsC1010
$60,793$1.47Interior DoorsC1020
$137,034$3.31SpecialtiesC1030
Excl.Stair ConstructionC2010
$65,626$1.59Wall FinishesC3010
$125,201$3.03Floor FinishesC3020
$33,285$0.80Ceiling FinishesC3030
$161,548$3.91Plumbing FixturesD2010
$82,724$2.00Domestic Water DistributionD2020
$107,352$2.60Sanitary WasteD2030
$126,464$3.06Other Plumbing SystemsD2090
$80,105$1.94Heat Generating SystemsD3020
$23,040$0.56Cooling Generating SystemsD3030
$40,655$0.98Distribution SystemsD3040
$38,040$0.92Terminal & Package UnitsD3050
$14,265$0.34Controls & InstrumentationD3060
$3,091$0.07Systems Testing & BalancingD3070
$67,017$1.62Other HVAC Systems and EquipmentD3090
$6,170$0.15Fire Suppression Water Supply and EquipmentD4020
$78,251$1.89SprinklersD4040
$21,000$0.51Fire Protection SpecialtiesD4050
$324,560$7.85Electrical Service & DistributionD5010
$429,476$10.38Lighting & Branch WiringD5020
$345,671$8.36Communications & SecurityD5030
$176,635$4.27Vehicular EquipmentE1030
$5,000$0.12Other EquipmentE1090
$28,530$0.69Fixed FurnishingsE2010
Excl.Moveable FurnishingsE2020
$125,000$3.02Site ClearingG1010
Page 3 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 7
Total CostCost/SFDescription
Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 3 Summary
$3,564,000$86.15Site EarthworkG1030
Excl.Hazardous Waste RemediationG1040
$1,500,000$36.26RoadwaysG2010
$1,829,034$44.21Parking LotsG2020
$109,896$2.66Pedestrian PavingG2030
$645,925$15.61Site DevelopmentG2040
$139,540$3.37LandcapingG2050
$96,930$2.34Water SupplyG3010
$129,320$3.13Sanitary SewerG3020
$833,298$20.14Storm SewerG3030
$344,490$8.33Fuel DistributionG3060
$175,540$4.24Electrical DistributionG4010
$126,480$3.06Site LightingG4020
$60,000$1.45Site Communication and SecurityG4030
$200,000$4.83Other Site Electrical UtilitiesG4090
$17,224,316$416.37ESTIMATED NET COST
MARGINS & ADJUSTMENTS
$516,7303.0 %Location Factor
$1,419,2848.0 %General Conditions
$670,6113.5 %Bonds & Insurance
$892,3934.5 %Overhead & Profit
$3,108,50015.0 %Design Contingency
$2,144,8659.0 %Escalation to 3Q2019
$25,976,699$627.94ESTIMATED TOTAL COST
Page 4 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 8
Concept Estimate
2.00 Basis of Estimate
Description
Project Details
Basis of Estimate
The project consists of construction of new Office, Vehicle Maintenance, Equipment Storage, De-Icer Storage, Sand Shed, Pre-Mix Containment and Fueling Station buildings at the Lincoln County site.
Items Specifically Included
ESTIMATE PRICING:
. Pricing is based on Construction Costs as of February 2018.
. Margins and Adjustments are included in the estimate.
. Items included or excluded are detailed in the estimate. Other assumptions, inclusions and exclusions are listed below.
GROSS FLOOR AREA:
. Combined building square footage - 41,368 SF
The following assumptions have been made in the preparation of this estimate:
. The works will be carried out during normal working hours.
. The Contractor will be required to pay prevailing wage rates.
. Resources are available locally.
ITEMS SPECIFICALLY INCLUDED:
. Please note where allowances have been made, we would request the Design Team and Owner to review the sum to ensure the allowance meets their intent.
. Sub-Contractors Overheads and Profit are included in the unit rates.
The following items have been specifically included in Margins and Adjustments:
. Location Factor (3%)
. General Conditions (8%)
. Bonds & Insurances (3.5%)
. Overhead and Profit (4.5%)
. Design Contingency (15%)
. Escalation to 3Q2019 (9%)
Page 1 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 10
Description
Project Details
Items Specifically Excluded
ITEMS SPECIFICALLY EXCLUDED:
. Items marked as "Excl." in the estimate.
. Shiftwork or overtime working or acceleration.
. Double handling or materials due to site access restrictions.
. Delays or working restrictions on the Contractor.
. Abatement of any type
. Underpinning of adjacent structures.
. Rock or concrete excavation.
. Underground services encountered during excavation.
. De-watering required during excavation other than surface water.
. Assumes disposal of materials to a local dump only.
. Allow for improvements to existing site where shown.
. Fireproofing steel.
. Walls coverings besides that shown in estimate.
. Moveable book cases to classrooms.
. Audio visual projectors.
. Interior Landscaping.
. Loose furniture, FF&E & equipment.
. The affects of potential unfair Contract Conditions which may affect Bid pricing.
. Building & Statutory Industry Fringe Benefits.
. Statutory Authorities' charges, contributions (and compliance orders).
. The implications of proposed Construction legislation which may occur during the Construction period.
. Lack of competition amongst Sub-Contractors bidding the Project
. Unavailability of local resources to undertake specific trades and the affect on bid pricing from non-regional bidders.
. Uncompetitive bidding due to the complexity of the project Sub-Contractors work loads.
. Abnormal changes in market conditions affecting our assessment of escalation.
. Construction Management Fees.
. Owner's Contingency & Insurances.
. Development Soft Costs including; Land, Financing and Legal costs.
Documents
DESIGN DETAILS USED FOR THE ESTIMATE:
This estimate is based upon measured quantities and built-up rates prepared from the following information :
Page 2 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 11
Description
Project Details
Architectural Details provided by capirarchitecture
August 5, 2016
. Pre-Schematic site plan and drawings
. Where information was insufficient, assumptions and allowances were made based on conversations with the architect and other consultants.
Page 3 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 12
Concept Estimate
3.00 Estimate Detail
TotalRateQtyUnitDescription
GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
23,7755.004,755SFAllowance for structural excavation, misc. earthwork 6
38,0408.004,755SFStandard foundations4
$61,815$13.00/SFStandard Foundations
Special FoundationsA1020
Excl.4,755SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
Excl.4,755SFPremium for cement-treated sub-base - Not required203
33,2857.004,755SFSlab on grade, 4", incl. base course and vapor barrier5
$33,285$7.00/SFSlab on Grade
$95,100$20.00/SFFoundations
SuperstructureB10
Roof ConstructionB1020
22,5544.505,012SFMetal roof deck 197
126,3364,200.0030.08TSteel roof framing to Office (assumes 12 psf)196
$148,890$31.31/SFRoof Construction
$148,890$31.31/SFSuperstructure
Exterior EnclosureB20
Exterior WallsB2010
267,65050.005,353SFExterior wall system; Siding/metal panel, framing, sheathing, rainscreen drainage plane, weather barrier, rigid insulation, batts in stud cavity, vapor permeable barrier, gyp board to inside face of wall
$267,650$56.29/SFExterior Walls
Exterior WindowsB2020
91,03585.001,071SFWindows9
$91,035$19.15/SFExterior Windows
Exterior DoorsB2030
7,1331.504,755SFExterior doors - Office11
$7,133$1.50/SFExterior Doors
$365,818$76.93/SFExterior Enclosure
Page 1 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 14
TotalRateQtyUnitDescription
GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
RoofingB30
Roof CoveringsB3010
120,28824.005,012SFStanding seam metal roof system to Office, incl. roof panels, cover board, rigid insulation, vapor barrier, and flashings/sealants
$120,288$25.30/SFRoof Coverings
$120,288$25.30/SFRoofing
Interior ConstructionC10
PartitionsC1010
3,5660.754,755SFAllowance for rough carpentry16
57,06012.004,755SFPartitions - Office Building14
$60,626$12.75/SFPartitions
Interior DoorsC1020
26,1535.504,755SFInterior doors and glazing - Office 17
$26,153$5.50/SFInterior Doors
SpecialtiesC1030
38,0408.004,755SFSpecialties - Office Buidling ; Includes markerboards, tackboards, signage, corner/wall protection, toilet fitments, lockers, fire extinguishers, etc.
$38,040$8.00/SFSpecialties
$124,819$26.25/SFInterior Construction
StairsC20
Stair ConstructionC2010
Excl.ItemMetal pan stair - None included. Assumes all single-story construction
Excl.Stair Construction
Excl.Stairs
Interior FinishesC30
Wall FinishesC3010
28,5306.004,755SFWall finishes - Office20
$28,530$6.00/SFWall Finishes
Floor FinishesC3020
35,6637.504,755SFFloor finishes - Office21
$35,663$7.50/SFFloor Finishes
Ceiling FinishesC3030
33,2857.004,755SFCeiling finishes - Office22
$33,285$7.00/SFCeiling Finishes
$97,478$20.50/SFInterior Finishes
Page 2 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 15
TotalRateQtyUnitDescription
GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
PlumbingD20
Plumbing FixturesD2010
4,0420.854,755SFAllowance for DW and NPW valves, vents, drains and accessories
38,0408.004,755SFPlumbing fixtures, pipework and equipment27
$42,082$8.85/SFPlumbing Fixtures
Sanitary WasteD2030
8,40060.00140LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
$8,400$1.77/SFSanitary Waste
$50,482$10.62/SFPlumbing
HVACD30
Heat Generating SystemsD3020
10,0803.003,360cfmFurnaces (3) 127
$10,080$2.12/SFHeat Generating Systems
Cooling Generating SystemsD3030
13,4404.003,360cfmCondensing Units (3) 129
9,60032.00300LFRefrigerant line set--Provide, install and charge132
$23,040$4.85/SFCooling Generating Systems
Distribution SystemsD3040
40,6558.554,755SFHVAC distribution ductwork, outlets, dampers and accessories
$40,655$8.55/SFDistribution Systems
Terminal & Package UnitsD3050
38,0408.004,755SFHVAC ventilation equipment allowance165
$38,040$8.00/SFTerminal & Package Units
Controls & InstrumentationD3060
14,2653.004,755SFDDC Controls - Open to alternate vendors/installers131
$14,265$3.00/SFControls & Instrumentation
Systems Testing & BalancingD3070
3,0910.654,755SFBalancing Testing and Commissioning-- Includes coordination with the subcontractor
$3,091$0.65/SFSystems Testing & Balancing
Other HVAC Systems and EquipmentD3090
4,0420.854,755SFExhaust fans/ductwork/grilles/flues--allowance134
Page 3 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 16
TotalRateQtyUnitDescription
GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
4,7551.004,755SFHVAC Supervision, Permit, As Builts and O&Ms-- Allowance
$8,797$1.85/SFOther HVAC Systems and Equipment
$137,968$29.02/SFHVAC
Fire ProtectionD40
Fire Suppression Water Supply and EquipmentD4020
880880.001EAFDC--Fire department connection84
1,0501,050.001EAFP Specialties--Wet fire sprinkler zone valve assemblies83
$1,930$0.41/SFFire Suppression Water Supply and Equipment
SprinklersD4040
14,2653.004,755SFFire sprinklers--Standard wet fire protection system--Office areas
$14,265$3.00/SFSprinklers
$16,195$3.41/SFFire Protection
ElectricalD50
Electrical Service & DistributionD5010
38,0408.004,755SFElectrical service and distribution149
$38,040$8.00/SFElectrical Service & Distribution
Lighting & Branch WiringD5020
8,3211.754,755SFConduit and wire to light fixtures and controls--Allowance25
5,9441.254,755SFLighting controls--Allowance159
57,06012.004,755SFLighting, receptacles, branch wiring - Office222
$71,325$15.00/SFLighting & Branch Wiring
Communications & SecurityD5030
4,0420.854,755SFSecurity system--Includes CCTV and Access Control167
33,2857.004,755SFSystems; Fire alarm, PA, tel/data, security26
11,8882.504,755SFTelecom/Data166
18,00018,000.001EATelephone/data; MDF and IDF Rooms system backbone--allowance
$67,215$14.14/SFCommunications & Security
$176,580$37.14/SFElectrical
Page 4 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 17
TotalRateQtyUnitDescription
GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
EquipmentE10
Other EquipmentE1090
5,000ItemAllowance for residential appliances10
$5,000$1.05/SFOther Equipment
$5,000$1.05/SFEquipment
FurnishingsE20
Fixed FurnishingsE2010
28,5306.004,755SFCasework and furnishings - Office23
$28,530$6.00/SFFixed Furnishings
Moveable FurnishingsE2020
Excl.ItemMovable furnishings incl. carts, desks, chairs etc. - Excluded (assumed by Owner)
Excl.Moveable Furnishings
$28,530$6.00/SFFurnishings
$1,367,148$287.52/SFSHARED ADMIN BUILDING
Page 5 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 18
TotalRateQtyUnitDescription
GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
14,0855.002,817SFAllowance for structural excavation, misc. earthwork 6
5,37614.00384SFSlab on grade, 12"217
22,5368.002,817SFStandard foundations4
$41,997$14.91/SFStandard Foundations
Special FoundationsA1020
Excl.2,817SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
Excl.2,817SFPremium for cement-treated sub-base - Not required203
23,9458.502,817SFSlab on grade, 6", incl. base course and vapor barrier48
$23,945$8.50/SFSlab on Grade
$65,942$23.41/SFFoundations
SuperstructureB10
Roof ConstructionB1020
112,68040.002,817SFPre-engineered metal canopy at Fueling Station/Sand Shed (unenclosed), incl. roof framing, roofing panels
$112,680$40.00/SFRoof Construction
$112,680$40.00/SFSuperstructure
Interior FinishesC30
Floor FinishesC3020
7,0432.502,817SFFloor finishes - Maintenance Buildings (sealed concrete)40
$7,043$2.50/SFFloor Finishes
$7,043$2.50/SFInterior Finishes
PlumbingD20
Plumbing FixturesD2010
270135.002EAPlumbing Fixtures--Hose Bibb65
$270$0.10/SFPlumbing Fixtures
Sanitary WasteD2030
4,1401,380.003EAPlumbing fixture--AD--Traffic rated area drain62
1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
Page 6 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 19
TotalRateQtyUnitDescription
GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
10,80060.00180LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
$16,228$5.76/SFSanitary Waste
$16,498$5.86/SFPlumbing
Fire ProtectionD40
SprinklersD4040
5,2111.852,817SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays
$5,211$1.85/SFSprinklers
$5,211$1.85/SFFire Protection
ElectricalD50
Electrical Service & DistributionD5010
22,5368.002,817SFElectrical service and distribution149
$22,536$8.00/SFElectrical Service & Distribution
Lighting & Branch WiringD5020
4,9301.752,817SFConduit and wire to light fixtures and controls--Allowance25
3,5211.252,817SFLighting controls--Allowance159
19,7197.002,817SFLighting, receptacles, branch wiring - Maintenance/Support Buildings
$28,170$10.00/SFLighting & Branch Wiring
Communications & SecurityD5030
19,7197.002,817SFSystems; Fire alarm, PA, tel/data, security26
$19,719$7.00/SFCommunications & Security
$70,425$25.00/SFElectrical
Site ImprovementsG20
Site DevelopmentG2040
34,200900.0038EABollards, incl. footing76
$34,200$12.14/SFSite Development
$34,200$12.14/SFSite Improvements
Site Civil/Mechanical UtilitiesG30
Fuel DistributionG3060
11,90085.00140LFDouble wall geoduct containment piping116
80,00020,000.004EAFuel dispensers including dispensing equipment, nozzles, hoses, etc.
Page 7 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 20
TotalRateQtyUnitDescription
GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
120,000120,000.001EAFuel Storage tank--Diesel--40,000 gal--Provide and install112
94,37094,370.001EAFuel Storage tank--Unleaded--10,000 gal--Provide and install
720180.004EAPortable Rotary Stinger Pumps and 15 gallon fuel transfer tanks
30,00010,000.003EARemote fill station/manhole110
4,5001,500.003EAVent pipe including termination114
3,0003,000.001EAWater and Air dispenser115
$344,490$122.29/SFFuel Distribution
$344,490$122.29/SFSite Civil/Mechanical Utilities
$656,489$233.05/SFFUELING STATION
Page 8 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 21
TotalRateQtyUnitDescription
GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
72,2505.0014,450SFAllowance for structural excavation, misc. earthwork 6
115,6008.0014,450SFStandard foundations4
$187,850$13.00/SFStandard Foundations
Special FoundationsA1020
Excl.14,450SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
Excl.14,450SFPremium for cement-treated sub-base - Not required203
122,8258.5014,450SFSlab on grade, 6", incl. base course and vapor barrier48
$122,825$8.50/SFSlab on Grade
$310,675$21.50/SFFoundations
SuperstructureB10
Roof ConstructionB1020
867,00060.0014,450SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels
$867,000$60.00/SFRoof Construction
Exterior WindowsB2020
Incl.ItemMechanical louvers - see HVAC195
Incl.Exterior Windows
$867,000$60.00/SFSuperstructure
Exterior EnclosureB20
Exterior WallsB2010
54,3694.5012,082SFInsulation to inside face of exterior walls (wall panels included in PEMB package)
$54,369$3.76/SFExterior Walls
Exterior WindowsB2020
61,45585.00723SFWindows9
$61,455$4.25/SFExterior Windows
Exterior DoorsB2030
10,8380.7514,450SFExterior man doors - Maintenance Buildings57
180,0007,500.0024EAMotorized overhead sectional doors49
$190,838$13.21/SFExterior Doors
$306,662$21.22/SFExterior Enclosure
Page 9 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 22
TotalRateQtyUnitDescription
GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
RoofingB30
Roof CoveringsB3010
115,6008.0014,450SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)
$115,600$8.00/SFRoof Coverings
$115,600$8.00/SFRoofing
Interior ConstructionC10
SpecialtiesC1030
43,3503.0014,450SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.
$43,350$3.00/SFSpecialties
$43,350$3.00/SFInterior Construction
StairsC20
Stair ConstructionC2010
Excl.ItemMetal pan stair - None included. Assumes all single-story construction
Excl.Stair Construction
Excl.Stairs
Interior FinishesC30
Floor FinishesC3020
36,1252.5014,450SFFloor finishes - Maintenance Buildings (sealed concrete)40
$36,125$2.50/SFFloor Finishes
Ceiling FinishesC3030
Excl.14,450SFCeiling finishes - Maintenance Buildings - No finish41
Excl.Ceiling Finishes
$36,125$2.50/SFInterior Finishes
PlumbingD20
Plumbing FixturesD2010
832208.004EAPlumbing Fixtures--FCO Floor Clean-out61
540135.004EAPlumbing Fixtures--Hose Bibb65
1,300325.004SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker
370185.002EAPlumbing Fixtures--WCO Wall Clean-out60
$3,042$0.21/SFPlumbing Fixtures
Sanitary WasteD2030
5,5201,380.004EAPlumbing fixture--AD--Traffic rated area drain62
Page 10 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 23
TotalRateQtyUnitDescription
GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
13,20060.00220LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
$20,008$1.38/SFSanitary Waste
Other Plumbing SystemsD2090
17,50017,500.001LSComplete maintenance restroom plumbing--Includes WC, LAV, FD, HB and WCO--Allowance
$17,500$1.21/SFOther Plumbing Systems
$40,550$2.81/SFPlumbing
HVACD30
Other HVAC Systems and EquipmentD3090
5,6001,400.004EAWall mounted exhaust fan with architectural louver, automatic damper, interlock and switch
4,2001,050.004EAWall mounted intake with architectural louver, automatic damper, interlock and switch
$9,800$0.68/SFOther HVAC Systems and Equipment
$9,800$0.68/SFHVAC
Fire ProtectionD40
Fire Suppression Water Supply and EquipmentD4020
880880.001EAFDC--Fire department connection84
1,2401,240.001EAFP Specialties--Dry fire sprinkler zone valve assembly82
$2,120$0.15/SFFire Suppression Water Supply and Equipment
SprinklersD4040
26,7331.8514,450SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays
$26,733$1.85/SFSprinklers
$28,853$2.00/SFFire Protection
ElectricalD50
Electrical Service & DistributionD5010
115,6008.0014,450SFElectrical service and distribution149
$115,600$8.00/SFElectrical Service & Distribution
Lighting & Branch WiringD5020
25,2881.7514,450SFConduit and wire to light fixtures and controls--Allowance25
18,0631.2514,450SFLighting controls--Allowance159
Page 11 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 24
TotalRateQtyUnitDescription
GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
101,1507.0014,450SFLighting, receptacles, branch wiring - Maintenance/Support Buildings
$144,501$10.00/SFLighting & Branch Wiring
Communications & SecurityD5030
57,8004.0014,450SFAllowance for stub-up for future systems215
21,6751.5014,450SFFire Alarm system168
$79,475$5.50/SFCommunications & Security
$339,576$23.50/SFElectrical
FurnishingsE20
Fixed FurnishingsE2010
Excl.14,450SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E
Excl.Fixed Furnishings
Excl.Furnishings
Site ImprovementsG20
Site DevelopmentG2040
46,800900.0052EABollards, incl. footing76
$46,800$3.24/SFSite Development
$46,800$3.24/SFSite Improvements
$2,144,991$148.44/SFODOT STORAGE BUILDING
Page 12 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 25
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
86,6005.0017,320SFAllowance for structural excavation, misc. earthwork 6
138,5608.0017,320SFStandard foundations4
$225,160$13.00/SFStandard Foundations
Special FoundationsA1020
Excl.17,320SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
Excl.17,320SFPremium for cement-treated sub-base - Not required203
147,2208.5017,320SFSlab on grade, 6", incl. base course and vapor barrier48
$147,220$8.50/SFSlab on Grade
$372,380$21.50/SFFoundations
SuperstructureB10
Roof ConstructionB1020
1,039,20060.0017,320SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels
$1,039,200$60.00/SFRoof Construction
Exterior WindowsB2020
Incl.ItemMechanical louvers - see HVAC195
Incl.Exterior Windows
$1,039,200$60.00/SFSuperstructure
Exterior EnclosureB20
Exterior WallsB2010
67,4464.5014,988SFInsulation to inside face of exterior walls (wall panels included in PEMB package)
$67,446$3.89/SFExterior Walls
Exterior WindowsB2020
73,61085.00866SFWindows9
$73,610$4.25/SFExterior Windows
Exterior DoorsB2030
12,9900.7517,320SFExterior man doors - Maintenance Buildings57
180,0007,500.0024EAMotorized overhead sectional doors49
$192,990$11.14/SFExterior Doors
$334,046$19.29/SFExterior Enclosure
Page 13 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 26
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
RoofingB30
Roof CoveringsB3010
138,5608.0017,320SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)
$138,560$8.00/SFRoof Coverings
$138,560$8.00/SFRoofing
Interior ConstructionC10
PartitionsC1010
12,9900.7517,320SFAllowance for rough carpentry16
51,9603.0017,320SFPartitions - Maintenance Buildings15
$64,950$3.75/SFPartitions
Interior DoorsC1020
34,6402.0017,320SFInterior doors and glazing - Maintenance Buildings39
$34,640$2.00/SFInterior Doors
SpecialtiesC1030
51,9603.0017,320SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.
$51,960$3.00/SFSpecialties
$151,550$8.75/SFInterior Construction
StairsC20
Stair ConstructionC2010
Excl.ItemMetal pan stair - None included. Assumes all single-story construction
Excl.Stair Construction
Excl.Stairs
Interior FinishesC30
Wall FinishesC3010
34,6402.0017,320SFWall finishes - Maintenance Buildings38
$34,640$2.00/SFWall Finishes
Floor FinishesC3020
43,3002.5017,320SFFloor finishes - Maintenance Buildings (sealed concrete)40
$43,300$2.50/SFFloor Finishes
Ceiling FinishesC3030
Excl.17,320SFCeiling finishes - Maintenance Buildings - No finish41
Excl.Ceiling Finishes
$77,940$4.50/SFInterior Finishes
Page 14 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 27
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
PlumbingD20
Plumbing FixturesD2010
14,7220.8517,320SFAllowance for DW and NPW valves, vents, drains and accessories
22,50022,500.001LSPlumbing fixtures, Domestic water filtration and heating equipment to serve maintenance bays
32,12532,125.001LSPlumbing fixtures, non-potable water filtration and heating equipment to serve maintenance bays
9,5260.5517,320SFPlumbing Fixtures--Allowance for unidentified plumbing fixtures
1,6901,690.001EAPlumbing Fixtures--Emergency eye wash and shower combination, including tempered water valve
624208.003EAPlumbing Fixtures--FCO Floor Clean-out61
810135.006EAPlumbing Fixtures--Hose Bibb65
15,8401,440.0011EAPlumbing Fixtures--Hose Reel--Air, water and power66
11,9351,085.0011EAPlumbing Fixtures--Lubricated air drop manifold68
1,950325.006SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker
740185.004EAPlumbing Fixtures--WCO Wall Clean-out60
$112,462$6.49/SFPlumbing Fixtures
Domestic Water DistributionD2020
17,25030.00575LFDomestic Water--Branches (1 1/4" and smaller), includes fittings and hangers
29,40042.00700LFDomestic Water--Mains (1 1/2" and larger), includes fittings, hangers
14,25030.00475LFNon Potable Water--Branches (1 1/4" and smaller), includes fittings and hangers
11,20028.00400EANon Potable Water--Service, drops 3/4" includes fittings and hangers
$72,100$4.16/SFDomestic Water Distribution
Sanitary WasteD2030
9,6601,380.007EAPlumbing fixture--AD--Traffic rated area drain62
1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
14,40060.00240LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
Page 15 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 28
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
30,680260.00118LFTrench Drain--includes installation88
$56,028$3.23/SFSanitary Waste
Other Plumbing SystemsD2090
12,1240.7017,320SFAllowance for compressed air isolation valves and devices75
17,50017,500.001LSComplete maintenance restroom plumbing--Includes WC, LAV, FD, HB and WCO--Allowance
28,10028,100.001EACompressed air equipment--Compressor/Receiver/Dryer with manifold--Used Quincy QGS
1,440180.008EAEnergy Supply--Branch Gas Pipework -- Connection to equipment or convector--Includes plug valve and regulator- -QTY is allowance
9,90033.00300LFEnergy Supply--Branch Gas Pipework -- Distribution, includes hangers--QTY is allowance
3,30055.0060LFEnergy Supply--Branch Gas Pipework -- Gas main to meter--QTY is allowance
1,2001,200.001LSExterior truck filling station86
14,40024.00600LFPipework--1"-1/2" CA, Compressed Air--150LB Blk, TE, Screwed fittings. Hangers included
$87,964$5.08/SFOther Plumbing Systems
$328,554$18.97/SFPlumbing
HVACD30
Heat Generating SystemsD3020
8,775585.0015EAInfrared heater combustion air or vent ductwork--4" Galvanized, Average 8ft long, with wall mounted sidewall gas vent
4,9002,450.002EASpace-Ray Infrared heater--20 lf long--Includes hangers, assembly and testing
10,3503,450.003EASpace-Ray Infrared heater--30 lf long--Includes hangers, assembly and testing
46,0004,600.0010EASpace-Ray Infrared heater--40 lf long--Includes hangers, assembly and testing
$70,025$4.04/SFHeat Generating Systems
Other HVAC Systems and EquipmentD3090
4,8001,200.004EACeiling fan--structure mounted126
17,3201.0017,320SFHVAC Supervision, Permit, As Builts and O&Ms-- Allowance
5,5002,750.002EAIlluminated fume extractor arm--Used Nederman #1055163
5,6001,400.004EAWall mounted exhaust fan with architectural louver, automatic damper, interlock and switch
Page 16 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 29
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
4,2001,050.004EAWall mounted intake with architectural louver, automatic damper, interlock and switch
11,0005,500.002EAWelding exhaust extractor boom with center pivot and mounting bracket
$48,420$2.80/SFOther HVAC Systems and Equipment
$118,445$6.84/SFHVAC
Fire ProtectionD40
Fire Suppression Water Supply and EquipmentD4020
880880.001EAFDC--Fire department connection84
1,2401,240.001EAFP Specialties--Dry fire sprinkler zone valve assembly82
$2,120$0.12/SFFire Suppression Water Supply and Equipment
SprinklersD4040
32,0421.8517,320SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays
$32,042$1.85/SFSprinklers
Fire Protection SpecialtiesD4050
21,00021,000.001LSVertical turbine fir pump set with accessories, panels and isolations valves
$21,000$1.21/SFFire Protection Specialties
$55,162$3.18/SFFire Protection
ElectricalD50
Electrical Service & DistributionD5010
138,5608.0017,320SFElectrical service and distribution149
$138,560$8.00/SFElectrical Service & Distribution
Lighting & Branch WiringD5020
30,3101.7517,320SFConduit and wire to light fixtures and controls--Allowance25
21,6501.2517,320SFLighting controls--Allowance159
121,2407.0017,320SFLighting, receptacles, branch wiring - Maintenance/Support Buildings
$173,200$10.00/SFLighting & Branch Wiring
Communications & SecurityD5030
14,7220.8517,320SFSecurity system--Includes CCTV and Access Control167
121,2407.0017,320SFSystems; Fire alarm, PA, tel/data, security26
43,3002.5017,320SFTelecom/Data166
$179,262$10.35/SFCommunications & Security
$491,022$28.35/SFElectrical
Page 17 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 30
TotalRateQtyUnitDescription
GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
EquipmentE10
Vehicular EquipmentE1030
62,00062,000.001LSConstruct pit for ECO 60 lift with 13ft travel range--Includes excavation, backfill, concrete work, electrical and plumbing.
98,67498,674.001LSIn-ground truck and equipment lift--30,000 lbs capacity-- Used ECO 60-13--FFA to Coos Bay, OR
4,9614,961.001LSIn-ground truck and equipment lift--Automatic wheel base positioning
11,00011,000.001LSIn-ground truck and equipment lift--Equipment installation and training
$176,635$10.20/SFVehicular Equipment
$176,635$10.20/SFEquipment
FurnishingsE20
Fixed FurnishingsE2010
Excl.17,320SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E
Excl.Fixed Furnishings
Excl.Furnishings
Site ImprovementsG20
Site DevelopmentG2040
46,800900.0052EABollards, incl. footing76
$46,800$2.70/SFSite Development
$46,800$2.70/SFSite Improvements
$3,330,294$192.28/SFODOT PRIMARY MAINTENANCE BUILDING
Page 18 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 31
TotalRateQtyUnitDescription
GFA: 798 SF Cost/SF: $121.91 Rates Current At February 2018A6 ODOT PRE-MIX CONTAINMENT BUILDING
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
3,9905.00798SFAllowance for structural excavation, misc. earthwork 6
6,3848.00798SFStandard foundations4
$10,374$13.00/SFStandard Foundations
Special FoundationsA1020
Excl.798SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
Excl.798SFPremium for cement-treated sub-base - Not required203
6,7838.50798SFSlab on grade, 6", incl. base course and vapor barrier48
$6,783$8.50/SFSlab on Grade
$17,157$21.50/SFFoundations
SuperstructureB10
Roof ConstructionB1020
23,94030.00798SFRoof framing219
$23,940$30.00/SFRoof Construction
$23,940$30.00/SFSuperstructure
Exterior EnclosureB20
Exterior WallsB2010
41,82030.001,394SFCMU walls218
$41,820$52.41/SFExterior Walls
$41,820$52.41/SFExterior Enclosure
RoofingB30
Roof CoveringsB3010
14,36418.00798SFStanding seam metal roofing, uninsulated220
$14,364$18.00/SFRoof Coverings
$14,364$18.00/SFRoofing
$97,281$121.91/SFODOT PRE-MIX CONTAINMENT BUILDING
Page 19 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 32
TotalRateQtyUnitDescription
GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FoundationsA10
Standard FoundationsA1010
6,1405.001,228SFAllowance for structural excavation, misc. earthwork 6
9,8248.001,228SFStandard foundations4
$15,964$13.00/SFStandard Foundations
Special FoundationsA1020
Excl.1,228SFPremium for piled foundation system - Not Required47
Excl.Special Foundations
Slab on GradeA1030
3,95535.00113LF12" concrete curb 216
4,9128.00614SFHousekeeping pad for de-icer tanks 202
Excl.1,228SFPremium for cement-treated sub-base - Not required203
10,4388.501,228SFSlab on grade, 6", incl. base course and vapor barrier48
$19,305$15.72/SFSlab on Grade
$35,269$28.72/SFFoundations
SuperstructureB10
Roof ConstructionB1020
73,68060.001,228SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels
$73,680$60.00/SFRoof Construction
Exterior WindowsB2020
Incl.ItemMechanical louvers - see HVAC195
Incl.Exterior Windows
$73,680$60.00/SFSuperstructure
Exterior EnclosureB20
Exterior WallsB2010
12,9384.502,875SFInsulation to inside face of exterior walls (wall panels included in PEMB package)
$12,938$10.54/SFExterior Walls
Exterior DoorsB2030
9210.751,228SFExterior man doors - Maintenance Buildings57
15,0007,500.002EAMotorized overhead sectional doors49
$15,921$12.96/SFExterior Doors
$28,859$23.50/SFExterior Enclosure
Page 20 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 33
TotalRateQtyUnitDescription
GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
RoofingB30
Roof CoveringsB3010
9,8248.001,228SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)
$9,824$8.00/SFRoof Coverings
$9,824$8.00/SFRoofing
Interior ConstructionC10
SpecialtiesC1030
3,6843.001,228SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.
$3,684$3.00/SFSpecialties
$3,684$3.00/SFInterior Construction
StairsC20
Stair ConstructionC2010
Excl.ItemMetal pan stair - None included. Assumes all single-story construction
Excl.Stair Construction
Excl.Stairs
Interior FinishesC30
Wall FinishesC3010
2,4562.001,228SFWall finishes - Maintenance Buildings38
$2,456$2.00/SFWall Finishes
Floor FinishesC3020
3,0702.501,228SFFloor finishes - Maintenance Buildings (sealed concrete)40
$3,070$2.50/SFFloor Finishes
Ceiling FinishesC3030
Excl.1,228SFCeiling finishes - Maintenance Buildings - No finish41
Excl.Ceiling Finishes
$5,526$4.50/SFInterior Finishes
PlumbingD20
Plumbing FixturesD2010
832208.004EAPlumbing Fixtures--FCO Floor Clean-out61
1,300325.004EAPlumbing Fixtures--Floor drain with auxiliary strainer87
540135.004EAPlumbing Fixtures--Hose Bibb65
650325.002SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker
Page 21 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 34
TotalRateQtyUnitDescription
GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
370185.002EAPlumbing Fixtures--WCO Wall Clean-out60
$3,692$3.01/SFPlumbing Fixtures
Domestic Water DistributionD2020
4,80030.00160LFNon Potable Water--Branches (1 1/4" and smaller), includes fittings and hangers
5,82428.00208EANon Potable Water--Service, drops 3/4" includes fittings and hangers
$10,624$8.65/SFDomestic Water Distribution
Sanitary WasteD2030
1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
5,40060.0090LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill
$6,688$5.45/SFSanitary Waste
Other Plumbing SystemsD2090
5,0005,000.001LSDe-icer storage tank dispensing pipework, pumps and truck fill stations
16,0008,000.002EADe-icer storage tanks173
$21,000$17.10/SFOther Plumbing Systems
$42,004$34.21/SFPlumbing
ElectricalD50
Electrical Service & DistributionD5010
9,8248.001,228SFElectrical service and distribution149
$9,824$8.00/SFElectrical Service & Distribution
Lighting & Branch WiringD5020
2,1491.751,228SFConduit and wire to light fixtures and controls--Allowance25
1,5351.251,228SFLighting controls--Allowance159
8,5967.001,228SFLighting, receptacles, branch wiring - Maintenance/Support Buildings
$12,280$10.00/SFLighting & Branch Wiring
$22,104$18.00/SFElectrical
Page 22 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 35
TotalRateQtyUnitDescription
GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)
A BUILDINGS
Location Uniformat Level 2/Uniformat Level 3 Item
FurnishingsE20
Fixed FurnishingsE2010
Excl.1,228SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E
Excl.Fixed Furnishings
Excl.Furnishings
$220,950$179.93/SFODOT DE-ICER CONTAINMENT BUILDING
Page 23 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 36
TotalRateQtyUnitDescription
Rates Current At February 2018B1 ON-SITE
B SITEWORK
Location Uniformat Level 2/Uniformat Level 3 Item
Site PreparationsG10
Site ClearingG1010
125,0005,000.0025.0AcreSite clearing32
$125,000Site Clearing
Site EarthworkG1030
2,475,000ItemExcavation; cut and fill - Per ODOT199
1,089,0001.001,089,000SFGrade, level, compact200
$3,564,000Site Earthwork
Hazardous Waste RemediationG1040
Excl.ItemHazardous waste remediation - Excluded29
Excl.Hazardous Waste Remediation
$3,689,000Site Preparations
Site ImprovementsG20
Parking LotsG2020
330,5368.0041,317SFAC paving at parking lots, incl. curbs, paving, base courses, etc.
630,2457.0090,035SFAC paving, heavy, incl. base courses201
868,2532.50347,301SFGravel 63
Excl.131,351SFPremium for cement-treated sub base - Not required205
$1,829,034Parking Lots
Pedestrian PavingG2030
109,8968.0013,737SFHardscape - paths, sidewalks 34
Excl.13,737SFPremium for cement-treated sub base - Not required206
$109,896Pedestrian Paving
Site DevelopmentG2040
50,00025,000.002EAAutomatic traffic gate71
7,50015.00500LFFoundation drain at retaining wall74
234,22575.003,123LFSecurity fencing70
36,400650.0056CYSite retaining wall footings46
90,00045.002,000SFSite retaining walls - Qty is Allowance36
100,000ItemAllowance for wash rack224
$518,125Site Development
LandcapingG2050
139,5404.0034,885SFSoftscape - landscaping adjacent Office Building. Assumes no irrigation
$139,540Landcaping
$2,596,595Site Improvements
Page 24 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 37
TotalRateQtyUnitDescription
Rates Current At February 2018B1 ON-SITE (continued)
B SITEWORK
Location Uniformat Level 2/Uniformat Level 3 Item
Site Civil/Mechanical UtilitiesG30
Water SupplyG3010
45,22068.00665LF8" Fire/Water Main Loop188
7,2007,200.001EABackflow Preventers in vault190
5,1505,150.001EADomestic Water Meter/Vault191
33,6004,200.008EAFire Hydrant Assemblies189
5,760480.0012EAWater Main Thrust Blocks192
$96,930Water Supply
Sanitary SewerG3020
36,0001,800.0020EACatch Basin with traffic grating182
51,92055.00944LFSanitary sewer pipework177
3,0003,000.001EASD outfall to detention pond with rip rap181
38,4004,800.008EASDMH on site183
$129,320Sanitary Sewer
Storm SewerG3030
67,20048.001,400LFAllowance for Storm Drain System Pipework--Average 15"180
766,0986.00127,683SFStormwater swales221
$833,298Storm Sewer
$1,059,548Site Civil/Mechanical Utilities
Site Electrical UtilitiesG40
Electrical DistributionG4010
80,00080,000.001LSAllowance for incoming electrical service to in ground transformer
50,00050,000.001EAAllowance for transformer and vault187
45,540103.50440LFInter-building feeder--includes excavation and backfill144
$175,540Electrical Distribution
Site LightingG4020
62,2403,890.0016EAAllowance for Site Lighting--25 FT LED Pole Mounted Site Light, including concrete base
9,240420.0022EAAllowance for Site Lighting--Building Mounted Downlights186
Page 25 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 38
TotalRateQtyUnitDescription
Rates Current At February 2018B1 ON-SITE (continued)
B SITEWORK
Location Uniformat Level 2/Uniformat Level 3 Item
55,00055,000.001LSAllowance for Site Lighting--Lighting Controls, Conduit and Handholes
$126,480Site Lighting
Site Communication and SecurityG4030
60,00060,000.001LSTelecom service feeder and vaults193
$60,000Site Communication and Security
Other Site Electrical UtilitiesG4090
200,000ItemEmergency generator - allowance includes engine, silencer, exhaust and shroud
$200,000Other Site Electrical Utilities
$562,020Site Electrical Utilities
$7,907,163ON-SITE
Page 26 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 39
TotalRateQtyUnitDescription
Rates Current At February 2018B2 OFF-SITE
B SITEWORK
Location Uniformat Level 2/Uniformat Level 3 Item
Site ImprovementsG20
RoadwaysG2010
1,500,0001,500,000.001LSPublic street improvements allowance28
$1,500,000Roadways
$1,500,000Site Improvements
$1,500,000OFF-SITE
Page 27 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 40
| Cover Sheet |
| Fly Sheets |
| Fly Sheets |
| GS (D) |
| GS (U), U2, U3 Summary |
| Fly Sheets |
| BoE |
| Fly Sheets |
| Detail |