This is a concept estimate document prepared for the Oregon Department of Transportation (ODOT) for a new facility project in Lincoln County, Oregon. The project consists of construction of seven buildings totaling 41,368 gross square feet, including a shared administrative building (4,755 SF), fueling station (2,817 SF), ODOT storage building (14,450 SF), ODOT primary maintenance building (17,320 SF), pre-mix containment building (798 SF), and de-icer containment building (1,228 SF), along with associated sitework. The estimate was prepared as of February 2018 with pricing escalated to third quarter 2019. The estimate includes detailed line-item costs broken down by Uniformat Level 2 and Level 3 classifications, covering foundations, superstructure, exterior enclosure, roofing, interior construction and finishes, plumbing, HVAC, fire protection, electrical systems, equipment, furnishings, and site improvements including on-site and off-site work.

The estimated total project cost is $25,976,699, with an estimated net cost of $17,224,316 before margins and adjustments. Margins and adjustments included in the estimate total $8,752,383 and comprise location factor (3.0% or $516,730), general conditions (8.0% or $1,419,284), bonds and insurance (3.5% or $670,611), overhead and profit (4.5% or $892,393), design contingency (15.0% or $3,108,500), and escalation to third quarter 2019 (9.0% or $2,144,865). The estimate assumes construction during normal working hours with prevailing wage rates applicable to the contractor. Specific exclusions include items marked as excluded in the estimate, shiftwork or overtime, rock or concrete excavation, underground services encountered during excavation, fireproofing steel, loose furniture and equipment, construction management fees, owner's contingency, and development soft costs.

View the file

Other files

File Type Posted
OregonBuys Vendor Quote How To Guide~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Concept Rev2

ODOT Lincoln County

ODOT Lincoln County

Our Reference: PDX21223-3

Prepared For: Oregon Department of Transportation Attn: Mike Schweizer

1.00 Estimate Summaries

2.00 Basis of Estimate

3.00 Estimate Detail

CONTENTS

Lincoln County, OR

Concept Estimate

1.00 Estimate Summaries

. Cost summary with Margins and Adjustments Distributed

. Cost summary with Margins and Adjustments Undistributed

. Uniformat Level 2 Summary

. Uniformat Level 3 Summary

Total CostCost/SFGFA SFLocation

GFA: Gross Floor Area Rates Current At February 2018Location Summary

BUILDINGSA

1,891,607397.814,755SHARED ADMIN BUILDINGA1

908,330322.452,817FUELING STATIONA2

2,967,843205.3914,450ODOT STORAGE BUILDINGA3

4,607,846266.0417,320ODOT PRIMARY MAINTENANCE BUILDINGA4

134,599168.67798ODOT PRE-MIX CONTAINMENT BUILDINGA6

305,709248.951,228ODOT DE-ICER CONTAINMENT BUILDINGA7

$10,815,934$261.4641,368A - BUILDINGS

SITEWORKB

10,940,477ON-SITEB1

2,075,423OFF-SITEB2

$13,015,900B - SITEWORK

$23,831,834$576.0941,368ESTIMATED NET COST

MARGINS & ADJUSTMENTS

$2,144,8659.0 %Escalation to 3Q2019

$25,976,699$627.9441,368ESTIMATED TOTAL COST

Page 1 of 1PDX21223-3 Printed 26 February 2018 3:51 PM 4

Total CostCost/SFGFA SFLocation

GFA: Gross Floor Area Rates Current At February 2018Location Summary

BUILDINGSA

1,367,148287.524,755SHARED ADMIN BUILDINGA1

656,489233.052,817FUELING STATIONA2

2,144,991148.4414,450ODOT STORAGE BUILDINGA3

3,330,294192.2817,320ODOT PRIMARY MAINTENANCE BUILDINGA4

97,281121.91798ODOT PRE-MIX CONTAINMENT BUILDINGA6

220,950179.931,228ODOT DE-ICER CONTAINMENT BUILDINGA7

$7,817,153$188.9741,368A - BUILDINGS

SITEWORKB

7,907,163ON-SITEB1

1,500,000OFF-SITEB2

$9,407,163B - SITEWORK

$17,224,316$416.3741,368ESTIMATED NET COST

MARGINS & ADJUSTMENTS

$516,7303.0 %Location Factor

$1,419,2848.0 %General Conditions

$670,6113.5 %Bonds & Insurance

$892,3934.5 %Overhead & Profit

$3,108,50015.0 %Design Contingency

$2,144,8659.0 %Escalation to 3Q2019

$25,976,699$627.9441,368ESTIMATED TOTAL COST

Page 1 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 5

Total CostCost/SFDescription

Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 2 Summary

$896,523$21.67FoundationsA10

$2,265,390$54.76SuperstructureB10

$1,077,205$26.04Exterior EnclosureB20

$398,636$9.64RoofingB30

$323,403$7.82Interior ConstructionC10

Excl.StairsC20

$224,112$5.42Interior FinishesC30

$478,088$11.56PlumbingD20

$266,213$6.44HVACD30

$105,421$2.55Fire ProtectionD40

$1,099,707$26.58ElectricalD50

$181,635$4.39EquipmentE10

$28,530$0.69FurnishingsE20

$3,689,000$89.18Site PreparationsG10

$4,224,395$102.12Site ImprovementsG20

$1,404,038$33.94Site Civil/Mechanical UtilitiesG30

$562,020$13.59Site Electrical UtilitiesG40

$17,224,316$416.37ESTIMATED NET COST

MARGINS & ADJUSTMENTS

$516,7303.0 %Location Factor

$1,419,2848.0 %General Conditions

$670,6113.5 %Bonds & Insurance

$892,3934.5 %Overhead & Profit

$3,108,50015.0 %Design Contingency

$2,144,8659.0 %Escalation to 3Q2019

$25,976,699$627.94ESTIMATED TOTAL COST

Page 2 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 6

Total CostCost/SFDescription

Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 3 Summary

$543,160$13.13Standard FoundationsA1010

Excl.Special FoundationsA1020

$353,363$8.54Slab on GradeA1030

$2,265,390$54.76Roof ConstructionB1020

$444,223$10.74Exterior WallsB2010

$226,100$5.47Exterior WindowsB2020

$406,882$9.84Exterior DoorsB2030

$398,636$9.64Roof CoveringsB3010

$125,576$3.04PartitionsC1010

$60,793$1.47Interior DoorsC1020

$137,034$3.31SpecialtiesC1030

Excl.Stair ConstructionC2010

$65,626$1.59Wall FinishesC3010

$125,201$3.03Floor FinishesC3020

$33,285$0.80Ceiling FinishesC3030

$161,548$3.91Plumbing FixturesD2010

$82,724$2.00Domestic Water DistributionD2020

$107,352$2.60Sanitary WasteD2030

$126,464$3.06Other Plumbing SystemsD2090

$80,105$1.94Heat Generating SystemsD3020

$23,040$0.56Cooling Generating SystemsD3030

$40,655$0.98Distribution SystemsD3040

$38,040$0.92Terminal & Package UnitsD3050

$14,265$0.34Controls & InstrumentationD3060

$3,091$0.07Systems Testing & BalancingD3070

$67,017$1.62Other HVAC Systems and EquipmentD3090

$6,170$0.15Fire Suppression Water Supply and EquipmentD4020

$78,251$1.89SprinklersD4040

$21,000$0.51Fire Protection SpecialtiesD4050

$324,560$7.85Electrical Service & DistributionD5010

$429,476$10.38Lighting & Branch WiringD5020

$345,671$8.36Communications & SecurityD5030

$176,635$4.27Vehicular EquipmentE1030

$5,000$0.12Other EquipmentE1090

$28,530$0.69Fixed FurnishingsE2010

Excl.Moveable FurnishingsE2020

$125,000$3.02Site ClearingG1010

Page 3 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 7

Total CostCost/SFDescription

Gross Floor Area: 41,368 SF Rates Current At February 2018Uniformat Level 3 Summary

$3,564,000$86.15Site EarthworkG1030

Excl.Hazardous Waste RemediationG1040

$1,500,000$36.26RoadwaysG2010

$1,829,034$44.21Parking LotsG2020

$109,896$2.66Pedestrian PavingG2030

$645,925$15.61Site DevelopmentG2040

$139,540$3.37LandcapingG2050

$96,930$2.34Water SupplyG3010

$129,320$3.13Sanitary SewerG3020

$833,298$20.14Storm SewerG3030

$344,490$8.33Fuel DistributionG3060

$175,540$4.24Electrical DistributionG4010

$126,480$3.06Site LightingG4020

$60,000$1.45Site Communication and SecurityG4030

$200,000$4.83Other Site Electrical UtilitiesG4090

$17,224,316$416.37ESTIMATED NET COST

MARGINS & ADJUSTMENTS

$516,7303.0 %Location Factor

$1,419,2848.0 %General Conditions

$670,6113.5 %Bonds & Insurance

$892,3934.5 %Overhead & Profit

$3,108,50015.0 %Design Contingency

$2,144,8659.0 %Escalation to 3Q2019

$25,976,699$627.94ESTIMATED TOTAL COST

Page 4 of 4PDX21223-3 Printed 26 February 2018 3:52 PM 8

Concept Estimate

2.00 Basis of Estimate

Description

Project Details

Basis of Estimate

The project consists of construction of new Office, Vehicle Maintenance, Equipment Storage, De-Icer Storage, Sand Shed, Pre-Mix Containment and Fueling Station buildings at the Lincoln County site.

Items Specifically Included

ESTIMATE PRICING:

. Pricing is based on Construction Costs as of February 2018.

. Margins and Adjustments are included in the estimate.

. Items included or excluded are detailed in the estimate. Other assumptions, inclusions and exclusions are listed below.

GROSS FLOOR AREA:

. Combined building square footage - 41,368 SF

The following assumptions have been made in the preparation of this estimate:

. The works will be carried out during normal working hours.

. The Contractor will be required to pay prevailing wage rates.

. Resources are available locally.

ITEMS SPECIFICALLY INCLUDED:

. Please note where allowances have been made, we would request the Design Team and Owner to review the sum to ensure the allowance meets their intent.

. Sub-Contractors Overheads and Profit are included in the unit rates.

The following items have been specifically included in Margins and Adjustments:

. Location Factor (3%)

. General Conditions (8%)

. Bonds & Insurances (3.5%)

. Overhead and Profit (4.5%)

. Design Contingency (15%)

. Escalation to 3Q2019 (9%)

Page 1 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 10

Description

Project Details

Items Specifically Excluded

ITEMS SPECIFICALLY EXCLUDED:

. Items marked as "Excl." in the estimate.

. Shiftwork or overtime working or acceleration.

. Double handling or materials due to site access restrictions.

. Delays or working restrictions on the Contractor.

. Abatement of any type

. Underpinning of adjacent structures.

. Rock or concrete excavation.

. Underground services encountered during excavation.

. De-watering required during excavation other than surface water.

. Assumes disposal of materials to a local dump only.

. Allow for improvements to existing site where shown.

. Fireproofing steel.

. Walls coverings besides that shown in estimate.

. Moveable book cases to classrooms.

. Audio visual projectors.

. Interior Landscaping.

. Loose furniture, FF&E & equipment.

. The affects of potential unfair Contract Conditions which may affect Bid pricing.

. Building & Statutory Industry Fringe Benefits.

. Statutory Authorities' charges, contributions (and compliance orders).

. The implications of proposed Construction legislation which may occur during the Construction period.

. Lack of competition amongst Sub-Contractors bidding the Project

. Unavailability of local resources to undertake specific trades and the affect on bid pricing from non-regional bidders.

. Uncompetitive bidding due to the complexity of the project Sub-Contractors work loads.

. Abnormal changes in market conditions affecting our assessment of escalation.

. Construction Management Fees.

. Owner's Contingency & Insurances.

. Development Soft Costs including; Land, Financing and Legal costs.

Documents

DESIGN DETAILS USED FOR THE ESTIMATE:

This estimate is based upon measured quantities and built-up rates prepared from the following information :

Page 2 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 11

Description

Project Details

Architectural Details provided by capirarchitecture

August 5, 2016

. Pre-Schematic site plan and drawings

. Where information was insufficient, assumptions and allowances were made based on conversations with the architect and other consultants.

Page 3 of 3PDX21223-3 Printed 26 February 2018 3:25 PM 12

Concept Estimate

3.00 Estimate Detail

TotalRateQtyUnitDescription

GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

23,7755.004,755SFAllowance for structural excavation, misc. earthwork 6

38,0408.004,755SFStandard foundations4

$61,815$13.00/SFStandard Foundations

Special FoundationsA1020

Excl.4,755SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

Excl.4,755SFPremium for cement-treated sub-base - Not required203

33,2857.004,755SFSlab on grade, 4", incl. base course and vapor barrier5

$33,285$7.00/SFSlab on Grade

$95,100$20.00/SFFoundations

SuperstructureB10

Roof ConstructionB1020

22,5544.505,012SFMetal roof deck 197

126,3364,200.0030.08TSteel roof framing to Office (assumes 12 psf)196

$148,890$31.31/SFRoof Construction

$148,890$31.31/SFSuperstructure

Exterior EnclosureB20

Exterior WallsB2010

267,65050.005,353SFExterior wall system; Siding/metal panel, framing, sheathing, rainscreen drainage plane, weather barrier, rigid insulation, batts in stud cavity, vapor permeable barrier, gyp board to inside face of wall

$267,650$56.29/SFExterior Walls

Exterior WindowsB2020

91,03585.001,071SFWindows9

$91,035$19.15/SFExterior Windows

Exterior DoorsB2030

7,1331.504,755SFExterior doors - Office11

$7,133$1.50/SFExterior Doors

$365,818$76.93/SFExterior Enclosure

Page 1 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 14

TotalRateQtyUnitDescription

GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

RoofingB30

Roof CoveringsB3010

120,28824.005,012SFStanding seam metal roof system to Office, incl. roof panels, cover board, rigid insulation, vapor barrier, and flashings/sealants

$120,288$25.30/SFRoof Coverings

$120,288$25.30/SFRoofing

Interior ConstructionC10

PartitionsC1010

3,5660.754,755SFAllowance for rough carpentry16

57,06012.004,755SFPartitions - Office Building14

$60,626$12.75/SFPartitions

Interior DoorsC1020

26,1535.504,755SFInterior doors and glazing - Office 17

$26,153$5.50/SFInterior Doors

SpecialtiesC1030

38,0408.004,755SFSpecialties - Office Buidling ; Includes markerboards, tackboards, signage, corner/wall protection, toilet fitments, lockers, fire extinguishers, etc.

$38,040$8.00/SFSpecialties

$124,819$26.25/SFInterior Construction

StairsC20

Stair ConstructionC2010

Excl.ItemMetal pan stair - None included. Assumes all single-story construction

Excl.Stair Construction

Excl.Stairs

Interior FinishesC30

Wall FinishesC3010

28,5306.004,755SFWall finishes - Office20

$28,530$6.00/SFWall Finishes

Floor FinishesC3020

35,6637.504,755SFFloor finishes - Office21

$35,663$7.50/SFFloor Finishes

Ceiling FinishesC3030

33,2857.004,755SFCeiling finishes - Office22

$33,285$7.00/SFCeiling Finishes

$97,478$20.50/SFInterior Finishes

Page 2 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 15

TotalRateQtyUnitDescription

GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

PlumbingD20

Plumbing FixturesD2010

4,0420.854,755SFAllowance for DW and NPW valves, vents, drains and accessories

38,0408.004,755SFPlumbing fixtures, pipework and equipment27

$42,082$8.85/SFPlumbing Fixtures

Sanitary WasteD2030

8,40060.00140LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

$8,400$1.77/SFSanitary Waste

$50,482$10.62/SFPlumbing

HVACD30

Heat Generating SystemsD3020

10,0803.003,360cfmFurnaces (3) 127

$10,080$2.12/SFHeat Generating Systems

Cooling Generating SystemsD3030

13,4404.003,360cfmCondensing Units (3) 129

9,60032.00300LFRefrigerant line set--Provide, install and charge132

$23,040$4.85/SFCooling Generating Systems

Distribution SystemsD3040

40,6558.554,755SFHVAC distribution ductwork, outlets, dampers and accessories

$40,655$8.55/SFDistribution Systems

Terminal & Package UnitsD3050

38,0408.004,755SFHVAC ventilation equipment allowance165

$38,040$8.00/SFTerminal & Package Units

Controls & InstrumentationD3060

14,2653.004,755SFDDC Controls - Open to alternate vendors/installers131

$14,265$3.00/SFControls & Instrumentation

Systems Testing & BalancingD3070

3,0910.654,755SFBalancing Testing and Commissioning-- Includes coordination with the subcontractor

$3,091$0.65/SFSystems Testing & Balancing

Other HVAC Systems and EquipmentD3090

4,0420.854,755SFExhaust fans/ductwork/grilles/flues--allowance134

Page 3 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 16

TotalRateQtyUnitDescription

GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

4,7551.004,755SFHVAC Supervision, Permit, As Builts and O&Ms-- Allowance

$8,797$1.85/SFOther HVAC Systems and Equipment

$137,968$29.02/SFHVAC

Fire ProtectionD40

Fire Suppression Water Supply and EquipmentD4020

880880.001EAFDC--Fire department connection84

1,0501,050.001EAFP Specialties--Wet fire sprinkler zone valve assemblies83

$1,930$0.41/SFFire Suppression Water Supply and Equipment

SprinklersD4040

14,2653.004,755SFFire sprinklers--Standard wet fire protection system--Office areas

$14,265$3.00/SFSprinklers

$16,195$3.41/SFFire Protection

ElectricalD50

Electrical Service & DistributionD5010

38,0408.004,755SFElectrical service and distribution149

$38,040$8.00/SFElectrical Service & Distribution

Lighting & Branch WiringD5020

8,3211.754,755SFConduit and wire to light fixtures and controls--Allowance25

5,9441.254,755SFLighting controls--Allowance159

57,06012.004,755SFLighting, receptacles, branch wiring - Office222

$71,325$15.00/SFLighting & Branch Wiring

Communications & SecurityD5030

4,0420.854,755SFSecurity system--Includes CCTV and Access Control167

33,2857.004,755SFSystems; Fire alarm, PA, tel/data, security26

11,8882.504,755SFTelecom/Data166

18,00018,000.001EATelephone/data; MDF and IDF Rooms system backbone--allowance

$67,215$14.14/SFCommunications & Security

$176,580$37.14/SFElectrical

Page 4 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 17

TotalRateQtyUnitDescription

GFA: 4,755 SF Cost/SF: $287.52 Rates Current At February 2018A1 SHARED ADMIN BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

EquipmentE10

Other EquipmentE1090

5,000ItemAllowance for residential appliances10

$5,000$1.05/SFOther Equipment

$5,000$1.05/SFEquipment

FurnishingsE20

Fixed FurnishingsE2010

28,5306.004,755SFCasework and furnishings - Office23

$28,530$6.00/SFFixed Furnishings

Moveable FurnishingsE2020

Excl.ItemMovable furnishings incl. carts, desks, chairs etc. - Excluded (assumed by Owner)

Excl.Moveable Furnishings

$28,530$6.00/SFFurnishings

$1,367,148$287.52/SFSHARED ADMIN BUILDING

Page 5 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 18

TotalRateQtyUnitDescription

GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

14,0855.002,817SFAllowance for structural excavation, misc. earthwork 6

5,37614.00384SFSlab on grade, 12"217

22,5368.002,817SFStandard foundations4

$41,997$14.91/SFStandard Foundations

Special FoundationsA1020

Excl.2,817SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

Excl.2,817SFPremium for cement-treated sub-base - Not required203

23,9458.502,817SFSlab on grade, 6", incl. base course and vapor barrier48

$23,945$8.50/SFSlab on Grade

$65,942$23.41/SFFoundations

SuperstructureB10

Roof ConstructionB1020

112,68040.002,817SFPre-engineered metal canopy at Fueling Station/Sand Shed (unenclosed), incl. roof framing, roofing panels

$112,680$40.00/SFRoof Construction

$112,680$40.00/SFSuperstructure

Interior FinishesC30

Floor FinishesC3020

7,0432.502,817SFFloor finishes - Maintenance Buildings (sealed concrete)40

$7,043$2.50/SFFloor Finishes

$7,043$2.50/SFInterior Finishes

PlumbingD20

Plumbing FixturesD2010

270135.002EAPlumbing Fixtures--Hose Bibb65

$270$0.10/SFPlumbing Fixtures

Sanitary WasteD2030

4,1401,380.003EAPlumbing fixture--AD--Traffic rated area drain62

1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

Page 6 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 19

TotalRateQtyUnitDescription

GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

10,80060.00180LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

$16,228$5.76/SFSanitary Waste

$16,498$5.86/SFPlumbing

Fire ProtectionD40

SprinklersD4040

5,2111.852,817SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays

$5,211$1.85/SFSprinklers

$5,211$1.85/SFFire Protection

ElectricalD50

Electrical Service & DistributionD5010

22,5368.002,817SFElectrical service and distribution149

$22,536$8.00/SFElectrical Service & Distribution

Lighting & Branch WiringD5020

4,9301.752,817SFConduit and wire to light fixtures and controls--Allowance25

3,5211.252,817SFLighting controls--Allowance159

19,7197.002,817SFLighting, receptacles, branch wiring - Maintenance/Support Buildings

$28,170$10.00/SFLighting & Branch Wiring

Communications & SecurityD5030

19,7197.002,817SFSystems; Fire alarm, PA, tel/data, security26

$19,719$7.00/SFCommunications & Security

$70,425$25.00/SFElectrical

Site ImprovementsG20

Site DevelopmentG2040

34,200900.0038EABollards, incl. footing76

$34,200$12.14/SFSite Development

$34,200$12.14/SFSite Improvements

Site Civil/Mechanical UtilitiesG30

Fuel DistributionG3060

11,90085.00140LFDouble wall geoduct containment piping116

80,00020,000.004EAFuel dispensers including dispensing equipment, nozzles, hoses, etc.

Page 7 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 20

TotalRateQtyUnitDescription

GFA: 2,817 SF Cost/SF: $233.05 Rates Current At February 2018A2 FUELING STATION (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

120,000120,000.001EAFuel Storage tank--Diesel--40,000 gal--Provide and install112

94,37094,370.001EAFuel Storage tank--Unleaded--10,000 gal--Provide and install

720180.004EAPortable Rotary Stinger Pumps and 15 gallon fuel transfer tanks

30,00010,000.003EARemote fill station/manhole110

4,5001,500.003EAVent pipe including termination114

3,0003,000.001EAWater and Air dispenser115

$344,490$122.29/SFFuel Distribution

$344,490$122.29/SFSite Civil/Mechanical Utilities

$656,489$233.05/SFFUELING STATION

Page 8 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 21

TotalRateQtyUnitDescription

GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

72,2505.0014,450SFAllowance for structural excavation, misc. earthwork 6

115,6008.0014,450SFStandard foundations4

$187,850$13.00/SFStandard Foundations

Special FoundationsA1020

Excl.14,450SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

Excl.14,450SFPremium for cement-treated sub-base - Not required203

122,8258.5014,450SFSlab on grade, 6", incl. base course and vapor barrier48

$122,825$8.50/SFSlab on Grade

$310,675$21.50/SFFoundations

SuperstructureB10

Roof ConstructionB1020

867,00060.0014,450SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels

$867,000$60.00/SFRoof Construction

Exterior WindowsB2020

Incl.ItemMechanical louvers - see HVAC195

Incl.Exterior Windows

$867,000$60.00/SFSuperstructure

Exterior EnclosureB20

Exterior WallsB2010

54,3694.5012,082SFInsulation to inside face of exterior walls (wall panels included in PEMB package)

$54,369$3.76/SFExterior Walls

Exterior WindowsB2020

61,45585.00723SFWindows9

$61,455$4.25/SFExterior Windows

Exterior DoorsB2030

10,8380.7514,450SFExterior man doors - Maintenance Buildings57

180,0007,500.0024EAMotorized overhead sectional doors49

$190,838$13.21/SFExterior Doors

$306,662$21.22/SFExterior Enclosure

Page 9 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 22

TotalRateQtyUnitDescription

GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

RoofingB30

Roof CoveringsB3010

115,6008.0014,450SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)

$115,600$8.00/SFRoof Coverings

$115,600$8.00/SFRoofing

Interior ConstructionC10

SpecialtiesC1030

43,3503.0014,450SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.

$43,350$3.00/SFSpecialties

$43,350$3.00/SFInterior Construction

StairsC20

Stair ConstructionC2010

Excl.ItemMetal pan stair - None included. Assumes all single-story construction

Excl.Stair Construction

Excl.Stairs

Interior FinishesC30

Floor FinishesC3020

36,1252.5014,450SFFloor finishes - Maintenance Buildings (sealed concrete)40

$36,125$2.50/SFFloor Finishes

Ceiling FinishesC3030

Excl.14,450SFCeiling finishes - Maintenance Buildings - No finish41

Excl.Ceiling Finishes

$36,125$2.50/SFInterior Finishes

PlumbingD20

Plumbing FixturesD2010

832208.004EAPlumbing Fixtures--FCO Floor Clean-out61

540135.004EAPlumbing Fixtures--Hose Bibb65

1,300325.004SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker

370185.002EAPlumbing Fixtures--WCO Wall Clean-out60

$3,042$0.21/SFPlumbing Fixtures

Sanitary WasteD2030

5,5201,380.004EAPlumbing fixture--AD--Traffic rated area drain62

Page 10 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 23

TotalRateQtyUnitDescription

GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

13,20060.00220LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

$20,008$1.38/SFSanitary Waste

Other Plumbing SystemsD2090

17,50017,500.001LSComplete maintenance restroom plumbing--Includes WC, LAV, FD, HB and WCO--Allowance

$17,500$1.21/SFOther Plumbing Systems

$40,550$2.81/SFPlumbing

HVACD30

Other HVAC Systems and EquipmentD3090

5,6001,400.004EAWall mounted exhaust fan with architectural louver, automatic damper, interlock and switch

4,2001,050.004EAWall mounted intake with architectural louver, automatic damper, interlock and switch

$9,800$0.68/SFOther HVAC Systems and Equipment

$9,800$0.68/SFHVAC

Fire ProtectionD40

Fire Suppression Water Supply and EquipmentD4020

880880.001EAFDC--Fire department connection84

1,2401,240.001EAFP Specialties--Dry fire sprinkler zone valve assembly82

$2,120$0.15/SFFire Suppression Water Supply and Equipment

SprinklersD4040

26,7331.8514,450SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays

$26,733$1.85/SFSprinklers

$28,853$2.00/SFFire Protection

ElectricalD50

Electrical Service & DistributionD5010

115,6008.0014,450SFElectrical service and distribution149

$115,600$8.00/SFElectrical Service & Distribution

Lighting & Branch WiringD5020

25,2881.7514,450SFConduit and wire to light fixtures and controls--Allowance25

18,0631.2514,450SFLighting controls--Allowance159

Page 11 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 24

TotalRateQtyUnitDescription

GFA: 14,450 SF Cost/SF: $148.44 Rates Current At February 2018A3 ODOT STORAGE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

101,1507.0014,450SFLighting, receptacles, branch wiring - Maintenance/Support Buildings

$144,501$10.00/SFLighting & Branch Wiring

Communications & SecurityD5030

57,8004.0014,450SFAllowance for stub-up for future systems215

21,6751.5014,450SFFire Alarm system168

$79,475$5.50/SFCommunications & Security

$339,576$23.50/SFElectrical

FurnishingsE20

Fixed FurnishingsE2010

Excl.14,450SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E

Excl.Fixed Furnishings

Excl.Furnishings

Site ImprovementsG20

Site DevelopmentG2040

46,800900.0052EABollards, incl. footing76

$46,800$3.24/SFSite Development

$46,800$3.24/SFSite Improvements

$2,144,991$148.44/SFODOT STORAGE BUILDING

Page 12 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 25

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

86,6005.0017,320SFAllowance for structural excavation, misc. earthwork 6

138,5608.0017,320SFStandard foundations4

$225,160$13.00/SFStandard Foundations

Special FoundationsA1020

Excl.17,320SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

Excl.17,320SFPremium for cement-treated sub-base - Not required203

147,2208.5017,320SFSlab on grade, 6", incl. base course and vapor barrier48

$147,220$8.50/SFSlab on Grade

$372,380$21.50/SFFoundations

SuperstructureB10

Roof ConstructionB1020

1,039,20060.0017,320SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels

$1,039,200$60.00/SFRoof Construction

Exterior WindowsB2020

Incl.ItemMechanical louvers - see HVAC195

Incl.Exterior Windows

$1,039,200$60.00/SFSuperstructure

Exterior EnclosureB20

Exterior WallsB2010

67,4464.5014,988SFInsulation to inside face of exterior walls (wall panels included in PEMB package)

$67,446$3.89/SFExterior Walls

Exterior WindowsB2020

73,61085.00866SFWindows9

$73,610$4.25/SFExterior Windows

Exterior DoorsB2030

12,9900.7517,320SFExterior man doors - Maintenance Buildings57

180,0007,500.0024EAMotorized overhead sectional doors49

$192,990$11.14/SFExterior Doors

$334,046$19.29/SFExterior Enclosure

Page 13 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 26

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

RoofingB30

Roof CoveringsB3010

138,5608.0017,320SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)

$138,560$8.00/SFRoof Coverings

$138,560$8.00/SFRoofing

Interior ConstructionC10

PartitionsC1010

12,9900.7517,320SFAllowance for rough carpentry16

51,9603.0017,320SFPartitions - Maintenance Buildings15

$64,950$3.75/SFPartitions

Interior DoorsC1020

34,6402.0017,320SFInterior doors and glazing - Maintenance Buildings39

$34,640$2.00/SFInterior Doors

SpecialtiesC1030

51,9603.0017,320SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.

$51,960$3.00/SFSpecialties

$151,550$8.75/SFInterior Construction

StairsC20

Stair ConstructionC2010

Excl.ItemMetal pan stair - None included. Assumes all single-story construction

Excl.Stair Construction

Excl.Stairs

Interior FinishesC30

Wall FinishesC3010

34,6402.0017,320SFWall finishes - Maintenance Buildings38

$34,640$2.00/SFWall Finishes

Floor FinishesC3020

43,3002.5017,320SFFloor finishes - Maintenance Buildings (sealed concrete)40

$43,300$2.50/SFFloor Finishes

Ceiling FinishesC3030

Excl.17,320SFCeiling finishes - Maintenance Buildings - No finish41

Excl.Ceiling Finishes

$77,940$4.50/SFInterior Finishes

Page 14 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 27

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

PlumbingD20

Plumbing FixturesD2010

14,7220.8517,320SFAllowance for DW and NPW valves, vents, drains and accessories

22,50022,500.001LSPlumbing fixtures, Domestic water filtration and heating equipment to serve maintenance bays

32,12532,125.001LSPlumbing fixtures, non-potable water filtration and heating equipment to serve maintenance bays

9,5260.5517,320SFPlumbing Fixtures--Allowance for unidentified plumbing fixtures

1,6901,690.001EAPlumbing Fixtures--Emergency eye wash and shower combination, including tempered water valve

624208.003EAPlumbing Fixtures--FCO Floor Clean-out61

810135.006EAPlumbing Fixtures--Hose Bibb65

15,8401,440.0011EAPlumbing Fixtures--Hose Reel--Air, water and power66

11,9351,085.0011EAPlumbing Fixtures--Lubricated air drop manifold68

1,950325.006SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker

740185.004EAPlumbing Fixtures--WCO Wall Clean-out60

$112,462$6.49/SFPlumbing Fixtures

Domestic Water DistributionD2020

17,25030.00575LFDomestic Water--Branches (1 1/4" and smaller), includes fittings and hangers

29,40042.00700LFDomestic Water--Mains (1 1/2" and larger), includes fittings, hangers

14,25030.00475LFNon Potable Water--Branches (1 1/4" and smaller), includes fittings and hangers

11,20028.00400EANon Potable Water--Service, drops 3/4" includes fittings and hangers

$72,100$4.16/SFDomestic Water Distribution

Sanitary WasteD2030

9,6601,380.007EAPlumbing fixture--AD--Traffic rated area drain62

1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

14,40060.00240LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

Page 15 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 28

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

30,680260.00118LFTrench Drain--includes installation88

$56,028$3.23/SFSanitary Waste

Other Plumbing SystemsD2090

12,1240.7017,320SFAllowance for compressed air isolation valves and devices75

17,50017,500.001LSComplete maintenance restroom plumbing--Includes WC, LAV, FD, HB and WCO--Allowance

28,10028,100.001EACompressed air equipment--Compressor/Receiver/Dryer with manifold--Used Quincy QGS

1,440180.008EAEnergy Supply--Branch Gas Pipework -- Connection to equipment or convector--Includes plug valve and regulator- -QTY is allowance

9,90033.00300LFEnergy Supply--Branch Gas Pipework -- Distribution, includes hangers--QTY is allowance

3,30055.0060LFEnergy Supply--Branch Gas Pipework -- Gas main to meter--QTY is allowance

1,2001,200.001LSExterior truck filling station86

14,40024.00600LFPipework--1"-1/2" CA, Compressed Air--150LB Blk, TE, Screwed fittings. Hangers included

$87,964$5.08/SFOther Plumbing Systems

$328,554$18.97/SFPlumbing

HVACD30

Heat Generating SystemsD3020

8,775585.0015EAInfrared heater combustion air or vent ductwork--4" Galvanized, Average 8ft long, with wall mounted sidewall gas vent

4,9002,450.002EASpace-Ray Infrared heater--20 lf long--Includes hangers, assembly and testing

10,3503,450.003EASpace-Ray Infrared heater--30 lf long--Includes hangers, assembly and testing

46,0004,600.0010EASpace-Ray Infrared heater--40 lf long--Includes hangers, assembly and testing

$70,025$4.04/SFHeat Generating Systems

Other HVAC Systems and EquipmentD3090

4,8001,200.004EACeiling fan--structure mounted126

17,3201.0017,320SFHVAC Supervision, Permit, As Builts and O&Ms-- Allowance

5,5002,750.002EAIlluminated fume extractor arm--Used Nederman #1055163

5,6001,400.004EAWall mounted exhaust fan with architectural louver, automatic damper, interlock and switch

Page 16 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 29

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

4,2001,050.004EAWall mounted intake with architectural louver, automatic damper, interlock and switch

11,0005,500.002EAWelding exhaust extractor boom with center pivot and mounting bracket

$48,420$2.80/SFOther HVAC Systems and Equipment

$118,445$6.84/SFHVAC

Fire ProtectionD40

Fire Suppression Water Supply and EquipmentD4020

880880.001EAFDC--Fire department connection84

1,2401,240.001EAFP Specialties--Dry fire sprinkler zone valve assembly82

$2,120$0.12/SFFire Suppression Water Supply and Equipment

SprinklersD4040

32,0421.8517,320SFFire sprinklers--Standard wet fire protection system-- Maintenance Bays

$32,042$1.85/SFSprinklers

Fire Protection SpecialtiesD4050

21,00021,000.001LSVertical turbine fir pump set with accessories, panels and isolations valves

$21,000$1.21/SFFire Protection Specialties

$55,162$3.18/SFFire Protection

ElectricalD50

Electrical Service & DistributionD5010

138,5608.0017,320SFElectrical service and distribution149

$138,560$8.00/SFElectrical Service & Distribution

Lighting & Branch WiringD5020

30,3101.7517,320SFConduit and wire to light fixtures and controls--Allowance25

21,6501.2517,320SFLighting controls--Allowance159

121,2407.0017,320SFLighting, receptacles, branch wiring - Maintenance/Support Buildings

$173,200$10.00/SFLighting & Branch Wiring

Communications & SecurityD5030

14,7220.8517,320SFSecurity system--Includes CCTV and Access Control167

121,2407.0017,320SFSystems; Fire alarm, PA, tel/data, security26

43,3002.5017,320SFTelecom/Data166

$179,262$10.35/SFCommunications & Security

$491,022$28.35/SFElectrical

Page 17 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 30

TotalRateQtyUnitDescription

GFA: 17,320 SF Cost/SF: $192.28 Rates Current At February 2018A4 ODOT PRIMARY MAINTENANCE BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

EquipmentE10

Vehicular EquipmentE1030

62,00062,000.001LSConstruct pit for ECO 60 lift with 13ft travel range--Includes excavation, backfill, concrete work, electrical and plumbing.

98,67498,674.001LSIn-ground truck and equipment lift--30,000 lbs capacity-- Used ECO 60-13--FFA to Coos Bay, OR

4,9614,961.001LSIn-ground truck and equipment lift--Automatic wheel base positioning

11,00011,000.001LSIn-ground truck and equipment lift--Equipment installation and training

$176,635$10.20/SFVehicular Equipment

$176,635$10.20/SFEquipment

FurnishingsE20

Fixed FurnishingsE2010

Excl.17,320SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E

Excl.Fixed Furnishings

Excl.Furnishings

Site ImprovementsG20

Site DevelopmentG2040

46,800900.0052EABollards, incl. footing76

$46,800$2.70/SFSite Development

$46,800$2.70/SFSite Improvements

$3,330,294$192.28/SFODOT PRIMARY MAINTENANCE BUILDING

Page 18 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 31

TotalRateQtyUnitDescription

GFA: 798 SF Cost/SF: $121.91 Rates Current At February 2018A6 ODOT PRE-MIX CONTAINMENT BUILDING

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

3,9905.00798SFAllowance for structural excavation, misc. earthwork 6

6,3848.00798SFStandard foundations4

$10,374$13.00/SFStandard Foundations

Special FoundationsA1020

Excl.798SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

Excl.798SFPremium for cement-treated sub-base - Not required203

6,7838.50798SFSlab on grade, 6", incl. base course and vapor barrier48

$6,783$8.50/SFSlab on Grade

$17,157$21.50/SFFoundations

SuperstructureB10

Roof ConstructionB1020

23,94030.00798SFRoof framing219

$23,940$30.00/SFRoof Construction

$23,940$30.00/SFSuperstructure

Exterior EnclosureB20

Exterior WallsB2010

41,82030.001,394SFCMU walls218

$41,820$52.41/SFExterior Walls

$41,820$52.41/SFExterior Enclosure

RoofingB30

Roof CoveringsB3010

14,36418.00798SFStanding seam metal roofing, uninsulated220

$14,364$18.00/SFRoof Coverings

$14,364$18.00/SFRoofing

$97,281$121.91/SFODOT PRE-MIX CONTAINMENT BUILDING

Page 19 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 32

TotalRateQtyUnitDescription

GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FoundationsA10

Standard FoundationsA1010

6,1405.001,228SFAllowance for structural excavation, misc. earthwork 6

9,8248.001,228SFStandard foundations4

$15,964$13.00/SFStandard Foundations

Special FoundationsA1020

Excl.1,228SFPremium for piled foundation system - Not Required47

Excl.Special Foundations

Slab on GradeA1030

3,95535.00113LF12" concrete curb 216

4,9128.00614SFHousekeeping pad for de-icer tanks 202

Excl.1,228SFPremium for cement-treated sub-base - Not required203

10,4388.501,228SFSlab on grade, 6", incl. base course and vapor barrier48

$19,305$15.72/SFSlab on Grade

$35,269$28.72/SFFoundations

SuperstructureB10

Roof ConstructionB1020

73,68060.001,228SFPre-engineered metal building, incl. roof framing, roofing panels, secondary framing (wind girts/cladding support), wall panels

$73,680$60.00/SFRoof Construction

Exterior WindowsB2020

Incl.ItemMechanical louvers - see HVAC195

Incl.Exterior Windows

$73,680$60.00/SFSuperstructure

Exterior EnclosureB20

Exterior WallsB2010

12,9384.502,875SFInsulation to inside face of exterior walls (wall panels included in PEMB package)

$12,938$10.54/SFExterior Walls

Exterior DoorsB2030

9210.751,228SFExterior man doors - Maintenance Buildings57

15,0007,500.002EAMotorized overhead sectional doors49

$15,921$12.96/SFExterior Doors

$28,859$23.50/SFExterior Enclosure

Page 20 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 33

TotalRateQtyUnitDescription

GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

RoofingB30

Roof CoveringsB3010

9,8248.001,228SFRoof insulation, weather barrier (standing seam metal panels included in PEMB package)

$9,824$8.00/SFRoof Coverings

$9,824$8.00/SFRoofing

Interior ConstructionC10

SpecialtiesC1030

3,6843.001,228SFSpecialties - Maintenance Buidlings ; Includes signage, corner/wall protection, fire extinguishers, etc.

$3,684$3.00/SFSpecialties

$3,684$3.00/SFInterior Construction

StairsC20

Stair ConstructionC2010

Excl.ItemMetal pan stair - None included. Assumes all single-story construction

Excl.Stair Construction

Excl.Stairs

Interior FinishesC30

Wall FinishesC3010

2,4562.001,228SFWall finishes - Maintenance Buildings38

$2,456$2.00/SFWall Finishes

Floor FinishesC3020

3,0702.501,228SFFloor finishes - Maintenance Buildings (sealed concrete)40

$3,070$2.50/SFFloor Finishes

Ceiling FinishesC3030

Excl.1,228SFCeiling finishes - Maintenance Buildings - No finish41

Excl.Ceiling Finishes

$5,526$4.50/SFInterior Finishes

PlumbingD20

Plumbing FixturesD2010

832208.004EAPlumbing Fixtures--FCO Floor Clean-out61

1,300325.004EAPlumbing Fixtures--Floor drain with auxiliary strainer87

540135.004EAPlumbing Fixtures--Hose Bibb65

650325.002SFPlumbing Fixtures--Wall Hydrant--removable handle, freeze proof, with vacuum breaker

Page 21 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 34

TotalRateQtyUnitDescription

GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

370185.002EAPlumbing Fixtures--WCO Wall Clean-out60

$3,692$3.01/SFPlumbing Fixtures

Domestic Water DistributionD2020

4,80030.00160LFNon Potable Water--Branches (1 1/4" and smaller), includes fittings and hangers

5,82428.00208EANon Potable Water--Service, drops 3/4" includes fittings and hangers

$10,624$8.65/SFDomestic Water Distribution

Sanitary WasteD2030

1,28846.0028LFSWV Pipe work--2" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

5,40060.0090LFSWV Pipe work--4" UG (PVC Sch. 40 DWV); Includes fittings, tracer cable and excavation/backfill

$6,688$5.45/SFSanitary Waste

Other Plumbing SystemsD2090

5,0005,000.001LSDe-icer storage tank dispensing pipework, pumps and truck fill stations

16,0008,000.002EADe-icer storage tanks173

$21,000$17.10/SFOther Plumbing Systems

$42,004$34.21/SFPlumbing

ElectricalD50

Electrical Service & DistributionD5010

9,8248.001,228SFElectrical service and distribution149

$9,824$8.00/SFElectrical Service & Distribution

Lighting & Branch WiringD5020

2,1491.751,228SFConduit and wire to light fixtures and controls--Allowance25

1,5351.251,228SFLighting controls--Allowance159

8,5967.001,228SFLighting, receptacles, branch wiring - Maintenance/Support Buildings

$12,280$10.00/SFLighting & Branch Wiring

$22,104$18.00/SFElectrical

Page 22 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 35

TotalRateQtyUnitDescription

GFA: 1,228 SF Cost/SF: $179.93 Rates Current At February 2018A7 ODOT DE-ICER CONTAINMENT BUILDING (continued)

A BUILDINGS

Location Uniformat Level 2/Uniformat Level 3 Item

FurnishingsE20

Fixed FurnishingsE2010

Excl.1,228SFStorage racking, tool storage - Maintenance Buildings - Assumes FF&E

Excl.Fixed Furnishings

Excl.Furnishings

$220,950$179.93/SFODOT DE-ICER CONTAINMENT BUILDING

Page 23 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 36

TotalRateQtyUnitDescription

Rates Current At February 2018B1 ON-SITE

B SITEWORK

Location Uniformat Level 2/Uniformat Level 3 Item

Site PreparationsG10

Site ClearingG1010

125,0005,000.0025.0AcreSite clearing32

$125,000Site Clearing

Site EarthworkG1030

2,475,000ItemExcavation; cut and fill - Per ODOT199

1,089,0001.001,089,000SFGrade, level, compact200

$3,564,000Site Earthwork

Hazardous Waste RemediationG1040

Excl.ItemHazardous waste remediation - Excluded29

Excl.Hazardous Waste Remediation

$3,689,000Site Preparations

Site ImprovementsG20

Parking LotsG2020

330,5368.0041,317SFAC paving at parking lots, incl. curbs, paving, base courses, etc.

630,2457.0090,035SFAC paving, heavy, incl. base courses201

868,2532.50347,301SFGravel 63

Excl.131,351SFPremium for cement-treated sub base - Not required205

$1,829,034Parking Lots

Pedestrian PavingG2030

109,8968.0013,737SFHardscape - paths, sidewalks 34

Excl.13,737SFPremium for cement-treated sub base - Not required206

$109,896Pedestrian Paving

Site DevelopmentG2040

50,00025,000.002EAAutomatic traffic gate71

7,50015.00500LFFoundation drain at retaining wall74

234,22575.003,123LFSecurity fencing70

36,400650.0056CYSite retaining wall footings46

90,00045.002,000SFSite retaining walls - Qty is Allowance36

100,000ItemAllowance for wash rack224

$518,125Site Development

LandcapingG2050

139,5404.0034,885SFSoftscape - landscaping adjacent Office Building. Assumes no irrigation

$139,540Landcaping

$2,596,595Site Improvements

Page 24 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 37

TotalRateQtyUnitDescription

Rates Current At February 2018B1 ON-SITE (continued)

B SITEWORK

Location Uniformat Level 2/Uniformat Level 3 Item

Site Civil/Mechanical UtilitiesG30

Water SupplyG3010

45,22068.00665LF8" Fire/Water Main Loop188

7,2007,200.001EABackflow Preventers in vault190

5,1505,150.001EADomestic Water Meter/Vault191

33,6004,200.008EAFire Hydrant Assemblies189

5,760480.0012EAWater Main Thrust Blocks192

$96,930Water Supply

Sanitary SewerG3020

36,0001,800.0020EACatch Basin with traffic grating182

51,92055.00944LFSanitary sewer pipework177

3,0003,000.001EASD outfall to detention pond with rip rap181

38,4004,800.008EASDMH on site183

$129,320Sanitary Sewer

Storm SewerG3030

67,20048.001,400LFAllowance for Storm Drain System Pipework--Average 15"180

766,0986.00127,683SFStormwater swales221

$833,298Storm Sewer

$1,059,548Site Civil/Mechanical Utilities

Site Electrical UtilitiesG40

Electrical DistributionG4010

80,00080,000.001LSAllowance for incoming electrical service to in ground transformer

50,00050,000.001EAAllowance for transformer and vault187

45,540103.50440LFInter-building feeder--includes excavation and backfill144

$175,540Electrical Distribution

Site LightingG4020

62,2403,890.0016EAAllowance for Site Lighting--25 FT LED Pole Mounted Site Light, including concrete base

9,240420.0022EAAllowance for Site Lighting--Building Mounted Downlights186

Page 25 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 38

TotalRateQtyUnitDescription

Rates Current At February 2018B1 ON-SITE (continued)

B SITEWORK

Location Uniformat Level 2/Uniformat Level 3 Item

55,00055,000.001LSAllowance for Site Lighting--Lighting Controls, Conduit and Handholes

$126,480Site Lighting

Site Communication and SecurityG4030

60,00060,000.001LSTelecom service feeder and vaults193

$60,000Site Communication and Security

Other Site Electrical UtilitiesG4090

200,000ItemEmergency generator - allowance includes engine, silencer, exhaust and shroud

$200,000Other Site Electrical Utilities

$562,020Site Electrical Utilities

$7,907,163ON-SITE

Page 26 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 39

TotalRateQtyUnitDescription

Rates Current At February 2018B2 OFF-SITE

B SITEWORK

Location Uniformat Level 2/Uniformat Level 3 Item

Site ImprovementsG20

RoadwaysG2010

1,500,0001,500,000.001LSPublic street improvements allowance28

$1,500,000Roadways

$1,500,000Site Improvements

$1,500,000OFF-SITE

Page 27 of 27PDX21223-3 Printed 26 February 2018 3:54 PM 40

Cover Sheet
Fly Sheets
Fly Sheets
GS (D)
GS (U), U2, U3 Summary
Fly Sheets
BoE
Fly Sheets
Detail

File details come from the government source that posted it. Updated .