PCSPHUHSBoilerRepalcementMechanical.pdf
PDF 5 MB Posted
- Attached to
- Boiler Replacement
- Solicitation number
- 26-CD-035
- Issued by
- Pinellas County, Florida
About this file
This is a 100% Construction Bid Set document prepared by consulting engineers for the Pinellas County Schools district regarding a boiler replacement project at Palm Harbor University High School located at 1900 Omaha Street, Palm Harbor, Florida. The project scope includes the installation of two new gas-fired condensing hydronic heating boilers (Riello AR 2000 models, 2,000 MBH each) with all associated piping, ductwork, hydronic accessories, and direct digital controls. The project also includes an alternate bid line item for replacing two existing base-mounted end suction pumps (HHWP-1 and HHWP-2) with new in-kind pumps. Sealed electronic bids are due by 4:00 pm on Wednesday, September 23, 2026, through the Pinellas County Schools e-Procurement Portal. The construction document set includes mechanical demolition plans, renovation plans, mechanical details, and controls details with an issue date of August 12, 2026.
The boilers specified are equipped with multiple independent burner modules, integral cascade sequencers with BACnet MSTP interface, stainless steel condensing heat exchangers, and 7-inch capacitive touchscreen interfaces with WiFi and Ethernet connectivity. Both units are rated at 96.1% thermal efficiency with operating pressures of 80 psig maximum and supply water temperature of 180°F. The contractor must provide shop drawings, perform factory-trained startup and owner training, coordinate with an independent commissioning authority and test and balance agency, and submit as-built drawings and operations and maintenance manuals within 90 days of certificate of occupancy receipt. All work shall comply with the 2023 Florida Building Code, NFPA standards, and ASHRAE guidelines, with equipment manufactured to withstand a sea coast environment. The contractor must visit the site before fabrication to verify clearances and coordinate with all trades.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTING ENGINEERS
154A Whitaker Rd.
Lutz, Florida 33549 (813)333-2103 www.BALengineering.com
DESIGN TEAM PROJECT INFORMATION DRAWING INDEX
CONSULTANTS:
PALM HARBOR UNIVERSITY HS
BOILER REPLACEMENT PROJECT
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
08-12-2026
PROJECT SHEET INDEX
Sheet Number Sheet Name Project Issue Date Current Revision
M0.1 LEGEND, NOTES, & SCHEDULES 08-12-2026
M1.1 MECHANICAL DEMOLITION PLAN 08-12-2026
M2.1 MECHANICAL RENOVATION PLANS 08-12-2026
M3.1 MECHANICAL DETAILS 08-12-2026
M3.2 MECHANICAL DETAILS 08-12-2026
M4.1 CONTROLS LEGEND, NOTES, & DETAILS 08-12-2026
E1.1 ELECTRICAL RENOVATION PLAN 08-12-2026
240 Pine Ave. N Oldsmar, Florida 34677 (813)855-2721 www.MPSENG.com
SCHOOL BOARD MEMBERS
KEVIN K. HENDRICK - SUPERINTENDENT
CAPRICE EDMOND - CHAIRPERSON
DAWN M. PETERS - VICE CHAIRPERSON
KATIE BLAXBERG - MEMBER
LISA N. CANE - MEMBER
LAURA HINE - MEMBER
EILEEN M. LONG - MEMBER
STEPHANIE MEYER - MEMBER
AREA MAP
CAMPUS LOCATION
CAMPUS MAP
AREA OF WORK
PCS PROJECT NUMBER: 9576
GENERAL MECHANICAL NOTES
M
230000
1. THE INTENT OF THESE NOTES AND THE MECHANICAL NOTES ON THE DRAWINGS IS TO CLARIFY THE SCOPE OF WORK AND ALERT THE CONTRACTOR OF FIELD CONDITIONS. CONTRACTOR TO VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE PROTECTION SUBCONTRACTOR BEFORE ANY CONSTRUCTION WORK. NO ALLOWANCES WILL BE MADE FOR THE
CONTRACTOR'S UNFAMILIARITY WITH THE JOB SITE AND CONDITIONS.
2. PLANS SHALL NOT BE SCALED. PLANS INDICATE THE SCHEMATIC LAYOUT AND LOCATION OF THE MECHANICAL SYSTEM COMPONENTS.
UNLESS SPECIFIC DIMENSIONS ARE NOTED, THE ACTUAL LOCATION OF THESE COMPONENTS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH THE WORK OF OTHER TRADES, THE USE OF MANUFACTURER’S SHOP DRAWINGS AND SIMILAR CERTIFIED DATA. THE ELEVATION OF EXPOSED DUCTWORK SHALL BE COORDINATED WITH THE ARCHITECT PRIOR TO ORDERING ANY DUCTWORK.
3. NO EXCLUSIONS FROM OR LIMITATIONS IN THE LANGUAGE USED IN THE CONTRACT DOCUMENTS SHALL BE INTERPRETED AS MEANING THAT THE EQUIPMENT, APPURTENANCES, AND/OR ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM ARE NOT TO
BE PROVIDED AS REQUIRED.
A. THE CONTRACTOR SHALL HAVE A COMPLETE SET OF THE CONTRACT DOCUMENTS. THE SEPARATE DIVISIONAL DRAWINGS AND
SPECIFICATIONS DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE THE WORK WHICH IS INDICATED ON ANY OF THE DRAWINGS OR DIVISION OF THE SPECIFICATIONS. REVIEW AND COORDINATE THE SCOPE OF WORK TO ASSURE A COMPLETE AND FUNCTIONAL SYSTEM IS INSTALLED. SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW.
4. SUBMIT SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW. WHERE MANUFACTURERS ARE LISTED IN THE PROJECT MANUAL, ONE OF THOSE MANUFACTURERS SHALL BE PROVIDED UNLESS A REQUEST FOR SUBSTITUTION HAS BEEN SUBMITTED PRIOR TO BID AND THE MANUFACTURER SUBSEQUENTLY IS LISTED AS AN ACCEPTABLE MANUFACTURER IN AN ADDENDUM. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW AND APPROVAL. INSTALL AND TEST ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND RECOMMENDATIONS. FOR ALL EQUIPMENT, WHICH HAS BEEN SCHEDULED DIRECTLY ON THE DRAWINGS, PROVIDE WITHIN THE SUBMITTAL, A PERFORMANCE SCHEDULE FOR THE PROPOSED EQUIPMENT IN THE EXACT SAME FORMAT AS INCLUDED ON THE CONTRACT DOCUMENTS. FAILURE TO PROVIDE REQUIRED PERFORMANCE SCHEDULE WILL RESULT IN REJECTION OF THE ENTIRE SUBMITTAL.
SUBMIT DRAWINGS AND CUT SHEETS FOR ALL PRODUCTS ALL AT ONE TIME. INDEX ALL ITEMS TO THE PROJECT MANUAL OR DRAWINGS AS APPLICABLE. SHOP DRAWINGS THAT DEVIATE FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL LIST ALL DIFFERENCES IN A COVER LETTER ATTACHED TO FRONT OF THE SUBMITTAL. ANY UNLISTED DEVIATIONS FOUND DURING REVIEW WILL RESULT IN THE REJECTION OF THE ENTIRE SUBMITTAL. FOR ITEMS REVIEWED AND MARKED "REJECTED" OR "REVISE AND RESUBMIT”, ONLY ONE ADDITIONAL SUBMITTAL WILL BE REVIEWED TO VERIFY PRODUCT COMPLIANCE WITH THE CONTRACT DOCUMENTS. SHOULD FURTHER SUBMITTALS BE REQUIRED FOR THE DESIGN PROFESSIONAL TO VERIFY THE SUBMITTAL WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS, THE HOURLY RATE OF $150.00 PLUS EXPENSES WILL BE BILLED TO THE CONTRACTOR FOR THE PROFESSIONAL(S) TIME IS SPENT ON THE REVIEW.
5. ALL PIPING AND/OR DUCTWORK MUST BE INSTALLED 6” AWAY FROM ANY FIRE RATED WALL.
6. ALL PIPE PENETRATIONS SHALL BE SEALED USING APPROVED UL DETAILS. ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE.
7. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF FIRE RATED WALLS. DUCTWORK OR PIPING
SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.
8. ROOF MOUNTED EQUIPMENT SHALL BE SECURED TO THE CURB AND THE CURBS SHALL BE SECURED TO THE STRUCTURE AS DETAILED BY THE
ARCHITECT OR STRUCTURAL ENGINEER.
9. PROVIDE PAINTED GALVANIZED EXPANDED METAL GRILLE OVER ALL CONDENSER COILS.
10. ALL EQUIPMENT (AIR HANDLERS, CONDENSING UNITS, ROOFTOP UNITS, ETC.) SHALL BE LABELED WITH PLASTIC SIGNS, LAMINATED. ENGRAVED: 1/8"
THICK BLANKS FOR SIGNS SHALL BE A MINIMUM OF 1 3/4" HIGH, WITH 1" HIGH LETTERS. LENGTH OF THE SIGN SHALL BE THE SUM OF THE LETTERS/NUMBERS PLUS 3/4” EACH END. SIGNS DESIGNATED FOR INSTALLATION ON THE OUTSIDE, IN OPEN AREAS, OR LOCATED IN A PROTECTED AREA THAT IS SUBJECT TO DIRECT SUNLIGHT, SHALL BE UV RATED, DESIGNATED AND MANUFACTURED TO BE EXPOSED TO THE ELEMENTS. SUBMITTAL DATA INDICATING THE ABOVE WILL BE REQUIRED. LABELS SHALL ALSO INCLUDE THE ROOM NUMBER, CORRESPONDING AIR HANDLER LOCATION OR AREA SERVED TO ASSIST IN THE DETERMINATION OF THE SERVICE LOCATION OF SAID EQUIPMENT. PROVIDE ADDITIONAL NAMEPLATE ON CEILING GRID DIRECTLY BELOW EQUIPMENT CONCEALED ABOVE CEILINGS TO AID IN LOCATING THE UNIT. NAMEPLATE DESIGNATION SHALL CONSIST OF UNIT
NUMBER.
11. EQUIPMENT SHALL BE MANUFACTURED AND/OR COATED AS REQUIRED FOR INSTALLATION IN A SEA COAST ENVIRONMENT.
12. ALL WALL MOUNTED TEMPERATURE AND HUMIDITY SENSORS SHALL BE INSTALLED AT A CENTER LINE ELEVATION OF 4’—0” ABOVE FINISHED
FLOOR UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL MOUNTED THERMOSTAT SHALL BE COORDINATED WITH THE OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTAT SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT OR HIS REPRESENTATIVE IN THE FIELD. WHEN SENSOR IS INSTALLED ON EXTERIOR WALLS, PROVIDE AN INSULATED SUB—BASE.
13. THE OWNER WILL RETAIN THE SERVICES OF A TEST AND BALANCE AGENCY TO PERFORM FINAL TESTING AND BALANCING OF ALL HVAC SYSTEMS.
CONTRACTOR SHALL COORDINATE WITH THE OWNER'S VENDOR TO PROVIDE SITE ACCESS AND ALL COORDINATION NECESSARY TO PERFORM THE
WORK.
14. PROVIDE SCHEDULE 40 STEEL PIPE SLEEVES FOR CONDENSATE DRAIN LINES PENETRATING EXTERIOR WALLS. NEATLY SEAL VOIDS AROUND PIPING
WITH A WEATHER TIGHT PERMANENT NON—SHRINKING SEALANT.
15. EQUIPMENT SERVICE ACCESS: PROVIDE ADEQUATE SERVICE SPACE AROUND AIR HANDLING UNITS, VARIABLE VOLUME BOXES, ELECTRIC DUCT HEATERS AND THE PULL SIDE OF FILTERS, OR AS REQUIRED BY THE MANUFACTURER’S INSTALLATION INSTRUCTIONS. SERVICE AREA SHALL BE CLEAR OF DUCTS, PIPES, CONDUITS, WALL STUDS, CEILING HANGERS. AND ANY OTHER CONSTRUCTION APPURTENANCE.
16. ADEQUATE MEANS OF PROTECTION FOR ALL UTILITIES SHALL BE PROVIDED AND. IF UTILITIES ARE DAMAGED DURING WORKING OPERATIONS, SUCH
SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER, AT NO COST TO THE CONTRACT.
17. ACCESS PANELS THAT MAY BE REQUIRED FOR INSPECTION OF DUCTWORK, PIPING. DUCT MOUNTED DEVICES OR PIPE MOUNTED DEVICES SHALL BE PROVIDED AND ADEQUATELY SIZED. REFER TO THE ARCHITECTURAL CONTRACT DOCUMENTS FOR DOOR SPECIFICATIONS.
18. ALL DUCTWORK SHALL BE STORED IN CLEAN AREAS. PROTECT ALL DUCTWORK FROM DUST AND DEBRIS WHILE IT IS STORED ON SITE. WHILE UNDER CONSTRUCTION, ALL INSTALLED DUCT\I/WORK SHALL BE TEMPORARILY SEALED WITH VISQUEEN PRIOR TO TEST AND BALANCE IN ORDER TO LIMIT ACCUMULATION OF CONSTRUCTION DUST INSIDE THE DUCTWORK SYSTEM. IF EITHER OF THESE PROCEDURES IS NOT CONDUCTED, THE ENTIRE ASSOCIATED DUCTWORK SYSTEM AND MECHANICAL EQUIPMENT SHALL BE CLEANED TO THE OWNER'S’S SATISFACTION.
19. RETAIN THE SERVICES OF AN INDEPENDENT COMMISSIONING AUTHORITY TO PERFORM COMMISSIONING SERVICES OF ALL NEW HVAC SYSTEMS AND CONTROL SYSTEMS IN ACCORDANCE WITH THE FLORIDA ENERGY CONSERVATION CODE. THE COMMISSIONING AUTHORITY SHALL BE HIRED INDEPENDENTLY FROM THE MECHANICAL CONTRACTOR THROUGH THE CONSTRUCTION MANAGER. THE COMMISSIONING AUTHORITY CANNOT BE THE SAME AS THE TEST AND BALANCE CONTRACTOR. THE COMMISSIONING AUTHORITY SHALL DEVELOP A COMMISSIONING PLAN, PERFORM FUNCTIONAL TESTING WITH THE ASSISTANCE OF THE ASSOCIATED CONTRACTOR(S), AND PROVIDE A PRELIMINARY AND FINAL COMMISSIONING
REPORT.
20. AS— BUILT DRAWINGS, O&M MANUALS, CERTIFIED TEST AND BALANCE REPORT, AND THE FINAL COMMISSIONING REPORT ARE TO BE PROVIDED TO THE OWNER WITHIN 90 DAYS OF THE DATE OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY AND SHALL BE SUBMITTED TO THE ARCHITECT FOR
REVIEW.
21. SYSTEMS SHALL BE MAINTAINED IN ACCORDANCE WITH ASHRAE STANDARD 180—2018— STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF
COMMERCIAL BUILDING HVAC SYSTEMS.
22. CONTRACTOR SHALL PROVIDE SEASONAL TESTING OF EQUIPMENT TO PROVE PERFORMANCE AT DESIGN CONDITIONS. HYDRONIC HEATING BOILERS
SHALL BEST TESTED BETWEEN JANUARY AND MARCH.
MECHANICAL CODE COMPLIANCE STATEMENT
M
230000
1. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE 8TH EDITION (2023) FLORIDA BUILDING CODE
A. BUILDING EDITION
B. EXISTING BUILDING EDITION
C. MECHANICAL EDITION
D. PLUMBING EDITION
E. FUEL GAS EDITION
F. ENERGY EFFICIENCY EDITION
G. 8TH EDITION (2023) FLORIDA FIRE PREVENTION CODE.
H. SREF MANUAL, 2014 EDITION.
2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
A. NFPA-1 NATIONAL FIRE CODE WITH FLORIDA MODIFICATIONS
B. NFPA-70 NATIONAL ELECTRIC CODE
C. NFPA-72 NATIONAL FIRE ALARM CODE
D. NFPA-90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS E. NFPA-90B STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITION SYSTEMS
F. NFPA-101 NATIONAL LIFE SAFETY CODE
3. AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS, INC. (ASHRAE) A. ASHRAE GUIDELINE 4-2008 - PREPARATION OF OPERATING AND MAINTENANCE DOCUMENTATION FOR BUILDING SYSTEMS B. ASHRAE STANDARD 62.1-2019 AND APPROVED ADDENDA - VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
C. ASHRAE STANDARD 126-2016 - METHOD OF TESTING HVAC AIR DUCTS
D. ASHRAE STANDARD 180-2016 - STANDARD PRACTICE FOR INSPECTION AND MAINTENANCE OF COMMERCIAL BUILDING HVAC
SYSTEMS.
4. SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
OUTDOOR
INDOOR
CONDITION
35.0°F
70.0°F
WINTER
DRY BULB
95.0°F
74.0°F
SUMMER
DRY BULB
62.5°F
WET BULB
80.0°F
DESIGN CONDITIONS
M
230000
NOTE:
ALL SYMBOLS OR ABBREVIATIONS MAY NOT APPEAR ON PLANS. CONTRACTOR
IS ONLY RESPONSIBLE FOR EQUIPMENT INDICATED ON CONSTRUCTION PLANS
OR BY SPECIFICATION.
BD
AD
NEW DUCTWORK OR
EQUIPMENT
NEW COMBINATION
FIRE/SMOKE DAMPER
NEW AUTOMATIC
SMOKE
DAMPER
NEW AUTOMATIC FIRE
DAMPER
COUNTER BALANCED
BACKDRAFT DAMPER
MANUAL VOLUME DAMPER
WITH 2" INSULATION
STAND-OFF
DRAWING SYMBOL DESCRIPTION DRAWING SYMBOL DESCRIPTION
EXISTING DUCTWORK OR
EQUIPMENT
DUCTWORK OR EQUIPMENT
TO BE REMOVED
NEW SMOKE
WALL
PENETRATION
NEW INTERNALLY LINED
DUCTWORK
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
INSULATED FLEXIBLE
DUCTWORK
DUCT ACCESS DOOR
ROUND DUCT TURNING
DOWN
ROUND DUCT TURNING UP
SUPPLY OR OA DUCT
TURNING DOWN
SUPPLY OR OA DUCT
TURNING UP
RETURN DUCT TURNING
DOWN
RETURN DUCT TURNING UP
EXHAUST DUCT TURNING
DOWN
EXHAUST DUCT TURNING UP
MITERED ELBOW WITH
TURNING VANESMITERED ELBOW
NEW / EXISTING
THERMOSTAT
NEW / EXISTING HUMIDISTAT
NEW / EXISTING
COMBINATION THERMOSTAT
/ HUMIDISTAT
NEW / EXISTING CO2 SENSOR
NEW / EXISTING FIRESTAT
NEW / EXISTING MOTOR
ACTUATOR
NEW / EXISTING SMOKE
DETECTOR (PROVIDED BY
DIV. 26)
PLAN NOTE
REVISION MARK
DEMOLITION NOTE
POINT OF DISCONNECT OR
CONNECTION
SUPPLY AIR DEVICE
EXHAUST AIR DEVICE
ROUND SUPPLY AIR DEVICE
RETURN AIR DEVICE
SIDEWALL SUPPLY
AIR
DEVICE
SIDEWALL EXHAUST
OR
RETURN AIR DEVICE
1" UNDERCUT FLOW ARROW
LEGEND
M
230000
ABBREVIATIONS
H
T
T/H
CO2
H
T
T/H
CO2
F
SD
M
F
SD
M
NEW / EXISTING SMOKE
DETECTOR (PROVIDED BY
DIV. 26)
TS TS
KEF
SA
MUA
EF
KH
SF
CT
CH
FP
MB
VV
RTU
CU
AH
AC
RA
OA
EA
[E]
[D]
TYP
CHW
CW
HW
CF
(0)
TF
CONDENSING UNIT
AIR HANDLING UNIT
AIR CONDITIONING UNIT
ROOF TOP UNIT
FAN POWERED VAV BOX
VAV BOX
MIXING BOX
CHILLER
COOLING TOWER
EXHAUST FAN SUPPLY FAN
KITCHEN HOOD
MAKE-UP AIR UNIT
KITCHEN EXHAUST FAN
SUPPLY AIR
RETURN AIR
OUTSIDE AIR
EXHAUST AIR
EXISTING TO REMAIN
TO BE DEMOLISHED
TYPICAL
CHILLED WATER
CONDENSER WATER
HEATING HOT WATER
CIRCULATING FAN
POSITIVE PRESSURE
NEGATIVE PRESSURE
NEUTRAL PRESSURE
TRANSFER FAN
[R] TO BE RELOCATED
MS
HP
MINI SPLIT
HEAT PUMP
L LOUVER
RD
NIC
RETURN AIR DEVICE
NOT IN CONTRACT
ED
UNO
EXHAUST AIR DEVICE
UNLESS NOTES OTHERWISE
CD CONDENSATE DRAIN
F FAN
P PUMP
PCHWP
PRIMARY CHILLED WATER
PUMP
SCHWP
SECONDARY CHILLED
WATER PUMP
CWP CONDENSER WATER PUMP
SD SUPPLY AIR DEVICE
SCOPE OF WORK
M
230000
THE PROJECT INCLUDES ALL MATERIAL, LABOR, EFFORT, & COORDINATION REQUIRED TO INSTALL (2) NEW GAS FIRED CONDENSING HYDRONIC HEATING BOILERS AND ALL ASSOCIATED PIPING, DUCTWORK, HYDRONIC ACCESSORIES, AND DDC CONTROLS AS DESCRIBED IN THE CONTRACT DOCUMENTS.
ADD ALTERNATE NO. 1
• CONTRACTOR SHALL PROVIDE A LINE ITEM PRICE TO REPLACE (2) EXISTING BASE MOUNTED
END SUCTION PUMPS (HHWP-1 AND HHWP-2) WITH NEW "IN-KIND" PUMPS. REFER TO PLANS
AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
HOT WATER FLOW DIAGRAM
M
230000
6"øHWR TO/FROM
HEAT RECOVERY
CHILLER CH-4.
CH-4
350 GPM
HWS&R BELOW
GRADE TO CAMPUS
LOOP. EXISTING 3-
WAY VALVES AT ALL
EXISTING AHUS.
EXISTING 6"HWS&R
PIPING THROUGH
BOILER ROOM SLAB
"ø
H W
R
6"øHWR
6"øHWS
B-1[N]
2,000 MBH
95 GPM
4"øHWS
B-2[N]
2,000 MBH
95 GPM
4"øHWR
4"øHWR
4"øHWS
"ø
H W
S
6"øHWS
8"ø
EXHAUST
FLUE
THROUGH
ROOF
8"ø
EXHAUST
FLUE
THROUGH
ROOF
HWP-1[N]
530 GPM
90 FT. HD
20 HP
HWP-2[N]
530 GPM
90 FT. HD
20 HP
6"øHWS
6"øHWS
6"øHWS
6"øHWS
6"øHWR
6"øHWS
ET-1[E] ET-2[E]
1 1/2"ø CW TO
MAKEUP WATER
ASSEMBLY
1 1/2"øCW1 1/2"øCW
1 1/2"øCW
1 1/2"øCW
CONTROL VALVE
1 1/2"
MAKEUP
WATER
ASSEMBLY
1 1/2"ø CW TO HWS
HEADER
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
12" = 1'-0"
M0.1
LEGEND, NOTES, &
SCHEDULES
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
ADT
BAL
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
1. 125 PSI ASME RATED STEEL BODY TANGENTIAL AIR SEPARATOR WITH FLANGED CONNECTIONS, INTERNAL STRAINER, AND
NPT AIR VENT CONNECTION.
2. SUPPORT FROM STRUCTURE ABOVE. REFER TO DETAILS FOR ADDITIONAL INSTALLATION REQUIREMENTS.
1. CONSTANT SPEED BASE MOUNTED END SUCTION HOT WATER PUMP WITH SUCTION DIFFUSER.
2. ANCHOR NEW PUMP TO EXISTING CONCRETE HOUSEKEEPING PAD. VERIFY PUMP DIMENSIONS WITH EXISTING PAD.
3. PROVIDE 5-YEAR WARRANTY.
4. REFER TO END SUCTION PUMP DETAIL FOR ADDITIONAL INFORMATION.
No. Description Date
NOTE: NEW BOILERS SUPPLIED BY EXISTING NATURAL GAS PIPING IN EXISTING MECHANICAL ROOM. GAS PIPE SIZING CALCULATIONS ARE PROVIDED FROM THE NEW AUTOMATIC SHUT OFF VALVE AT BUILDING
EXTERIOR. ASSUMED GAS PRESSURE UPSTREAM OF EXISTING IS 2 PSI.
2 86 < 2 0.5 0.6
PIPE SIZE
(IN. DIA.)
PIPE LENGTH
(EQUIVALENT LENGTH)
INLET
PRESSURE
(PSI)
PRESSURE
DROP
(IN. W.C.)
SPECIFIC GRAVITY
2023 FBC-FUEL GAS, SECTION 402.4(4)
TOTAL GAS CONSUMPTION (CFH) 4000
B-2[N] FORCED DRAFT CONDENSING BOILER 1 NG 2,000
B-1[N] FORCED DRAFT CONDENSING BOILER 1 NG 2,000
Mark Description Quantity NG/LP
GAS INPUT
(MBH)
231123
P
NATURAL GAS / LP SERVICE CALCULATIONS
14. FACTORY TRAINED START-UP AND OWNERS TRAINING REQUIRED. FULL VERIFICATION OF SPECIFIED
TURNDOWN RATIO SHALL BE WITNESSED BY OWNERS REP.
13. PRESSURE VESSEL AND HEAT EXCHANGER SHALL BE PROTECTED BY A FACTORY WARRANTY THAT COVERS
LIFETIME THERMAL SHOCK, 5 YEAR ON BURNER AND 18 MONTHS ON PARTS.
12. BOILER SHALL BE ABLE TO ANTICIPATE SYSTEM LOAD CHANGES VIA A 0-10VDC SIGNAL FROM BOILER LOW
VOLTAGE CONTACTS.
11. VARIABLE PRIMARY PIPING: BOILER ISOLATION VALVES SHALL BE PROVIDED ON THE OUTLET OF EACH
BOILER AND CONTROLLED BY THE BOILER OPERATING SYSTEM.
10. BOILER SHALL HAVE 7 ” CAPACITIVE TOUCHSCREEN INTERFACE WITH WIFI AND ETHERNET CONNECTION FOR
REMOTE MONITORING AND CONTROL.
9. BOILER MUST INTEGRAL CASCADE SEQUENCER WITH BACNET MSTP INTERFACE, LEAD/LAG, EFFICIENCY
OPTIMIZATION, AND CASCADE REDUNDANCY.
8. BOILER SHALL NOT HAVE A PUBLISHED EXCESS OXEGYN OF MORE THAN 5.8%. EXCESS OXEGYN PERCENTAGE SHALL BE VALIDATED BY THE INTERNAL OXEGYN SENSOR AND READOUT ON DIGITAL DISPLAY.
7. PROVIDE BOILER WITH MANUFACTURER'S SYSTEM SENSOR, OUTDOOR SENSOR, CONDENSATE
NEUTRALIZER, ANCHORING BRACKETS, SYSTEM TEMPERATURE THERMOWELL, AND INLINE GAS FILTER.
6. PROVIDE BOILER WITH INLINE REGULATOR EQUAL TO MAXITROL RV81 WITH ANSI COMPLIANT VENT LIMITER.
5. BOILER SHALL BE CSA CERTIFIED, AT SITE ALTITUDE AT HIGH AND LOW TURNDOWN RATIO.
4. BOILER HEAT EXCHANGER SHALL BE CONDENSING, STAINLESS STEEL, FIRE TUBE DESIGN. NO EXCEPTIONS.
3. BOILER TO BE CSD-1 / FACTORY MUTUAL / GAPS, AND CALIFORNIA CODE COMPLIANT.
2. BOILER SHALL MEET ANSI STANDARD Z21.13 AND THERMAL AND COMBUSTION EFFICIENCIES AND SHALL BE
AHRI CERTIFIED.
1. CONDENSING HYDRONIC HEATING BOILER WITH MULTIPLE INDEPENDENT BURNER MODULES WITH INTERNAL
BOILER PUMP AND FACTORY MODULATION AND CASCADE CONTROL.
NOTES:
NOTES --- ALL ALL
MODEL --- AR 2000 AR 2000
MANUFACTURER --- RIELLO RIELLO
LOCATION --- 13-102 MECH. RM. 13-102 MECH. RM.
VENT SIZE DIA. INCHES 8 8
WEIGHT (DRY) LBS. 1,676 1,676
CONTROLS --- BACnet BACnet
TOTAL AMPS (FLA) AMPS 15.5 15.5
ELECTRICAL V/PH./HZ. 240/1/60 240/1/60
THERMAL EFFICIENCY % 96.1 96.1
HEATING SURFACE SQ. FT. (4) 43 (4) 43
GAS PRESSURE MIN./MAX. IN. WC. 3.5 / 13.5 3.5 / 13.5
NG/LP GAS --- NG NG
OUTPUT (LOW) BTUH 96,100 96,100
OUTPUT (HIGH) BTUH 1,922,000 1,922,000
MIN. INPUT BTUH 100,000 100,000
MAX. INPUT BTUH 2,000,000 2,000,000
RETURN WATER TEMP. °F 140 140
SUPPLY WATER TEMP. °F 180 180
FLOW RATE (@ 40°F ΔT) GPM 95 95
FLOW RATE (MAX) GPM 150 150
FLOW RATE (MIN) GPM 85 85
STORAGE CAPACITY (TOTAL) GAL. 35 35
OPERATING PRESSURE (MAX) PSIG 80 80
MODULES --- 4 4
SERVICE --- HEATING HOT WATER HEATING HOT WATER
ITEM NO. --- B-1[N] B-2[N]
235216
M
BOILER SCHEDULE
NOTES:
NOTES --- 2
MODEL --- TASS004
MANUFACTURER --- PATTERSON
OPERATING WEIGHT LBS 108
LOCATION --- 13-102
PIPE SIZE CONNECTIONS IN. DIA. 6
MAX. PRESSURE DROP FT. WTR. <1
FLOW RATE GPM 450
SERVICE --- HOT WATER
ITEM NO. --- AS-01
233700
M AIR SEPARATOR SCHEDULE
NOTES --- ALL ALL
MODEL --- E3D13A-2 E3D13A-2
MANUFACTURER --- PATTERSON PATTERSON
LOCATION --- 13-102 13-102
WEIGHT LBS. 1037 1037
CONTROL --- STARTER STARTER
FLA AMPS 24 24
ELECTRICAL V/PH./HZ. 460/3/60 460/3/60
DISCHARGE DIA. IN. 3 3
SUCTION DIA. IN. 4 4
IMPELLER DIA. IN. 13.5 13.5
FRAME SIZE --- 256T 256T
BASE TYPE --- FRAME MOUNTED FRAME MOUNTED
MOTOR TYPE --- TEFC TEFC
EFFICIENCY % 75.20% 75.20%
SPEED RPM 1760 1760
MOTOR BHP/HP -- / 20 -- / 20
TOTAL DYNAMIC HEAD FT. HD. 90 90
WATER FLOW GPM 530 530
TYPE --- END SUCTION END SUCTION
SERVICE --- HOT WATER HOT WATER
ITEM NO. --- HWP-1 HWP-2
232123
M
PUMP SCHEDULE (ADD ALTERNATE NO. 1)
MECHANICAL SHEET INDEX
Sheet Number Sheet Name Project Issue Date Current Revision
M0.1 LEGEND, NOTES, & SCHEDULES 08-12-2026
M1.1 MECHANICAL DEMOLITION PLAN 08-12-2026
M2.1 MECHANICAL RENOVATION PLANS 08-12-2026
M3.1 MECHANICAL DETAILS 08-12-2026
M3.2 MECHANICAL DETAILS 08-12-2026
M4.1 CONTROLS LEGEND, NOTES, & DETAILS 08-12-2026
B-1[D]
HWP-2[D]
HWP-1[D]
ET-2[E]ET-1[E]
BP-1[D]
MECHANICAL
13-102
MECHANICAL
13-101
CONTROL ROOM
13-103
6"ø HHWR[E]
6"ø HHWR[E]
"ø
H H
W R
[E
6"ø HHWS[D]
6"ø HHWS[E]
"ø
H H
W S
[E
"ø
H H
W S
[E
6"ø HHWR[E]
LV-1[E]
48"x72"
LV-1[E]
48"x72"
1 1/2"ø CW[E]1 1/2"ø CW[E]
6"ø HHWR[D]
"ø
H H
W S
[D
2"ø GAS[E]
"ø
G A
S [E
"ø
H H
W S
[D
14"ø[D]
11 11
"ø
G A
S [E
/2
"ø G
A S
[E
2"ø GAS[E]
DELEWARE AVE.
O M
A H
A S
T
19 19
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
KEY PLAN
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
1/4" = 1'-0"
M1.1
MECHANICAL DEMOLITION
PLAN
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
ADT
BAL
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
1/4" = 1'-0"M1.1
1 BUILDING 13 - PARTIAL DEMOLITION PLAN
DEMOLITION NOTES
1. EXISTING CENTRAL PLANT BUILDING. NO WORK IN EXISTING CHILLER
PLANT.
2. REFER TO ELECTRICAL PLANS FOR WORK IN THIS AREA.
3. EXISTING GAS FIRED BOILER PREVIOUSLY REMOVED BY OWNER (SHOWN
FOR REFERENCE).
4. EXISTING HHW PUMPS TO BE DEMOLISHED AS PART OF BID ALTERNATE
NO. 1. REFER TO BID ALTERNATE NO. 1 ON SHEET M0.1.
5. EXISTING BOILER PUMP, STRAINER, AND ASSOCIATED PIPIING TO BE
DEMOLISHED. REMOVE SUPPORTS AND CONDUITS. NEW BOILERS
PROVIDED WITH INTEGRAL BOILER PUMP.
6. EXISTING GAS REGULATOR AND PIPING TO BE DEMOLISHED FOR
INSTALLATION OF NEW AUTOMATIC GAS SHUT OFF VALVE. CONTRACTOR
SHALL FIELD VERIFY EXISTING GAS METER AND REGULATOR FOR
ISOLATION OF UNDERGROUND GAS PIPING FOR NEW WORK. REFER TO
RENOVATION PLANS AND SECTIONS FOR ADDITIONAL INFORMATION.
7. EXISTING 2”GAS PIPING TO REMAIN. DEMOLISH EXISTING VALVE TRAIN
AND PREPARE PIPING FOR NEW CONNECTION.
8. EXISTING 1½”CW TO REMAIN. DEMOLISH EXISTING MAKEUP WATER
ASSEMBLY AND PREPARE PIPING FOR NEW CONNECTIONS.
9. EXISTING VENTILATION LOUVERS TO REMAIN.
10. EXISTING 14” BOILER FLUE TO BE DEMOLISHED. REMOVE EXISTING FLUE
CAP ON ROOF AND CAP ROOF CURB OPENING PERMANENTLY.
11. EXISTING EXPANSION TANKS TO REMAIN.
12. EXISTING CHEMICAL SHOT FEEDER TO BE DEMOLISHED.
13. EXISTING PARTICULATE FILTER TO BE REMOVED.
14. EXISTING FIRE ALARM PULL STATION TO REMAIN. CONTRACTOR SHALL
TEST AND VERIFY OPERATION. REFER TO ELECTRICAL PLANS FOR
ADDITIONAL INFORMATION.
15. EXISTING BUTTERFLY ISOLATION VALVES TO BE REPLACED WITH NEW
VALVES.
16. EXISTING 3-WAY CONTROL VALVE TO BE DEMOLISHED.
17. EXISTING HOT WATER RETURN PIPING TO / FROM HEAT RECOVERY
CHILLER TO REMAIN.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
START OF THE WORK. VERIFY EXISTING ISOLATION VALVES ARE
WORKING PRIOR TO DRAINING OF SYSTEMS.
2. CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH OWNER'S
SCHEDULE. REFER TO SPECIFICATIONS FOR SPECIFIC CONTRACT
REQUIREMENTS.
3. COORDINATE DEMOLITION AND NEW WORK WITH EXISTING CONTROLS
SEQUENCES. CH-4 HEAT RECOVERY CHILLER SHALL BE DISABLED WHILE
HOT WATER LOOP IS NOT ACTIVE.
No. Description Date
ESO
EXT. FIN. FLOOR
0' - 0"
EXT ROOF DECK
17' - 0"
B-1[N]
B-2[N]
M2.1
6"ø HHWR[E]
6"ø HHWR[E]
6"ø HHWR[E]
"ø
H H
W S
[E
6"ø HHWS[N]
4"ø HHWS[N]
4"ø HHWR[N]
2"ø GAS[E]
6"ø HHWR[E]
"ø
H H
W S
[E
6"ø HHWS[E]
4"ø HHWS[E]
2"ø GAS[E]
1 1/2"ø CW[E]
"ø
[N
"ø
[N
HWP-1[N]
HWP-2[N]
MECHANICAL
13-101
CONTROL ROOM
13-103
MECHANICAL
13-102
4"ø HHWS[N]
M2.1
1 1/2"ø GAS[N]
6"ø HHWS[N]
15AS-1[N]
6"ø HHWR[E]
ET-1[E] ET-2[E]
2"ø GAS[E]
1/2"ø GAS[E]
1 1/2"ø CD[N] 17
2' - 6"
1 1/2"ø CD[N] 17
EXT. FIN. FLOOR
0' - 0"
NEW 2" GAS
LOCKWING BALL
VALVE EQUAL TO
JOMAR 175-LWN
NEW 2 1/2"NPT AUTOMATIC
GAS VALVE. EQUAL TO ASCO
8215 SERIES N.C.
1/2" EXISTING
GAS TO BUILDING
19 BELOW
GRADE
6"ø HHWR[E] 6"ø HHWS[E]
EXISTING COVER PLATE
EXISTING GFCI OUTLET
NEW 2"GAS THROUGH
EXISTING PENETRATION
1/2" EXISTING
ISOLATION
VALVE
2" EXISTING GAS
PIPING BELOW
GRADE. (2 PSI).
CONTRACTOR TO
FIELD VERIFY.
MECHANICAL
13-102
MECHANICAL
13-101
CONTROL ROOM
13-103
EXST. PAD
4' - 10"
NEW PAD EXT.
0' - 6"
E X
S T
P
A D
2' - 4"
M
IN
/1
B O
IL
E
R
/1
BOILER
5' - 0 13/16"
BOILET TO EXST. WALL
2' - 4 25/32"
M
IN
S
E R
V
IC
E C
L E
A R
A N
C E
/1
MIN. BOILER SERVICE CLEARANCE
9' - 8 5/16"
EXST. DOOR
6 '- 0" x 7'-10"
EXST. BOILER ROOM
16' - 9 5/8"
E X
S T
B
O
IL
E R
R O
O M
/8
2' - 7 1/2" 2' - 0"
B-2[N]
B-1[N]
N E
W F
E N
C E
NEW FENCE
6' - 7 5/8"
NEW GATE
3' - 0"
ET-1[E]
ET-2[E]
HWP-1[N]
HWP-2[N]
FD[E]
6"ø HHWS[E]
6"ø HHWR[E]
2"ø GAS[E]
"ø
G A
S [E
B-2[N]
B-1[N]
8"ø[N] 8"ø[N]
"ø
[D ]8
"ø [D
AS-1[N]
6"ø HHWR[E]
6"ø HHWS[E]
4"ø HHWS[N]
4"ø HHWR[N]
1 1/2"ø HHWS[E]
6"ø HHWR[E]
EXT. FIN. FLOOR
0' - 0"
EXT ROOF DECK
17' - 0"
4"ø HHWS[N]
6"ø HHWS[N]
4"ø HHWR[N]
8"ø[N]
8"ø[N]
1 1/2"ø GAS[N]
2"ø GAS[E]
1 1/2" DRIP LEG AND
THREADED CAP
1 1/2"NPT QUARTER TURN GAS BALL
VALVE EQUAL TO APOLLO 82-100
1 1/2" GAS REGULATOR EQUAL TO
MAXITROL RV81 WITH VENT LIMITER.
MAX. 13.5" W.C.
1 1/2"ø CD[N]
MANUFACTURER
PROVIDED 20
MICRON GAS
FILTER
4" HWR CONTROL VALVE
4" HWR STRAINER
8" DOUBLE WALL STAINLESS
BOILER EXHAUST FLUE UP
THROUGH EXISTING ROOF WITH
NEW FLUE CAP.
8" SCH.40 PVC
COMBUSTION AIR DUCT
4" BUTTERFLY
ISOLATION
VALVES. HWS&R.
BOILER ON NEW 1/4"
NEOPRENE ISOLATION
PADS WITH
MANUFACTURER'S
ANCHORING BRACKETS
ANCHORED TO MODIFIED
CONCRETE HOUSEKEEPING
PAD.
SLOPE NEW CONDENSATE DISCHARGE
PIPING TO NEW MANUFACTURER
PROVIDED CONDENSATE NEUTRALIZER
ROUTE NEW 2 1/2"
RELIEF DRAIN PIPING
TO EXISTING FLOOR
DRAIN.
REFER TO SPECIFICATIONS FOR PIPE
SUPPORT SIZING AND SPACING
REQUIREMENTS.
3/8" ATR WITH NVENT
CADDY FROM METAL ROOF
JOISTS ABOVE
DELEWARE AVE.
O M
A H
A S
T
19 19
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
KEY PLAN
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
1/4" = 1'-0"
M2.1
MECHANICAL RENOVATION
PLANS
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
Author
BAL
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
1/4" = 1'-0"M2.1
1 BUILDING 13 - PARTIAL RENOVATION PLAN
RENOVATION NOTES
1. NEW CONDENSING HYDRONIC HEATING GAS FIRED BOILER ON MODIFIED
CONCRETE HOUSEKEEPING PAD. REFER TO SECTIONS AND DETAILS FOR
ADDITIONAL REQUIREMENTS.
2. NEW HHWS&R HEADERS CONNECTED TO EXISTING HHW LOOP PIPING.
3. MIN. REQUIRED DISTANCE BETWEEN SUPPLY AND RETURN
CONNECTIONS TO HHW LOOP, PER MFGR.
4. NEW 4”ø HHWS&R PIPING CONNECTIONS TO NEW BOILERS. INSTALL WITH
MANUAL BUTTERFLY ISOLATION VALVES IN ACCESSIBLE LOCATION.
REFER TO SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS.
5. NEW 8”ø COMBUSTION AIR CPVC PIPE THROUGH EXISTING CMU WALL TO
NEW BOILER COMBUSTION AIR INLET. PROVIDE 90° ELBOW DOWN WITH
INSECT SCREEN AT EXTERIOR OF BUILDING.
6. NEW 8”ø VENTILATION AIR DUCT UP THROUGH ROOF TO NEW BOILER
FLUE CAP. PROVIDE NEW ROOF FLASHING AT NEW PENETRATION. REFER
TO DETAILS FOR ADDITIONAL INFORMATION.
7. NEW WYE STRAINER, 2-WAY CONTROL VALVE, AND MANUAL BUTTERFLY
VALVE IN HHWR PIPING TO BOILER. TYPICAL OF EACH BOILER. REFER TO
SECTIONS AND ISOMETRICS FOR ADDITIONAL INFORMATION.
8. NEW PAD MOUNTED END SUCTION PUMPS ON EXISTING HOUSEKEEPING
PADS AS PART OF BID ALTERNATE NO. 1. REFER TO DETAILS FOR
ADDITIONAL REQUIREMENTS. REFER TO SHEET M0.1 FOR BID ALTERNATE
NO. 1 DESCRIPTION.
9. NEW CHEMICAL SHOT FEEDER ON EXISTING HOUSEKEEPING PAD.
10. NEW CARBON MONOXIDE (CO) AND METHANE (CH4) GAS DETECTOR
SYSTEM WITH AUTOMATIC GAS SHUT OFF VALVE AND FIRE ALARM DRY
CONTACT RELAYS. REFER TO ELECTRICAL DRAWINGS FOR 120V CIRCUIT.
REFER TO CONTROLS DRAWINGS AND DETAILS FOR ADDITIONAL
INFORMATION.
11. NEW MAKEUP WATER ASSEMBLY CONNECTED TO EXISTING 1½”CW
PIPING.
12. NEW 2” GAS PIPING WITH NEW ISOLATION AND AUTOMATIC CONTROL
VALVE IN NEW 6'-0" TALL CHAIN LINK FENCE WITH 3'-0" MIN. WIDE GATE.
REFER TO SECTION AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
13. NEW 1-1/2"GAS PIPING FROM EXISTING 2" PIPE ALONG WALL. INSTALL
NEW QUARTER TURN GAS BALL ISOLATION VALVE, 7-14" WC GAS
REGULATOR, AND 20 MICRON MESH GAS FILTER UPSTREAM OF BOILER
GAS INLET CONNECTION.
14. NEW AUTOMATIC GAS VALVE TIED INTO NEW GAS MONITORING SYSTEM
WITH NEW DRY CONTACT RELAY TO EXISTING FIRE ALARM. NEW
AUTOMATIC GAS SHUT OFF VALVE EQUAL TO ASCO 8215 N.C. REFER TO
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
15. NEW AIR SEPARATOR SUSPENDED FROM STRUCTURE ABOVE. REFER TO
SCHEDULES AND DETAILS FOR ADDITIONAL INFORMATION.
16. INSTALL NEW BUTTERFLY ISOLATION VALVES AT HWS&R RISERS UP
THROUGH FLOOR. INSTALL NEW ELECTROMAGNETIC FLOW METER IN
EXISTING HWS UPSTREAM OF VALVE IN VERTICAL RISER DOWN
THROUGH SLAB.
17. INSTALL NEW 1 1/2" COPPER DWV CD PIPING SLOPED FROM UNIT
DISCHARGE TO NEW MANUFACTURER PROVIDED CONDENSATE
NEUTRALIZER ON SLAB. TREATED CONDENSATE DISCHARGE TO
EXISTING FLOOR DRAIN.
18. INSTALL NEW 2 1/2" COPPER DWV RELIEF DRAIN SLOPED FROM UNIT
DISCHARGE TO EXISTING FLOOR DRAIN.
GENERAL NOTES
1. REFER TO RENOVATION FLOOR PLANS FOR NEW AND EXISTING
HOUSEKEEPING PAD DIMENSIONS AND EQUIPMENT SERVICE CLEARANCE
REQUIREMENTS.
2. NEW BOILERS AND ACCESSORIES SHALL BE INSTALLED IN EXISTING
MECHANICAL ROOM. COORDINATE NEW EQUIPMENT AND PIPING WITH
EXISTING COMPONENTS TO REMAIN.
3. PROVIDE THREADED UNIONS AT ALL GAS CONNECTIONS TO EQUIPMENT
AND AT ALL SERVICEABLE COMPONENTS. REFER TO DETAILS FOR
ADDITIONAL INFORMATION.
4. PROVIDE ALL MANUFACTURER'S ADAPTERS TO MAKE CONNECTIONS TO
NEW BOILERS AS SPECIFIED.
5. ALL NEW GAS PIPING ABOVE AND BELOW GRADE SHALL BE EQUAL TO
ASTM A53/A53M SCHEDULE 40 BLACK STEEL WITH (2) COATS OF SAFETY
YELLOW DTM EPOXY EQUAL TO RUSTOLEUM 9100 ROC EPOXY AND PIPE
LABELS PER SPECIFICATIONS.
6. PROVIDE AND INSTALL NEW PIPE LABELS AND VALVE TAGS IN
ACCORDANCE WITH SPECIFICATION 230553.
1/4" = 1'-0"M2.1
5 GAS REGULATOR SECTION
1/4" = 1'-0"M2.1
2 BUILDING 13 - RENOVATION FLOOR PLAN
M2.1
3 RENOVATION ISOMETRIC VIEW
1/4" = 1'-0"M2.1
4 TYPICAL BOILER SECTION
PIPE
BOLT BOLT
PIPE
CLAMP
MOLDED
NEOPRENE
MATERIAL
CLAMP
FASTEN CHANNEL TO STRUCTURE WITH #12 SELF TAPPING STEEL SCREWS 12" O.C.
WITH MINIMUM OF 1/2" OF THREADS THROUGH STEEL STRUCTURE OR 3/16" TAPCON
12" O.C. WITH MINIMUM 2" ENGAGEMENT INTO CONCRETE.
CUSH-A-CLAMP DETAIL
SCALE: NONE
M 230500
MOLDED
NEOPRENE
MATERIAL
PIPE HANGER DETAIL
SCALE: NONE
M 230500
MIN.
12"
12"
MIN.
PROVIDE A SECTION OF HIGH COMPRESSION STRENGTH INSULATION AT EACH HANGER
POINT. INSULATION SHALL BE HALF ROUND AND EXTEND 2" BEYOND GALVANIZED
SHIELD EACH WAY
GALVANIZED
IRON HANGER
ROD &
HANGER
16 GAUGE
GALVANIZED SHEET
SHIELDINSULATION
PIPE
U-CLAMP OR
CONDUIT
CLAMP
GALVANIZED
IRON TRAPEZE
OR UNISTRUT
16 GAUGE
GALVANIZED SHEET
SHIELD FULLY
WRAPPED AROUND
INSULATION
INSULATION
PIPE
MAXIMUM PAIR AT 10' SPACING PAIR AT 5' SPACING
1" x 20 GA.
1" x 18 GA.
1" x 16 GA.
STRAP
1" x 22 GA.
1.5" x 16 GA.
1.5" x 16 GA.
NOTES:
1" x 16 - TWO 3/8" BOLT
PLACE FASTENERS IN SERIES, NOT SIDE BY
SIDE
30"
72"
96"
120"
HALF OF
PERIMETER
168"
192"
193"
UP"
WHEN STRAPS ARE LAP JOINED
1" x 18, 20, 22 GA. - TWO
#10 OR ONE 1/4" BOLT
1" x 16 - TWO 1/4" BOLT
USE THESE MINIMUM FASTENERS:
P
P
P
P
P
P
P
DUCT
NOT GIVEN
1.5" x 16 GA. 1/2"
1/2"
1" x 22 GA.
1" x 18 GA.
1" x 16 GA.
1.5" x 16 GA.
STRAP ROD/WIRE
10 GA.
(0.135")
3/8"
3/8"
1/2"
3/8" - 680 LBS.
1/2" - 1250 LBS.
5/8" - 2000 LBS.
3/4" - 3000 LBS.
1.5" x 16 GA. - 1100 LBS.
1/4" - 270 LBS.
WIRE OR ROD
(DIA.)
0.106" - 80 LBS.
0.135" - 120 LBS.
0.162" - 160 LBS.
SINGLE HANGER MAXIMUM ALLOWABLE
LOAD
1" x 16 GA.
1" x 16 GA.
1" x 22 GA. - 260 LBS.
1" x 20 GA. - 320 LBS.
1" x 18 GA. - 420 LBS.
1" x 16 GA. - 420 LBS.
SPECIAL ANALYSIS REQUIRED
STRAP
1/2"
1/2" 3/8"
3/8"
STRAP
1" x 18 GA.
1" x 20 GA.
1" x 22 GA.
1" x 22 GA.(0.135")
1/4"
3/8"
3/8"
(0.106")
3/8"
1/4"
3/8"
3/8"
3/8"1" x 16 GA.
1" x 18 GA.
(0.106")
1/4"
1/4"
1/4"
STRAP
1" x 20 GA.
1" x 22 GA.
1" x 22 GA.
1" x 22 GA.
HANGER STRAP
24"∅ MAX. BAND
FOR STRAP HANGER
HANGER STRAP
HANGER
STRAPS
S.S.
FASTENERS
S.S. LOAD
RATED
FASTENERS
50"∅ MAX. BAND
OF ONE PIECE
HANGER
STRAP HANGERS
HANGER
ROD
ANGLE IRON
LOAD RATED
FASTENER
NUTS
(TYP.)
HANGER ROD
ANGLE IRON
HANGER ROD
TRAPEZE HANGERS
HANGER STRAP
a. DIMENSIONS OTHER THAN GAUGE ARE IN INCHES.
b. TABLES ALLOW FOR DUCT WEIGHT, 1 LB./SF. INSULATION WEIGHT AND NORMAL
REINFORCEMENT AND TRAPEZE WEIGHT, BUT NO EXTERNAL LOADS.
c. STRAPS ARE GALVANIZED STEEL, OTHER MATERIALS ARE UNCOATED STEEL
d. ALLOWABLE LOADS FOR P/2 ASSUME THAT DUCTS ARE 16 GA. MAX., EXCEPT THAT WHEN
MAX. DUCT DIMENSION (W) IS OVER 60" THEN P/2 MAX. IS 1.25
W.
60" MAX
DUCT HANGER DETAIL (IN ACCORDANCE WITH SMACNA - THIRD EDITION)
SCALE: NONE
M 233300
TABLE 5-1 RECTANGULAR DUCT HANGERS MINIMUM
SIZE
TABLE 5-5 MINIMUM HANGER SIZES FOR ROUND
DUCT
DIAMETER
10 IN. DIA.
11-18 IN. DIA.
19-24 IN. DIA.
25-36 IN. DIA.
37-50 IN. DIA.
51-60 IN. DIA.
61-84 IN. DIA.
85-96 IN. DIA.
MAXIMUM SPACING WIRE DIA. ROD STRAP
12 FT
12 FT
12 FT
12 FT
12 FT
12 FT
12 FT
12 FT
ONE 12 GA.
TWO 12 GA. OR ONE 8 GA.
TWO 10 GA.
TWO 8 GA.
1/4 IN.
1/4 IN.
1/4 IN.
3/8 IN.
TWO 3/8 IN.
TWO 3/8 IN.
TWO 3/8 IN.
TWO 1/2 IN.
1 IN. X 22GA.
1 IN. X 22GA.
1 IN. X 22GA.
1 IN. X 20GA.
TWO 1 IN. X 20GA.
TWO 1 IN. X 18GA.
TWO 1 IN. X 16GA.
TWO 1-1/2 IN. X 16GA.
REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS METAL AND FLEXIBLE - THIRD EDITION, CHAPTER 5.
ROD/WIRE
10 GA.
ROD/WIRE
12 GA.
PAIR AT 8' SPACING PAIR AT 4' SPACING
ROD/WIRE
12 GA.
SINGLE PIPE SUPPORT DETAIL
SCALE: NONE
M 230500
EQUAL TO NVENT CADDY
ALL THREAD ROD
CLEVIS STYLE HANGER
PIPE
PIPE INSULATION
METAL SADDLE 1/2
THE DIAMETER OF
INSULATED PIPE
EXTEND ALL-THREAD ROD AS
REQUIRED TO PROPERLY
SUPPORT MECHANICAL
EQUIPMENT IN AN APPROVED
MANNER
ALL-THREAD ROD
ATTACH TO
STRUCTURE IN AN
APPROVED MANNER
WASHER AND LEVELING
NUT
LOCKING NUT
AND WASHER
ANGLE
ALL-THREAD ROD
ATTACH TO
STRUCTURE IN
AN APPROVED MANNER
CHANNEL
LEVELING NUT
AND WASHER
LOCKING NUT
AND WASHER
STEEL SUPPORT DETAIL
SCALE: NONE
M 230500
SUPPORT CHANNELSUPPORT ANGLE
BAR JOIST HANGER DETAIL - TOP AND BOTTOM CHORD
SCALE: NONE
M 230529
EQUIPMENT BASE PAD DETAIL
SCALE: NONE
M 230500
FIELD VERIFY
1. MAKE CONCRETE BASE PAD 6" LARGER ALL AROUND THAN EQUIPMENT BASE.
2. SUBMIT SHOP DRAWINGS FOR APPROVAL.
3. CONCRETE 3000 PSI.
VARIESFIELD VERIFY
EMBED #5 MIN. 4" INTO
EXISTING PAD. PROVIDE MIN.
4" EXPOSED IN NEW PAD.
EMBED WITH EPOXY EQUAL
TO HILTI HIT-RE 500
1/2"ATR MIN. 4" EMBEDMENT
ON 12" CENTERS. ROUGHEN
EXISTING SLAB AND PREP
SURFACE WITH BONDING
AGENT.
EXISTING PAD
EXISTING SLAB
NEW PAD EXTENSION
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
As indicated
M3.1
MECHANICAL DETAILS
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
ADT
BAL
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
SCALE: NONE
M 232100
CHEMICAL SHOT FEEDER DETAIL
AIR RELEASE
VALVE
FLOW
DRAIN
ONE SHOT FEEDER
WITH TANK WITH
FILTER. EQUAL TO
NEPTUNE DPFC-5
GATE VALVE (TYP.)
FUNNEL
PUMP
SCALE: NONE
M 232100
TYPICAL EXPANSION TANK CONNECTIONS AND MAKEUP WATER DETAIL
GLOBE VALVE
UNION (TYP.)
STRAINER W/
HOSE BIBB
LINE SIZE SHALL BE AS
SHOWN ON DRAWINGS.
DOUBLE CHECK BACKFLOW
PREVENTER EQUAL TO
WATTS SERIES 709-QT
GATE VALVE
(TYP.)
(2) EXISTING BLADDER TYPE
EXPANSION TANK(S)
RUN TO FLOOR DRAIN
PRESSURE RELIEF VALVE (30 PSIG)
PRESSURE REDUCING
VALVE (12 PSIG
ADJUSTABLE)
P
EXISTING 6"ø HWR
HEADER
AIR SEPARATOR DETAIL
SCALE: NONE
M 232100
AUTOMATIC AIR
VENT - PATTERSON
MODEL AR-075
LUG TYPE
BUTTERFLY
ISOLATION VALVE
STRAINER
1"∅ MAKE-UP
WATER.
GATE
VALVE
GATE
VALVE
AIR
SEPARATOR
WITH
STRAINER
END SUCTION PUMP DETAIL
SCALE: NONE
M 232100
PRESS.
GAGE
BUTTERFLY VALVE
FLEXIBLE CONNECTION (TYP.)
SUCTION
DIFFUSER/STRAINER
RUN TO NEAREST
FLOOR DRAIN
MOTOR
COUPLING
ASSY.
PUMP
NON SLAM WAFER CHECK
VALVE
BALANCING VALVE
WYE STRAINER WITH VALVE
AND BLOW DOWN
STACK CAP
STORM COLLAR TALL CONE
FLASHING
SEAL WATERTIGHT
AROUND FLASHING
DOUBLE WALL FLUE STACK AND THIMBLE AS MANUFACTURED
BY METALBESTOS. VERIFY SIZE WITH EQUIPMENT.
ROOF
'-0
M
IN
BOILER EXHAUST STACK DETAIL
SCALE: NONE
M 233300
BOILER
CONDENSATE
DRAIN
CONNECTION
BOILER CONDENSATE DETAIL
SCALE: NONE
M 232100
DRAIN LINE SHALL BE AT LEAST
THE SAME SIZE AS THE NIPPLE ON
THE BOILER
CLEAN
OUT
PITCH TOWARD
NEUTRAILZER
CLEAN
OUT
PROVIDE UNION AT
THREADED CONNECTIONS,
TYPICAL
BOILER
CONDENSATE PH
NEUTRALIZER,
EQUAL TO
NEUTRASAFE
CN4BC-2000C
PITCH AND
EXTEND TO
EXISTING
SANITARY
FLOOR DRAIN
DO NOT TRAP
BOILER
CONDENSATE
CONNECTION. UNIT
CONDENSATE IS
INTERNALLY
TRAPPED
SUPPORT PIPING
ABOVE FLOOR
BOILER EXHAUST STACK DETAIL
SCALE: NONE
M 233300
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
As indicated
M3.2
MECHANICAL DETAILS
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
ADT
BAL
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
NOTE:
ALL SYMBOLS OR ABBREVIATIONS MAY NOT APPEAR ON PLANS. CONTRACTOR IS ONLY
RESPONSIBLE FOR EQUIPMENT INDICATED ON CONSTRUCTION PLANS OR BY SPECIFICATION.
FAN
DRAWING SYMBOL DESCRIPTION DRAWING SYMBOL DESCRIPTION
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
CONTROL DIAGRAM LEGENDM
230900
ABBREVIATIONS
HP
RPM
LO
EA
HI
SDSP
EFF STG
RH
CMP
A
AFF
RDSP
MOD
DP
DMD
DH
SFTY
COV
HC
VLV
WRN
SF
COMPRESSOR
AMPS
ABOVE FINISHED FLOOR
RELATIVE HUMIDITY
EFFECTIVE STAGE
EXHAUST AIR
SUPPLY DUCT STATIC PRESSURE
HIGH
LOW
HORSE POWER
ROTATIONS PER MINUTE
RETURN DUCT STATIC PRESSURE
MODULATING
DIFFERENTIAL PRESSURE
DEMAND
DEHUMIDIFICATION
SAFETY
CHANGE OF VIEW
HEATING COIL
VALVE
WARNING/FAULT
SUPPLY FAN
RA RETURN AIR
FLT FILTER
HW HEATING WATER
RF
MA
RETURN FAN
MIXED AIR
DPT
STBY
DEW POINT TEMPERATURE
STANDBYEF EXHAUST FAN
P PRESSURE
PI PROPORTIONAL + INTEGRAL CONTROL
S STATUS
CW CONDENSER WATER
SD SMOKE DETECTOR
PCT PERCENT
CLG
CC
CHW
C
COOLING COIL
COOLING
CHILLED WATER
COMMAND
BYP BYPASS
ALM ALARM
PID PROPORTIONAL + INTEGRAL + DERIVATIVE CONTROL
PWR POWER
SA SUPPLY AIR
D DAMPER
DLY DELAY
DA DISCHARGE AIR
BHP BRAKE HORSE POWER
F FEEDBACK
SP SETPOINT
O OUTPUT
SUC SUCTION
T
UNOCC UNOCCUPIED
V VOLTS
TEMPERATURE
BSP BUILDING STATIC PRESSURE
SPD SPEED
DIS DISCHARGE
CFM CUBIC FEET PER MINUTE
HTG HEATING
KW KILOWATT
OCC OCCUPIED
OA OUTSIDE AIR
VFD VARIABLE FREQUENCY DRIVE
ISO ISOLATION
LIM LIMIT
AI ANALOG INPUT (0-10 VDC, 4-20 MA)
AO ANALOG OUTPUT (0-10 VDC, 4-20 MA)
DI DIGITAL INPUT (DRY CONTACT, 0 OR 24 VDC)
DO DIGITAL OUTPUT (DRY CONTACT, 0 OR 24 VDC)
2-WAY MOTORIZED BALL VALVE
3-WAY MOTORIZED BALL VALVE
AVERAGING TEMPERATURE SENSOR - SENSOR
LENGTH TO CROSS FACE OF COIL MINIMUM 2X
DUCT TEMPERATURE SENSOR - SENSOR LENGTH
TO BE A MINIMUM OF 1/4 THE TOTAL WIDTH OF
DUCT OR INSTALLED TO SENSE THE MIDDLE OF
THE DUCTWORK.
VLV-X
VLV-X
ATS
DTS
DHS
--- DUCT HUMIDITY SENSOR - OUTPUT SHALL BE
0-10VDC OR 4-20MA WITH A 2% ACCURACY
DPT
HI LO
DIFFERENTIAL PRESSURE TRANSMITTER - OUTPUT
SHALL BE 0-10VDC OR 4-20MA WITH A 2%
ACCURACY
DPS
HI LO
DIFFERENTIAL PRESSURE SWITCH - DRY CONTACT
NORMALLY CLOSED
DPS
HI LO
DIFFERENTIAL PRESSURE SWITCH MANUAL
RESET - DRY CONTACT NORMALLY CLOSED
MRS
CT
CURRENT TRANSDUCER - DRY CONTACT
NORMALLY OPEN
RL
--- 24 VDC COIL RELAY - NORMALLY OPEN CONTACT
xAD
--- MOTORIZED DAMPER
OAD = OUTSIDE AIR DAMPER
RAD = RETURN AIR DAMPER
FILTER
OAF
EBTRON AIR MONITOR: MODEL GTx116e-PC
OAF = OUTDOOR AIR FLOW IN CFM
RAF = RETURN AIR FLOW IN CFM
SAF = SUPPLY AIR FLOW IN CFM
PUMP
WM
--- WATER METER - OUTPUT SHALL BE PWM, 0-10VDC
OR 4-20MA WITH A 0.4% ACCURACY
FM
--- FLOW METER - OUTPUT SHALL BE 0-10VDC OR
4-20MA WITH A 1% ACCURACY
WELL TEMPERATURE SENSOR
WTS
2-WAY, 2-POSITION MOTORIZED BUTTERFLY VALVE
VLV-X
2-WAY, 2-POSITION SOLENOID VALVE
VLV-X
2S
I CURRENT
BMS BUILDING MANAGEMENT SYSTEM
M5.1
M5.1
HEATING HOT WATER CONTROL DIAGRAM
SCHEDULING:
THE BOILERS SHALL BE SCHEDULED BASED ON A USER INTERFACE SCHEDULE WITH 2 MODES OF OPERATION, ENABLED OR DISABLED. EXISTING OCCUPANCY SCHEDULE TO
REMAIN
ENABLED MODE:
WHEN OUTSIDE AIR TEMP. IS LESS THAN 55°F(ADJ.) AND ANY AIR HANDLER CALLS FOR HEATING THE HEATING PLANT SHALL BE ENABLED. THE CONTROLLER SHALL ENABLE THE SECONDARY HOT WATER HWP-1. IF FLOW IS NOT PROVEN WITHIN (3) MINUTES (ADJ.) THE CONTROLS SHALL GENERATE AN ALARM SIGNAL FOR HWP-1, LOCKOUT PUMP, AND ENERGIZE HWP-2. UPON PROOF OF FLOW THROUGH SECONDARY LOOP AS CONFIRMED BY NEW FLOW SENSOR THE CONTROLLER SHALL ENABLE B-1, OPEN IT'S MOTORIZED ISOLATION VALVE, AND ENERGIZE INTERNAL BOILER PUMP. BOILER SHALL MODULATE FIRING AND FLOW TO MAINTAIN DISCHARGE SET POINT OF 180°F(ADJ.) AS SENSED BY THE BOILER HWS SENSOR.
UPON A DROP IN HWR RETURN TEMPERATURE AS SENSED BY HW LOOP HWR SENSOR BELOW 140°F(ADJ.) THE CONTROLLER SHALL ENABLE BOILER B-2. BOILER SHALL MODULATE FIRING AND FLOW TO MAINTAIN DISCHARGE SET POINT OF 180°F(ADJ.) AS SENSED BY THE HW LOOP HWS SENSOR.
DISABLED MODE:
WHEN OUTSIDE AIR TEMP. IS ABOVE 55°F(ADJ.) THE HEATING PLANT SHALL BE LOCKED OUT. REHEAT HEATING HOT WATER PROVIDED BY EXISTING HEAT RECOVERY CHILLER (CH-4).
EXISTING CHILLER SEQUENCES TO REMAIN.
HOT WATER PUMP ROTATION:
HOT WATER PUMPS HHWP-1 AND HHWP-2 ARE REDUNDANT PUMPS AND SHALL ONLY OPERATE ONE AT A TIME. THE ACTIVE PUMP SHALL BE ROTATED WEEKLY VIA USER ADJUSTABLE
SCHEDULE. INACTIVE PUMP SHALL BE LOCKED OUT THROUGH THE CONTROLS.
GAS LEAK DETECTION:
SHALL BE PROVIDED VIA A SELF CONTAINED PROGRAMMABLE CONTROLLER WITH CARBON MONOXIDE (C0) AND NATURAL GAS METHANE (CH4) GAS DETECTORS WITH EITHER 24VAC OR 120VAC OUTLET SIGNAL TO AUTOMATIC GAS SHUT-OFF VALVE AND FIRE ALARM TIE-IN, AND 0.5 A BMS RELAY FOR ALARM. PROVIDE DRY CONTACT RELAYS FROM NEW GAS
MONITORING CONTROLLER TO :
NEW 120VAC AUTOMATIC GAS SHUT OFF VALVE
BOILER SAFETY SHUT DOWN CONTACTS
FIRE ALARM CONTACT
ORANGE STROBE WARNING LIGHT (EXTERIOR WALL ABOVE BOILER PLANT DOOR)
EMERGENCY SHUT DOWN PANIC BUTTON (EXTERIOR WALL OF BOILER PLANT)
BMS ALARM
GAS MONITOR EQUAL TO AGS MINI MERLIN WITH REMOTE ESO BUTTON
FORCED DRAFT CONDENSING HYDRONIC HEATING BOILER
HAND
OFF
AUTO
HWP-1
STARTER
HAND
OFF
AUTO
HWP-2
STARTER
RL-1
HWP1C
BO-1
CT-1
HWP1S
BI-1
RL-2
HWP2C
BO-2
CT-2
HWP2S
BI-2
HEATING WATER SUPPLY AND
RETURN TO & FROM CAMPUS
HWP-2
HWP-1
WTS-4
HHWS-T
AI-4
WFS-1
HHWS-F
AI-6
WTS-2
HHWR-T
AI-2
BLR-1
B1-EN
BO-3
BLR-1
B1-A
BI-4
BLR-1
B1-S
BI-3
BLR-1
B1-SP
AI-9
B-1
WTS-3
HHWR-T
AI-3
B-2
WTS-5
HHWS-T
AI-5
HEATING WATER
RETURN TO AND FROM
CH-4 (HEAT RECOVERY
CHILLER)
BLR-2
B2-EN
BO-4
BLR-2
B2-A
BI-7
BLR-2
B2-S
BI-6
BLR-2
B2-SP
AI-10
B-2
CONTROLS
B-1
CONTROLS
VLV-2
B1-P
AI-8
VLV-2
B1-O
AO-2
VLV-1
B1-P
AI-7
VLV-1
B1-O
AO-1
BLR-1
B1-CMDPR-S
BI-5
BLR-2
B2-CMDPR-S
BI-8
GAS MONITOR
CO & CH4 GAS SENSORS
GM
CO-PALRM
BI-9
GM
CH4-PALRM
BI-10
RL-3
GASVLV
BO-5
RL-4
B1SSHTDWN
BI-11
RL-5
B2SSHTDWN
BI-12
RL-6
BP FALRM
BI-13
WTS-1
HHWR-T
AI-1
Scale
Project number
Date
Drawn by
Checked by
CONSULTING ENGINEERS
154A WHITAKER RD.
LUTZ, FLORIDA 33549
(813)333-2103
WWW.BALENGINEERING.COM
Pinellas County Schools 301 4TH St. SW Largo, FL 33770
727-588-6000 https://www.pcsb.org
TO THE BEST KNOWLEDGE OF THE ENGINEERS AND
ARCHITECTS, SAID PLANS AND SPECIFICATIONS
COMPLY WITH THE APPLICABLE MINIMUM BUILDING
CODES AND THE APPLICABLE MINIMUM FIRE SAFETY
STANDARDS
As indicated
M4.1
CONTROLS LEGEND,
NOTES, & DETAILS
26015
PCS PALM HARBOR
UNIVERSITY HS BOILER
REPLACEMENT PROJECT
08-12-2026
Author
Checker
1900 Omaha St, Palm Harbor, FL 34683
100% CONSTRUCTION BID SET
BOILER PLANT CONTROLS POINTS LIST
Point Type Device ID Point Name Description
AI-1 WTS-1 HHWR-T COMMON HEATING HOT WATER SUPPLY FLOW SENSOR
AI-2 WTS-2 HHWR-T COMMON HEATING HOT WATER RETURN TEMPERATURE SENSOR
AI-3 WTS-3 HHWR-T BOILER LOOP HEATING HOT WATER RETURN TEMPERATURE SENSOR
AI-4 WTS-4 HHWS-T BOILER LOOP HEATING HOT WATER SUPPLY TEMPERATURE SENSOR
AI-5 WTS-5 HHWS-T COMMON HEATING HOT WATER SUPPLY TEMPERATURE SENSOR
AI-6 WFS-1 HHWS-F COMMON HEATING HOT WATER SUPPLY FLOW SENSOR
AI-7 VLV-1 B1-P B-1 HEATING HOT WATER RETURN VALVE POSITION
AI-8 VLV-2 B1-P B-2 HEATING HOT WATER RETURN VALVE POSITION
AI-9 BLR-1 B1-SP BOILER 1 CURRENT SET POINT
AI-10 BLR-2 B2-SP BOILER 2 CURRENT SET POINT
AO-1 VLV-1 B1-O B-1 HEATING HOT WATER RETURN VALVE OUTPUT
AO-2 VLV-2 B1-O B-2 HEATING HOT WATER RETURN VALVE OUTPUT
BI-1 CT-1 HWP1S HEATING HOT WATER PUMP 1 STATUS
BI-2 CT-2 HWP2S HEATING HOT WATER PUMP 2 STATUS
BI-3 BLR-1 B1-S B-1 STATUS
BI-4 BLR-1 B1-A B-1 ALARM STATUS
BI-5 BLR-1 B1-CMDPR-S B-1 COMUSTION DAMPER STATUS
BI-6 BLR-2 B2-S B-2 STATUS
BI-7 BLR-2 B2-A B-2 ALARM STATUS
BI-8 BLR-2 B2-CMDPR-S B-2 COMBUSTION DAMPER STATUS
BI-9 GM CO-PALRM CARBON MONOXIDE PRE ALARM > 20 PPM
BI-10 GM CH4-PALRM METHANE PRE ALARM > 8% LEL
BI-11 RL-4 B1SSHTDWN B-1 SHUT DOWN RELAY
BI-12 RL-5 B2SSHTDWN B-2 SHUT DOWN RELAY
BI-13 RL-6 BP FALRM FIRE ALARM CONTACT
BO-1 RL-1 HWP1C HEATING HOT WATER PUMP 1 START/STOP
BO-2 RL-2 HWP2C HEATING HOT WATER PUMP 2 START/STOP
BO-3 BLR-1 B1-EN B-1 ENABLE
BO-4 BLR-2 B2-EN B-2 ENABLE
BO-5 RL-3 GASVLV AUTOMATIC GAS SHUT OFF VALVE
| Sheets |
| 000 - COVER |
| M0.1 - LEGEND, NOTES, & SCHEDULES |
| M1.1 - MECHANICAL DEMOLITION PLAN |
| M2.1 - MECHANICAL RENOVATION PLANS |
| M3.1 - MECHANICAL DETAILS |
| M3.2 - MECHANICAL DETAILS |
| M4.1 - CONTROLS LEGEND, NOTES, & DETAILS |