This is a bid document package containing architectural and engineering drawings for the Palm Beach County Department of Airports' James L. Turnage Boulevard Bridge Repair project, designated as Bid No. PB 22-5 and Task I-21-PBI-A-053. The project involves repairs to ten bridges (Bridges 1, 2, 3, 4, 5, 8, and 10) located at Palm Beach International Airport in West Palm Beach, Florida. The repair scope includes concrete spall and delamination repairs, crack sealing and epoxy injection, expansion joint rehabilitation, drainage grate cleaning and replacement, electrical conduit repairs, fire suppression system restoration, bridge deck coating application (Class 5 finish), friction course repairs, and methacrylate deck sealing. The project encompasses comprehensive quantity schedules detailing specific deficiencies for each bridge structure, including superstructure (beams, deck, diaphragms), substructure (piers, abutments, columns), and ancillary systems. Repair tables specify dimensions, materials, and repair methodologies for each identified deficiency. Traffic control plans have been developed for each bridge phase, with restrictions limiting lane closures to non-peak hours (Sunday through Thursday, 10:00 PM to 6:00 AM) and maximum closure lengths of 200 feet for Bridges 3 and 10. The document package includes signature sheets from professional engineers Saul Perez, P.E. No. 37337; Khalid Motiwala, P.E. No. 50633; and Claudia Patricia Echeverri-Parra, P.E. No. 84761, prepared by AECOM Technical Services, Inc.
The project specifications require compliance with the 2021 Florida Department of Transportation Standard Specifications for Road and Bridge Construction, the 2020 Florida Building Code (7th Edition), and FDOT-approved materials listed on the Approved Products List (APL). Contractor responsibilities include field verification of existing conditions, maintenance of deficiency records, coordination with existing utilities and attachments, mobilization, traffic control, and restoration of affected areas. Concrete repairs must achieve 50 percent of 28-day compressive strength before form removal, with specific curing requirements detailed in FDOT Specification Section 400. The contractor must obtain existing bridge drawings from the Palm Beach International Airport Department of Aviation prior to construction commencement and submit shop drawings for structural elements and utility repairs for engineer approval. Funding and award information are not included in this bid document package; however, all construction work must be coordinated with airport operations and approved by the Department of Airports staff, including the Project Manager, Project Engineer, Construction Coordinator, and Operations Manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PB 22-5 JLT Blvd_Bridge Repairs_Project Manual BID.pdf | ||
| PB 22-5 Addendum 2.pdf | ||
| PB 22-5 Addendum 1.pdf | ||
| Inv. to Bid (Project No. PB 22-5).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PALM BEACH INTERNATIONAL AIRPORT
Task I-21-PBI-A-053
Bid No.: PB 22-5
PBIA JAMES L. TURNAGE BLVD.
BRIDGE REPAIR PLANS
7650 WEST COURTNEY CAMPBELL CAUSEWAY
TAMPA, FLORIDA 33607
LICENSE NO: EB 7937
BID DOCUMENTS
MARCH 6, 2022
PREPARED BY:
PREPARED FOR:
PALM BEACH COUNTY DEPARTMENT OF AIRPORTS
VICINITY MAP
INTERNATIONAL
PALM BEACH
NORTH
VERDENIA C. BAKER
GARY SYPEK , SENIOR DEPUTY DIRECTOR OF AIRPORTS
DEPARTMENT OF AIRPORTS
LAURA BEEBE, DIRECTOR OF AIRPORTS
COUNTY ADMINISTRATOR
BOARD OF COUNTY COMMISSIONERS
MARIA G. MARINO DISTRICT 1
GREGG K. WEISS, VICE MAYOR DISTRICT 2
DAVE KERNER DISTRICT 3
ROBERT S. WEINROTH, MAYOR DISTRICT 4
MARIA SACHS DISTRICT 5
MELISSA McKINLAY DISTRICT 6
MACK BERNARD DISTRICT 7
SIGNATURE SHEET
SUMMARY OF QUANTITIES (1 OF 3)
SUMMARY OF QUANTITIES (2 OF 3)
BRIDGE 1 PLAN AND ELEVATION
BRIDGE 1 REPAIR TABLES (1 OF 2)
BRIDGE 1 REPAIR TABLES (2 OF 2)
BRIDGE 1 SPECIAL REPAIRS
BRIDGE 2 PLAN AND ELEVATION
BRIDGE 2 REPAIR TABLES (1 OF 2)
BRIDGE 2 REPAIR TABLES (2 OF 2)
BRIDGE 2 SPECIAL REPAIR
BRIDGE 3 PLAN AND ELEVATION
BRIDGE 3 REPAIR TABLES (1 OF 2)
BRIDGE 3 REPAIR TABLES (2 OF 2)
BRIDGE 3 SPECIAL REPAIR
BRIDGE 4 PLAN AND ELEVATION
BRIDGE 4 REPAIR TABLES
BRIDGE 4 SPECIAL REPAIR
BRIDGE 5 PLAN AND ELEVATION
BRIDGE 5 REPAIR TABLES
BRIDGE 5 SPECIAL REPAIR
BRIDGE 8 PLAN AND ELEVATION
BRIDGE 8 REPAIR TABLES (1 OF 2)
BRIDGE 8 REPAIR TABLES (2 OF 2)
BRIDGE 8 SPECIAL REPAIR
BRIDGE 10 REPAIR TABLES
BRIDGE 10 SPECIAL REPAIR
TRAFFIC CONTROL PLAN - BRIDGE 1
TRAFFIC CONTROL PLAN - BRIDGE 2
TRAFFIC CONTROL PLAN - BRIDGE 3
TRAFFIC CONTROL PLAN - BRIDGE 8
TRAFFIC CONTROL PLAN - BRIDGE 10
BRIDGE 10 PLAN AND ELEVATION (2 OF 2)
COVER SHEET (INCLUDES INDEX OF SHEETS)
PROJECT LAYOUT AND GENERAL NOTES
BRIDGE 10 PLAN AND ELEVATION (1 OF 2)
TRAFFIC CONTROL PLAN - GENERAL NOTES
TRAFFIC CONTROL PLAN - BRIDGE 4 AND 5
TYPICAL BRIDGE REPAIR DETAILS (5 OF 5)
TYPICAL BRIDGE REPAIR DETAILS (1 OF 5)
TYPICAL BRIDGE REPAIR DETAILS (2 OF 5)
TYPICAL BRIDGE REPAIR DETAILS (3 OF 5)
TYPICAL BRIDGE REPAIR DETAILS (4 OF 5)
B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8
BQ-1
BQ-2
B1-1 B1-2 B1-3 B1-4 B2-1 B2-2 B2-3 B2-4 B3-1 B3-2 B3-3 B3-4 B4-1 B4-2 B4-3 B5-1 B5-2 B5-3 B8-1 B8-2 B8-3 B8-4 B10-1 B10-2 B10-3 B10-4
MOT-1
MOT-2
MOT-3
MOT-4
MOT-5
MOT-6
MOT-7
SHEET
NUMBER SHEET TITLE
INDEX OF DRAWINGS
SUMMARY OF QUANTITIES (3 OF 3)BQ-3
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
OKEECHOBEE BLVD.
AutoCAD SHX Text
DIXIE HWY. U.S. 1
AutoCAD SHX Text
BELVEDERE RD.
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
N. MILITARY TRAIL
AutoCAD SHX Text
SOUTHERN BLVD.
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
AutoCAD SHX Text p
AutoCAD SHX Text
CONGRESS AVE.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
FLORIDA'S TURNPIKE
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:50:40 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\SIGNST01.dgnmario.ramos
REF. DWG. NO.
SHEET TITLE:
PROJECT NAME:
AECOM Technical Services, Inc.
Certificate of Authorization No. 8115 Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
YT
SP
WEST PALM BEACH, FL 33406
1000 PBIA, SUITE 123
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
STATE OF
No 37337
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
ZEREP LUAS
THE FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
THE FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
SHEET DESCRIPTION SHEET NO. SHEET DESCRIPTION SHEET NO.
SAUL PEREZ, P.E. NO. 37337
MIAMI, FL 33126-1220
7650 CORPORATE CENTER DRIVE, SUITE 400
AECOM TECHNICAL SERVICES, INC.
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
KHALID MOTIWALA, P.E. NO. 50633
ORLANDO, FL 32801
101 S EOLA DRIVE, APT 1021
AECOM TECHNICAL SERVICES, INC.
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
B-2
SIGNATURE SHEET
B-8
B-2
TYPICAL BRIDGE REPAIRS DETAILS (5 OF 5)
SIGNATURE SHEET
THE FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR
SHEET DESCRIPTION SHEET NO.
CLAUDIA PATRICIA ECHEVERRI-PARRA, P.E. NO. 84761
MIAMI, FL 33126-1220
7650 CORPORATE CENTER DRIVE, SUITE 400
AECOM TECHNICAL SERVICES, INC.
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
MOT-7
MOT-6
MOT-5
MOT-4
MOT-3
MOT-2
MOT-1
B-2
P R
O F
E S
SIONAL E
N G
IN
E E
R
L
IC
ENSE
F
LO RID
A
C L
A U
D
IA
P
ATRIC
IA ECHEVER
R I-P
A R
R A
P R
O F
E S
SIONAL E
N G
IN
E E
R
L
IC
ENSE
F
LO RID
A
K
H
ALID
MOTIW
A
LA
TRAFFIC CONTROL PLAN - BRIDGE 10
TRAFFIC CONTROL PLAN - BRIDGE 8
TRAFFIC CONTROL PLAN - BRIDGE 4 AND 5
TRAFFIC CONTROL PLAN - BRIDGE 3
TRAFFIC CONTROL PLAN - BRIDGE 2
TRAFFIC CONTROL PLAN - BRIDGE 1
TRAFFIC CONTROL PLAN - GENERAL NOTES
SIGNATURE SHEET
BQ-2
B10-4
B10-3
B10-2
B10-1
B8-4
B8-3
B8-2
B8-1
B5-3
B5-2
B5-1
B4-3
B4-2
B4-1
B3-6
B3-5
B3-4
B3-3
B3-2
B3-1
B2-4
B2-3
B2-2
B2-1
B1-4
B1-3
B1-2
B1-1
BQ-3
BQ-2
BQ-1
B-7
B-6
B-5
B-4
B-3
B-2
B-1
BRIDGE 10 SPECIAL REPAIRS
BRIDGE 10 REPAIR TABLES
BRIDGE 10 PLAN AND ELEVATION (2 OF 2)
BRIDGE 10 PLAN AND ELEVATION (1 OF 2)
BRIDGE 8 SPECIAL REPAIRS
BRIDGE 8 REPAIR TABLES (2 OF 2)
BRIDGE 8 REPAIR TABLES (1 OF 2)
BRIDGE 8 PLAN AND ELEVATION
BRIDGE 5 SPECIAL REPAIRS
BRIDGE 5 REPAIR TABLES
BRIDGE 5 PLAN AND ELEVATION
BRIDGE 4 SPECIAL REPAIRS
BRIDGE 4 REPAIR TABLES
BRIDGE 4 PLAN AND ELEVATION
BRIDGE 3 SPECIAL REPAIRS (2 OF 2)
BRIDGE 3 SPECIAL REPAIRS (1 OF 2)
BRIDGE 3 REPAIR TABLES (2 OF 2)
BRIDGE 3 REPAIR TABLES (1 OF 2)
BRIDGE 3 PLAN AND ELEVATION (2 OF 2)
BRIDGE 3 PLAN AND ELEVATION (1 OF 2)
BRIDGE 2 SPECIAL REPAIRS
BRIDGE 2 REPAIR TABLES (2 OF 2)
BRIDGE 2 REPAIR TABLES (1 OF 2)
BRIDGE 2 PLAN AND ELEVATION
BRIDGE 1 SPECIAL REPAIRS
BRIDGE 1 REPAIR TABLES (2 OF 2)
BRIDGE 1 REPAIR TABLES (1 OF 2)
BRIDGE 1 PLAN AND ELEVATION
SUMMARY OF QUANTITIES (3 OF 3)
SUMMARY OF QUANTITIES (2 OF 3)
SUMMARY OF QUANTITIES (1 OF 3)
TYPICAL BRIDGE REPAIRS DETAILS (4 OF 5)
TYPICAL BRIDGE REPAIRS DETAILS (3 OF 5)
TYPICAL BRIDGE REPAIRS DETAILS (2 OF 5)
TYPICAL BRIDGE REPAIRS DETAILS (1 OF 5)
PROJECT LAYOUT AND GENERAL NOTES
SIGNATURE SHEET
KEY SHEET
BRIDGE REPAIR PLANS
PBIA JAMES L. TURNAGE BLVD.
N
BRIDGE 8
BRIDGE 3
GARAGE AND TERMINAL
SHORT-TERM PARKING
BRIDGE 10
BRIDGE 4
PARKING GARAGE 2
LONG-TERM
PARKING GARAGE 3
LONG-TERM
BRIDGE 5
Road
Perimeter
(#934260)
BRIDGE 1
(#934261)
BRIDGE 2
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:50:46 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0GeneralNotes01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
BRIDGE REPAIRS - GENERAL NOTES
PROJECT LAYOUT
James L. Tur nage Blv d.
Belvedere Road
James L. Turnage Blvd.
B-3
PROJECT LAYOUT AND GENERAL NOTES
jperusse@pbia.org
(561) 471-7404
Jeremy PerusseOperations Managar:
mhurst@pbia.org
(561) 471-7434
Marvin HurstConstruction Coordinator:
gsantos@bpia.org
(561) 681-5121
George Santos, P.E.Project Engineer:
cportnoy@bpia.org
(561) 471-7411
Cindy Portnoy, P.E.Project Manager:
Gary Sypek, AAESenior Deputy Director:
Below is the contact information of key staff at Palm Beach International Airport:
PALM BEACH INTERNATIONAL AIRPORT CONTACT INFORMATION:
See Traffic Control Plans.
MAINTENANCE OF TRAFFIC:
care not to damage existing bridge and landscaping. Cost of vegetation control is considered incidental to Mobilization.
Use herbicides in accordance with FDOT Specification Section 7-1.7. When removing unwanted vegetation, Contractor shall take shall remove this unwanted vegetation by manual or mechanical means and shall apply a herbicide to prevent further growth.
Several bridges in this plan set have vegetation growing in undesired areas such as MSE walls and substructures. Contractor
VEGETATION CONTROL:
All dimensions in these plans are measured in feet either horizontally or vertically unless otherwise noted.
beginning construction and notify the Engineer of any discrepancies.
the existing plans and may not represent as-built conditions. It is the Contractor's responsibility to verify this data before
Unless otherwise noted, the dimensions, elevations and intersecting angles shown are based on the information as detailed in
EXISTING DIMENSIONS:
about the location, description, dimensions, repair method and the materials used.
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record includes information 2.
shall notify the Engineer of any discrepancies or additional deficiencies found.
Prior to the start of construction, Contractor shall field verify the deficiencies shown in the repair tables. Contractor 1.
REPAIR TABLES AND RECORD OF DEFICIENCIES:
removal and restoration of these utilities.
reattachment materials and procedure. Contractor's bid shall include all labor, equipment and materials associated with the restoration of these utilities and attachments with the DOA. Contractor shall submit shop drawings showing the proposed
In the event that the utility or attachment has to be temporarily removed, Contractor shall coordinate the removal and the
c. If the repair will have to be re-engineered.
b. If the repair can be constructed with the utility in place.
a. If the utility or attachment can be temporarily removed in order to allow the repair to be constructed.
existing utility or attachment conflicts with a proposed repair, the Contractor shall coordinate with Engineer to determine:
these plans and identify if any of these utilities or attachments are in conflict with proposed repairs. In the event that an
Prior to start of construction, Contractor shall verify the existing attachments and utilities attached to the bridges shown in
EXISTING UTILITIES AND ATTACHMENTS:
Bridge Drains identified for repair or replacement.4.
Utilities and Attachments conflicting with repairs that need to be removed and re-attached.3.
Bridge Lighting indentified for repair or replacement. Bridge lighting and electrical components identified for repair.2.
Bridge 3 Vertical Hangers for Fire Sprinklers.1.
shall be required for the following:
When called out on plans, Contractor shall submit signed and sealed shop drawings for review and approval. Shop Drawings
SHOP DRAWINGS:
Stay-in-place forms are not allowed.
STAY-IN-PLACE FORMS:
Unless otherwise noted, reinforcing steel shall be ASTM A615, Grade 60.
REINFORCING STEEL:
Concrete surface finish of repaired areas shall match existing.
CONCRETE FINISH:
Minimum concrete cover shall be per existing plans unless otherwise noted in this plan set.
CONCRETE COVER:
(f'c) or is 7 days old.
Per Specification Section 400, forms shall not be removed until concrete reaches 50% of its 28 day compressive strength 4.
concrete curing shall be per FOOT Specification Section 400.
Requirements for falsework, forms, concrete placement, construction and expansion joints, concrete finishing, and 3.
other mixing proportions, sampling and testing requirements, quality control, and mixing and delivery requirements.
Specification Section 346 includes material requirements, strength and slump requirements, water to cement ratio and 2.
Concrete Classes as specified in bridge repair details.
All concrete shall be in accordance with Specification Section 346. Use concrete design mixes that comply with FOOT 1.
CONCRETE:
Design loads are per existing plans. See General Notes on each bridge's existing plans.
DESIGN LOADS:
Shop drawings for structural elements called out in the existing plans are not available.2.
drawings from Palm Beach International Airport (Department of Aviation) prior to start of construction.
Existing drawings for most of the bridges shown in these plans are available. Contractor must obtain a copy of these 1.
EXISTING DRAWINGS:
Documents.
2021 Florida Department of Transportation Standard Specifications for Road and Bridge Construction as amended by Contract
CONSTRUCTION SPECIFICATIONS:
2. 2020 Florida Building Code, 7th Edition.
1. Construction shall be in accordance with all applicable Federal, State and Palm Beach County codes and ordinances.
CODES AND SPECIFICATIONS:
A
A sawcut (Typ.)
1" depth
Limits of reused (Typ.)
be cleaned and
Reinforcing to
Existing Steel be restored at perimeter of area to
1" depth sawcut typical
Surface
Aggregate Fractured
Injection Hose
Injection Port
Temporary surface seal for injection
Epoxy Type E crack at surface
Location of
Concrete
Existing
(T y p
M in
M a x .8
0.25in Max.
Approximate crack width
2" Max.
1" Min.
of Concrete
Depth of removal
Spalled Concrete
Area of Unsound or
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:50:53 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0MiscDet01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
SPALL AND DELAMINATION REPAIR NOTES
TYPICAL SPALL REPAIR CONFIGURATIONS
Delaminated Concrete
Boundary of loose and/or area to be repaired
Recomended layout of
PARTIAL DEPTH REPAIR PLAN
SPALL REPAIR DETAILS
SECTION A-A
EPOXY INJECT AND SEAL CRACK REPAIR
NOTES:
Section 413.
Apply a penetrant sealer for cracks with widths less that 0.008" per Specification 6.
completed and epoxy has set.
Grind off the excess epoxy and ports to the existing profile after epoxy injection is 5.
Refer to section 411 of Standard Specifications for additional information. 4.
Approved Products List (APL) Section 926.
Type E epoxy is for injection. Use Type E and F-1 epoxies that are listed on FDOT
Use Type F-1 compound epoxy for sealing crack surfaces in preparation for injection. 3.
order to develop a special repair procedure.
", notify engineer in 4 1with cracks measuring 0.008" or greater. For cracks wider than
Epoxy injection repair is to be applied to concrete elements except top side of deck 2.
If concrete around the crack is delaminated, repair as a delamination.
Sound test around the cracks prior to injecting to assure that it is not delaminated. 1.
TYPICAL BRIDGE REPAIR DETAILS (1 OF 5)
B-4
Cure repair as per Manufacturer's recommendations.5.
and edges to the original dimensions and shape of the concrete element.
recommendations. Firmly consolidate the grout mix in the cutout area. Restore surfaces non-metallic, non-shrink grout mixed and applied in accordance with Manufacturer's manufacturer's recommendations. Fill the cutout area with an approved high-strength, Coat the prepared surface with an approved epoxy bonding agent applied in accordance to 4.
the repair area.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from 3.
rebar or strand to provide 1 inch clearance all around.
reinforcing bars or prestressing strand is exposed, remove concrete from around the the depth of sound concrete or to a minimum depth of 1", whichever is deeper. When surface of the concrete element. See Partial Depth Repair Plan on this sheet. Cut to a
Carefully cut the area of unsound concrete to be repaired back to perpendicular to the 1.
DELAMINATIONS AND HONEYCOMBING:
Cure repair as per Manufacturer's recommendations.5.
and edges to the original dimensions and shape of the concrete element.
recommendations. Firmly consolidate the grout mix in the cutout area. Restore surfaces non-metallic, non-shrink grout mixed and applied in accordance with Manufacturer's manufacturer's recommendations. Fill the cutout area with an approved high-strength, Coat the prepared surface with an approved epoxy bonding agent applied in accordance to 4.
the repair area.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from 3.
the rebar or strand to provide a minimum of 1 inch clearance all around.
When reinforcing bars or prestressing strand is exposed, remove concrete from around
Cut to a the depth of sound concrete or to a minimum depth of 1/2", whichever is deeper.
surface of the concrete element. See Typical Spall Repair Configurations on this sheet.
Carefully cut all feathered edges of the area to be repaired back to perpendicular to the 2.
exposed reinforcing steel or prestressing strand exposed.
criteria for minor spalls and minor surface deficiencies. Typically, major spalls have
Major spalls are defined as spalls and surface deficiencies larger and/or deeper that 1.
MAJOR SPALLS:
Cure repair as per Manufacturer's recommendations.5.
and edges to the original dimensions and shape of the concrete element.
recommendations. Firmly consolidate the grout mix in the cutout area. Restore surfaces non-metallic, non-shrink grout mixed and applied in accordance with Manufacturer's manufacturer's recommendations. Fill the cutout area with an approved high-strength, Coat the prepared surface with an approved epoxy bonding agent applied in accordance to 4.
the repair area.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from 3.
Cut to the depth of sound concrete or to a minimum depth of 1/2", whichever is deeper.
surface of the concrete element. See Typical Spall Repair Configurations on this sheet.
Carefully cut all feathered edges of the area to be repaired back to perpendicular to the 2.
2.0 square feet and no deeper than the rebar cover.
Minor spalls and minor surface deficiencies are defined in these plans as not larger than 1.
MINOR SPALLS AND MINOR SURFACE DEFICIENCIES:
repaired.
strength (f'c) shall meet or exceed concrete strength of existing structural element being
Use only non-shrink grout that is listed on FDOT Approved Products List (APL). Grout 5.
appearance of the unaffected surrounding area.
Ensure repaired surfaces have a surface texture, finish and color which matches the 4.
manufacturer of the repair material.
Cure repair surfaces for at least 72 hours or for the curing time recommended by the 3.
the repair area.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from 2.
the materials used.
record includes information about the location, description, dimensions, repair method and
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the 1.
GENERAL:
Limits of Methacrylate
Work ZoneTraffic Lane
Spall
Deficient Cover
Reinforment with
Exposed Top
Concrete Beam
Deficient Cover
Reinforment with
Exposed underside of deck
Spalling at
Vertical Drain Pipe drain pipe
Spalling around
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:50:53 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0MiscDet01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
PLAN VIEW - UNDERSIDE OF DECK SPALLS - UNDERSIDE OF DECKPLAN VIEW - TOP OF DECK EXPOSED REBAR - SIDE OF BEAM
EXPOSED SURFACE REBAR (INADEQUATE CONCRETE COVER) REPAIRS OVERHEAD CONCRETE REPAIRS (UNDERSIDE OF DECK)
TYPICAL SECTION
CONCRETE DECK SEALING GENERAL NOTES (METHACRYLATE):
Left Side Zone Similar
Right Side Work Zone Shown
GENERAL LIGHTING AND ELECTRICAL REPAIRS
sufficiently to provide 1 in cover, notify engineer for special repair instructions.
concrete element. For rebar protruding from concrete surface that could not be field bent surfaces and edges to the original dimensions and shape of the recommendations. Restore
Prepare surface, mix and apply epoxy grout in accordance to Manufacturer's 3.
at least 1 in of cover.into concrete element in order to provide approved method. For rebar protruding from concrete surface, attempt to field bend rebar repair area. Clean exposed rebar to remove surface corrosion using sandblasting or other
Remove all laitenace, loose and unsound material, oil, and other deleterious material from the 2.
rebar or strand to provide 1 inch clearance all around. Remove concrete from around the surface of the concrete element. See Typical Spall Repair Configurations on this sheet.
Carefully cut all feathered edges of the area to be repaired back to perpendicular to the 1.
REPAIR NOTES:
Use Type F-1 epoxy grouts that are listed on FDOT Approved Products List (APL) Section 926.5.
unaffected surrounding area of the product.
appearance of the
Ensure repaired surfaces have a surface texture, finish and color which matches the 4.
repair area.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from the 3.
information about the location, description, dimensions, repair method and the materials used.
record includes
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the 2.
cover.
Repair details on this sheet apply to exposed rebar visible from the surface with inadequate 1.
GENERAL:
ensure the methacrylate coating does not seep under the tape.
prior to application of the methacrylate. The temporary pavement marking tape shall be securely adhered to the bridge deck to
Temporary pavement marking tape shall be installed after surface preparation in the location of the permanent pavement markings 7.
See Traffic Control Plans for placement of temporary and permanent pavement markings.6.
Methacrylate applications shall overlap previous work zone areas in accordance with the manufacturer's requirements.5.
residue.
Contractor shall ensure the surface preparation methods remove all existing pavement markings, including any pavement marking stations. The Perform surface preparation and application to all areas as per the limits shown, from Begin to End Bridge4.
Work shall be performed during non-peak hours.3.
Methacrylate shall be applied in two phases in accordance with the Traffic Control Plans.2.
Use HMWM that is listed on FDOT Approved Products List (APL) Section 413 methacrylates (HMWM) as specified in section 413 of FDOT Specifications and in accordance with manufacturer's recommendations.
Seal concrete surfaces and cracks in concrete using materials, surface preparation and application of high molecular weight 1.
Cure repair as per Manufacturer's recommendations.4.
original dimensions and shape of the concrete element.
Prepare surface, mix and apply repair material in accordance to Manufacturer's recommendations. Restore surfaces and edges to the 3.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from the repair area.2.
provide 1 inch clearance all around.
recommendations. When reinforcing bars or prestressing strand is exposed, remove concrete from around the rebar or strand to
Spall Repair Configurations on this sheet. Mechanically roughen the existing concrete mating surface per Manufacturer's
Carefully cut all feathered edges of the area to be repaired back to perpendicular to the surface of the concrete element. See Typical 1.
REPAIR NOTES:
Section 930. Verify that repair material chosen is suitable for overhead applications.
Use predominately vertical surface-high performance concrete repair materials that are listed on FDOT Approved Products List (APL) 6.
of the product.
Ensure repaired surfaces have a surface texture, finish and color which matches the appearance of the unaffected surrounding area 5.
compound.
the application of a curing Cure repair surfaces as recommended by the manufacturer of the repair material, such as wet cure or4.
Remove all laitenace, loose and unsound material, oil, and other deleterious material from the repair area.3.
location, description, dimensions, repair method and the materials used.
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record includes information about the 2.
Repair details on this sheet apply to overhead repairs located on the underside of concrete deck such as spalls at underside of decks.1.
GENERAL:
Proposed conduits must comply with FDOT Standard Specifications.4.
protect pedestrians and vehicles from electrical shock during repairs.
procedure, and methods used to the conduit repair including materials to be used and conduit replacement or repair
Once the conduit repairs have been coordinated with DOA and Engineer, Contractor will submit formal shop drawings for 3.
repair. DOA and Engineer will review the proposed repairs.
Contractor shall submit proposed conduit repairs to the Engineer and DOA including the materials needed for the 2.
manner to repair or replace the conduit.
the best Contractor shall inspect the broken conduits that require repair per the Repair Tables in order to determine1.
BROKEN CONDUITS:
Proposed conduits and new underdeck luminaries must comply with FDOT Standard Specifications.4.
to protect pedestrians and vehicles from electrical shock during repairs.
shop drawings for the underdeck lighting including materials to be used, electrical repair procedure, and methods used
Once underdeck repairs and replacements have been coordinated with DOA and Engineer, Contractor will submit formal 3.
Contractor.
review these findings and notify Contractor whether each light fixture will be repaired or replaced as indicated by be repaired or if it must be replaced and the materials needed for the repair or replacement. DOA and Engineer will
Contractor shall submit findings to the Engineer and DOA which include stating whether each damaged light fixture can 2.
etc).
entire substructure mounted light fixture needs to be replaced or if it can be repaired (broken bulbs, broken covers, Contractor shall inspect the lighting items that require repair per the Repair Tables in order to determine whether the 1.
UNDERDECK LIGHTING:
about the location, description, dimensions, repair method and the materials used.
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record includes information 2.
Repair details apply to broken bridge underdeck lighting and broken electrical conduits.1.
GENERAL:
B-5
TYPICAL BRIDGE REPAIR DETAILS (2 OF 5)
Existing Exp Jt
Existing Compression Seal
Standard Plans Index 458-110
Sealant per FDOT
Backer Rod and Silicone
Angle (Typ)
Existing Armor
Blockout (Typ)
Angle (Typ)
Existing Armor
Nosing (Typ)
Existing
Sealant
Silicone
Angle (Typ)
Existing Armor
Backer Rod
Standard Plans Index 458-110
Silicone Sealant per FDOT and Replace with Backer Rod and
Remove Existing Compression Seal
6" Existing Compression Seal
Nosing or Equal (Typ) Silspec 900 Polymeric Nosing or Equal (Typ)
Silspec 900 Polymeric
Concrete Deck
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:50:55 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0MiscDet02.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
EXISTING NOSING PRESENT NO EXISTING NOSING
EXPANSION JOINT REPAIR DETAILS
sealant.
After nosing has cured, install backer rod and silicone2.
recommendations.
material in accordance to Manufacturer's system or equal. Prepare surface, mix and apply nosing
Place new nosing using Silspec 900 polymeric nosing1.
STEP 2 - NEW NOSING AND SILCONE SEALANT JOINT
Type D silicone sealant that is listed on FDOT Approved Products List (APL) Section 932.
Use silicone sealant and backer rod that comply with FDOT Spec. Sections 458 and 932. Use a 5.
prior to applying the backer rod and silicone sealant.
Remove all loose and unsound material, oil, and other deleterious material from the armor angles 4.
levels of corrision or other deficiencies.
After removal of existing compression seal, notify engineer if existing armor angles show high 3.
used.
includes information about the location, description, dimensions, repair method and the materials
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record 2.
with a poured joint with backer rod per FDOT Standard Plans Index 458-110.
good condition. In the repair detail, the existing compression seal is to be removed and replaced
Repair detail is for expansion joints with deficient compression seals but with armor angles in 1.
NOTES:
EXPANSION JOINT REPAIR DETAIL 1
existing armor angle to remain)
(Replace compression seal with silicone sealant area.
material from the nosing unsound material, oil, and other deleterious
Clean rebar and concrete surfaces. Remove all laitenace, loose and 3.
Roughen concrete mating surface to 1/4" amplitude.2.
reinforcement.
proposed blockout for new nosing. Contractor shall not damage existing
Remove existing armor angle and compression seal and create the 1.
STEP 1 - REMOVAL OF EXISTING EXPANSION JOINT
material from the nosing area.material, oil, and other deleterious
Clean rebar and concrete surfaces. Remove all laitenace, loose and unsound 3.
Roughen concrete mating surface to 1/4" amplitude.2.
not damage existing reinforcement.
Remove existing nosing, armor angle and compression seal. Contractor shall 1.
STEP 1 - REMOVAL OF EXISTING EXPANSION JOINT
After nosing has cured, install backer rod and silicone sealant.2.
Manufacturer's recommendations.
Prepare surface, mix and apply nosing material in accordance to
Place new nosing using Silspec 900 polymeric nosing system or equal. 1.
STEP 2 - NEW NOSING AND SILCONE SEALANT JOINT
studs.
needed in order to remove armor angle to depth of angle. Increase slightly as
Min. depth of blockout shall be equal �
EXPANSION JOINT REPAIR DETAIL 2
(Replace existing armor angle and compression seal)
B-6
GENERAL DRAINAGE GRATING AND INLET SYSTEM REPAIR NOTES
used to replace broken grates.
the same size, style and thickness. Contractor shall submit shop drawings for replacement grates
5. Replace damaged grates in kind as per Manufacturer's recommendations. Replacement grates must be
Regulations.
of the water and debris collected in accordance with Federal, State, and Local Rules and or pumping system capable of removing water and debris into a collection bin. Remove and dispose
4. For inlet drainage systems that are clogged, clean inlets and drains using a jet/vacuuming system determine whether the inlets need to be cleaned and if damaged grates need to be replaced.
3. Contractor shall inspect the drainage systems that require repairs per Repair Tables in order to used.
includes information about the location, description, dimensions, repair method and the materials
2. For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record
1. Repair Details apply to corroded and broken drainage gratings and clogged Inlet drainage systems.
TYPICAL BRIDGE REPAIR DETAILS (3 OF 5)
be Silspec 900 polymer nosing system.is listed on FDOT Approved Products List (APL) Section 932. Polymeric nosing shall
Use silicone sealant and backer rod that comply with FDOT Spec. Sections 458 and 932. Use a Type D silicone sealant that 5.
temporarily removed, Contractor shall note its location so that it can be returned to its correct position.
bonded dowels is not permitted as a construction option. During concrete removal, if reinforcement needs to be
Existing rebar shall be protected, salvaged and utilized in the new nosing. Cutting of this rebar and substitution of epoxy 4.
Depth of existing nosing is not known.3.
about the location, description, dimensions, repair method and the materials used.
For each bridge, maintain the record of deficiencies and their repair methods. Ensure the record includes information 2.
Standard Plans Index 458-110 and a new polymeric nosing.
compression seal, nosing, and armor angles are to be removed and replaced with a poured joint with backer rod per FDOT
Repair detail is for expansion joints with deficient compression seals and armor angles. In the repair detail, the existing 1.
NOTES:
Beam
Concrete
Exterior
Ground Line
Coating Limit
Class 5 Applied
Coating N.S. & F.S.
Class 5 Applied
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:01 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0MiscDet03.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
SURFACE COATING FINISH DETAIL
Class 5 Applied Finish Coating Notes:
1. All exposed surfaces with limits shown in the detail and the exposed surfaces of the end bents shall receive a
Class 5 applied finish coating to produce a uniform appearance. Method to be reviewed by the Engineer.
2. Clean the exposed surfaces and remove residual of previous coating by pressure washing before applying
Class 5 surface finish coating per FDOT Standard Spec
400-19.
3. After cleaning has been successfully completed, apply
Class 5 finish per FDOT Standard Spec. 400-15.2.6. The finish coat shall meet FED-STD-595, Table VIII, Shade
No. 36622. Use a Class 5 finish that is listed on the
FDOT Approved Product List (APL) Section 400.
B-7
TYPICAL BRIDGE REPAIR DETAILS (4 OF 5)
CEG
CEG
JSP
150 N. Orange Ave., Suite 200 Orlando, FL 32801 Tel: (407) 843-6552
Certificate of Authorization No. 8115
Khalid Motiwala, P.E. No. 50633
Perimeter
Rd.
BRIDGE 1
(#934260)
BRIDGE 2
(#934261)
BRIDGE 5
BRIDGE 3
BRIDGE 8
BRIDGE 4
BRIDGE 10
KM
MS
KM
PALM BEACH
INTERNATIONAL AIRPORT
1000 PBIA, SUITE 123
WEST PALM BEACH, FL 33406
LOCATION MAP
MS
James L. Turnage Blvd.
Belvedere Rd.
J a m e s L
T u r n a g e B lv d
BRIDGE 3
BRIDGE 8
PLAN
LEGEND
= Approximate Limits of Coating Installation Type 1
±100'-0"
±75'-0"
±100'-0"
±60'-0"
Bent 3
Bent 2
Bent 1
Existing
Expansion Joint
Column Below
(Typ. Col. Line 1)
Conc. Column (Typ.) Concrete
Pedestrian
Median (Typ.)
Curb (Typ.)
Curb (Typ.)
Existing
Expansion Joint
Column Below (Typ.
Beyond Col. Line 27)
Existing Conc.
Barriers (Typ.)
Pavement
Striping (Typ.)
Pavement
Striping (Typ.)
Existing concrete deck
MasterSeal P 255 Primer at a rate of 200 - 300 square feet per gallon
Existing concrete deck
Powerwash surface prior to shotblasting surface to ICRI profile 3
Existing coating
SURFACE PREPARATION DECK COATING INSTALLATION - TYPE 1
NOTES
1. Contractor shall verify all dimensions, locations, and conditions prior to construction.
2. Repair any voids or delaminated areas with epoxy patching materials prior to abrasive shotblasting.
3. Perform surface preparation in accordance with ICRI profile 3.
4. Apply coatings and aggregate per manufacturer recommended installation procedures and project specifications.
5. Work shall be performed in accordance with the
Traffic Control Plans.
6. Perform lane re-striping after coating work has completed in accordance with the project specifications.
7. Terminate coating utilizing saw cuts per coating manufacturer specifications (not to exceed 1/4" in depth).
8. Coating system must cure for a minimum of 24 hours after final coat and lane markings are installed prior to opening lanes to vehicular traffic.
251 2 3 4 27 29 30 31
Bridge 10
28-1 28-2
Bridge 8
Bridge 3
Terminal
Building
Bridge 5
= Approximate Limits of Coating Installation Type 2
Existing concrete deck
MasterSeal P 255 Primer at a rate of 200 - 300 square feet per gallon
MasterSeal M 265 Base
Coat at a rate of 55 - 60 square feet per gallon
DECK COATING INSTALLATION - TYPE 2
MasterSeal TC 295 Top Coat (at a rate of 60 - 80 square feet per gallon) w/ Alpha Star 16+40
Aggregate (at a rate of 15 pounds per 100 square feet)
DECK COATING INSTALLATION
MasterSeal TC 295 Top Coat (at a rate of 60 - 80 square feet per gallon) w/ Alpha Star 16+40
Aggregate (at a rate of 15 pounds per 100 square feet)
AutoCAD SHX Text N
AutoCAD SHX Text By
AutoCAD SHX Text Description
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text Date
AutoCAD SHX Text By
AutoCAD SHX Text Description
AutoCAD SHX Text Date
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text 2/28/2022
AutoCAD SHX Text
2:30:35 PM
AutoCAD SHX Text C:\USERS\MATT.SAKAL\ONEDRIVE - AECOM DIRECTORY\DOCUMENTS\WORKING\60664604 - PBI-47-GARAGE REPAIRS\LOCAL CAD\B0MISCDET04.DWG
AutoCAD SHX Text
MATT.SAKAL
AutoCAD SHX Text
REF. DWG. NO.
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text By
AutoCAD SHX Text Description
AutoCAD SHX Text Date
AutoCAD SHX Text Drawn By:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text B-8
AutoCAD SHX Text
TYPICAL BRIDGE REPAIR DETAILS (5 OF 5)
AutoCAD SHX Text
PBIA JAMES L. TURNAGE BLVD. BRIDGE REPAIR PLANS
AutoCAD SHX Text
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:02 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0SumOfQuantities01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by: BQ-1
SUMMARY OF QUANTITIES (1 OF 3)
BRIDGE 2 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 22,578.2
0401 70 4 Superstructure Spalls and Delaminations CF 1.0
SUBSTRUCTURE
0413 154 Substructure HL Cracks SF 300.5
0411 1 Abutments Cracks > HL Gal 1.0
0411 2 Abutments Cracks > HL LF 3.9
0411 1 Piers Cracks > HL Gal 1.0
0411 2 Piers Cracks > HL LF 62.4
0350 5 Silicone Joint Seal LF 373.6
0715 11 225 Broken Pier Mounted Light EA 1
JOINTS 0458 1 22 Damaged Compression Joint Seal LF 342.1
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 13,634.8
BRIDGE 1 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 17,979.3
0401 70 4 Superstructure Spalls and Delaminations CF 3.2
SUBSTRUCTURE
0413 154 Substructure HL Cracks SF 0.1
0401 70 4 Substructure Spalls and Delaminations CF 3.9
0411 1 Piers Cracks > HL Gal 1.0
0411 2 Piers Cracks > HL LF 54.6
0715 11 225 Broken Pier Mounted Light EA 1
JOINTS 0458 1 22 Damaged Compression Joint Seal LF 294.6
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 13,036.2
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:02 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0SumOfQuantities01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by: BQ-2
SUMMARY OF QUANTITIES (2 OF 3)
BRIDGE 5 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 3,701.0
0401 70 4 Superstructure Spalls and Delaminations CF 12.0
0715 11 225 Defective Underside of Deck Lighting EA 12
SUBSTRUCTURE
0401 70 4 Substructure Spalls and Delaminations CF 1.8
0350 5 1 Joint Sealant at Column Base LF 49.0
JOINTS 0458 1 22 Damaged Compression Joint Seal LF 160.6
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 5,423.5
BRIDGE 4 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 1,857.7
0401 70 4 Superstructure Spalls and Delaminations CF 31.0
JOINTS 0458 1 22 Damaged Compression Joint Seal LF 77.0
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 1,552.3
BRIDGE 3 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 27,479
0401 70 4 Deck Spalls and Delaminations CF 4.4
SUBSTRUCTURE
0413 154 Abutments HL Cracks SF 1.3
0411 1 Abutments Cracks > HL Gal 1.0
0411 2 Abutments Cracks > HL LF 12.24
0401 70 4 Substructure Spalls and Delaminations SF 3.2
JOINTS 0458 1 22 Damaged Compression Joint Seal LF 357.5
MISCELLANEOUS
0635 2 50 Electrical (Corroded Electrical conduit with exposed wires) EA 1
0460 1 13 One Way Sign with Loose Bolts (Relocation) LB 4
0460 98 2 Pipe Hanger, Stainless (Corroded and Broken Fire Suppresion System) EA 14
MISC-1 Undercut Anchor (Corroded and Broken Fire Suppresion System) EA 14
MISC-2 Threaded Rod (Corroded and Broken Fire Suppresion System) EA 14
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 47,519
FRICTION COURSE
P-102-1 Friction Course Repair (Northern Lanes) SF 3,232
P-102-2 Friction Course Repair (Passenger Droff off Lanes) SF 5,367
Notes:
undercut anchors in the deck and attaching new hangers.
1. The replacement of corroded and broken fire suppresion system includes work such as inspection of all hangers, high level manlift, installing under Pay Item 400 143.
2. Class 5 finish will not be applied to the architectural panels of Bridge 10. Pressure washing of these panels shall be performed and paid for replace existing grates as called for in plans.
It also includes all costs for labor, equipment, materials (including concrete), removing and disposing of existing grate, and incidentals necessary to temporary removal of grates and covers, any temporary pipe plugs necessary to complete the work, and disposal of all water and debris removed.
1. Pay item "Clogged/Broken Drainage Grates" includes all costs for labor, equipment, materials, and incidentals necessary for cleaning inlets, Notes:
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:02 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B0SumOfQuantities01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by: BQ-3
SUMMARY OF QUANTITIES (3 OF 3)
BRIDGE 8 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 43,241.9
0401 70 4 Superstructure Spalls and Delaminations CF 14.8
SUBSTRUCTURE
0413 154 Substructure HL Cracks SF 2.0
0411 1 Abutments Cracks > HL Gal 1.0
0411 2 Abutments Cracks > HL LF 52.0
0411 1 Piers Cracks > HL Gal 4.0
0411 2 Piers Cracks > HL LF 639.6
0401 70 4 Substructure Spalls and Delaminations CF 1.3
JOINTS 0458 1 21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint with Backer Rod LF 464
FRICTION COURSE
P-102-1 Friction Course Repair (Northern Lanes) SF 819
P-102-2 Friction Course Repair (Passenger Droff off Lanes) SF 1,451
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 18,174
BRIDGE 10 - Structural Quantities & Cost Estimate
SECTION PAY ITEMS REPAIR DESCRIPTION UNIT QUANTITY
GENERAL
C-105 Mobilization LS 1
102-1 MOT LS 1
SUPERSTRUCTURE
0413 154 Superstructure HL Cracks SF 43,264.2
0401 70 4 Superstructure Spalls and Delaminations CF 10.7
SUBSTRUCTURE
0401 70 4 Substructure Spalls & Delaminations CF 0.38
0411 1 Beam Caps Cracks > HL Gal 1.0
0411 2 Beam Caps Cracks > HL LF 239.2
JOINTS
0458 1 25 Damaged Compression Joint Seal LF 156.0
0458 1 35 Deck Joints with heavy debris LF 264.0
SURFACE FINISH COATING 0400 143 Exposed Concrete Surfaces for Class 5 Finish SF 106,920.5
MISCELLANEOUS 0506 3 Clogged/Broken Drainage Grates EA 7
254'-0" Overall Length of Bridge
254'-0" Overall Length of Bridge
90°00'00"
90°00'00" 76°30'00" 90°00'00"
FFBW Abutment 4
End Bridge CL Pier 2CL Pier 3
BL/PGL INBOUND BRIDGE
Approach
20'-0"
Span 1
95'-0"
Span 2
83'-0"
Span 3
76'-0"
Approach
20'-0"
Sta. 39+80.78
FFBW Abutment 4
End Bridge
Sta. 37+26.78
FFBW Abutment 1
Begin Bridge
Sta. 38+21.78
CL Pier 2
Sta. 39+04.78
CL Pier 3
Approach
20'-0"
Span 1
95'-0"
Span 2
83'-0"
Span 3
76'-0"
Approach
20'-0"
FFBW Abutment 1
Begin Bridge
CB 1
CB 3
CB 2
CB 4
CB 5
CB 6
CB 9
CB 7
CB 8
CB 1
CB 3
CB 2
CB 4
CB 5
CB 6
CB 7
CB 9
CB 10
CB 8
CB 3
CB 2
CB 4
CB 5
CB 6
CB 7
CB 8
CB 9
CB 10
CB 1
Rd.
Perimeter
(#934260)
BRIDGE 1
(#934261)
BRIDGE 2
BRIDGE 5
BRIDGE 3
BRIDGE 8
BRIDGE 4
BRIDGE 10
B r id g e
W id t h
Column 1
Column 2
Column 3
Column 1
Column 2
Column 3
(#934260)
BRIDGE 1
Direction of Stationing
P er im et er R oa dP e rim e te r R o a d
N o r t h
P e r im e t e r
R d
40+00 39+00 38+00 37+00
PLAN
ELEVATION
Measured along
Baseline/PGL
SlabSlab
Slab Slab
By Description
REVISIONS
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:04 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B1PlanElev01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
LOCATION MAP
= MSE Wall11
= Slope Protection10
= Diaphragm 9
= Barrier 8
= Approach Slab 7
= Expansion Joint 6
= Pier Cap 5
= End Bent / Backwall 4
= Column 3
= Beam 2
= Deck 1
= General Repair/Replacement
= Repair Spall/Delamination
= Repair Cracks
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
James L. Turnage Blvd.
Belvedere Rd.
James L. Turnag e Blvd.
6 9�
4�
9� 5�
5�
9�
8 8
9�
4�
1 1
7 6
42�
9�
8 1
2�
9�
2�5 5�
6 6 6 71 1
9�
2�
9�
9� 9�
8 8
8 8 86 6
9� 9�
4�
5�
5� 5� structural member locations along the noted
� = Occurs at several
BRIDGE 1 - PLAN AND ELEVATION
LEGEND
= Centerline of BeamCB
B1-1
Date By DescriptionDate
SHEET NO.
3/4/2022 10:51:09 AM L:\Legacy\1513SR-MIAMI01\Projects\Structures\Projects\PBIA\900-CAD-GIS\910 CAD\Bridge Repairs\B1RepairTables01.dgnmario.ramos
REF. DWG. NO.
Tel: (305) 262-7466
Coral Gables, FL 33134 2 Alhambra Plaza, Suite 900
Saul Perez, P.E. No. 37337
SP
INTERNATIONAL AIRPORT
PALM BEACH
By DescriptionDate
MAR
Drawn By:
Checked by:
Designed by:
Checked by:
LEGEND:
Between=Btw
South Face=SF
North Face=NF
West Face=WF
East Face=EF
B1-2
BRIDGE 1 - REPAIR TABLES (1 OF 2)
Substructure Location Deficiency
Deficiency Dimensions / Quantities
Description Repair TypeSpall / Delamination Cracks
Width (in) Height (in)Depth (in) Vol. (cf) Width (in) Length (in)Depth (in) (Gal)
Epoxy
Abutment 1
Below Beam 2 Delamination 30 7 6 0.73 N/A - - - On Abutment wall Delamination Repair
South Cheekwall Spall/Delamination 3 12 6 0.13 N/A - - - Spall Repair
Below Beam 2 Vertical Crack N/A - - - 0.004 129 - - Apply Penetrant Sealer
Below Beam 4 Vertical Crack N/A - - - 0.004 129 - - Propagating from weep hole Apply Penetrant Sealer
Btw Beams 5 & 6 Vertical Crack N/A - - - 0.004 129 - - Propagating from weep hole Apply Penetrant Sealer
Backwall - Btw Beams 5 & 6 Vertical Crack N/A - - - 0.004 12 - - No access to full height Apply Penetrant Sealer
Backwall - South of Beam 10 Horizontal & Vertical Cracks N/A - - - 0.004 48 - - Map Cracking Apply Penetrant Sealer
Abutment 4
Below Beam 2 Vertical Crack N/A - - - 0.004 110 - - Propagating from weep hole Apply Penetrant Sealer
Below Beam 3 Vertical Crack N/A - - - 0.004 132 - - Propagating from weep hole Apply Penetrant Sealer
Btw Beams 3 & 4 Vertical Crack N/A - - - 0.004 132 - - Apply Penetrant Sealer
Below Beam 4 Vertical Crack N/A - - - 0.004 132 - - Propagating from weep hole Apply Penetrant Sealer
Below Beam 6 Vertical Crack N/A - - - 0.004 48 - - Propagating from weep hole Apply Penetrant Sealer
Btw Beams 6 & 7 Crack N/A - - - 0.004 24 - - Apply Penetrant Sealer
Below Beam 7 Vertical Crack N/A - - - 0.004 132 - - Propagating from weep hole Apply Penetrant Sealer
Below Beam 8 Vertical Crack N/A - - - 0.004 110 - - Propagating from weep hole Apply Penetrant Sealer
Below Beam 9 Vertical Crack N/A - - - 0.004 110 - - Propagating from weep hole Apply Penetrant Sealer
Total 0.86
NOTE: Northwest MSE wall near the center top of the wall has minor vegetation growth that needs to be removed.
Substructure Location Deficiency
Deficiency Dimensions / Quantities
Description Repair TypeSpall / Delamination Cracks
Width (in) Height (in)Depth (in) Vol. (cf) Width (in) Length (in)Depth (in) (Gal)
Epoxy
Pier 2
EF Pier Cap Btw Beams 3 & 4 3 Small Cracks N/A - - - 0.004 4 (2) & 6 - - Apply penetrant sealer
EF Pier Cap Btw Beams 4 & 5 Crack & Spall 2 2 0.25 0.001 0.004 36 - - Spall propagating from utility bracket Apply penetrant sealer
EF Pier Cap Btw Beams 5 & 6 Crack N/A - - - 0.004 36 - - Apply penetrant sealer
WF Pier cap Btw Beams 5 & 6 4 Cracks N/A - - - 0.004 24 Extend to the topside of pier cap Apply penetrant sealer
EF Pier Cap Below Beam 6 2 Cracks N/A - - - 0.004 4 & 6 - - Extends to Underside of pier cap Apply penetrant sealer
EF Pier Cap Below Beam 6 Crack N/A - - - 0.004 36 - - Extends to Underside of pier cap Apply penetrant sealer
EF Pier Cap Below Beam 7 Crack N/A - - - 0.004 12 - - Apply penetrant sealer
Pier 3
EF Pier Cap Btw Beams 1 & 3 6 Cracks N/A - - - 0.014 Up to 42 6 0.09 Some Cracks have efflorescence Epoxy Injection
EF Pier cap Below Beam 4 2 Cracks N/A - - - 0.004 Up to 36 - - Apply penetrant sealer
EF Pier Cap Btw beams 5 & 6 Crack N/A - - - 0.004 48 - - Apply penetrant sealer
EF Pier Cap Btw Beams 7 & 8 2 Cracks N/A - - - 0.004 Up to 24 - - Extend to Underside of pier cap Apply penetrant sealer
EF Pier Cap Btw Beams 9 & 10 5 Cracks N/A - - - 0.004 Up to 48 - - Shear cracks over previously repaired cracks Apply penetrant sealer
WF Pier Cap Btw Beams 1 & 3 6 Cracks N/A - - - 0.014 Up to 42 6 0.09 Some Cracks have efflorescence Epoxy Injection
WF Pier Cap Btw Beams 3 & 4 Crack N/A - - - 0.004 6 - - Extends to Underside of pier cap Apply penetrant sealer
WF of Beam 5 Pedestal Delamination 12 6 6 0.250 N/A - - - Delamination Repair
WF Pier Cap Btw Beams 6 & 7 Crack N/A - - - 0.004 6 - - Extends to Underside of pier cap Apply penetrant sealer
WF Pier Cap Btw Beams 6 & 7 Crack N/A - - - 0.004 48 - - Extends to Underside of pier cap Apply penetrant sealer
WF Pier Cap Below Beam 8 Crack N/A - - - 0.004 24 - - Shear cracks over previously repaired cracks Apply penetrant sealer
WF Pier Cap Btw Beams 8 & 9 3 Crack N/A - - - 0.004 Up to 30 - - Shear cracks over previously repaired cracks Apply penetrant sealer
Bottom NF of Column 3 Delamination 30 18 6 1.880 N/A - - - Delaminated Patch Delamination Repair
Total 0.18
NOTE: Light in pier cap 2 on east face between columns 1…