This is an Erosion, Sedimentation & Pollution Control (ES&PC) Plan for the PATH400 Along Adina Drive project in Fulton County, Georgia, prepared by Livable Buckhead Inc. in coordination with the City of Atlanta and the Georgia Department of Transportation. The project consists of constructing a 10-foot multi-use trail along Adina Drive connecting to Lindbergh Drive, incorporating a road diet that reduces existing 12-foot lanes to 10.5-foot lanes. The construction scope includes clearing and grubbing, roadway construction with reduced lane widths, drainage improvements, utility coordination, permanent grassing and sod installation, and comprehensive erosion and sedimentation control measures. The project is located between stations 10+75.00 and 18+50.00 on Adina Drive with a total disturbed area of 0.26 acres. The ES&PC Plan was prepared on July 31, 2015, with revisions dated August 1, 2016, and identifies two outfall discharge locations draining into Peachtree Creek, an impaired stream segment designated as Category 4a under the 305(b)/303(d) list with fish biointegrity criteria violations attributed to urban runoff.
The plan incorporates a three-stage construction sequence with specific Best Management Practices (BMPs) for each phase: initial BMPs including perimeter inlet sediment traps and construction exits prior to clearing operations; intermediate BMPs including temporary grassing, mulch placement, and inlet sediment trap maintenance during earthwork progression; and final BMPs consisting of permanent grassing and sod installation upon final grade establishment. Sediment basins are not utilized at the outfall locations due to adverse impacts from construction and removal activities, and the plan documents representative sampling justification based on disturbed acreage, average outfall slope, and soil erosion index characteristics. The contractor is responsible for establishing construction exit locations, developing the detailed construction schedule post-award, and implementing pollution control measures including petroleum storage and spill prevention plans, dewatering and pumping protocols with water quality sampling requirements, dust control in accordance with Standard Specification Section 161, and strict adherence to stream buffer protection regulations. The project requires design professional certification, Level II erosion and sedimentation control qualification, and compliance with Georgia's GAR 100002 NPDES permit requirements and the Manual for Erosion and Sediment Control in Georgia standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Path Scope PART 1 pg 1_12.pdf | ||
| Path Scope PART 3.pdf | ||
| Path Scope PART 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL CONSTRUCTION DETAIL
REVISION DATES
DATE$$$
$USER$
$PRF8$
$DGN$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
38-0004
PATH400 ALONG ADINA DRIVE
LIVABLE BUCKHEAD INC.
GEORGIA DETAILS
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
40-0001
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
40-0002
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
40-0003
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
40-0004
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
40-0005
GEORGIA STANDARDS
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
41-0001
NOT TO SCALE
NRCS SOIL SERIES MAP
Map Unit Name
Totals for Area of Interest in AOI
Acres of AOI
Percent
18.6
Fulton County, Georgia
100.0%
Map Unit Symbol
Ub Urban land 100.0%
18.6
ESPCP GENERAL NOTES
The following is a summary of the soils that are expected to be found on the project site:
SOIL SERIES INFORMATION
PETROLEUM STORAGE, SPILLS, AND LEAKS
requirements.
Standard Specification 107-Legal Regulations and Responsibility to the public for additional
GAR100002 for inclusion with these plans. The Contractor's attention is specifically directed to petroleum products. This plan shall be prepared by a Certified Design Professional as required by addendum that addresses the additional BMPs needed for onsite storage and spill prevention for
If the Contractor elects to store petroleum products on site, the Contractor shall prepare an ESPCP the action plan. The Contractor shall not park, refuel, or maintain equipment within stream buffers.
maintained on the project site. All personnel operating or servicing equipment shall be familiar with utilized at the site. A copy of the action plan shall be submitted to the Project Engineer and material, leaks or spills associated with the servicing, refueling or operation of any equipment materials on site for the capture, clean up, and disposal of any petroleum product, or other hazardous to the Contractor. The Contractor shall at a minimum provide an action plan and keep the necessary
These plans expressly delegate the responsibility of proper on-site hazardous material management
SOIL SERIES INFORMATION
The following is a summary of the soils that are expected to be found on the project site:
http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm.
also available online at:
The NRCS soil survey and soil series maps for the project site are locations of the above listed soils on the construction plans.
series maps, it is not reasonably practical to delineate the precise
Due to the size and scope of this project and the nature of soil
Month
Activities
Perform Construction
Vegetation
Establish Permanent
Control Measures
Erosion
Install Temporary
Control Measures
Temporary Erosion
Maintenance of
Control Measures
Erosion
Remove Temporary
Construction Schedule
1 2 3
ESPCP GENERAL NOTES:
TEMPORARY MULCHING
VEGETATION AND PLANTING SCHEDULE
SEQUENCE OF MAJOR ACTIVITIES
control measures and practices prior to land-disturbing activities.
The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures shall be implemented to control or treat the sediment source.
of the approved plan does not provide for effective control, additional erosion and sedimentation
Erosion and sedimentation control measures will be maintained at all times. If full implementation documents, or landscaping plans.
of the Department's Standards Specifications (or special provisions) and other applicable contract fertilizing, liming, and mulching for this project can be found in Section 700 of the current edition
All temporary and permanent vegetative practices including plant species, planting dates, seeding, also responsible for selecting the location(s) of the construction exit(s).
construction exit detail included in this ESPCP. To facilitate project logistics, the Contractor is is responsible for establishing at least one (1) construction exit per the specifications of the
The project budget includes suffcient funds for the payment of construction exits. The Contractor
REVISED August 1, 2016
A copy of the construction schedule shall be maintained at the project site.
construction schedule for this project shall be submitted after the project is awarded.
The Contractor is responsible for developing the construction schedule for the project. The
163, 700, or 711.
practicable with a suitable material listed in Standard Specification (or Special Provision) Sections temporarily or permanently ceased shall be stabilized within 14 days of such cessation as soon as any disturbed area where construction activities have perform stabilization more often than 14 days.
However in special cases, the Project Engineer may require the contractor to
EPD General Permit GAR 100002 states that
DESCRIPTION OF CONSTRUCTION ACTIVITY
10' multi-use trail will be developed along Adina Drive connecting at the Lindbergh Drive.
The existing road has 12' lanes that will be reduced to 10.5' lanes. With the road diet a
This project is a road diet and trail extention along Adina Drive in Fulton County, Georgia.
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
51-0001
EAST PACES FERRY RD SPUR TO PATH 400
1. Permanent grassing and sod where shown on the Stage 3 plans.
C. Final BMPs: As soon as final grade has been established in any area of the project, install the following:
B. Intermediate BMPs: N/A
A. Initial BMPs: N/A
FINAL STAGE 3:
1. Permanent grassing and sod where shown on the Stage 3 plans.
C. Final BMPs: As soon as final grade has been established in any area of the project, install the following:
3. Construct and maintain inlet sediment traps where shown on the Stage 2 plans.
2. Adjust perimeter silt fence as drainage structures are being installed.
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs: While earthwork is progressing, do the following:
A. Initial BMPs: N/A
INTERMEDIATE STAGE 2:
C. Final BMPs: N/A
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs:
2. Contractor is responsible for establishing construction exits.
1. Install perimeter inlet sediment traps as shown on Stage 1 plans prior to clearing and grubbing operations.
A. Initial BMPs: Install the following BMPs prior to construction
INITIAL STAGE 1: Work in this stage includes clearing and grubbing and installing Initial BMPs.
PAVEMENT
GUTTER
FLOW
CATCH BASIN
B B
F L
O W
F L
O W
PAVEMENT
CURBING
CATCH BASIN
FILTER FABRIC
8" CONCRETE BLOCK WRAPPED IN
SECTION B-B
Sd2-P CURB INLET PROTECTION
4" GAP BETWEEN INLET AND FILTER
IN A HAZARDOUS CONDITION.
INSTALLATION AND MAINTENANCE ARE CRUCIAL TO AVOID PONDING IN THE ROADWAY, RESULTING
TO ALLOW FOR OVERFLOW AND PREVENT HAZARDOUS PONDING IN THE ROADWAY. PROPER
A GAP OF APPROXIMATELY 4 INCHES SHALL BE LEFT BETWEEN THE INLET FILTER AND THE INLET
MATERIAL.
BY WRAPING DOT #57 STONE WIHT FILTER FABRIC, WIRE, PLASTIC MESH, OR EQUIVALENT
WRAPPED IN FILTER FABRIC. SEE DETAIL. ANOTHER METHOD USES GRAVEL BAGS CONSTRUCTED
ONE METHOD OF CURB INLET PROTECTION USES "PIGS-IN-A-BALNKET": 8-INCH CONCRETE BLOCKS
REMOVED IF A SAFETY HAZARD IS CREATED.
RECEIVING RUNOFF FROM DISTURBED AREAS. THIS METHOD OF INLET PROTECTION SHALL BE
ONCE PAVEMENT HAS BEEN INSTALLED, A CURB INLET FILTER SHALL BE INSTALLED ON INLETS
CURB INLET PROTECTION
ESPCP GENERAL NOTES
TEMPORARY SEDIMENT BASIN DETAILS
would cause additional adverse impacts based on existing physical constraints.
Land disturbance activities associated with constructing and removing sediment basins at these locations
All Outfalls: Sediment basins are not used at these locations.
OTHER CONTROLS
SITE STABILIZATION AND BMP MAINTENANCE MEASURES
stream buffers.
familiar with the action plan. The Contractor shall not park, refuel, or maintain equipment within and maintained on the project site. All personnel operating or servicing equipment shall be equipment utilized at the site. A copy of the action plan shall be submitted to the Project Engineer other hazardous material, leaks or spills associated with the servicing, refueling or operation of any necessary materials on site for the capture, clean up, and disposal of any petroleum product, or to the Contractor. The Contractor shall at a minimum provide an action plan and keep the
These plans expressly delegate the responsibility of proper on-site hazardous material management
PETROLEUM STORAGE, SPILLS, AND LEAKS
SILT FENCE INSTALLATIONS WITH J HOOKS AND SPURS
costs and other incidental items are included in cost of installing and maintaining silt fence.
immediately upgradient J hook. J Hooks shall be paid for as silt fence items per linear foot. All hook spacing is reached when the top of the J hook is at the same elevation as the bottom of the hooks shall be spaced in accordance with GDOT Construction Detail D-24C. The maximum J located around the perimeter of the project and along the toe of embankments or slopes. The J technique is called using J hooks (or spurs). The J hooks shall be utilized on all silt fences that are create small pockets that trap silt and force stormwater to flow through the silt fence. This
Silt fence should never be run continuously. The silt fence should turn back into the fill or slope to other contract documents for stabilization and maintenance measures.
See the Department's Standard Specifications (or Special Provisions) 161, 163, 165, 700, 711, and
DEWATERING AND PUMPING ACTIVITIES
will be made for water quality sampling of pump discharges.
GAR100002 NPDES permit by utilizing a Certified Design Professional. No separate payment discharges. The contractor shall prepare sampling plans in accordance with the current create sheet flow will obligate the contractor to perform water quality sampling of pumped
BMP's. The contractor shall ensure the post BMP treated discharge is sheet flowing. Failure to appropriately sized sediment basin, silt filter bag, or shall be treated equivalently with suitable
Any pumped discharge from an excavation or disturbed area shall be routed through an and petroleum storage.
applicable State and/or local regulations for waste disposal, sanitary sewer and septic system, The Contractor shall follow this ESPCP and ensure and demonstrate compliance with all edition of the Department's Standard Specifications.
The Contractor shall control dust from the site in accordance with Section 161 of the current requirements.
Standard Specification 107-Legal Regulations and Responsibility to the public for additional
GAR100002 for inclusion with these plans. The Contractor's attention is specifically directed to petroleum products. This plan shall be prepared by a Certified Design Professional as required by addendum that addresses the additional BMPs needed for onsite storage and spill prevention for
If the Contractor elects to store petroleum products on site, the Contractor shall prepare an ESPCP
USE OF ALTERNATIVE AND/OR ADDITIONAL BMPS
No alternative or additional BMP's will be used on this project.
SEDIMENT STORAGE
SEDIMENT BASINS:
maintain the storage volumes for the BMP's specified in this table.
The following table summarizes the required and available sediment storage for every outfall on this project. The Contractor shall provide and
The site has a total disturbed area of 0.26 acres.
project.
erosion control plans are adequate to control sediment runoff from the disturbed areas of the outfalls locations would cause additional adverse impacts to each basin. BMP's as shown in the
Land disturbance activities associated with constructing and removing sediment basins at these
The disturbance activities consist of clearing & grubbing and general roadway construction.
Sediment basins are not used at these locations.
*Outfalls 1-2:
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
51-0002
WATERSHED AS ANY PORTION OF A BIOTA IMPAIRED STREAM SEGMENT
DISCHARGES INTO OR WITHIN ONE LINEAR MILE UPSTREAM OF AND WITHIN THE SAME
or 5, and the potential cause is either "NP" (nonpoint source) or "UR" (urban runoff).
4b 4a, Category within community), invertebrate macro (impaired M" "Bio and/or community) fish
(impaired F" "Bio violated, criteria for listed been has that segment stream impaired identified an of watershed the within and mile 1 within outfalls project of summary a is following The
Control Plan and implement all necessary measures to meet that allocation.
Pollution and Sedimentation Erosion, the into allocation that incorporate must Professional
Design Certified the then Segment, Stream Impaired the to discharge(s) project the to applies that allocation load waste numeric specific a establishes Plan Implementation TMDL the If *
OFFSET)
(STATION AND
AND LOCATION
OUTFALL ID #
REACH NAME
305B/303D LIST
INDICATED IN THE
SEGEMTN AS
IMPAIRED STREAM
LOCATION OF THE
(BIO F OR BIO M)
CRITERIA VIOLATED
(NP OR UR)
POTENTIAL CAUSE
(4a,4b,or 5)
CATEGORY
FOR SEDIMENT
LOAD ALLOCATION
NUMERIC WASTE
26.24' LT
STA 11+62.00,
BASIN #2
PEACHTREE CREEK
RIVER, ATLANTA
I-85 TO CHATTAHOOCHEE
BIO F UR 4a N/A
ESPCP GENERAL NOTES
valid for the duration of the project. The table shows the groups of similar outfall drainage basins.
hydrology and hydraulic studies, construction plans, geotechnical soil survey, and erosion sedimentation and pollution control plans, the Department has determined that the representative sampling scheme shown below is than 0.03, and steep if it is greater than 0.03. The soil erosion index is low if it is less than or equal to 5 and high if it is greater than 5. After evaluation of these characteristics as presented in the project's drainage area map, widening, and maintenance/safety. The disturbed area classes are less than or equal to 1 acre, greater than 1 acre to less than 2 acres, and equal to or greater than 2 acres. The average outfall slope is mild if it is equal to or less type of construction activity, the disturbed acreage, the average slope about the outfall, and the soil erosion index 0-10, 10 being the most erodible soil. The construction activity types are new road on fill, new road in cut, road
Representative sampling may be utilized on this project as explained here. The individual outfall drainage basins along the project corridor have been carefully evaluated and compared on the basis of four characteristics: the
City/County:___________________________________________________
54-ALL
56-ALL
52-ALL;
Effective January 1, 2016 sampling as stated on page 26 of permit as applicable.*
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
40.
39.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
*If using this checklist for a project that is less than 1 acre and not part of a common development but within 200 ft of a perennial stream
Y
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
N/A N
Y
N/A N
Y
(The completed Checklist must be submitted with the ES&PC Plan or the Plan will not be reviewed)
(Signature, seal and Level II number must be on each sheet pertaining to ES&PC plan or the Plan will not be reviewed)
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST
INFRASTRUCTURE CONSTRUCTION PROJECTS
Project Name Address:____________________________________________
Date on Plans:_______________________________________
Plan Included
TO BE SHOWN ON ES&PC PLAN
Page # Y/N
1.The applicable Erosion, Sedimentation and Pollution Control Plan Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
2.Level II certification number issued by the Commission, signature and seal of the certified design professional.
3.The name and phone number of the 24-hour local contact responsible for erosion, sedimentation and pollution controls.
4.Provide the name, address and phone number of primary permittee.
5.Note total and disturbed acreage of the project or phase under construction.
6.Provide the GPS locations of the Beginning and End of the Infrastructure project. Give the Latitude and Longitude in decimal degrees.
7.Initial date of the Plan and the dates of any revisions made to the Plan including the entity who requested the revisions.
8.Description of the nature of construction activity.
9.
Identify the project receiving waters and describe all sensitive adjacent areas including streams, lakes, residential areas, wetlands, etc. which may be affected.
Design professional's certification statement and signature that the site was visited prior to development of the ES&PC
Plan as stated on page 15 of the permit.
and comprehensive system of BMPs and sampling to meet permit requirements as stated on page 15 of the permit.*
Design professional certification statement and signature that the permittee's ES&PC plan provides for representative
Clearly note the statement that "The design professional who prepared the ES&PC Plan is to inspect the installation of the initial sediment storage requirements, perimeter control BMPs and sediment basins in accordance with part IV.A.5.
within 7 days after installation."*
Clearly note the statement that "Non-exempt activities shall not be conducted within the 25 or 50-foot undisturbed stream
Clearly note the statement that "Amendments/revisions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional."*
Clearly note the statement that "Waste materials shall not be discharged to waters of the State, except as authorized by a section 404 permit."*
Clearly note statement that "The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities."
Clearly note statement that "Erosion control measures will be maintained at all times. If full implementation of the approved plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."
Clearly note the statement "Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding."
Any construction activity which discharges storm water into an Impaired Stream Segment, or within 1 linear mile upstream of and within the same watershed as, any portion of an Biota Impaired Stream Segment must comply with Part III. C. of the
Permit. Include the completed Appendix 1 listing all the BMPs that will be used for those areas of the site which discharge to the Impaired Stream Segment.*
If a TMDL Implementation Plan for sediment has been finalized for the Impaired Stream Segment (identified in item 21 above) at least six months prior to submittal of NOI, the ES&PC Plan must address any site-specific conditions or requirements included in the TMDL Implementation Plan.*
BMPs for concrete washdown of tools, concrete mixer chutes, hoppers and the rear of the vehicles. Washout of the drum at the construction site is prohibited.*
Provide BMPs for the remediation of all petroleum spills and leaks.
Description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed.*
Description of the practices that will be used to reduce the pollutants in storm water discharges.*
Description and chart or timeline of the intended sequence of major activities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMPs, clearing and grubbing activities, excavation activities, utility activities, temporary and final stabilization).
Provide complete requirements of inspections and record keeping by the primary permittee.*
Provide complete requirements of sampling frequency and reporting of sampling results.*
Provide complete details for retention of records as per Part IV.F. of the permit.*
Description of analytical methods to be used to collect and analyze the samples from each location.*
Appendix B rationale for NTU values at all outfall sampling points where applicable.*
Delineate all sampling locations, perennial and intermittent streams and other water bodies into which storm water is discharged also provide a summary chart of the justification and analysis for the representative sampling as applicable.* description of appropriate controls and measures that will be implemented at the construction site including: (1) initialA sediment storage requirements and perimeter control BMPs, (2) intermediate grading and drainage BMPs, and (3) final
BMPs. For construction sites where there will be no mass grading and the initial perimeter control BMPs, intermediate grading and drainage BMPs, and final BMPs are the same, the plan may combine all of the bmps into a single phase.*
Graphic scale and north arrow.
Existing and proposed contour lines with contour lines drawn at an interval in accordance with the following:
USGS 1": 2000' Topographical Sheets
Proposed Contours 1" : 400' Centerline Profile
Use of alternative BMPs whose performance has been documented to be equivalent to or superior to conventional BMPs as certified by a Design Professional (unless disapproved by EPD or the Georgia Soil and Water Conservation
Commission). Please refer to the Alternative BMP Guidance Document found at www.gaswcc.org.
Delineation of the applicable 25-foot or 50-foot undisturbed buffers adjacent to state waters and any additional buffers required by the Local Issuing Authority. Clearly note and delineate all areas of impact.
Delineation of on-site wetlands and all state waters located on and within 200 feet of the project site.
Delineation and acreage of contributing drainage basins on the project site.
Delineate on-site drainage and off-site watersheds using USGS 1' :2000' topographical sheets.
An estimate of the runoff coefficient or peak discharge flow of the site prior to and after construction activities are completed.
Storm-drain pipe and weir velocities with appropriate outlet protection to accommodate discharges without erosion.
Identify/Delineate all storm water discharge points.
Soil series for the project site and their delineation.
The limits of disturbance for each phase of construction.
Provide a minimum of 67 cubic yards of sediment storage per acre drained using a temporary sediment basin, retrofitted detention pond, and/or excavated inlet sediment traps for each common drainage location. Sediment storage volume must be in place prior to and during all land disturbance activities until final stabilization of the site has been achieved. A written justfication explaining the decision to use equivalent controls when a sediment basin is not attainable must be included in the plan for each common drainage location in which a sediment basin is not provided. A written justification as to why 67 cubic yards of storage is not attainable must also be given. Worksheets from the Manual must be included for structural BMPs and all calculations used by the design professional to obtain the required sediment storage when using equivalent controls. When discharging from sediment basins and impoundments, permittees are required to utilize outlet structures that withdraw water from the surface, unless infeasible. If outlet structures that withdraw water from the surface are not feasable, a written justification explaining this decision must be included in the plan.
Location of Best Management Practices that are consistent with and no less stringent than the Manual for Erosion and
Sediment Control in Georgia. Use uniform coding symbols from the Manual, Chapter 6, with legend.
Provide detailed drawings for all structural practices. Specifications must, at a minimum, meet the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.
Provide vegetative plan, noting all temporary and permanent vegetative practices. Include species, planting dates and seeding, fertilizer, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for the appropriate geographic region of Georgia.
Y
Y
Y
Y
Y
Y
Y
Y
Y Provide vicinity map showing site's relation to surrounding areas. Include designation of specific phase, if necessary.
Design professional's certification statement and signature that the permittee's ES&PC Plan provides for an appropriate
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y54-ALL
Y
Y
Y
Y the * checklist items would be N/A.
GSWCC
10.
11.
12.
13.
14.
15.
Existing Contours
:_________________________________________________SWCD
buffers as measured from the point of wrested vegetation or within 25-feet of the coastal marshland buffer as measured from the Jurisdictional Determination Line without first acquiring the necessary variances and permits."
16.Provide a description of any buffer encroachments and indicate whether a buffer variance is required.
Use of alternative BMP for application to the Equivalent BMP List. Please refer to Appendix A-2 of the Manual for
Erosion & Sediment Control in Georgia 2016 Edition.*
54-ALL
53-0001;
51-0001
51-0002
53-0001
53-0001
53-0001
53-0001
51-0001
51-0002
51-0001
51-0003
51-0001
51-0001
51-0001
51-0001
51-0002
53-0001;54-ALL
53-0001
53-0001
REGION III
PATH 400 ALONG ADINA DRIVE
FULTON COUNTY
01-0001
01-0001
01-0001
53-0001
01-0001
01-0001
01-0001
NN/A
NN/A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
51-0003
03-28-2017
ADINA DRIVE
51-0002 Y
Sd2-P
FILTER
CURB INLET
"PIGS-IN-A-BLANKET"
GEORGIA, SIXTH EDITION, 2014
SEDIMENT CONTROL IN
MANUAL FOR EROSION AND
Ds5
Ds5
GRASSING
PERMANENT
SEE SPI-15 LINDBERGH DISTRICT
GRASS OR LIRIOPE SPICATA.
PLANTED WITH EVERGREEN GROUND COVER SUCH AS MONDO
THE AREA BETWEEN THE REQUIRED PLANTINGS SHALL BE
LIRIOPE SPICATA*
*MONDO GRASS OR
LINE CODE
LINE CODE
EROSION CONTROL DRAINAGE AREA MAP
22'
TYP.
RECONSTRUCTED CATCH BASIN
OUTFALL 2
BASIN 2
SHEET FLOW
OUTFALL 1
BASIN 1
A-6
A-4
A-1
A-2A
A-3
A-5
A-7
A-2
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
TOTAL PROJECT DISTURBED AREA = 0.26 AC
TOTAL PROJECT AREA = 0.63 AC
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
SCALE IN FEET
0 100 200
ADINA DRIVE
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
PATH 400 ALONG ADINA DRIVE
CITY OF ATLANTA
LONG: 84.3633°
LAT: 33.8185°
E: 2236869.0623
N: 1389064.8187
STA 10+75.00
ADINA DRIVE
BEGIN CONSTUCTION
BEGIN PROJECT
LONG: 84.3633°
LAT: 33.8206°
E: 2236871.3749
N: 1389839.8153
STA 18+50.00
ADINA DRIVE
END CONSTUCTION
END PROJECT
CONTROL POINT #13
DESC:60DNAIL
N:1389807.900
E:2236989.513
EL.:841.38
ELEVATIONS AT ALL STAIRWAY AND WALKWAY LOCATIONS.
PROPOSED TRAIL SHALL TIE IN TO MATCH EXISTING
ELEVATIONS AT ALL STAIRWAY AMD WALKWAY LOCATIONS.
PROPOSED TRAIL SHALL TIE IN TO MATCH EXISTING
3'-9" 4'
5'
Sd2-P Sd2-P
6" GRANITE CURB
6" CONC. CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
BMP LOCATION DETAILS
C. Final BMPs: N/A
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs:
2. Place construction exits.
clearing and grubbing operations.
1. Install inlet sediment traps as shown on Stage 1 plans prior to
A. Initial BMPs: Install the following BMPs prior to construction
Stage 1: Work in this stage includes clearing and grubbing and installing Initial BMPs.
E: 2236869.0623
N: 1389064.8187
STA 10+75.00
ADINA DRIVE
BEGIN CONSTUCTION
BEGIN PROJECT
SCALE IN FEET
0 40 80
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.1-0001
C CONSTRUCTION ADINA DRIVEL
A D I
N A
D R I
V E
F O
U N T
A I
N H E
A D
L
A N E
DRIVEWAY
ASPHALT
CONCRETE
S
ID
E W
A L
K
PL
PL
6" GRANITE CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
6" CONC. CURB
BROKEN GUTTER
SIGNALIZED INTERSECTION
C O
N C
S
ID
E W
A L
K
BOX
TRAFFIC SIGNAL
BMP LOCATION DETAILS
C. Final BMPs: N/A
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs:
2. Place construction exits.
clearing and grubbing operations.
1. Install inlet sediment traps as shown on Stage 1 plans prior to
A. Initial BMPs: Install the following BMPs prior to construction
Stage 1: Work in this stage includes clearing and grubbing and installing Initial BMPs.
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.1-0002
C CONSTRUCTION ADINA DRIVEL
L I
N D
B E
R G
H
I
V E
CONTROL POINT #13
DESC:60DNAIL
N:1389807.900
E:2236989.513
EL.:841.38
S T
A
IR
S
Sd2-P Sd2-P
Ds1 Ds2 Ds1 Ds2
6" GRANITE CURB
6" CONC. CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALKSd2-P Sd2-P
BMP LOCATION DETAILS
1. Permanent grassing and sod
C. Final BMPs: As soon as final grade has been established in any area of the project, install the following:
3. Construct and maintain inlet sediment traps where shown on the Stage 2 plans.
2. Adjust perimeter silt fence as drainage structures are being installed.
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs: While earthwork is progressing, do the following:
A. Initial BMPs: N/A
Stage 2:
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.2-0001
C CONSTRUCTION ADINA DRIVEL
A D I
I
V E
F O
U N T
A I
N H E
A D
L
A N E
24" RCP36" RCP
42" RCP
R C P
R C P
48"
RCP
DRIVEWAY
ASPHALT
CONCRETE
S
ID
E W
A L
K
Sd2-F
Ds1 Ds2
Ds1 Ds2 Ds1 Ds2
PL
PL
6" GRANITE CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
6" CONC. CURB
BROKEN GUTTER
SIGNALIZED INTERSECTION
C O
N C
S
ID
E W
A L
K
BOX
TRAFFIC SIGNAL
Sd2-P
BMP LOCATION DETAILS
1. Permanent grassing and sod
C. Final BMPs: As soon as final grade has been established in any area of the project, install the following:
3. Construct and maintain inlet sediment traps where shown on the Stage 2 plans.
2. Adjust perimeter silt fence as drainage structures are being installed.
1. Place temporary grassing and mulch as needed.
B. Intermediate BMPs: While earthwork is progressing, do the following:
A. Initial BMPs: N/A
Stage 2:
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.2-0002
C CONSTRUCTION ADINA DRIVEL
L I
N D
B E
R
I
V E
CONTROL POINT #13
DESC:60DNAIL
N:1389807.900
E:2236989.513
EL.:841.38
24"
RC
P
24" RCP
S T
A
IR
S
Ds4
6" GRANITE CURB
6" CONC. CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
1. Permanent grassing and sod area of the project, install the following:
grade has been established in any
C. Final BMPs: As soon as final
B. Intermediate BMPs: N/A
A. Initial BMPs: N/A
Stage 3:
BMP LOCATION DETAILS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.3-0001
C CONSTRUCTION ADINA DRIVEL
A D I
I
V E
F O
U N T
A I
N H E
A D
L
A N E
24" RCP36" RCP
42" RCP
R C P
R C P
48"
RCP
DRIVEWAY
ASPHALT
CONCRETE
S
ID
E W
A L
K
Ds4 Ds4 Ds4
PL
PL
6" GRANITE CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
6" CONC. CURB
BROKEN GUTTER
SIGNALIZED INTERSECTION
C O
N C
S
ID
E W
A L
K
BOX
TRAFFIC SIGNAL
1. Permanent grassing and sod area of the project, install the following:
grade has been established in any
C. Final BMPs: As soon as final
B. Intermediate BMPs: N/A
A. Initial BMPs: N/A
Stage 3:
BMP LOCATION DETAILS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
PERMANENT EASEMENT
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
FOR CONSTRUCTION
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
S E E
S
H E E T
M A T
C H L I
N E
S T
A
REVISION DATES
DATE$$$
R
E F
R
E F
R
E F
R
E F
R
E F
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
54.3-0002
C CONSTRUCTION ADINA DRIVEL
L I
N D
B E
R
I
V E
CONTROL POINT #13
DESC:60DNAIL
N:1389807.900
E:2236989.513
EL.:841.38
24"
RC
P
24" RCP
S T
A
IR
S
EROSION DETAILS
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
56-0001
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
56-0002
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
56-0003
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
56-0004
R
E F
R
E F
R
E F
R
E F
R
E F
Design File and Plot Substitution information
TIME$$$
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
GPLN7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
56-0005
PL
PL
PLPL
PL
PL
PL
NET LENGTH OF BRIDGES
NET LENGTH OF EXCEPTIONS
DATE
PLANS PREPARED BY
UNDER THE SUPERVISION OF
MILES
GRID CO-ORDINATES BASED ON THE GA. STATE PLANE
P P
T T
CONVENTIONAL SIGNS
STATE OR COUNTY LINE
CITY LIMIT LINE
PROPERTY LINE
SURVEY OR BASE LINE
EXISTING
REQUIRED
LIMIT OF ACCESS
R/W MARKERS
RIGHT OF WAY LINE
STATE OR COUNTY LINE
CITY LIMIT LINE
PROPERTY LINE
SURVEY OR BASE LINE
EXISTING
REQUIRED
LIMIT OF ACCESS
R/W MARKERS
RIGHT OF WAY LINE
FENCE
RAILROAD
POWER LINE
TELEPHONE LINE
POWER POLES
TELEPHONE OR TELEGRAPH POLES
X X
P P
T T
STATE OR COUNTY LINE
CITY LIMIT LINE
PROPERTY LINE
SURVEY OR BASE LINE
EXISTING
REQUIRED
LIMIT OF ACCESS
R/W MARKERS
RIGHT OF WAY LINE
FENCE
RAILROAD
POWER LINE
TELEPHONE LINE
POWER POLES
TELEPHONE OR TELEGRAPH POLES
LAND LOT LINE
OFFICE OF DESIGN
APPROVED:
REQD R/W & LIMIT OF ACCESS . .
LENGTH OF RIGHT OF WAY PROJECT
NET LENGTH OF RIGHT OF WAY
GROSS LENGTH OF RIGHT OF WAY
FEDERAL AID PROJECT
REVISIONS:
LOCATION AND DESIGN APPROVAL DATE:
PLANS COMPLETED DATE:
HOWARD P. COPELAND , STATE RIGHT OF WAY ADMINISTRATOR
PROJECT LOCATION
LOCATION SKETCH
PROJECT LOCATION
LIVABLE BUCKHEAD INC.
RIGHT OF WAY OF PROPOSED
PATH 400 ALONG ADINA DRIVE
CITY OF ATLANTA - FULTON COUNTY
FEDERAL ROUTE No.: N/A
STATE ROUTE No.: LINDBERGH DRIVE (SR 236)
FULTON COUNTY
THIS PROJECT IS LOCATED 100% IN FULTON COUNTY
0.00
0.00
0.00
0.00
COUNTY NO.
AND CONGRESSIONAL DISTRICT 7.
CO-ORDINATE SYSTEM OF 1984.
HORIZONTAL DATUM : NAD 1983/94 HARN
VERTICAL DATUM : NAVD 1988
NOTE: THE CO-ORDINATES LISTED ARE WEST ZONE
60-0001
PL
PL
6" GRANITE CURB6" GRANITE CURB
6" CONC. CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
6" CONC. CURB
BROKEN GUTTER
SIGNALIZED INTERSECTION
C O
N C
S
ID
E W
A L
K
TS A
T
E
O G
F E
O
R
GIA
CON
S T I T
U T I
ON
J U
S T I
C E
O M
D
ER
A T
IO
N D O
M
W
IS
E: 2236869.0623
N: 1389064.8187
STA 10+75.00
ADINA DRIVE
BEGIN CONSTUCTION
BEGIN PROJECT
E: 2236871.3749
N: 1389839.8153
STA 18+50.00
ADINA DRIVE
END CONSTUCTION
END PROJECT
C CONSTRUCTION ADINA DRIVEL
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
A D I
I
V E
F O
U N T
A I
N H E
A D
L
A N E
L I
N D B E R
I
V E
PL
DATE$$$
GRWCOV
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
01/26/2015 GRWCOV
DRAWING No.
0 100 200
22'
TYP.
S T
A
IR
S
BUILDING OUTLINE
BUILDING OUTLINE
BUILDING OUTLINE
IRFIRF IRFIRFX MARK IN SWX MARK IN SW
N/FN/FIRF/CAPIRF/CAP
6" GRANITE CURB
6" CONC. CURB
CONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
E: 2236869.0623
N: 1389064.8187
STA 10+75.00
ADINA DRIVE
BEGIN CONSTUCTION
BEGIN PROJECT
38.00' LT
STA 11+24.11
38.00' LT
STA 12+75.21
38.00' LT
STA 13+25.21
DE10017
DE10018
DE10019
REQ'D PERM. EASM'T
PARCEL 1
REQ'D TEMP. EASM'T
PARCEL 2
REQ'D TEMP. EASM'T
PARCEL 3
REQ'D TEMP. EASM'T
PARCEL 4
M A
G N
O L I
A
H O
L L
Y
H O
L L
Y
B I
R C
H
B I
R C
H
O A
K
B I
R C
H
B I
R C
H
B I
R C
H
O A
K
O A
K
O A
K
M A
P L
E
O A
K
O A
K
O A
K
SCALE IN FEET
0 40 80
S E E
S
H E E T
M A T
C H L I
N E
S T
A
2 4
GRWPLN
DATE REVISIONSDATE REVISIONS
RIGHT OF WAY MAP
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
EASEMENT FOR CONSTR
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS PROJECT NO:
COUNTY: FULTON
LAND DISTRICT: 121
LAND LOT NO: 49
GMD
SH OFDATE
DRAWING No.
P.I. No.
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
7/31/2015 GRWPLN
60-0002
C CONSTRUCTION ADINA DRIVEL
A D I
I
V E
F O
U N T
A I
N H E
A D
L
A N E
ELEVATIONS AT ALL STAIRWAY AMD WALKWAY LOCATIONS.
PROPOSED TRAIL SHALL TIE IN TO MATCH EXISTING
3'-9" 4'
METZGER / LINDBERG LLC
N/F
METZGER / LINDBERG LLC
N/F
REDUS ATLANTA SUBDIVISION LLC
N/F
LINDMONT APARTMENTS LP
N/F
ASSOCIATION INC
LINDMONT PROPERTY OWNERS
N/F
OWNERS ASSOCIATION INC
LINDMONT PROPOERTY
N/F
OWNERS ASSOCIATION INC
LINDMONT PROPOERTY
N/F
34.46' LT
STA 10+76.16
15.96' LT
STA 10+76.14
34.40' LT
STA 11+24.25
34.18' LT
STA 12+75.21
34.11' LT
STA 13+25.21
DE10001
DE10000 DE10002
DE10003
DE10004
EXIST. R/W
EXIST. R/W EXIST. R/W
EXIST. R/WEXIST. R/W
PLCONC. SIDEWALK
CONC. SIDEWALK
CONC. SIDEWALK
C O
N C
S
ID
E W
A L
K
-60
E: 2236871.3749
N: 1389839.8153
STA 18+50.00
ADINA DRIVE
END CONSTUCTION
END PROJECT
38.00' LT
STA 15+40.00
33.00' LT
STA 15+55.00
36.00' LT
STA 17+25.00
33.00' LT
STA 17+25.00
32.00' LT
STA 18+02.37
36.00' LT
STA 17+90.00
DE10021
DE10020
DE10023
DE10022 DE10024
DE10025
REQ'D TEMP. EASM'T
PARCEL 1
REQ'D TEMP. EASM'T
PARCEL 4
REQ'D PERM. EASM'T
PARCEL 1
O A
K
O A
K
O A
K
O A
K
O A
K
O A
K
T
E E
O A
E E
O A
E E
O A
E E
O A
E E
E E
E E
O A
E E
SCALE IN FEET
0 40 80
S E E
S
H E E T
M A T
C H L I
N E
S T
A
3 4
$USER$
$PRF8$
$$PENTABLE$$
$DGN$
GRWPLN
DATE REVISIONSDATE REVISIONS
RIGHT OF WAY MAP
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
EASEMENT FOR CONSTR
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS PROJECT NO:
COUNTY:
LAND DISTRICT:
LAND LOT NO:
GMD
SH OFDATE
DRAWING No.
P.I. No.
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
7/31/2015 GRWPLN
FULTON
C CONSTRUCTION ADINA DRIVEL
L I
N D
B E
R
I
V E
CONTROL POINT #13
DESC:60DNAIL
N:1389807.900
E:2236989.513
EL.:841.38
ELEVATIONS AT ALL STAIRWAY AND WALKWAY LOCATIONS.
PROPOSED TRAIL SHALL TIE IN TO MATCH EXISTING
5'
ASSOCIATION INC
LINDMONT PROPOERTY OWNERS
N/F
LINDMONT APARTMENTS LP
N/F
METZGER / LINDBERG LLC
N/F
ASSOCIATION INC
LINDMONT PROPERTY OWNERS
N/F
33.80' LT
STA 15+47.80
26.79' LT
STA 15+54.79
26.56' LT
STA 17+17.11
30.61' LT
STA 17+48.00
30.62' LT
STA 17+43.75
22.00' LT
STA 17+91.98
14.90' LT
STA 18+26.82
30.54' LT
STA 17+98.97
22.00' LT
STA 17+48.00
45.05' LT
STA 18+26.83
45.20' LT
STA 18+13.98
41.29' LT
STA 18+13.37
DE10006
DE10005
DE10007
DE10008
DE10009
DE10010
DE10011
DE10016
DE10012
DE10014
DE10013
DE10015
E X I S
W
E X I S
W
EXIST. R/W
E X I S
W
E X I S
W
EXIST. R/W
EXIST. R/WEXIST. R/W
4 4
GRWPLN
DATE REVISIONSDATE REVISIONS
RIGHT OF WAY MAP
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
EASEMENT FOR CONSTR
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ'D R/W & LIMIT OF ACCESS PROJECT NO:
COUNTY: FULTON
LAND DISTRICT: 121
LAND LOT NO: 49
GMD
SH OFDATE
DRAWING No.
P.I. No.
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
R
E F
7/31/2015 GRWPLN
60-0004
SEE SHT. 2 & 3
REQD EASMT = 0.277 ACRES
REQD EASMT = 12086.05 SF
DE10000 15.96 L 10+76.14 Centerline Adina Rd
750.68 S 0°15'06.5" W
DE10015 14.90 L 18+26.82 Centerline Adina Rd
30.14 S 89°48'53.5" E
DE10014 45.05 L 18+26.83 Centerline Adina Rd
12.85 N 0°50'27.8" E
DE10013 45.20 L 18+13.98 Centerline Adina Rd
DEGREE = 381°58'18.7"
RADIUS = 15.00
LNTH CHORD = 3.95
CHORD BEAR = N 80°57'16.5" W
ARC LENGTH = 3.96
DE10012 41.29 L 18+13.37 Centerline Adina Rd
DEGREE = 266°29'31.2"
RADIUS = 21.50
LNTH CHORD = 28.80
CHORD BEAR = N 41°52'58.2" W
ARC LENGTH = 31.56
DE10011 22.00 L 17+91.98 Centerline Adina Rd
43.98 N 0°10'15.5" E
DE10010 22.00 L 17+48.00 Centerline Adina Rd
8.61 S 89°49'44.5" E
DE10009 30.61 L 17+48.00 Centerline Adina Rd
4.25 N 0°15'06.9" E
DE10008 30.62 L 17+43.75 Centerline Adina Rd
26.94 N 8°29'43.1" W
DE10007 26.56 L 17+17.11 Centerline Adina Rd
162.32 N 0°15'06.9" E
DE10006 26.79 L 15+54.79 Centerline Adina Rd
9.90 N 45°15'06.9" E
DE10005 33.80 L 15+47.80 Centerline Adina Rd
222.59 N 0°15'06.9" E
DE10004 34.11 L 13+25.21 Centerline Adina Rd
50.00 N 0°15'06.9" E
DE10003 34.18 L 12+75.21 Centerline Adina Rd
150.96 N 0°15'06.9" E
DE10002 34.40 L 11+24.25 Centerline Adina Rd
48.09 N 0°15'06.9" E
DE10001 34.46 L 10+76.16 Centerline Adina Rd
18.50 N 89°44'53.5" W
DE10000 15.96 L 10+76.14 Centerline Adina Rd
DIST BEARING
PNT OFFSET/ STATION/ ALIGNMENT
PERM_EASMT PARCEL 1 REQ'D PERM. EASM'T. DE10000
REQD EASMT AREA = 503.95 SF
DE10009 30.61 L 17+48.00 Centerline Adina Rd DE10010 22.00 L 17+48.00 Centerline Adina Rd DE10011 22.00 L 17+91.98 Centerline Adina Rd
DEGREE = 266°29'31.2"
RADIUS = 21.50
LNTH CHORD = 28.80
CHORD BEAR = S 41°52'58.2" E
ARC LENGTH = 31.56
DE10012 41.29 L 18+13.37 Centerline Adina Rd
DEGREE = 381°58'18.7"
RADIUS = 15.00
LNTH CHORD = 17.98
CHORD BEAR = N 36°34'19.9" W
ARC LENGTH = 19.27
DE10016 30.54 L 17+98.97 Centerline Adina Rd DE10009 30.61 L 17+48.00 Centerline Adina Rd
PNT OFFSET/ STATION/ ALIGNMENT
TEMP_EASMT_PARCEL 1 REQ'D TEMP. EASM'T. DE10001
SEE SHT. 3
REQD EASMT AREA = 560.40 SF
DE10017 38.00 L 11+24.11 Centerline Adina Rd
DEGREE = 31°34'04.5"
RADIUS = 181.50
LNTH CHORD = 3.61
CHORD BEAR = S 87°54'51.7" W
ARC LENGTH = 3.61
DE10002 34.40 L 11+24.25 Centerline Adina Rd DE10003 34.18 L 12+75.21 Centerline Adina Rd DE10018 38.00 L 12+75.21 Centerline Adina Rd DE10017 38.00 L 11+24.11 Centerline Adina Rd
PNT OFFSET/ STATION/ ALIGNMENT
TEMP_EASMT_PARCEL 2 REQ'D TEMP. EASM'T. DE10002
SEE SHT. 2
SEE SHT. 2
REQD EASMT AREA = 192.63 SF
DE10018 38.00 L 12+75.21 Centerline Adina Rd DE10003 34.18 L 12+75.21 Centerline Adina Rd DE10004 34.11 L 13+25.21 Centerline Adina Rd DE10019 38.00 L 13+25.21 Centerline Adina Rd DE10018 38.00 L 12+75.21 Centerline Adina Rd
PNT OFFSET/ STATION/ ALIGNMENT
TEMP_EASMT_PARCEL 3 REQ'D TEMP. EASM'T. DE10003
SEE SHT. 2 & 3
REQD EASMT AREA = 2444.75 SF
DE10019 38.00 L 13+25.21 Centerline Adina Rd DE10004 34.11 L 13+25.21 Centerline Adina Rd DE10005 33.80 L 15+47.80 Centerline Adina Rd DE10006 26.79 L 15+54.79 Centerline Adina Rd DE10007 26.56 L 17+17.11 Centerline Adina Rd DE10008 30.62 L 17+43.75 Centerline Adina Rd DE10009 30.61 L 17+48.00 Centerline Adina Rd DE10016 30.54 L 17+98.97 Centerline Adina Rd
DEGREE = 381°58'18.7"
RADIUS = 15.00
LNTH CHORD = 17.98
CHORD BEAR = S 36°34'19.9" E
ARC LENGTH = 19.27
DE10012 41.29 L 18+13.37 Centerline Adina Rd
DEGREE = 381°58'18.7"
RADIUS = 15.00
LNTH CHORD = 3.95
CHORD BEAR = S 80°57'16.5" E
ARC LENGTH = 3.96
DE10013 45.20 L 18+13.98 Centerline Adina Rd
DEGREE = 155°12'05.8"
RADIUS = 36.92
LNTH CHORD = 17.57
CHORD BEAR = N 48°30'07.8" W
ARC LENGTH = 17.75
DE10025 32.00 L 18+02.37 Centerline Adina Rd DE10024 36.00 L 17+90.00 Centerline Adina Rd DE10023 36.00 L 17+25.00 Centerline Adina Rd DE10022 33.00 L 17+25.00 Centerline Adina Rd DE10021 33.00 L 15+55.00 Centerline Adina Rd DE10020 38.00 L 15+40.00 Centerline Adina Rd DE10019 38.00 L 13+25.21 Centerline Adina Rd
PNT OFFSET/ STATION/ ALIGNMENT
TEMP_EASMT_PARCEL 4 REQ'D TEMP. EASM'T. DE10004
February 8, 2023
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
SPECIAL PROVISION
SECTION 108 - PROSECUTION AND PROGRESS
Retain Sub-Section 108.08 as written and add the following:
108.08. Failure or Delay in Completing Work on Time
D. Restrictive Work Hours
1. Failure to re-open travel lanes as specified in Special Provision Section 150.6.A will result in the assessment of liquidated damages in the amount of $1,000.00, per hour or portion thereof.
The above rates are cumulative and are in addition to any Liquidated Damages which may be assessed for failure to complete the overall project ppeters Text Box
February 8, 2023
DEPARTMENT OF TRANSPORTATION
STATE OF GEORGIA
SPECIAL PROVISION
SECTION 150 – TRAFFIC CONTROL
Delete Subsection 150.6 and add the following:
150.6 Special Conditions:
A. Lane Closures
The Contractor shall not install lane closures, shoulder closures (if applicable), pace traffic or move equipment or materials that interferes with traffic on local side streets between the hours of 6:00 am to 9:00 am and 3:00 pm to 6:00 pm, Monday through Friday.
The Contractor shall coordinate all lane closures and construction access from county, city, and state roads and streets with the the City of Atlanta ppeters Text Box
Blank Page
File details come from the government source that posted it. Updated .