This is a Past and Present Performance Questionnaire template for solicitation number 36C25625R0026, issued by the Department of Veterans Affairs Network Contracting Office (NCO) 16 for the Upgrade Switchgear Electronic Components project at Fayetteville VHSO.
The questionnaire requires completion by both the contractor and their reference contacts, with responses due by February 10, 2025 to Contract Specialist Robert Arabie and Contracting Officer Felicia Lovelady. The form includes 24 evaluation criteria rated on a 1-6 scale (Unsatisfactory to Neutral), covering areas such as project management, quality control, schedule adherence, problem resolution, and overall performance. The template includes sections for contractor information, reference contact details, and performance ratings with narrative explanations required for any low scores (1 or 2). Additional questions address whether the contractor received any cure notices, their CPARS status, and if the reference would award future contracts to them.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 564-23-503 - PRE-BID RFIs - COMPLETE.docx | DOCX document | |
| 564-23-503 Pre-Bid Site Visit Sign In Sheet 02.04.2025.pdf | ||
| 36C25625R0026 0001.docx | DOCX document | |
| 564-23-503 SOW R5.docx | DOCX document | |
| LV Generator Wiring Diagram.pdf | ||
| Washington County Wage Determination.docx | DOCX document | |
| Site Plan Map.pdf | ||
| Kohler Low Voltage Switchgear Operation Manual.pdf | ||
| 36C25625R0026 SOLICITATION.docx | DOCX document | |
| Contractor Evaluation Form.docx | DOCX document | |
| Combined Specifications R4.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Switchgear Electronic Components (B-17, B-29) Network Contracting Office (NCO) 16 Solicitation No. 36C25625R0026
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE
INSTRUCTIONS TO CONTRACTOR
Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions below.
INSTRUCTIONS TO REFERENCE CONTACT
The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contract Specialist via email directly to:
Department of Veterans Affairs NCO 16 Contracting Office
| TO: Robert (Dustan) Arabie, Contract Specialist | Email Address: robert.arabie@va.gov | |
| Felicia Lovelady, Contracting Officer | Email Address: felicia.lovelady@va.gov |
Please return the completed form no later than February 10, 2025. If you have any questions, please contact Robert (Dustan) Arabie via email. Thank you for your assistance in this matter.
GENERAL INFORMATION [completed by Contractor]
Contractor Company Name
Street Address
Contractor Point of Contact Name
City
Point of Contact Phone Number
State
Reference Project Title
Zip Code
Contract Period of Performance (start to finish):
Contract Number
Contract Dollar Value
Description of Work
Role of Contractor on This Project (check appropriate box) ☐ Prime Contractor ☐ Sub-contractor ☐ Key Personnel
RESPONDENT INFORMATION [completed by Reference Contact]
Company Name
Street Address
POC Name
City
Phone Number
State
Fax Number
Zip Code
PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the applicable text box OR in the Remarks section, below (text box will expand to whatever extent is necessary).
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| UNSATISFACTORY |
| MARGINAL |
| SATISFACTORY |
| VERY GOOD |
| EXCEPTIONAL |
| NEUTRAL |
| Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective. |
| Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective. |
| Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory. |
| Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner. |
| Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner. |
| No record of past performance or the record is inconclusive.[endnoteRef:1] [1: Printed Name |
Title
Signature]
| The Contractor … |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 1. |
| Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 2. | |||||
| Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 3. | |||||
| Delegated authority to project managers and supervisors commensurate with contract requirements. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 4. | |||||
| Home office participated in solving significant local problems. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 5. | |||||
| Followed approved quality control plan. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 6. | |||||
| Provided effective quality control and/or inspection procedures to meet contract requirements. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 7. | |||||
| Corrected deficiencies in timely manner and pursuant to their quality control procedures. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 8. | |||||
| Provided timely resolution of contract discrepancies |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 9. | |||||
| Identified problems as they occurred. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 10. | |||||
| Suggested alternative approaches to problems. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 11. | |||||
| Displayed initiative to solve problems. |
Narrative
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 12. | |||||
| Developed realistic progress schedules. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 13. | |||||
| Met established project schedules. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 14. | |||||
| Provided timely resolution of warranty defects. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 15. | |||||
| Was responsive to contract changes. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 16. | |||||
| Provided adequate project supervision. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 17. | |||||
| Obtained consent of surety for increases in bonding as work-in-progress increased. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 18. | |||||
| Paid subcontractors/suppliers in a timely manner. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 19. | |||||
| Provided accurate and complete line item cost proposals including all aspects of work required for each task. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 20. | |||||
| Cooperated with Government personnel after award. |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 21. | |||||
| How would you rate the contractor's overall performance? |
Narrative:
| ☐ | ☐ | ☐ | ☐ | ☐ | ☐ |
| 22. | |||||
| Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.” |
| ☐ | YES |
| ☐ | NO |
| 23 |
| Would you award another contract to this contractor? If not, please explain in “remarks.” |
| ☐ | YES |
| ☐ | NO |
| 24 | |
| To the best of your knowledge, is the contractor rated in CPARS? | |
| ☐ | YES |
| ☐ | NO |
REMARKS (Please use as much space as is needed – the box will expand as you type).
Source Selection Sensitive-See FAR Part 3.104Page 22 of 32 Source Selection Information--See FAR 2.101 and 3.104
File details come from the government source that posted it. Updated .