This is a pre-bid Request for Information (RFI) document containing nine questions and answers related to Solicitation No. 36C25625R0026 for upgrading switchgear components at the Fayetteville VA Medical Center.
The Q&A addresses technical aspects of the switchgear upgrade project, including existing communications between switchgear sets, load shedding capabilities, and PLC programming. Key operational details revealed include normal working hours of 0700-1630, confirmation that both MV and LV generators have load shedding abilities, and Nixon Power as the local Kohler service representative. The VA indicates that unforeseen site conditions requiring additional work will be handled through the COR and CO on a case-by-case basis. A request to extend the bid date by 10 working days was denied.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 564-23-503 Pre-Bid Site Visit Sign In Sheet 02.04.2025.pdf | ||
| 36C25625R0026 0001.docx | DOCX document | |
| 564-23-503 SOW R5.docx | DOCX document | |
| LV Generator Wiring Diagram.pdf | ||
| Past and Present Performance Questionnaire.docx | DOCX document | |
| Washington County Wage Determination.docx | DOCX document | |
| Site Plan Map.pdf | ||
| Kohler Low Voltage Switchgear Operation Manual.pdf | ||
| 36C25625R0026 SOLICITATION.docx | DOCX document | |
| Contractor Evaluation Form.docx | DOCX document | |
| Combined Specifications R4.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C25625R0026 Project No. 564-23-503 Prebid Requests For Information
UPGRADE SWITCHGEAR COMPONENTS – FAYETTEVILLE VAMC
ITEM #
QUESTIONS
VA RESPONSES
There is currently communication between the two sets of switchgear. If, during the upgrade, it is determined that a new communications cable needs to be installed, do you know if the existing conduit can be used?
If the conduit is found to be unusable during construction, will the cost to repair it be covered under a change order?
Unforeseen site conditions that result in additional efforts will be discussed and investigated with the COR and approved by the CO on a case-by-case basis.
| Does the switchgear currently have the capability to shed non-critical loads? If so, which switchgear performs the load shedding? |
| Yes, MV generator & LV generators have load shedding abilities. |
| Do you have any historical data on peak loads? This information would be useful for sizing a standby generator if needed during construction. |
| Recommend sizing generators based on station’s existing equipment. |
| 4 |
| Is there a designated area where the contractor can stage materials and equipment? |
| See SOW. |
| 5 |
| Are there specific working hours that the contractor must adhere to? |
| Normal business hours for the station (0700-1630) are acceptable. Reference SOW for exceptions. |
| 6 |
| Do you have a copy of the PLC program available? |
| No |
| 7 |
| Do you have a copy of the Woodward configuration files? |
| No |
| 8 |
| Do you have a local Kohler service representative who has previously assisted you with troubleshooting or accessing the PLC or Woodward controllers? If so, could you please provide their contact information? |
| Nixon Power |
| 9 |
| Would it be possible to extend the bid date by 10 working days? |
| No extension at this time |