This is an Invitation to Bid and project manual issued by the Passaic Valley Water Commission (PVWC) for Contract #26-B-13, concerning the replacement of penstock intake structure stoplogs at the existing Little Falls Water Treatment Plant in Totowa, New Jersey. The project encompasses aluminum stoplogs, concrete rehabilitation, portable gantry crane installation, underwater repairs, and related general construction work. The contract includes lump sum bid items for mobilization ($10,000), penstock intake structure stoplogs (price to be bid), and a contingency allowance ($40,000), along with unit price items for concrete surface repair (20 cubic feet), underwater stone masonry repointing and resurfacing (8 cubic feet), and sediment and debris removal (35 cubic yards). A non-mandatory pre-bid conference is scheduled for November 19, 2026, at 10:00 A.M. at the Little Falls Water Treatment Plant, 800 Union Boulevard, Totowa, New Jersey. Sealed bids are due December 17, 2026, at 2:00 P.M. at PVWC's offices, 1525 Main Avenue, Clifton, New Jersey 07011. The Commission will award the contract within 60 days of bid receipt, and the successful bidder must execute the contract within 21 days of award. The contract term is not specified in the bidding documents provided.
Bidders must submit one signed original and three duplicate hard copies of their bid submission, including a bid guarantee of 10 percent of the total bid amount (not to exceed $20,000). Performance and maintenance bonds equal to 100 percent of the contract price are required. Prevailing wage rates as determined by the New Jersey Department of Labor apply to this public works project. Bidders must comply with New Jersey's Local Public Contracts Law, ownership disclosure requirements, affirmative action regulations, non-collusion affidavits, and certification regarding debarment and suspension. Business registration certificates and Public Works Contractor Registration are mandatory for both the contractor and any subcontractors. The Commission reserves the right to reject any and all bids and to award the contract to the lowest responsible bidder. No set-asides for disadvantaged businesses are indicated in the bidding documents. Questions regarding the bidding documents must be submitted by December 8, 2026, at 3:00 P.M. to the Commission's representative, Lisa Bresemann (lbresemann@pvwc.com).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PASSAIC VALLEY WATER COMMISSION
INFORMATION AND INSTRUCTIONS TO BIDDERS, SPECIFICATIONS
PROPOSAL AND CONTRACT
CONTRACT #26-B-13
PENSTOCK INTAKE STRUCTURE STOPLOGS
REPLACEMENT
BIDS TO BE RECEIVED ON
DECEMBER 17, 2026
i
Confidential
PASSAIC VALLEY WATER COMMISSION
CONTRACT #26-B-13
PENSTOCK INTAKE STRUCTURE STOPLOGS REPLACEMENT
TABLE OF CONTENTS
DESCRIPTION PAGE
Table of Contents ...................................................................................................................................... i-ii
Invitation to Bidders ................................................................................................................................. I-1
Information and Instructions for Bidders ................................................................................... B-1 to B-17
Bid Document Submission Checklist ...................................................................................................... P-1
Form of Proposal ........................................................................................................................... P-2 to P-3
Bid Guarantee .......................................................................................................................................... P-4
Consent of Surety ..................................................................................................................................... P-5
Acknowledgement of Receipt of Addenda ............................................................................................. P-6
Statement of Ownership .............................................................................................................. P-7 to P-10
Corporate Resolution ............................................................................................................................. P-11
Bidder’s Certification ............................................................................................................................ P-12
Affirmative Action Certification ........................................................................................................... P-13
Non-Collusion Affidavit ........................................................................................................................ P-14
Bidder’s Proposed Subcontractors ........................................................................................................ P-15
Questionnaire for Contract ........................................................................................................ P-16 to P-17
Bidder’s Acknowledgement of American Iron and Steel Provisions ................................................... P-18
Disclosure of Investment Activities in Iran ........................................................................................... P-19
Certification of Non-Involvement in Prohibited Activities in Russia or Belarus ................................ P-20
Certification Regarding Debarment and Suspension ............................................................................ P-21
Prevailing Wage Determination .................................................................................................... 123 pages
Contract ......................................................................................................................................... C-1 to C-4
Performance Bond ........................................................................................................................ C-5 to C-8
Maintenance Bond ............................................................................................................... C-9 to C-13
General Conditions ......................................................................................................... GC-0 to GC-67 ii
Technical Specifications Cover Page .................................................................................................... TS-1
00 73 63 Safety and Security 01 11 00 Summary of Work 01 20 50 Measurement and Payment 01 32 13 Construction Progress Documentation 01 32 33 Photographic Documentation 01 33 00 Submittals 01 40 00 Quality Requirements 01 54 23 Temporary Scaffolding 01 57 13 Soil Erosion and Sediment Control 01 64 00 Owner Furnished Products 01 65 00 Product Delivery, Storage and Handling 01 71 13 Mobilization
40 05 59 Aluminum Stoplogs 41 22 13 Portable Gantry Crane and Hoist
Exhibits (NOT PART OF THE CONTRACT DOCUMENTS)
A Stop Log Field [Inspection] Report, by Bander-Smith, March 2026
Contract Drawings (bound separately)
--- Title Sheet G-001 Project Area Plan G-101 Site Plan, General Notes & Abbreviations G-102 Partial Plan at El. 161.0’ G-103 Section & Detail G-104 Representative Photographs G-105 Stoplogs Details
I-1
INVITATION TO BIDDERS
Sealed bids for performing the Contract identified below will be received by the Passaic Valley Water Commission, at its offices located at 1525 Main Avenue, Clifton, New Jersey, on Thursday, December 17, 2026 at 2:00 P.M., local time, at which time and place said bids will be publicly opened and read. No bids shall be received after the time designated in this Invitation to Bidders.
CONTRACT #26-B-13
PENSTOCK INTAKE STRUCTURE STOPLOGS REPLACEMENT
This Contract includes aluminum stop logs, concrete rehabilitation, portable gantry crane, underwater repairs, and related general construction work. Work is located at the existing Little Falls Water Treatment Plant site.
Information and Instructions for Bidders, Specifications and other Contract Documents are available in electronic form by forwarding an e-mail request to lbresemann@pvwc.com. Each submission shall be provided on the standardized forms as supplied in the submission package and the said standardized forms shall not be modified or altered in any way.
Bidders shall comply with the requirements of the Local Public Contracts Law N.J.S.A. 40A:11-1 et. seq. as supplemented and amended; Ownership Disclosure Notice (P.L. 1977, c 33) N.J.S.A. 52:24.1 and Affirmative Action Requirements. (P.L. 1975 c 127) N.J.S.A. 10:5-32 in addition to other applicable State Laws.
A non-mandatory pre-bid conference will be held on Thursday, November 19, 2026 at 10:00 A.M. at the Little Falls Water Treatment Plant, 800 Union Boulevard, Totowa, NJ 07512, in the Auditorium.
Representatives of the Commission will be present to discuss the project. Bidders are encouraged to attend and participate in the pre-bid conference. Bidders shall submit questions regarding the bid documents by no later than Tuesday, December 8, 2026 at 3:00 P.M. to the project representative listed in the bid documents.
The successful bidder for the Contract shall be required to comply with the prevailing local minimum wage rates as determined by the New Jersey Department of Labor.
Within the parameters established by the governing law, the Commission reserves the right to reject any and all bids or to waive minor informalities or irregularities in the Proposals received and to award the contract to the lowest responsible bidder.
B-1
INFORMATION AND INSTRUCTIONS FOR BIDDERS
0.01 BID SUBMISSION
The "Bid Submission" means all of the documents submitted by the bidder in response to this Invitation to Bid, including all of the forms accompanying this Invitation to Bid which are paginated with the prefix "P-".
The bidder's completed "Form of Proposal" shall be based upon the Bidding Documents and shall be made only upon the blank Form of Proposal herewith provided. The Form of Proposal shall not be changed. Every blank space for entries in the Form of Proposal shall be filled in and no alterations or interlineations shall be made thereto. Bidder is advised that except where specifically permitted otherwise by the Bidding Documents, Bidder shall complete all of the Commission's forms included as part of the Bidding Documents. Failure to properly fill in and execute all of the Commission's forms may result in rejection of the bid. Any bid Submission which attempts to modify, alter or otherwise change the specifications, and/or contract terms, shall be deemed non-conforming and rejected as required by law.
The term "Bidding Documents" refers to any one or more of the documents included with this Invitation to Bid, including but not limited to, the Advertisement for this Invitation to Bid, the Invitation to Bid, Information and Instructions for Bidders, the Form of Proposal, other forms required to be completed and submitted as part of the Bidder's Bid Submission, the form of Contract to be issued upon award, the Supplementary Conditions (if any), General Conditions, Technical Specifications, Drawings, Appendices, any documents or specifications incorporated by reference in the aforementioned accompanying documents, and any Addenda to the Bidding Documents issued by the Commission prior to receipt of Bids. Any reference herein to "Bidding Documents" can refer to one, more than one, or all of the individual documents comprising the Bidding Documents.
The Bid Submission shall be submitted via one signed, unbound original and three (3) duplicate hard copies.
The Bid Submission shall be signed and enclosed in a sealed opaque envelope and shall be plainly marked with the name and address of the bidder along with the name of the project: Contract #26-B-13 – PENSTOCK INTAKE STRUCTURE STOPLOGS REPLACEMENT – Bidder Name. Submissions shall be hand-delivered between the hours of 8:30 A.M. and 4:30 P.M. or mailed by way of First Class Mail or overnight delivery service to the Commission's office located at 1525 Main Avenue, Clifton, New Jersey 07011, attention Purchasing Department.
0.02 OTHER SELECTED DEFINITIONS
"Owner", "Commission", or "Contracting Unit" shall all refer to the Passaic Valley Water Commission, New Jersey. The Owner is also referred to herein as “PVWC”.
"Engineer" shall mean the Director of Engineering, Passaic Valley Water Commission or his duly authorized representative.
"Commission's Representative" refers to a person serving as the Commission's point-of-contact for certain specified purposes, including but not limited to coordinating site visits, pre-construction meetings, and the handling of questions relating to the Bidding Documents. For purposes of these Bidding Documents, the name and contact information of the Commission's Representative is:
Name: Lisa Bresemann Contact Info: lbresemann@pvwc.com
B-2
"Contractor" means the Bidder to whom the Commission awards a Contract to perform the work identified in these Bidding Documents.
"Qualified Surety Company" means a surety that: (i) is duly licensed to issue surety bonds in the State of New Jersey; (ii) is in good standing in the State of New Jersey, (iii) is sufficiently capitalized to serve as a surety for this Contract; (iv) meets all of the qualifications necessary to issue surety bonds pursuant to N.J.S.A.
§ 2A:44-143(a)(1); and (v) abides by all laws and regulations relating to the issuance of surety bonds on public projects in this State including, as applicable, N.J.S.A. § 2A:44-143.
"Take-and-Pay" means that the Owner shall pay the Contractor for all units that the Owner orders, receives, and accepts from the Contractor in accordance with the unit pricing in the Contractor’s Bid Submission. The Owner is not obligated to pay for any unit that: (i) the Owner did not order; or (ii) the Owner ordered but did not receive; or (iii) the Owner ordered but did not accept.
0.03 AMERICAN GOODS AND PRODUCTS TO BE USED WHERE POSSIBLE
Subject to prevailing law (NJAC 40A:11-18), only manufactured and farm products of the United States, wherever available, shall be used in the materials to be furnished under this Contract. Products shall meet the requirements of the Buy American Act.
0.04 DESCRIPTION OF WORK
The Commission is soliciting bids, all as indicated specified or required by the Bidding Documents or which can be reasonably inferred therefrom. The Bidding Documents describe these goods and services in greater detail.
The duration of the Contract shall be as indicated in the Bidding Documents.
0.05 QUALIFICATIONS OF BIDDERS
Bidders shall complete the Form of Proposal, as part of their Bid Submission setting forth details of the proposed Work. The Bidder shall submit evidence that they have, or can obtain before the Contract is executed, all licenses, registrations, and any and all other approvals required to perform the Work.
Bidders shall certify that they are in compliance with State and Federal laws with respect to non-discrimination against any persons because of age, sex, race, color, religion or national origin.
B-3
0.06 NON-MANDATORY PRE-BID CONFERENCE AND INSPECTION OF SITE(S)
☐ A non-mandatory pre-bid conference will not be conducted by the Commission.
☒ A non-mandatory pre-bid conference will be conducted at the location, time and date indicated in the Invitation to Bidders. Bidders are encouraged to attend and participate in the pre-bid conference.
0.07 EXAMINATION OF BIDDING DOCUMENTS AND SITE(S)
It is the responsibility of each Bidder, before submitting a bid to:
a. Examine the Bidding Documents thoroughly.
b. Visit the Commission's facilities to become familiar with local conditions that might affect cost, performance or furnishings of the goods and services.
c. Receive and be familiar with any minutes of the pre-bid conference.
d. Be familiar with federal, state and local laws, regulations, ordinances, permits, approvals and orders that may affect the cost, progress, performance or furnishings of the goods and services.
e. Study and carefully correlate Bidder's observations with the Commission's needs.
f. Notify the Commission of all conflicts, errors or discrepancies in the Bidding Documents.
g. Examine the project site(s) and the existing facilities, and like items that may affect the scope, effort and related costs of the Work, as the Bidder deems appropriate.
By submission of a bid, the Bidder represents that: (i) they have complied with every requirement of the Bidding Documents, (ii) their Bid Submission is premised upon performing and furnishing the Work required by the Bidding Documents without exception, and (iii) the Bidding Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
0.08 GUARANTEE TO ACCOMPANY BID: FORM AND AMOUNT
No Proposal will be considered unless it is accompanied by a Guarantee payable to Passaic Valley Water Commission, that if this Contract is awarded to the Bidder, said Bidder shall enter into a Contract therefore and shall furnish a Performance Bond as required by the Bidding Documents and any other security that may be required.
The Guarantee shall be in the amount of 10% of the total amount bid, but not in excess of $20,000.00 except as otherwise provided by law; and said Guarantee may be given, at the option of the Bidder, by Certified Check, Cashier's Check, or said Guarantee may take the form of a Bid Bond executed by the Bidder together with a Qualified Surety Company, as that term is defined herein.
B-4
In the event that any law or regulation of the United States imposes any condition upon the awarding of a grant to the Commission, which condition requires the depositing of a Guarantee in an amount other than 10% of the bid or in excess of $20,000.00, the provisions of this section shall not apply and the requirements of the law or regulation of the United States shall govern.
The provisions of N.J.S.A. § 40A:11-21, as amended, are made part of this section by reference thereto.
0.09 SURETY COMPANY: CERTIFICATE
Each Bidder shall submit a certificate from a Qualified Surety Company, stating that it will provide the Bidder, if successful, with a Performance Bond for the sum required in the Bidding Documents, but in no case for less than the full amount of the Contract Price, and with any other bonds that may be required by the Bidding Documents including but not limited to a payment bond (if any) and maintenance bond (if any). The Commission reserves the right to reject any certificate submitted from the “individual surety” in lieu of a Qualified Surety Company, to the fullest extent permitted by law, including but not limited to N.J.S.A. § 40A:11-22 as amended.
0.10 PERFORMANCE BOND PROVISION
The Contractor shall deliver to Passaic Valley Water Commission a performance bond, in the form provided for in these Bidding Documents, executed by the Contractor and a Qualified Surety Company, in an amount equal to the total price of the Contract as security for the faithful performance of the Contract. The Contractor may not submit any form of performance bond that deviates in any way from the form of performance bond provided with these Bidding Documents without the Commission’s expressed, written approval, which approval is subject to the Commission’s sole discretion and can be withheld for any reason whatsoever, with no reason required to be given.
To the fullest extent permitted by law, the Commission reserves the right to reject any performance bond that is not issued by a Qualified Surety Company. Furthermore, to the fullest extent permitted by law, the Commission reserves the right to reject any performance bond that is issued by a Qualified Surety Company:
(a) with which the Commission is in litigation or against which the Commission is actively pursuing substantial claims; (b) with which the Commission has had a prior negative experience; or (c) for any other just and reasonable cause.
In the event that the Commission elects to extend the Contract under the provisions stipulated elsewhere herein, the Contractor shall be required to maintain and extend all Insurance and Performance Bonds (and any other Bonds required by the Contract Documents), and shall continue to provide Goods and Services under the extended Contract under the same terms and conditions indicated by the Contract Documents or which can be reasonably inferred therefrom.
In the event the Commission elects to extend the Contract Time, the Commission will provide written notification to the Contractor not less than 60 days prior to the date the Contract would otherwise end. Said notification will advise the Contractor of the duration of the extended time frame.
0.11 TIME FOR MAKING AWARD: DEPOSITS RETURNED
Passaic Valley Water Commission will award the Contract or reject all bids therefor within 60-days after they are received. All checks or bonds delivered with the Bid Submissions except the check or bond of the Bidder
B-5 to whom the Contract is awarded, shall be returned within three days thereafter, Sundays and Holidays excepted. The check or bond of the Bidder to whom the Contract is awarded shall be retained until a Contract is executed and all bonds and other security required by the Bidding Documents are submitted.
If for any reason the Commission is unable to make an award within such 60-day period, the Commission may request some or all of the bidders to hold open their bid submission for a longer period as may be agreed upon. By the submission of a bid, each Bidder hereby agrees that should it be selected as one of the three lowest responsible Bidders, it shall agree upon at least a 30-day extension and to holding its pricing and other offers firm during the extended period.
The Contract shall be signed by the Bidder who is awarded the Contract ("Contractor") within the time limit set forth in the Bidding Documents, which shall not exceed 21 days, Sundays and holidays excepted, after the making of the award; provided, however, that all parties to the Contract may agree to extend the limit set forth in the Bidding Documents beyond the 21 day limit required in this subsection. The Contractor, upon written request to the contracting unit, is entitled to receive, within seven days of the request, an authorization to proceed pursuant to the terms of the Contract on the date set forth in the Contract for work to commence, or, if no date is set forth in the Contract, upon receipt of authorization. If for any reason the Contract is not awarded and the Bidders have paid for or paid a fee for the Bidding Documents to the contracting unit, the payment or deposit shall immediately be returned to the Bidders when the Bidding Documents are returned in reasonable condition within 90 days of notice that the Contract has not been awarded.
0.12 DISCLOSURE NOTICE
No corporation, partnership, or limited liability company shall be awarded any contract nor shall any agreement be entered into for the performance of any work or the furnishing of any materials or supplies, the cost of which is to be paid with or out of any public funds, by the State, or any county, municipality or school district, or any subsidiary or agency of the State, or of any county, municipality or school district, or by any authority, board, or commission which exercises governmental functions, unless prior to the receipt of the bid or accompanying the bid, of said corporation, said partnership, or said limited liability company there is submitted a statement setting forth the names and addresses of all stockholders in the corporation who own 10 percent or more of its stock, of any class, or of all individual partners in the partnership who own a 10 percent or greater interest therein, or of all members in the limited liability company who own a 10 percent or greater interest therein, as the case may be. If one or more such stockholder or partner or member is itself a corporation or partnership or limited liability company, the stockholders holding 10 percent or more of that corporation's stock, or the individual partners owning 10 percent or greater interest in that partnership, or the members owning 10 percent or greater interest in that limited liability company, as the case may be, shall also be listed. The disclosure shall be continued until names and addresses of every noncorporate stockholder, and individual partner, and member, exceeding the 10 percent ownership criteria established in this act, has been listed.
To comply with this section, a bidder with any direct or indirect parent entity which is publicly traded may submit the name and address of each publicly traded entity and the name and address of each person that holds a 10 percent or greater beneficial interest in the publicly traded entity as of the last annual filing with the federal Securities and Exchange Commission or the foreign equivalent, and, if there is any person that holds a 10 percent or greater beneficial interest, also shall submit links to the websites containing the last annual filings with the federal Securities and Exchange Commission or the foreign equivalent and the relevant page numbers of the filings that contain the information on each person that holds a 10 percent or greater beneficial interest.
B-6
0.13 NON-COLLUSION AFFIDAVIT
Each Bidder is required to submit with their Bid Submission an Affidavit stating that neither they nor their agents, nor any other party for them, has paid or agreed to pay, directly or indirectly, any person, firm or corporation any money or valuable consideration for assistance in producing or attempting to procure the Contract herein referred to, and further agreeing that no such money or reward will be hereafter paid. This Affidavit is included in the Bidding Documents.
0.14 PREPARATION AND SUBMISSION OF PROPOSALS
Included and bound herewith is a complete set of the forms for the Bidder's use in preparing the Bid Submission, which forms include the “Form of Proposal”, Affidavit of Non-Collusion, and a variety of other forms that these Bidding Documents require Bidders to fill out and submit (most if not all such forms should be paginated with the prefix "P-").
With the paper distribution of the bid documents, the bound copy of these forms is for the Bidder’s reference only and need not be detached from the binding. Instead, for the Bidder's use and convenience, the Commission provides a separately fastened set of said forms within the cover of the bound volume of the Bidding Documents. If the Bidder has not received additional copy of the aforementioned forms, the Bidder should notify the Commission as soon as possible.
For the electronic distribution of the bid documents, the Bidder must print the “P” pages from within the complete PDF document.
The Bidder is requested not to return the "Information and Instructions for Bidders" section, Specification pages, nor the sample Contract pages, General Conditions or Supplementary Conditions (if any).
The Bidder's Form of Proposal must be properly signed in ink and all blanks filled in with type or printed.
All amounts shall be written out in full as well as stated in figures. If a discrepancy occurs, the written amounts shall govern. Each Bidder shall tabulate all the information pertaining to his equipment and materials that are requested. These tabulations form a part of the Bidder's Bid Submission and failure to furnish this tabulated information may be taken as sufficient grounds for the rejection of the bid. Erasures, alterations or other changes in the bid must be explained or noted over the signature of the Bidder.
The firm, corporation, or individual name of the bidder must be signed in the space provided for the signatures on the proposal blanks. In the case of a corporation, the title of the officer signing must be stated, and such officer must be thereunto duly authorized. In the case of a partnership, the signature of at least one of the partners must follow the firm name, using the term "member of firm". In the case of an individual, use the term "doing business" or "sole owner". No Contract will be awarded to a Bidder who is a foreign corporation or is operating under a different name, unless they have complied with the proper registration under the laws of the State of New Jersey.
Should the Bidder be awarded a Contract by the Commission, the successful Bidder shall be expected to sign the form of Contract provided for in the Bidding Documents and abide by all terms and conditions of the Bidding Documents in performance of the Contract. The Bidding Documents shall be made part of the Contract and part of any surety bond(s) (bid, performance, payment, and/or maintenance) required pursuant to the Bidding Documents.
B-7
0.15 WITHDRAWALS OF BIDS
Bidders may withdraw a Bid Submission provided that they follow the procedures for withdrawing bids set forth in the Local Public Contracts Law (N.J.S.A. § 40A:11-23.3), The Commission will be guided by the Law in its response. Negligence on the part of the bidder in preparing his bids confers no automatic right of withdrawal or modification of his bid after such bid has been opened.
0.16 CONSIDERATION OF PROPOSALS
Along with cost, the competency and responsibility of Bidders, their facilities, experience in similar work, and that of their proposed Subcontractors, will be considered in making awards.
Bids from parties not regularly and practically engaged as contractors for the scope and class of work bid upon, may be rejected at the discretion of the Commission.
No bid will be accepted from or a contract awarded to, any party, nor will any surety or bonding corporation be accepted as surety, who or which, is in default upon any contract or other obligation to the State, or to this Commission or any other municipality. Failure of any Bidder to have completed a previous contract will be considered evidence of irresponsibility.
The prices bid for each pay item shall represent the actual cost the Bidder reasonably anticipates that performance of that pay item will entail, together with a proportionate share of the cost to perform Work for which no separate pay item is provided and a proportionate share of the Bidder’s anticipated overhead and profit. In the event a Bidder submits bid pricing that, in the sole opinion of the Commission, is determined to be materially unbalanced, the Commission shall reject the bid. A materially unbalanced bid is a bid where the Commission has reasonable doubt that award to the Bidder submitting the materially unbalanced bid will result in the lowest ultimate cost to the Commission, and/or the materially unbalanced bid creates the possibility that progress payments for items completed early may result in the unpaid contract price balance being insufficient to complete the Work. When determining whether a bid is materially unbalanced, the Commission may take into consideration the reasonable potential for, and effect of, adjustment of quantities during the course of the Project, including but not limited to “If and Where Directed” items and quantities.
Any or all proposals will be rejected if there is a reasonable ground for supposing that there is collusion among the Bidders, and all participants in such collusion will receive no further recognition for this work.
Commission may conduct such investigations as Commission deems necessary to assist in the evaluation of any Bid to establish the responsibility, qualifications and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Bidding Documents to Commission's satisfaction within the prescribed time.
0.17 BIDDER’S RESPONSIBILITY
Each Bidder shall visit the project site and shall be responsible for having ascertained the conditions likely to be encountered and other pertinent conditions such as locations, accessibility, general character of the site, the character and extent of existing work within or adjacent to the site and any other work being performed thereon at the time of the submission of the Bid.
B-8
Each Bidder shall carefully examine the Bidding Documents and become informed of all local ordinances and requirements necessary to perform the work. It will be assumed that each Bidder has satisfied themself as to the site conditions, goods and services to be provided, and other work to be performed; all as indicated, specified or required by the Bidding Documents or which can be reasonably inferred therefrom. No allowance or concession will be made for lack of such information on the part of the Bidder. Each Bidder by submitting a bid represents that they rely exclusively upon their own investigations and makes their bid with full knowledge of conditions, kinds, quality and quantity of work required.
The submission of a Bid will constitute an incontrovertible representation by Bidder that without exception its Bid Submission is premised on performing and furnishing all Work required by the Bidding Documents and applying the specific means, methods, techniques, sequences or procedures that may be shown or indicated or expressly required by the Contract Documents, that the Bidder has given the Commission written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Bidding Documents and that the written resolutions by Commission are acceptable to Bidder and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
At the time of the opening of bids, each Bidder will be presumed to have read and be thoroughly familiar with the Bidding Documents, including all Addenda. The failure of any Bidder to receive or examine any form, instrument, or document shall in no way relieve the Bidder from any obligation in respect to their Bid. No adjustment of Contract Time or Contract Price will be made based upon the Bidder's claim and lack of prior information.
0.18 QUESTIONS REGARDING BIDDING DOCUMENTS
Before submitting a Bid Submission, the Bidder shall bring to the attention of the Commission's Representative any questions or issues for clarification or interpretation including but not limited to: (i) any conflicting information between two or more portions of the Bidding Documents; (ii) any doubt that the Bidder may have as to the meaning, intent, or interpretation of any provision(s) found within the Bidding Documents; and/or (iii) any apparent ambiguity, inconsistency, error, discrepancy, or omission in the Bidding Documents. Any failure to bring such matters to the attention of the Commission as provided for herein shall bar the successful Bidder from later making a claim for additional compensation from the Commission based on an alleged conflicting provisions, ambiguities, inconsistencies, errors, discrepancies, or omissions in the Bidding Documents. Furthermore, if clarifications to the Bidding Documents are not requested before bidding as provided for herein, the Bidder shall be responsible to do such work, and furnish such materials as necessary to comply with whichever interpretation of the Bidding Documents that the Commission and/or Engineer, during construction, judges to be proper. Moreover, any Bidder whose bid is rejected for failing to comply with allegedly ambiguous bid instructions shall have no right to challenge the Commission’s finding and interpretation of its Bidding Documents after Bid Opening, if the Bidder failed to bring the alleged ambiguity in the instructions to the Commission’s attention for clarification before submitting the Bid.
The Bidder must bring the matters referenced above to the attention of the Commission Representative by no later than the time and date specified in the Invitation to Bidders on Page I-1. The Commission will compile any questions or clarification for response to the bid document holders in a single response. The Commission is under no obligation to consider and/or respond to questions from bidders made thereafter.
Any responsive interpretation or instruction made by the Commission will be in the form of an addendum to the Bidding Documents or responsive clarification and will be furnished to all prospective Bidders via
B-9
Memorandum. The Commission will not provide oral explanations or instructions, and Bidders are prohibited from relying upon alleged pre-bid oral explanations or instructions in connection with its Bid Submission.
The Commission and/or Engineer reserves the right to correct any errors or omissions in said Bidding Documents wherever such corrections are necessary for the proper fulfillment of the intention of the Bidding Documents.
0.19 COMPLIANCE WITH ALL LAWS
The Contractor shall keep themself informed and shall comply with all Federal, State and Local laws or ordinances, such as may apply. Special attention is called to paragraphs under Public Liability and Property Damage Insurance, Workmen's Compensation Insurance, Social Security Act, Labor-Employment- Unemployment Wages, Hours and Assignment of Contract.
0.20 PAYMENTS
Payment to the Contractor will be made as provided for in the Bidding Documents. Special attention is called to General Conditions, Article 14, and Division 1 and/or other Sections of the Technical Specifications.
0.21 PROVISIONS FOR CONTRACT EXTENSIONS
In accordance with the provisions of N.J.S.A. 40A:11-1 et. seq, the Commission reserves the right to allow the Contract to expire at the end of the Contract Time stipulated in the Contract or, by mutual consent between the Commission and the Contractor, the Commission reserves the right to extend the Contract Time.
The Contractor shall be required to maintain and extend all Insurance and any surety bond(s) (performance, payment, and/or maintenance) required pursuant to the Bidding Documents, and shall continue to provide Goods and Services under the extended Contract under the same terms and conditions indicated by the Bidding Documents or which can be reasonably inferred therefrom.
In the event that the Commission has commenced re-bidding prior to the Contract expiration or when award of a contract is pending at the time that this Contract expires, by mutual consent between the Commission and the Contractor, this Contract can be extended for the duration of the interim period until the subsequent contract has been awarded and able to satisfy the Commission's requirements.
0.22 START OF WORK AND TIME OF COMPLETION
The execution of the Contract by the Commission constitutes the notice to commence Work within 30 days, or if a Notice to Proceed is given, on the date indicated in the Notice to Proceed. Time is an essential consideration of the Contract. Work shall progress with a proper and sufficient force of workman and amply supply of materials (to the satisfaction of the Commission and/or Engineer) to ensure full conformance with the requirements of the Contract Documents for the duration of the Contract.
0.23 FINAL COMPLETION OF CONTRACT DEFINED
Final Completion is the point at which all provisions of the Contract, including any and all "punch list" items are complete and accepted by the Commission. The date of final completion shall be the date the final certificate for payment is approved by the Commission.
B-10
0.24 LIQUIDATED DAMAGES
As indicated in the Contract, the Contractor shall pay to the Commission by way of liquidated and ascertained damages, and not as a penalty, the sum stipulated in Article II, Time of Completion, of the Contract for each and every day on which there is a delay beyond the date named for substantial completion of the Contract or part thereof. This is intended to compensate the Commission for damages and loss sustained by reason of inability to take possession of the work on account of the Contractor's failure to complete the Contract. The sums shall be deducted from any monies, which may be due, or become due the Contractor for work done under this Contract.
0.25 EXTENSION OF TIME NOT A WAIVER
Any extension of time beyond the date fixed for completion, or acceptance of any part of the work called for by the Contract, shall not be deemed a waiver by the Commission of its right to annul or terminate the Contract for abandonment or delay in the manner provided for by the terms of the Contract, and shall not relieve the Contractor from full responsibility to perform.
0.26 TAXES
The Commission is exempt from payment of Federal Excise Tax and New Jersey Sales Tax and no such tax need be included in this Bid. All taxes other than those mentioned herein shall be paid by the Contractor. The Contractor shall contact Passaic Valley Water Commission to obtain all Information on tax exemption for the Commission.
0.27 MANDATORY EQUAL EMPLOYMENT OPPORTUNITY LANGUAGE
(N.J.S.A. 10:5-31 et seq., N.J.A.C. 17:27) - GOODS, PROFESSIONAL
SERVICES AND GENERAL SERVICE CONTRACTS
During the performance of this contract, the contractor agrees as follows:
The contractor or subcontractor, where applicable, will not discriminate against any employee or applicant for employment because of age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex. Except with respect to affectional or sexual orientation and gender identity or expression, the contractor will ensure that equal employment opportunity is afforded to such applicants in recruitment and employment, and that employees are treated during employment, without regard to their age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex. Such equal employment opportunity shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Public Agency Compliance Officer setting forth provisions of this nondiscrimination clause.
The contractor or subcontractor, where applicable will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex.
B-11
The contractor or subcontractor will send to each labor union, with which it has a collective bargaining agreement, a notice, to be provided by the agency contracting officer, advising the labor union of the contractor's commitments under this chapter and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
The contractor or subcontractor, where applicable, agrees to comply with any regulations promulgated by the Treasurer pursuant to N.J.S.A. 10:5-31 et seq., as amended and supplemented from time to time and the Americans with Disabilities Act.
The contractor or subcontractor agrees to make good faith efforts to meet targeted county employment goals established in accordance with N.J.A.C. l7:27-5.2.
The contractor or subcontractor agrees to inform in writing its appropriate recruitment agencies including, but not limited to, employment agencies, placement bureaus, colleges, universities, and labor unions, that it does not discriminate on the basis of age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex, and that it will discontinue the use of any recruitment agency which engages in direct or indirect discriminatory practices.
The contractor or subcontractor agrees to revise any of its testing procedures, if necessary, to assure that all personnel testing conforms with the principles of job-related testing, as established by the statutes and court decisions of the State of New Jersey and as established by applicable Federal law and applicable Federal court decisions.
In conforming with the targeted employment goals, the contractor or subcontractor agrees to review all procedures relating to transfer, upgrading, downgrading and layoff to ensure that all such actions are taken without regard to age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex, consistent with the statutes and court decisions of the State of New Jersey, and applicable Federal law and applicable Federal court decisions.
The contractor shall submit to the public agency, after notification of award but prior to execution of a goods and services contract, one of the following three documents:
Letter of Federal Affirmative Action Plan Approval;
Certificate of Employee Information Report; or Employee Information Report Form AA-302 (electronically provided by the Division and distributed to the public agency through the Division’s website at: http:// www.state.nj.us/treasury/contract_compliance.
The contractor and its subcontractors shall furnish such reports or other documents to the Division of Purchase & Property, CCAU, EEO Monitoring Program as may be requested by the office from time to time in order to carry out the purposes of these regulations, and public agencies shall furnish such information as may be requested by the Division of Purchase & Property, CCAU, EEO Monitoring Program for conducting a compliance investigation pursuant to N.J.A.C. 17:27-1.1 et seq.
B-12
0.28 MANDATORY EQUAL EMPLOYMENT OPPORTUNITY LANGUAGE
(N.J.S.A. 10:5-31 et seq., N.J.A.C. 17:27)-CONSTRUCTION CONTRACTS
During the performance of this contract, the contractor agrees as follows:
The contractor or subcontractor, where applicable, will not discriminate against any employee or applicant for employment because of age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex. Except with respect to affectional or sexual orientation and gender identity or expression, the contractor will ensure that equal employment opportunity is afforded to such applicants in recruitment and employment, and that employees are treated during employment, without regard to their age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex. Such equal employment opportunity shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Public Agency Compliance Officer setting forth provisions of this nondiscrimination clause.
The contractor or subcontractor, where applicable will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to age, race, creed, color, national origin, ancestry, marital status, affectional or sexual orientation, gender identity or expression, disability, nationality or sex.
The contractor or subcontractor will send to each labor union, with which it has a collective bargaining agreement, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under this act and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
The contractor or subcontractor, where applicable, agrees to comply with any regulations promulgated by the Treasurer, pursuant to N.J.S.A. 10:5-31 et seq., as amended and supplemented from time to time and the Americans with Disabilities Act.
When hiring or scheduling workers in each construction trade, the contractor or subcontractor agrees to make good faith efforts to employ minority and women workers in each construction trade consistent with the targeted employment goal prescribed by N.J.A.C. l7:27-7.2; provided, however, that the Dept. of LWD, Construction EEO Monitoring Program, may, in its discretion, exempt a contractor or subcontractor from compliance with the good faith procedures prescribed by the following provisions, A, B, and C, as long as the Dept. of LWD, Construction EEO Monitoring Program is satisfied that the contractor or subcontractor is employing workers 15 EXHIBIT B (Cont) provided by a union which provides evidence, in accordance with standards prescribed by the Dept. of LWD, Construction EEO Monitoring Program, that its percentage of active “card carrying” members who are minority and women workers is equal to or greater than the targeted employment goal established in accordance with N.J.A.C. 17:27-7.2. The contractor or subcontractor agrees that a good faith effort shall include compliance with the following procedures:
(A) If the contractor or subcontractor has a referral agreement or arrangement with a union for a construction trade, the contractor or subcontractor shall, within three business days of the contract award, seek assurances from the union that it will cooperate with the contractor or subcontractor as it fulfills its affirmative action obligations under this contract and in accordance with the rules promulgated by the Treasurer pursuant to
B-13
N.J.S.A. 10:5-31 et. seq., as supplemented and amended from time to time and the Americans with Disabilities Act. If the contractor or subcontractor is unable to obtain said assurances from the construction trade union at least five business days prior to the commencement of construction work, the contractor or subcontractor agrees to afford equal employment opportunities minority and women workers directly, consistent with this chapter. If the contractor's or subcontractor's prior experience with a construction trade union, regardless of whether the union has provided said assurances, indicates a significant possibility that the trade union will not refer sufficient minority and women workers consistent with affording equal employment opportunities as specified in this chapter, the contractor or subcontractor agrees to be prepared to provide such opportunities to minority and women workers directly, consistent with this chapter, by complying with the hiring or scheduling procedures prescribed under (B) below; and the contractor or subcontractor further agrees to take said action immediately if it determines that the union is not referring minority and women workers consistent with the equal employment opportunity goals set forth in this chapter.
(B) If good faith efforts to meet targeted employment goals have not or cannot be met for each construction trade by adhering to the procedures of (A) above, or if the contractor does not have a referral agreement or arrangement with a union for a construction trade, the contractor or subcontractor agrees to take the following actions:
(l) To notify the public agency compliance officer, the Dept. of LWD, Construction EEO Monitoring Program, and minority and women referral organizations listed by the Division pursuant to N.J.A.C. 17:27-5.3, of its workforce needs, and request referral of minority and women workers;
(2) To notify any minority and women workers who have been listed with it as awaiting available vacancies;
(3) Prior to commencement of work, to request that the local construction trade union refer minority and women workers to fill job openings, provided the contractor or subcontractor has a referral agreement or arrangement with a union for the construction trade;
(4) To leave standing requests for additional referral to minority and women workers with the local construction trade union, provided the contractor or subcontractor has a referral agreement or arrangement with a union for the construction trade, the State Training and Employment Service and other approved referral sources in the area;
(5) If it is necessary to lay off…