Part8-00 DRAWINGS.pdf
PDF 8 MB Posted
- Solicitation number
- 36C77624R0025
About this file
This set of construction drawings and schedules outlines plumbing system upgrades and renovations for Building 80 at the Tucson VA Medical Center. The project involves expanding and renovating clinics, including new gravity piping, pressure piping, and medical gas systems for two areas on the first and second floors. Plumbing fixtures, drainage, and water supply are specified. Detailed drawings show fixture locations, pipe routing and sizes, and connection points to existing infrastructure. Schedules provide fixture types and counts, drainage and water load calculations, medical gas alarm and valve requirements, and notes for construction and installation standards. The solicitation number is likely for a construction contract to implement these design plans for plumbing systems work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77624R0025 0006.docx | DOCX document | |
| Amendment 06 Att.zip | ZIP file | |
| 36C77624R0025 0005.docx | DOCX document | |
| Amendment 04 Att.zip | ZIP file | |
| 36C77624R0025 0004.docx | DOCX document | |
| 36C77624R0025 0003.docx | DOCX document | |
| 36C77624R0025 0002.docx | DOCX document | |
| 36C77624R0025 0001.docx | DOCX document | |
| S04 - Site Visit Mtg Min - RFP 2-13-2024.doc | DOC document | |
| 678-328 Bid Walk Sign In Sheet.pdf | ||
| tucson b80 pre-bid presentation rev1.pdf | ||
| Part4-00 DRAWINGS.pdf | ||
| Part7-00 DRAWINGS.pdf | ||
| Part6-00 DRAWINGS.pdf | ||
| DBA WD AZ20240040 01.19.2024.pdf | ||
| SPECIAL NOTE - BID TAXES - AFTER FAR 52.229-3.docx | DOCX document | |
| Site Visit SITE MAP Parking Location1.pdf | ||
| Part5-00 DRAWINGS.pdf | ||
| PPQ.docx | DOCX document | |
| SPEC VOL I.pdf | ||
| Part3-00 DRAWINGS.pdf | ||
| 36C77624R0025_1.docx | DOCX document | |
| SPEC VOL II.pdf | ||
| Part1-00 DRAWINGS.pdf | ||
| Brand Name JA.pdf | ||
| Limitations on Subcontracting - Construction.docx | DOCX document | |
| Part2-00 DRAWINGS.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
3 3
3 3
1 4
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
3" OD 6" OD 8" OD
CO
2" SS2" SS
2" S
S
3" S
D
3" SD
3" OD
CO
CO CO
CO
CO
FCO
CO
CO
CO
CO
CO
CO
CO
2" S
S
WCO
CO
3" S
S 4"
S S
4" SS
WCO
2" S
S 2"
S S
2" S
S
4" SS
4" S
S
CO
CO
2" S
S
4" SS
2" S
S
2" SS
4" S
S 4"
S S
4" S
S
CO
CO
WCO
4" S
S 4"
S S
2" SS
4" SS
2" SS
2" S
S
2" SS
2" S
S
2" SS
2" S
S
2" SS
4" S
S
3" SS
4" S
S
CO
3" SS 2" SS3" SS
CO
2" SS
CO
3" SS
4" S
S
CO
86" S
D
2 15
6" OD
CO
CO
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E
6" O
D
(E) 3" SD(E) 3" SD
(E
6" S
D
(E
3" S
D
(E
2" V
(E
2" V
(E) 3" V
(E) 4" SS
(E) 2" V
(E
3" V
(E) 2" V
(E
2" V (E
2"
V
(E) 2" V
(E
2" V
(E
2" V
(E) 2" V
(E
4" O
D
(E) 2" SS
(E
2" S
S
(E
4" O
D
(E
2" V
(E
2" V
(E
6" S
D
(E) 6" SD
(E
6" S
D
(E) 2" SS
(E) 2" V
(E) 2" V
(E) 3" V
(E
2" V
(E
2" V
(E
2" V
(E
2" S
S
(E
3" S
D
(E) 3" SD
(E
4" S
S
(E) 2" V
2" SS CO
CO
2" S
S
2" S
S
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H.A.C.
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
WOMEN'S
HEALTH TOILET
1239A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
WOMEN'S
HEALTH TOILET
1213A
(E)
FCO
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-104
FIRST FLOOR GRAVITY PIPING PLAN -
AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
SCALE: 1/8" = 1'-0"
FIRST FLOOR GRAVITY PIPING PLAN -
AREA B
1. 2"V-UP.
2. 3"V-UP.
3. 2"SS-UP.
4. 3"SS-UP.
5. 3" TRAP. 3"SS-UP.
6. 4"SS-UP TO FIXTURE.
7. 3"SD-UP.
8. 6"SD-UP.
9. 3"OD-UP.
10. 6"OD-UP.
11. 4"SS-DN.
12. 3"SD-DN.
13. 8"OD-DN TO DOWNSPOUT NOZZLE. PROVIDE SPLASH BLOCK.
14. CONNECT NEW SANITARY SEWER PIPING TO EXISTING
SANITARY SEWER PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
15. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING
ABOVE CEILING AT THE APPROXIMATE LOCATION INDICATED.
16. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
17. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
18. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING AT THE APPROXIMATE LOCATION
INDICATED.
19. 2"TRAP. 2"SS-UP.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
3 3
3 3
4 6
3" OD 6" OD 8" OD
CO
2" SS2" SS
2" S
S
3" S
D
3" SD
3" OD
CO
CO CO
CO
CO
FCO
CO
CO
CO
CO
CO
CO
2" S
S
WCO
CO
3" S
S 4"
S S
4" SS
WCO
2" S
S 2"
S S
2" S
S
WCO
2" SS
2" S
S
2" SS
2" SS
2" S
S
2" SS
4" S
S
3" SS
4" S
S
CO
3" SS 2" SS3" SS
CO
2" SS
CO
3" SS
4" S
S
CO
86" S
D
2 15
6" OD
CO
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E
6" O
D
(E) 3" SD(E) 3" SD
(E
6" S
D
(E
3" S
D
(E
2" V
(E
2" V
(E) 3" V
(E) 4" SS
(E) 2" V
(E
3" V
(E) 2" V
(E
2" V (E
2"
V
(E) 2" V
(E
2" V
(E
2" V
(E) 2" V
(E
4" O
D
(E) 2" SS
(E
2" S
S
(E
4" O
D
(E
2" V
(E
2" V
(E
6" S
D
(E) 6" SD
(E
6" S
D
(E) 2" SS
(E) 2" V
(E) 2" V
(E) 3" V
(E
2" V
(E
2" V
(E
2" V
(E
2" S
S
(E
3" S
D
(E) 3" SD
(E
4" S
S
(E) 2" V
2" SS CO
CO
2" S
S
2" S
S
4" S
S 4"
S S
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H.A.C.
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
WOMEN'S
HEALTH TOILET
1239A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
WOMEN'S
HEALTH TOILET
1213A
(E) 3" V
(E) 2" SS
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-104A
FIRST FLOOR GRAVITY PIPING PLAN -
AREA B - ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
SCALE: 1/8" = 1'-0"
FIRST FLOOR GRAVITY PIPING PLAN -
AREA B - ALT. #1
1. 2"V-UP.
2. 3"V-UP.
3. 2"SS-UP.
4. 3"SS-UP.
5. 3" TRAP. 3"SS-UP.
6. 4"SS-UP TO FIXTURE.
7. 3"SD-UP.
8. 6"SD-UP.
9. 3"OD-UP.
10. 6"OD-UP.
11. 4"SS-DN.
12. 3"SD-DN.
13. 8"OD-DN TO DOWNSPOUT NOZZLE. PROVIDE SPLASH BLOCK.
14. CONNECT NEW SANITARY SEWER PIPING TO EXISTING
SANITARY SEWER PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
15. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING
ABOVE CEILING AT THE APPROXIMATE LOCATION INDICATED.
16. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
17. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
18. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING AT THE APPROXIMATE LOCATION
INDICATED.
19. 2"TRAP. 2"SS-UP.
MATCH LINE A
MATCH LINE A
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
4" O
D 4"
S D
4" S
D 4"
O D
2" V
2" V
4" S
D 4"
O D
4" S
D
P-401 P-101
P-401
P-433
P-433
P-433
P-433
P-433
P-101 P-401
P-401
P-433
P-401
P-101
P-433
P-433
P-433
P-609
P-401 P-401
P-101P-101
P-524
P-433
P-433
P-401 P-114
P-433
P-433
8 9
9.69.08.28.07.57.37.17.0
M
L.8
L
K.8
K
J.8
J.5
I
H.8
H.7
H.6
M.8
H.6A
2" V
2" V
CO
CO
4" SD
4" OD
CO
CO
4" SD
4" OD
4" OD
ELECTRICAL
DATA
LOCKER NICHE
BREAKOUT
BREAKROOM
STAFF CORRIDOR
2C02
PACT WORKROOM
STAFF TOILET
STAFF TOILET
MED ROOM
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
TEAMLET 3
2877 P A
T
IE
N T
T O
IL
E
T
EXAM/CONSULT
E X
A M
/C O
N S
U L
T
SHARED MEDICAL
APPOINTMENT ROOM
WAITING / CORRIDOR
2C00
STORAGE
WOMEN'S HEALTH
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
P A
T
IE
N T
C O
R R
ID
O
R
C
PROSTH. STORAGE
SCALE
2S01
TOILET
UTILITY
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
PATIENT TOILET
P-433
P-528
2" V
EXAM
EXAM
EXAM
EXAM
STAFF ALCOVE
EXAM
EXAM
EXAM
EXAM
STAFF
STAFF
STAFF
STAFF
EXAM
EXAM
EXAM
EXAM
STAFF ALCOVE
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
ELECTRICAL
CONFERENCE
ALCOVE
STAIR
2805 WAITING AREA
CHECK IN /
CHECK OUT
LOBBY
ELEVATOR
80-P3
ELEVATOR
80-P4ELEVATOR
EQUIP.
TOILET
TOILET
TOILET
TOILET
CORRIDOR
EXAM
EXAM
WOMEN'S EXAM
STAFF TOILET
STAFF LOUNGE
STAFF
CORRIDOR
H.A.C.
DATA
SOILED UTILITY
C O
R R
ID
O
R
BARIATRIC /
TREATMENT
C O
R R
ID
O
R
C O
R R
ID
O
R
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-105
SECOND FLOOR GRAVITY PIPING PLAN
- AREA A
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
C. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
D. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
SCALE: 1/8" = 1'-0"
SECOND FLOOR GRAVITY PIPING
PLAN - AREA A
1. 2"V-DN.
2. 3"V-UP TO VTR.
3. 2"SS-DN.
4. 2"SS-DN AND 2"V-UP TO VTR.
5. 3"SS-DN.
6. 3"SD-UP.
7. 3"OD-UP.
8. 4"SD-DN.
9. 4"OD-DN.
10. 4"SS-DN.
MATCH LINE A
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
P-101P-401
P-433
P-401 P-433
P-101P-433
P-433
P-401
P-101
P-433 P-433 P-114
P-433
P-401
P-433P-114 P-401
P-433 P-433
P-528
P-433 P-433
P-502
P-433
P-433
P-401
P-433
P-433
P-101
P-401
P-101 P-401
P-609
1 1 1
1 1
P-401
P-433
P-433
P-433
P-433
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
P-433
2" V
2" V
CO
6" OD
3" V
2" V
2" V
2" V
2" V
2" V
2" V2" V
2" V 2" V
2" V
2" V
3" V
3" V
3" V
3" V
3" V
2" V
2" V
2" V
P-433
P-433
2" V
3" V
2" V
2" V
2" V
6" S
D
13 2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
2" V
4" O
D 4"
S D
3" OD
3" SDP-433
2" V
2" V
2" V
P-524
2" V
P-401
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
MED ROOM
WOMENS TOILET
2916A
WOMEN'S HEALTH
P A
T
IE
N T
C O
R R
ID
O
R
C
EXAM/CONSULT
TEAMLET 2
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
STAFF TLT.
EXAM/CONSULT
EXAM/CONSULT
PATIENT TLT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
TEAMLET 1
WOMEN'S HEALTH
PATIENT CORRIDOR
2C06
W O
M E
N S
T O
IL
E
T
A
SHARED MEDICAL
APPOINTMENT ROOM
EXAM/CONSULT
HAC
2S04
P A
T
IE
N T
C O
R R
ID
O
R
C
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
LOCKER NICHE
P A
T
IE
N T
T O
IL
E
T
STAFF TLT.
BREAKROOM
PACT WORKROOM
LOCKER NICHE
BREAKOUT
BREAKOUT
STAFF CORRIDOR
2C09
PACT WORKROOM
2" V
P-401
14 14
PATIENT TLT
TELE-RETINAL
P-528
P-528
2" V
2" V
2" V
2" V
2" V
MED ROOM
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
SCALE
2S05
SCALE
2S06
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-106
SECOND FLOOR GRAVITY PIPING PLAN
- AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
SCALE: 1/8" = 1'-0"
SECOND FLOOR GRAVITY PIPING
PLAN - AREA B
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
F. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
G. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
1. 2"SS-DN.
2. 3"SS-DN.
3. 3"SD-UP.
4. 3"OD-UP.
5. 2"V-DN.
6. 3"SD-DN.
7. 3"OD-DN.
8. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING
ABOVE CEILING AT THE APPROXIMATE LOCATION INDICATED.
9. 3"V-DN.
10. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
11. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
12. 6"SD-DN.
13. 6"OD-DN.
14. 4"SS-DN.
15. FLOOR DRAIN FD-C
M .G
FEC
FEC
FEC
DN
F E C
FEC
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
P-114
P-433
P-401
P-433 P-433
P-528
P-433 P-433
P-502
P-433
P-433
P-433
P-101
P-401
P-101 P-401
P-609
1 1 1
1 1
P-401
P-433
P-433
P-433
P-433
P-433
2" V
(E) 2" V
(E
2" V
(E
3" V
(E
2" V
CO
6" OD
3" V
(E
6" O
D
2" V
2" V
2" V
2" V
2" V
2" V 2" V
2" V
(E) 4" OD(E) 4" OD
3" V
2" V
2" V
2" V
6" S
D
13 2" V
2" V
2" V
2" V
2" V
2" V
(E
6" O
D (E
6"
O D
2" V
2" V
2" V
2" V
2" V
4" O
D 4"
S D
3" OD
3" SDP-433
(E) 2" V
(E
2" V
(E
6" O
D
P-524
(E
3" V
(E) 4" OD
(E) 4" SD
(E) 4" OD
(E) 4" SD
(E
4" S
D
(E
4" O
D
P-401
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
TEAMLET 1
WOMEN'S HEALTH
PATIENT CORRIDOR
2C06
W O
M E
N S
T O
IL
E
T
A
SHARED MEDICAL
APPOINTMENT ROOM
EXAM/CONSULT
HAC
2S04
P A
T
IE
N T
C O
R R
ID
O
R
C
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
LOCKER NICHE
P A
T
IE
N T
T O
IL
E
T
STAFF TLT.
BREAKROOM
PACT WORKROOM
LOCKER NICHE
BREAKOUT
BREAKOUT
PACT WORKROOM
TELE-RETINAL
P-528
2" V
2" V
2" V
MED ROOM
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
EXAM
TREATMENT
DIETITIAN
CONSULT
CORR
PHARM
CONSULT
PHARM
CONSULT
SW CONSULT
SW CONSULT
PHARM
CONSULT
NURSE
CLEAN SUPPLY
CORR
EXAM
EXAM
CORR
SOILED UTIL
CORR
LOUNGE
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-106A
SECOND FLOOR GRAVITY PIPING PLAN
- AREA B - ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
F. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
G. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
SCALE: 1/8" = 1'-0"
SECOND FLOOR GRAVITY PIPING
PLAN - AREA B - ALT. #1
1. 2"SS-DN.
2. 3"SS-DN.
3. 3"SD-UP.
4. 3"OD-UP.
5. 2"V-DN.
6. 3"SD-DN.
7. 3"OD-DN.
8. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING
ABOVE CEILING AT THE APPROXIMATE LOCATION INDICATED.
9. 3"V-DN.
10. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
11. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
12. 6"SD-DN.
13. 6"OD-DN.
14. 4"SS-DN.
15. FLOOR DRAIN FD-C
EXISTING
BLDG. 80
EXISTING
BLDG. 80
EXISTING
BLDG. 80
EXISTING
BLDG. 80
H W S
H W R
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
2,254 SQFT
71 GPM
2,341 SQFT
74 GPM
2,341 SQFT
74 GPM
2,365 SQFT
74 GPM
882 SQFT
28 GPM
9.69.08.28.07.57.37.17.0
M
L.8
L
K.8
K
J.8
J.5
I
H.8
H.7
H.6
M.8
H.4
H
H.6A
P-804
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-107
ROOF PIPING PLAN
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
SCALE: 1/8" = 1'-0"
ROOF PIPING PLAN - AREA A
1. 2" VENT THRU ROOF.
2. 3" VENT THRU ROOF.
3. 3"ROOF DRAIN.
4. 3" EMERGENCY OVERFLOW DRAIN.
5. 3/4"DCWS-DN.
6. INSULATE COLD WATER PIPING EXPOSED TO ELEMENTS.
PROVIDE ALUMINUM JACKET TO PROTECT INSULATION FROM
DAMAGE.
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
D. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
2" V
2" V
2" V
2" V
2" SS
2" S S
2" V
2" V
2" V
2" V
2" V
2" SS
4" S S
3" S
S
4" S S
4" SS
2" V
2" SS
6" S S
6" S S
6" S S
6" S S
2" S S
2" S S
2" S S
2" S
S
2" V
2" S
S
2" S
S
2" S
S
2" V
2" V
2" V
2" V
2" V 2" V
2" V
2" V
2" V
2" SS
4" S
S
2" V
2" V
2" V
2" V
2" S
S
4" S
S
2" V
2" V 2" V
3" V
4" SS
2" V
2" V
4" SS
2" SS
P-401 P-101
P-114
P-401
P-401
P-433
P-433
P-433
P-433
P-433
P-401
P-433
P-433 P-401
P-101
P-433
P-433
YCO
P-524
P-433
P-433
P-433
P-101
P-401
CO
CO
CO
4" S S
4" S
S
P-101
P-101
P-401
P-401
P-609
2" S
S
2" S
S
2" S
S
2" S
S
4" SS
6" S S
2" SS
2" SS
2" V
2" S S
2" V
2" V
2" V
4" SSCO
CO
2" SS
CO
2" S S
CO
P-433
P-433
4" SS
CO
4" S S
2" V
4" SS
6" S S
4" SS
2" S S
P-528
2" S S
CO
WCO
WCO
WCO
WCO
YCO
YCO
8" S D
6" O D
6" O D
8" S D
4" OD 4" SD
3" SD
6" O D
4" O D
6" SD
4" SD 4"
S
D
CO
4" O
D
4" S
D
6" SD
3" SD
(E
3" S
D
(E
3" S
D
(E
3" S
D
(E) 3" S D
3" S D
4" SD
4" SD
4" S D
4" S D
3" SD
CO
CO
CO
CO
3"OD
3"RD
3"OD
3"RD
3"OD
3"RD
3"OD
3"RD
YCO
CO
4" OD
4" OD
4" SD
4" OD4" SD
4" O
D
CO
4" S D
4" O D
4" S D
4" O D
WCO
WCO
WCO
YCO
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-301
GRAVITY PIPING ISOMETRIC RISER
DIAGRAM - AREA A
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
NO SCALE
GRAVITY PIPING ISOMETRIC RISER DIAGRAM - AREA A
NONE
1. 2" VENT THRU ROOF.
2. 3" VENT THRU ROOF.
3. 6"OD-DN TO DOWNSPOUT NOZZLE. PROVIDE SPLASH BLOCK.
4. REFER TO CIVIL DRAWINGS FOR CONTINUATION OF PIPING.
5. TWO-WAY CLEANOUT TEE
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
C. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
NO SCALE
STORM DRAINAGE PIPING ISOMETRIC RISER DIAGRAM - AREA A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
2" V
2" V
3" S
S 2"
V 2"
S S
2" V
2" S
S
2" V
2" V
3" V
2" V
2" V
2" V
2" V
2" S
S
2" V
2" V
2" V
2" V
3" S
S
2" V
2" V
2" SS
P-433
P-114
P-401
P-433
P-528
P-433
P-433
P-101
P-401 P-433
P-433
P-433
P-101
P-401
P-401
P-433
P-101 P-401
P-433
P-433
P-401 P-114
P-433
P-433
P-433
P-433
P-101 P-401
P-609
P-401
P-101 P-524
P-433
P-433
P-502
P-433
P-433
P-433
P-433
P-401
2" V
2" V
2" SS
2" S S
CO
2" SS
3" SS
3" SS
2" V 2" V
CO
2" S S
P-401
2" S S
2" SS
2" V
2" V2" V
2" S S
2" V
4" S
S
4" S S
CO
3" S S
2" V
2" V
2" V
CO
2" SS
2" V
2" V
(E) 4" SS
(E) 4" SS
(E) 3" S S
(E) 3" S S
(E) 4" SS
(E) 2 1/2" S S
(E) 2" S S
(E) 2 1/2" S S
WCO
2" SS
2" V
2" V
2" S S
2" S S
2" S S
CO
2" V
2" V
3" V
2" V
2" V
2" V 2" V
2" V
2" V
2" SS
CO
4" SS
4" S S
4" S S
4" S S
CO
2" V
2" V
2" V
2" V
2" V
2" V
P-401
4" S S
WCO
4" S S
2" S S
2" SS
2" V
2" V
4" S S
2" V
2" V 2" V
2" V
CO
3" V
3" V
CO
CO
2" SS
2" SS
CO
CO
4" SS
2" S S
CO
2" S S
2" S S
CO
2" S S
4" S S
CO
3" S S
4" SS
2" V
2" V
4" SS
2" V
2" V
2" V
3" V
WCO
CO
CO
2" SS
4" SS
3" SS
CO
2" V
CO 4" S
S
4" S
S
2" S S
2" SS
3" V
3" V
3" V
3" V
3" V
(E) 2" SS
(E) 4" SS
(E) 4" S S
(E) 2" SS
(E) 2" SS
(E) 2 1/2" SS
(E) 2" SS
(E) 4" S
S
(E) 2" V
(E
2" V
(E) 4" SS
(E) 3" V
(E) 3" V
(E) 2" V(E) 2" S S
(E) 2" S S
(E) 2" S S
(E
2" S
S
(E) 2" SS
(E) 2" S S
(E) 4" SS
(E) 2" SS
(E) 4" SS
(E) 4" S S
(E) 4" SS
(E) 2" V
(E) 3" V
(E) 4" SS
(E) 4" SS
(E) 4" S S
(E) 2" V
(E) 2" V
(E) 2" SS
(E) 2" V
(E) 2" V
(E) 2" V
(E) 2" SS
(E) 2" S S
(E) 2" SS
(E) 3" SS
(E) 4" SS
(E) 4" SS
(E) 2" SS
(E
2" V
(E) 2" V
(E) 2" V
(E) 2" V
(E) 2" V
(E) 3" V
(E) 2" V
(E) 2" S S
(E) 2" S S
(E) 2" SS
(E) 2" S S
(E) 2" SS
(E) 2" SS
(E) 2" SS
2" V
2" V
2" V
2" V
2" V
P-433
P-433
FD-C
P-528
P-528
2" V
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-302
GRAVITY PIPING ISOMETIRC RISER
DIAGRAM - AREA B
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
NONE
NO SCALE
GRAVITY PIPING ISOMETIRC RISER DIAGRAM - AREA B
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
F. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
G. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
1. CONNECT NEW SANITARY SEWER PIPING TO EXISTING
SANITARY SEWER PIPING BELOW FLOOR AT THE
APPROXIMATE LOCATION INDICATED.
2. CONNECT NEW SANITARY SEWER PIPING TO EXISTING
SANITARY SEWER PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
3. CONNECT NEW VENT PIPING TO EXISTING VENT PIPING
ABOVE CEILING AT THE APPROXIMATE LOCATION
INDICATED.
3 3
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
(E) 6" O D
(E) 3" SD
(E) 6" O D
6" S D
CO
(E) 6" S D
(E) 6" O D
(E) 8" SD
(E) 6" O D
(E) 6" O D
6" OD
(E) 6" O D
(E) 6" O D
3" OD
6" OD
8" OD (E) 3" SD
(E) 3" S
D
(E) 3" S D
(E) 3" S D
(E
3" O
D
(E
3" O
D
(E
3" O
D
8" O
D
3" S D
FCO
3" SD
3" S D
CO
3" SD
3" S D
(E) 6" S D
(E) 6" S D
(E) 8" SD
6" OD
(E) 6" O D
(E) 4" OD
(E) 6" SD
(E) 4" OD
3" S
D 3"
O D
3" OD
3" SD
CO
CO
CO
CO
3"RD
3"OD
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-303
STORM DRAINAGE PIPING ISOMETIRC
RISER DIAGRAM - AREA B
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
NONE
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. CONTRACTOR SHALL INSPECT AND ROD OUT EXISTING
SANITARY WASTE AND/OR SEWER PIPING BEFORE MAKING
ANY NEW CONNECTIONS. CONTRACTOR SHALL NOTIFY
OWNER AND COR OF ALL SANITARY SEWER WHICH IS NOT
SERVICEABLE AND REQUIRE REPLACEMENT.
D. PRIOR TO PERFORMING ANY PLUMBING WORK OR
PURCHASING ANY MATERIALS, VERIFY EXACT LOCATION,
ROUTING, AND PIPE SIZES, ETC. OF ALL EXISTING SANITARY
SEWER, VENT, AND STORM DRAINAGE PIPING.
E. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
F. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
G. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
NO SCALE
STORM DRAINAGE PIPING ISOMETIRC RISER DIAGRAM - AREA B
1. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
2. CONNECT NEW EMERGENCY STORM DRAINAGE PIPING TO
EXISTING EMERGENCY STORM DRAINAGE PIPING AT THE
APPROXIMATE LOCATION INDICATED.
3. 8"OD-DN TO DOWNSPOUT NOZZLE. PROVIDE SPLASH BLOCK.
4. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING ABOVE CEILING AT THE
APPROXIMATE LOCATION INDICATED.
5. CONNECT NEW STORM DRAINAGE PIPING TO EXISTING
STORM DRAINAGE PIPING AT THE APPROXIMATE LOCATION
INDICATED.
4 4
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
UP
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
2" DHWS
3/4" DHWR
3/ 4"
D H
W R
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
1203 SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H .A
.C
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
W O
M E
N 'S
H E
A L
T H
T O
IL
E
T
A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
3/ 4"
D H
W R
(E
1" D
H W
R
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PP-101
FIRST FLOOR PRESSURE PIPING PLAN -
AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. CONTRACTOR SHALL REMOVE AND REPAIR PORTIONS OF
FLOORS, CEILINGS, AND/OR SLABS AFFECTED BY PLUMBING
MODIFICATIONS. REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
C. SEE ARCHITECTURAL PLANS FOR WALL RATINGS.
D. ALL DOMESTIC HOT WATER SUPPLY AND DOMESTIC HOT
WATER RETURN PIPING SHALL BE INSULATED, IN CEILINGS,
PIPE CHASES, AND IN WALLS.
E. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
SCALE: 1/8" = 1'-0"
FIRST FLOOR PRESSURE PIPING
PLAN - AREA B
1. CONNECT NEW DOMESTIC COLD WATER SUPPLY PIPING TO
EXISTING DOMESTIC COLD WATER SUPPLY PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
2. CONNECT NEW DOMESTIC HOT WATER SUPPLY PIPING TO
EXISTING DOMESTIC HOT WATER SUPPLY PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
3. CONNECT NEW DOMESTIC HOT WATER RETURN PIPING TO
EXISTING DOMESTIC HOT WATER RETURN PIPING ABOVE
CEILING AT THE APPROXIMATE LOCATION INDICATED.
4. 3"DCWS & 2"DHWS-UP.
5. 3/4"DHWR-UP.
6. PROVIDE AND INSTALL DOMESTIC HOT WATER RETURN
BALANCING VALVE ASSEMBLY. REFER TO DETAIL ON
PLUMBING DRAWING P-001. HOT WATER RETURN CIRCUITS
SHALL BE TESTED AND BALANCED BY A THIRD PARTY
COMPANY THAT SPECIALIZES IN SUCH SERVICES.
MATCH LINE A
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
M
L.8
L
K.8
K
J.8
J.5
I
H.8
H.7
H.6
M.8
H.6A
P-401
P-433
P-401
P-101
P-433
P-433
P-433
P-609
P-101
P-101
P-401P-401
P-524
P-401
P-433
P-433
P-433
P-433
P-433
P-401
P-114 P-401
P-101
P-433
P-433
P-433
P-101 P-401
P-433
P-433
1/
4" D
H W
S 2"
D C
W S
1/
4" D
H W
S 2"
D C
W S
1" D
H W
S 2"
D C
W S
1" D
H W
S 2"
D C
W S
3/4" DHWS
1 1/2" DCWS
3/4" DHWS
1/2" DCWS
3/4" DHWR
3/4" DHWR
3/ 4"
D H
W R
3/4" DHWR
3/ 4"
D H
W R
3/ 4"
D H
W R
3/ 4"
D H
W R
1/
4" D
H W
S 2"
D C
W S
1/
4" D
H W
S 2"
D C
W S
1" DHWS
2" DCWS
3/ 4"
D H
W S
1/
2" D
C W
S 1"
D H
W S
2" D
C W
S 3/
4" D
H W
S 1/
2" D
C W
S
3/ 4"
D H
W S
3/ 4"
D C
W S
1" D
H W
S 1"
D C
W S
1" D
H W
S 1"
D C
W S
1/
4" D
H W
S
1/ 4"
D C
W S
1/
4" D
H W
S 2"
D C
W S
1 1/4" DCWS
DATA
ELECTRICAL
BREAKOUT
BREAKROOM
PACT WORKROOM
STAFF CORRIDOR
2C02
TEAMLET 3
STAFF TOILET
STAFF TOILET
M E
D R
O O
M
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
P A
T
IE
N T
T O
IL
E
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
SHARED MEDICAL
APPOINTMENT ROOM
STORAGE
WAITING / CORRIDOR
2C00
PROSTH. STORAGE
W O
M E
N 'S
H E
A L
T H
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
EXAM/CONSULT
PATIENT TOILET
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
UTILITY
TOILET
1/ 2"
O X
1/2" OX
1/ 2"
O X
P-528
VB-1
EXAM
EXAM
EXAM
EXAM
STAFF ALCOVE
EXAM
EXAM
EXAM
EXAM
STAFF
STAFF
STAFF
STAFF
EXAM
EXAM
EXAM
EXAM
STAFF ALCOVE
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
ELECTRICAL
CONFERENCE
ALCOVE
STAIR
2805 WAITING AREA
CHECK IN /
CHECK OUT
LOBBY
ELEVATOR
80-P3
ELEVATOR
80-P4ELEVATOR
EQUIP.
TOILET
TOILET
TOILET
TOILET
CORRIDOR
EXAM
EXAM
WOMEN'S EXAM
STAFF TOILET
STAFF LOUNGE
STAFF
CORRIDOR
H.A.C.
DATA
SOILED UTILITY
C O
R R
ID
O
R
BARIATRIC /
TREATMENT
C O
R R
ID
O
R
C O
R R
ID
O
R
EXAM
CLEAN UTILITY
P-812
P-812
5 5
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PP-102
SECOND FLOOR PRESSURE PIPING
PLAN - AREA A
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
SCALE: 1/8" = 1'-0"
SECOND FLOOR PRESSURE PIPING
PLAN - AREA A
A. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT
TO BE SCALED. FIELD VERIFY ALL DIMENSIONS, PIPE SIZES,
AND INVERTS. REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS AND LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
C. ALL DOMESTIC HOT WATER SUPPLY AND DOMESTIC HOT
WATER RETURN PIPING SHALL BE INSULATED, IN CEILINGS,
PIPE CHASES, AND IN WALLS.
1. PROVIDE AND INSTALL DOMESTIC HOT WATER RETURN
BALANCING VALVE ASSEMBLY. REFER TO DETAIL ON
PLUMBING DRAWING P-001. HOT WATER RETURN CIRCUITS
SHALL BE TESTED AND BALANCED BY A THIRD PARTY
COMPANY THAT SPECIALIZES IN SUCH SERVICES.
2. PROVIDE AND INSTALL INLET/OUTLET STATION. 1/2" OXYGEN
DOWN TO INLET/OUTLET STATION. MOUNT CENTERLINE OF
OUTLET/INLET ROUGH-IN BOX AT 54-INCHES ABOVE
FINISHED FLOOR.
3. 3/4"DCWS-UP.
4. MEDICAL GAS ALARM PANEL. MOUNT ALARM PANEL AT 54"
ABOVE FINISHED FLOOR LEVEL. ROUTE ALL CABLES IN 3/4"
EMT CONDUIT.
5. SHUT-OFF VALVE(S) TYPICAL.
MATCH LINE A
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
2" DCWS
1 1/4" DHWS
2" DCWS
1 1/2" DHWS
2 1/2" DCWS
1 1/2" DHWS
2" D
H W
S
1/ 2"
D C
W S
1/
2" D
H W
S
1/ 2"
D C
W S
1 1/2" DHWS
2 1/2" DCWS
1/
4" D
H W
S 2"
D C
W S
2" D
C W
S 3/
4" D
H W
S 1/
2" D
C W
S
1/
4" D
H W
S 2"
D C
W S
1" D
H W
S 1"
D C
W S
3/4" DHWS
1/2" DCWS
(E
1" M
V (E
3/
4" M
A (E
3/
4" O
X
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
P-401
P-433
P-433
P-401
P-101
P-433
P-433
P-433
P-433 P-401
P-114
P-401
P-433
P-101 P-401
P-433
P-433
P-433
P-401
P-101
P-433
P-433
P-433
P-433
P-401
P-433
P-401 P-114
P-433
P-433
P-433
P-401
P-433
P-401
P-101
P-609
P-101
P-401
P-524
P-812
P-812
LOCKER NICHE
MED ROOM
STAFF TLT.
BREAKROOM
PACT WORKROOM
LOCKER NICHE
LOCKER NICHE
PACT WORKROOM
BREAKOUT
BREAKOUT
P A
T
IE
N T
C O
R R
ID
O
R
C
TEAMLET 1
WOMEN'S HEALTH
P A
T
IE
N T
T O
IL
E
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
PATIENT CORRIDOR
2C06
EXAM/CONSULT
HAC
2S04
P A
T
IE
N T
C O
R R
ID
O
R
C
EXAM/CONSULT
SHARED MEDICAL
APPOINTMENT ROOM
W O
M E
N 'S
H E
A L
T H
WOMENS TOILET
2909A
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
STAFF CORRIDOR
2C09
E X
A M
/C O
N S
U L
T
EXAM/CONSULT
E X
A M
/C O
N S
U L
T
TEAMLET 2
PATIENT TLT
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
E X
A M
/C O
N S
U L
T
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
STAFF TLT.
MED ROOM
WOMENS TOILET
2916A
P-433 P-433 P-433
EXAM/CONSULT
EXAM/CONSULT
EXAM/CONSULT
3/4" DHWR
3/ 4"
D H
W R
P-433P-433
P-502
P-528
TELE-RETINAL
3/ 4"
D H
W S
1" D
H W
S
1 1/2" DCWS
2" DCWS
1" DHWS
1 1/4" DHWS
2" D
C W
S
1/ 4"
D H
W S
1" DHWS
1" DCWS3/4" DCWS
3/4" DHWS
1/
4" D
H W
S
1/ 4"
D C
W S
1 1/4" DCWS
2" DCWS
3/4" DCWS
2" DCWS
3/4" DHWS
1" DHWS
1" D
H W
S
1/ 4"
D H
W S
2" D
C W
S
1 1/2" DHWS
2 1/2" DCWS
2 1/2" DCWS
1 1/2" DHWS
1 1/2" DHWS
2 1/2" DCWS1 1/2" DHWS
2 1/2" DCWS
1/
2" D
H W
S
1/ 2"
D C
W S
1 1/2" DHWS
2" DCWS
1 1/4" DHWS
2" DCWS
3/4" DHWR
1/ 2"
O X
1/2" OX
1/ 2"
O X
1/2" OX
1/ 2"
O X
1" D
C W
S 1"
D H
W S
1/ 2"
O X
1/2" OX
(E) 1/2" OX 1/2" OX
3/4" DHWR
3/ 4"
D H
W R
3/4" DHWR
3/ 4"
D H
W R
3/ 4"
D H
W R
P-528
P-528
P-812
BFP-1
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
VB-1
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PP-103
SECOND FLOOR PRESSURE PIPING
PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
SCALE: 1/8" = 1'-0"
SECOND FLOOR PRESSURE PIPING
PLAN - AREA B
A. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT
TO BE SCALED. FIELD VERIFY ALL DIMENSIONS, PIPE SIZES,
AND INVERTS. REFER TO ARCHITECTURAL DRAWINGS FOR
DIMENSIONS AND LOCATIONS OF ALL PLUMBING FIXTURES
AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
C. ALL DOMESTIC HOT WATER SUPPLY AND DOMESTIC HOT
WATER RETURN PIPING SHALL BE INSULATED, IN CEILINGS,
PIPE CHASES, AND IN WALLS.
1. PROVIDE AND INSTALL…