Part7-00 DRAWINGS.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77624R0025
About this file
This document provides details on a federal solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation, numbered 36C77624R0025, is for the expansion and renovation of Clinics Building 80 and seeks to award a contract for construction services. Key information includes the solicitation number, agency and opportunity type listed. No further specifics on required products, services, response dates or other salient details are provided in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77624R0025 0006.docx | DOCX document | |
| Amendment 06 Att.zip | ZIP file | |
| 36C77624R0025 0005.docx | DOCX document | |
| Amendment 04 Att.zip | ZIP file | |
| 36C77624R0025 0004.docx | DOCX document | |
| 36C77624R0025 0003.docx | DOCX document | |
| 36C77624R0025 0002.docx | DOCX document | |
| 36C77624R0025 0001.docx | DOCX document | |
| S04 - Site Visit Mtg Min - RFP 2-13-2024.doc | DOC document | |
| 678-328 Bid Walk Sign In Sheet.pdf | ||
| tucson b80 pre-bid presentation rev1.pdf | ||
| Part4-00 DRAWINGS.pdf | ||
| Part6-00 DRAWINGS.pdf | ||
| DBA WD AZ20240040 01.19.2024.pdf | ||
| SPECIAL NOTE - BID TAXES - AFTER FAR 52.229-3.docx | DOCX document | |
| Site Visit SITE MAP Parking Location1.pdf | ||
| Part5-00 DRAWINGS.pdf | ||
| PPQ.docx | DOCX document | |
| SPEC VOL I.pdf | ||
| Part3-00 DRAWINGS.pdf | ||
| 36C77624R0025_1.docx | DOCX document | |
| SPEC VOL II.pdf | ||
| Part1-00 DRAWINGS.pdf | ||
| Part8-00 DRAWINGS.pdf | ||
| Brand Name JA.pdf | ||
| Limitations on Subcontracting - Construction.docx | DOCX document | |
| Part2-00 DRAWINGS.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE: NONE
SCALE: NONE
T
SCALE: NONE
PLUMBING VALVE SYMBOLS
DOMESTIC COLD WATER SUPPLY
DOMESTIC HOT WATER SUPPLY
DOMESTIC HOT WATER RETURN
MEDICAL AIR
OXYGEN
MEDICAL VACUUM
DRAIN
VENT, SANITARY
SANITARY SEWER
STORM WATER
CHECK VALVE
BALL VALVE
TEST PLUG
BALANCING VALVE
VALVE ON RISER
PIPE REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
WATER HAMMER ARRESTOR
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
HOSE BIBB
NON-FREEZE WALL HYDRANT
FLOOR DRAIN
HUB DRAIN
PLUGGED TEE
WALL CLEANOUT
PUMP
NEW WORK CONNECTION
LIMIT OF DEMOLITION
LOCKED OPEN IN LINE VALVE
LOCKED CLOSED IN LINE VALVE
LOCAL ALARM PANEL
VALVE BOX RECESSED
PRESSURE AND VACUUM
TRANSDUCER SWITCH
MAIN LINE GAUGE
MEDICAL INLET/OUTLET DISS TYPE
THERMOSTATIC BALANCING VALVE WITH INTEGRAL CHECK VALVE
AND UNION. CONTRACTOR SHALL PROVIDE THERMOSTATIC
BALANCING VALVE. MINIMUM SIZE SHALL BE 3/4".
ISOLATION VALVE. (BALL VALVE)
UNION.
PETES PLUG.
DIGITAL THERMOMETER.
PLUGGED 3/4" FIP ADAPTER FOR FUTURE BUILDING MANAGEMENT
SYSTEM SENSOR CONNECTION. SEE THERMOWELL AND
APPARATUS DETAIL THIS SHEET.
REDUCER FOR LINE SIZE ADJUSTMENT. SEE DETAIL ON THIS SHEET.
REDUCER FOR LINE SIZE ADJUSTMENT (IF REQUIRED).
(BALANCING VALVE ASSEMBLY DETAIL ONLY)
FITTING REDUCER
PLUGGED 3/4" FIP ADAPTER FOR FUTURE (NIC) CONTROL
CONTRACTOR SUPPLIED THERMOWELL AND SENSOR
(INSTALLED
BY PLUMBING CONTRACTOR).
3/4" FIP ADAPTOR FOR THERMOWELL INSERTION.
THERMOWELL AND DIGITAL THERMOMETER AS SPECIFIED.
REDUCER AS NEEDED FOR ALL PIPE SIZES 1/2" THROUGH 1 1/2".
2" X 3/4" TEE.
(THERMOWELL AND APPARATUS DETAIL ONLY)
5 6
FOOTER
CONCRETE
COLUMN
SANITARY OR
STORM PIPE
SANITARY OR
STORM PIPE
NOTES:
NOTES:
WATER RETURN BALANCING
VALVE ASSEMBLY DETAIL
THERMOWELL AND APPARATUS DETAIL
PIPE AND FOOTER DETAIL
778 1
PLUMBING PIPING SYMBOLS
GENERAL PLUMBING SYMBOLS
SPECIALITIES PLUMBING SYMBOLS
SDSD
MAMA
MVMV
OXOX
SSSS
DD
PLUMBING ABBREVIATIONS
CONTRACTOR GENERAL NOTES
LEGEND
A. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND ARE NOT TO BE
SCALED. FIELD VERIFY ALL DIMENSIONS, PIPE SIZES, AND INVERTS.
REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND
LOCATIONS OF ALL PLUMBING FIXTURES AND EQUIPMENT.
B. COORDINATE PIPE ROUTING WITH DUCT ROUTING, EQUIPMENT
LOCATIONS, ELECTRICAL INSTALLATIONS, AND BUILDING STRUCTURAL
MEMBERS. OFFSET PIPING WHERE REQUIRED TO AVOID CONFLICTS.
AVOID PENETRATING ANY MAIN STRUCTURAL BEAM. NOTIFY COR OF ANY
CONFLICTS.
C. CONTRACTOR SHALL REMOVE AND REPAIR/RESTORE ALL
PENETRATIONS, HOLES, VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS,
INDENTS, CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS, MARKS,
RECESSES, BAYS, INLETS, AND ANY COVES IN FLOORS, CEILINGS, AND
WALLS AND/OR SLABS AFFECTED BY PLUMBING MODIFICATIONS OR
WHICH ARE DISCOVERED DURING DEMOLITION BACK TO THE ORIGINAL
BASE MATERIAL OR BETTER COMPLYING WITH WATER TIGHT OR FIRE
RETARDANT CONDITIONS.REPAIR SURFACES TO MATCH EXISTING
UNLESS OTHERWISE NOTED ON ARCHITECTURAL DRAWINGS.
D. WHERE CHASES ARE NOT PRESENT, CONNECT VENT PIPING TOGETHER
IN CEILING SPACE IF POSSIBLE TO AVOID CUTTING THROUGH STUDS.
E. PRIOR TO PERFORMING ANY PLUMBING WORK OR PURCHASING ANY
MATERIALS VERIFY EXACT LOCATION, ROUTING, AND PIPE SIZES, ETC.
OF ALL EXISTING WASTE, DRAIN, VENT, DOMESTIC WATER SUPPLY AND
RETURN PIPING.
F. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL PLUMBING
CODE, LOCAL CODE, BOTTOM OF STACKS, AND WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45°.
G. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A MINIMUM OF TWO
PERCENT, ONE-QUARTER INCH PER FOOT. NEW 3" AND 4" SANITARY
SEWER PIPING SHALL BE SLOPED A MINIMUM OF ONE PERCENT,
ONE-EIGHTH INCH PER FOOT.
AC ABOVE CEILING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
ASHRAE AMERICAN SOCIETY OF
HEATING,
REFRIGERATION,
AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY
OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY
OF
PLUMBING ENGINEERS
ASR AUTOMATIC
RISER
BF BELOW FLOOR
CFM CUBIC FEET PER
COTG CLEANOUT TO GRADE
MINUTE
DCWS DOMESTIC COLD
DFU DRAINAGE FIXTURE
WATER SUPPLY
UNITS
DHWR DOMESTIC HOT
WATER RETURN
DHWS DOMESTIC HOT
WATER SUPPLY
DN DOWN
EL ELEVATION
DWG DRAWING
ET EXPANSION TANK
EWH ELECTRIC WATER
HEATER
FCO FLOOR CLEANOUT
F FAHRENHEIT
FD FLOOR DRAIN
(HOSE) CONNECTION
FDC FIRE DEPARTMENT
FS FLOW SWITCH
FU FIXTURE UNITS
A/E ARCHITECT / ENGINEER
AG AIR GAP
GAL GALLON
GPM GALLONS PER MINUTE
GT GREASE TRAP
H&CW HOT AND COLD
WATER
HB HOSE BIB
HD HUB DRAIN
HP HORSEPOWER
HYD HYDRANT
INV.EL INVERT ELEVATION
INV INVERT
IPC INTERNATIONAL PLUMBING
CODE
IRW IRRIGATION WATER
KW KILOWATT
KWH KILOWATT-HOUR
AP ACCESS PANEL
SPRINKLER
BG BELOW GRADE
MA MEDICAL AIR
MBH 1000 BTUH
MED MEDICAL
MV MEDICAL VACUUM
NC NORMALLY CLOSED
NTS NOT TO SCALE
OX OXYGEN
OSCO OUTSIDE CLEANOUT
PG PRESSURE GAGE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH
GAGE
RP RECIRULATION PUMP
SS SANITARY SEWER
SCFM STANDARD CUBIC
FOOT/MINUTE
TYP TYPICAL
V VENT
VP VACUUM PUMP
VE VENT EXHAUST
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WCO WALL CLEANOUT
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WSFU WATER SUPPLY FIXTURE
UNITS
YCO YARD CLEANOUT
DS DOWNSPOUT
RL RAIN WATER LEADER
BF BELOW FLOOR
BG BELOW GRADE
BFP BACKFLOW PREVENTER
NO NORMALLY OPENCENT CENTRIFUGAL
ENT ENTERING
EWT ENTERING WATER
TEMPERATURE
LWT LEAVING WATER
TEMPERATURE
CD CONDENSATE DRAIN
FIP FEMALE IRON PIPE
P.I.D. PLUMBING AND DRAINAGE
QTY QUANTITY
SD STORM DRAINAGE
SAN SANITARY SEWER
INSTITUTECT CURRENT TEMPERATURE
H. ALL WORK ON THE FIRST FLOOR SHALL BE DONE AFTER HOURS.
LPM LITERS PER MINUTE
GCO GRADE CLEANOUTS
GPH GALLONS PER HOUR
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-P-001
ABBREVIATIONS, GENERAL NOTES,
LEGEND, AND DETAILS
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
2 2
4(E
2" V
(D) 2" SS
(E) 2" SS
(D
2" S
S
(D) 2" SS
(E) 6" SD
(E
6" S
D
(D) 3" SD (D) 3" SD
(E
6" S
D
(E) 2" V
(E
2" V
(E
2" V
(E
2" V
(D) 2" SS
(D) 3" V
(E
2" V
(E
4" O
D (E
4"
O D
(D
2" S
S
(E
2" V
(E) 2" SS
(E
2" S
S
(E
2" V
(D
2" S
S (E
2"
S S
(E
2" V
(E
2" V
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E) 3" SD (E) 3" SD
5 5
(E
2" V
(E
2" V
(E) 3" SD
(D) 2" SS
(E) 4" SS
(E) 4" SS
(D
2" S
S
(E
3" V
(E) 3" V(E) 2" V
(E) 2" V(D) 2" SS
(D
2" S
S
(E ) 4
" S S
(E) 3" V
(D
2" S
S (D
2"
S S
(D
2" S
S (E
3"
S D
(E
2" V
(E
6" S
D
(E
3" V
(D
2" S
S (D
2"
S S
(E
2" V
(E
2" V
(E) 2" V
(E
2" V
(E) 2" V
(E) 2" V
(E
2" V
(D) 2" SS
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H.A.C.
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
1224EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C L
E A
N S
U P
P L
Y
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
WOMEN'S
HEALTH TOILET
1239A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
1211 WOMEN'S
HEALTH TOILET
1213A
(E)
FCO
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-101
FIRST FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. ALL EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED
PIPING SERVING FIRST FLOOR TO REMAIN.
B. PRIOR TO PERFORMING ANY WORK OR PURCHASING ANY
MATERIALS, THE CONTRACTOR SHALL VERIFY LOCATION OF
EXISTING PLUMBING PIPING.
C. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
D. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
E. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN
FLOORS AND CEILINGS WHICH ARE DISCOVERED DURING
DEMOLITION BACK TO THE ORIGINAL BASE MATERIAL OR
BETTER COMPLYING WITH WATER TIGHT AND/OR FIRE
RETARDANT CONDITIONS. REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION ON THE FLOOR
AND CEILING REPAIR.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
SCALE: 1/8" = 1'-0"
FIRST FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B
1. LIMITS OF DEMOLITION.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. LIMIT OF DEMOLITION. REMOVE AND DISCARD PIPING TO
BELOW SLAB. CAP PIPING BELOW FLOOR AND REPAIR FLOOR
TO MATCH EXISTING FINISH.
4. LIMIT OF DEMOLITION. CUT EXISTING VENT PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW VENT PIPING DURING NEW
WORK.
5. LIMIT OF DEMOLITION. CUT EXISTING SS PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SS PIPING DURING NEW
WORK.
6. LIMIT OF DEMOLITION. CUT EXISTING SD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SD PIPING DURING NEW
WORK.
7. LIMIT OF DEMOLITION. CUT EXISTING OD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW OD PIPING DURING NEW
WORK.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
2 2
(E
2" V
(D) 2" SS
(E) 2" SS
(E
2" S
S
(E) 2" SS
(E) 6" SD
(E
6" S
D
(D) 3" SD (D) 3" SD
(E
6" S
D
(E) 2" V
(E
2" V
(E
2" V
(E
2" V
(E) 2" SS
(E) 3" V
(E
2" V
(E
4" O
D (E
4"
O D
(E
2" S
S
(E
2" V
(E) 2" SS
(E
2" S
S
(E
2" V
(D
2" S
S (E
2"
S S
(E
2" V
(E
2" V
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E
6" O
D (E
6"
O D
(E) 3" SD (E) 3" SD
5 5
(E
2" V
(E
2" V
(E) 3" SD
(D) 2" SS
(E) 4" SS
(E) 4" SS
(D
2" S
S
(E
3" V
(E) 3" V(E) 2" V
(E) 2" V(D) 2" SS
(D
2" S
S
(E ) 4
" S S
(E) 3" V
(D
2" S
S (D
2"
S S
(D
2" S
S (E
3"
S D
(E
2" V
(E
6" S
D
(E
3" V
(D
2" S
S (D
2"
S S
(E
2" V
(E
2" V
(E) 2" V
(E
2" V
(E) 2" V
(E) 2" V
(E
2" V
(E) 2" SS
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H.A.C.
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
1224EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
WOMEN'S
HEALTH TOILET
1239A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
WOMEN'S
HEALTH TOILET
1213A
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-101A
FIRST FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B - ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. ALL EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED
PIPING SERVING FIRST FLOOR TO REMAIN.
B. PRIOR TO PERFORMING ANY WORK OR PURCHASING ANY
MATERIALS, THE CONTRACTOR SHALL VERIFY LOCATION OF
EXISTING PLUMBING PIPING.
C. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
D. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
E. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN
FLOORS AND CEILINGS WHICH ARE DISCOVERED DURING
DEMOLITION BACK TO THE ORIGINAL BASE MATERIAL OR
BETTER COMPLYING WITH WATER TIGHT AND/OR FIRE
RETARDANT CONDITIONS. REFER TO ARCHITECTURAL
DRAWINGS FOR ADDITIONAL INFORMATION ON THE FLOOR
AND CEILING REPAIR.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
SCALE: 1/8" = 1'-0"
FIRST FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B - ALT. #1
1. NOTE NOT USED.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. LIMIT OF DEMOLITION. REMOVE AND DISCARD PIPING TO
BELOW SLAB. CAP PIPING BELOW FLOOR AND REPAIR FLOOR
TO MATCH EXISTING FINISH.
4. LIMIT OF DEMOLITION. CUT EXISTING VENT PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW VENT PIPING DURING NEW
WORK.
5. LIMIT OF DEMOLITION. CUT EXISTING SS PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SS PIPING DURING NEW
WORK.
6. LIMIT OF DEMOLITION. CUT EXISTING SD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SD PIPING DURING NEW
WORK.
7. LIMIT OF DEMOLITION. CUT EXISTING OD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW OD PIPING DURING NEW
WORK.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
(E) 3/4" MV
(E) 1/2" MA
(E) 1/2" OX
(E) 3/4" CA
(E) 3/4" MV (E) 1/2" MA
(E) 1/2" OX
2 4
3 2
1 1 1
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
2 4
34 4
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H .A
.C
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
W O
M E
N 'S
H E
A L
T H
T O
IL
E
T
A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
W O
M E
N 'S
H E
A L
T H
T O
IL
E
T
A
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-102
FIRST FLOOR PRESSURE PIPING
DEMOLITION PLAN - AREA B
SCALE: 1/8" = 1'-0"
FIRST FLOOR PRESSURE PIPING
DEMOLITION PIPING PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
1. EXISTING PLUMBING PIPING ABOVE CEILING TO REMAIN.
2. LIMIT OF DEMOLITION. CUT AND CAP EXISTING DOMESTIC
COLD WATER PIPING AT APPROXIMATE LOCATION INDICATED.
3. LIMIT OF DEMOLITION. CUT AND CAP EXISTING DOMESTIC HOT
WATER PIPING AT APPROXIMATE LOCATION INDICATED.
4. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
A. ALL EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED
PIPING SERVING FIRST FLOOR TO REMAIN.
B. DEMOLITION SHALL INCLUDE ALL PIPE, FITTINGS, VALVES,
PIPE SUPPORTS, AND HANGERS OF PIPING BEING REMOVED.
C. ABANDONED OR UNUSED PIPING AND/OR RISERS SHALL BE
REMOVED.
D. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
E. DOMESTIC HOT AND COLD WATER PIPING SERVE BOTH
FIRST AND SECOND FLOOR PLUMBING FIXTURES.
CONTRACTOR SHALL COORDINATE ALL SERVICE
INTERUPTIONS WITH COR.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
(E) 3/4" MV
(E) 1/2" MA
(E) 1/2" OX
(E) 3/4" CA
(E) 3/4" MV (E) 1/2" MA
(E) 1/2" OX
2 4
3 2
1 1 1
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
STAFF TOILET
WOMEN'S
HEALTH TOILET
1245A
EXAM/
CONSULT
PACT
WORKROOM
BREAKOUT
WORKROOM
1201D
BREAKOUT
WORKROOM
1201E
PACT
WORKROOM
1202D
COMM
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
CONSULT
CONSULT
H .A
.C
PATIENT
TOILET
1208A
CONSULT
CONSULT
SUB-WAIT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1216A
PACT TEAMLET
AREA B3
C O
R R
ID
O
R
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
STAFF TOILET
W O
M E
N 'S
H E
A L
T H
T O
IL
E
T
A
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PATIENT
TOILET
1234A
PACT TEAMLET
AREA B2
EXAM/
CONSULT
1226EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
C O
R R
ID
O
R
CLEAN SUPPLY
UTILITY
WOMEN'S
HEALTH
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
EXAM/
CONSULT
PACT TEAMLET
AREA B1
PATIENT
TOILET
1248A
STAFF TOILET
1201C
STAFF TOILET
1201B
STAFF BREAK
ROOM
SHARED
MEDICAL
APPOINTMENT
PATIENT
CIRCULATION
STAFF
CIRCULATION
1290B
STAFF TOILET
W O
M E
N 'S
H E
A L
T H
T O
IL
E
T
A
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-102A
FIRST FLOOR PRESSURE PIPING
DEMOLITION PLAN - AREA B - ALT. #1
SCALE: 1/8" = 1'-0"
FIRST FLOOR PRESSURE PIPING
DEMOLITION PIPING PLAN - AREA B -
ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
1. EXISTING PLUMBING PIPING ABOVE CEILING TO REMAIN.
2. LIMIT OF DEMOLITION. CUT AND CAP EXISTING DOMESTIC
COLD WATER PIPING AT APPROXIMATE LOCATION INDICATED.
3. LIMIT OF DEMOLITION. CUT AND CAP EXISTING DOMESTIC HOT
WATER PIPING AT APPROXIMATE LOCATION INDICATED.
4. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
A. ALL EXISTING PLUMBING FIXTURES AND ALL ASSOCIATED
PIPING SERVING FIRST FLOOR TO REMAIN.
B. DEMOLITION SHALL INCLUDE ALL PIPE, FITTINGS, VALVES,
PIPE SUPPORTS, AND HANGERS OF PIPING BEING REMOVED.
C. ABANDONED OR UNUSED PIPING AND/OR RISERS SHALL BE
REMOVED.
D. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
E. DOMESTIC HOT AND COLD WATER PIPING SERVE BOTH
FIRST AND SECOND FLOOR PLUMBING FIXTURES.
CONTRACTOR SHALL COORDINATE ALL SERVICE
INTERUPTIONS WITH COR.
F. ALL WORK ON FIRST FLOOR SHALL BE DONE AFTER HOURS.
MATCH LINE A
MATCH LINE A
M .G
FEC
FEC
FEC
FEC
FEC
FEC
DN
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
5 5
7 9
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
(E) 4" OD
(E) 4" SD
(E
3" V
(E) 4" OD
(E) 4" SD
(E) 4" OD(E) 4" OD
(D) 2" V (D) 2" V
(D
3" V
(D
6" S
D
(D
3" V
(E
6" O
D (E
6"
O D
(E
6" O
D
(E) 2" V(E) 2" V
(E
2" V
(E
2" V
(D) 2" V
(D
2" V
(D) 1 1/2" V (D) 1 1/2" V
(D
3" V
(D) 2" V
(D
2" V
(D) 1 1/2" V
(E
2" V
(E
6" O
D
(D
1/
2" V
(D
2" V
(D
2" V
(D
2" V
(D
2" V
(D
1/
2" S
S (D
1/ 2"
S S
(D) 1 1/2" SS
(D
2" V
(D
2" V
(D) 1 1/2" V
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
EXAM
TREATMENT
DIETITIAN
CONSULT
CORR
PHARM
CONSULT
PHARM
CONSULT
SW CONSULT
SW CONSULT
PHARM
CONSULT
NURSE
CLEAN SUPPLY
CORR
EXAM
EXAM
CORR
SOILED UTIL
2382 CORR
LOUNGE
PHARM
CONSULT
EXAM
CORR
CORR
M TLT
WAITING
RECEPTION
EXAM
EXAM
NURSE
EXAM
EXAM
RN EXAM
RN EXAM
PR OFFICE
CONFERENCE /
CLASSROOM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
CORR
PR OFFICE
PR OFFICE
CORR
EXT BALCONY
EXAM
EXAM
EXAM
ST TLT
EXAM
CORR
EXAM
PT TLT
ISOL EXAM
EXAM
2253EXAM
TREATMENT
DIETITION
CONSULT
CORR
CORR
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-103
SECOND FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B
SCALE: 1/8" = 1'-0"
SECOND FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
B. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
C. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN FLOORS
AND CEILINGS WHICH ARE DISCOVERED DURING DEMOLITION
BACK TO THE ORIGINAL BASE MATERIAL OR BETTER
COMPLYING WITH WATER TIGHT AND/OR FIRE RETARDANT
CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION ON THE FLOOR AND CEILING
REPAIR.
1. LIMITS OF DEMOLITION.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. REMOVE AND DISCARD EXISTING WATER CLOSET AND ALL
ASSOCIATED PIPING.
4. REMOVE AND DISCARD EXISTING WALL HUNG LAVATORY,
FIXTURE SUPPORT, TAILPIECE, TRAP. AND ALL ASSOCIATED
PIPING.
5. REMOVE AND DISCARD EXISTING SINK, TAILPIECE, TRAP. AND
ALL ASSOCIATED PIPING.
6. REMOVE AND DISCARD EXISTING DOUBLE COMPARTMENT
SINK, TAILPIECE, TRAP. AND ALL ASSOCIATED PIPING.
7. REMOVE AND DISCARD EXISTING CLINICAL SINK, FLUSH
VALVE, FAUCET, AND ALL ASSOCIATED PIPING.
8. REMOVE AND DISCARD EXISTING MOP BASIN, FAUCET, AND
ALL ASSOCIATED PIPING.
9. REMOVE AND DISCARD EXISTING BI-LEVEL ELECTRIC WATER
COOLER, AND ALL ASSOCIATED PIPING.
10. REMOVE AND DISCARD EXISTING FLOOR DRAIN, TRAP, AND
ALL ASSOCIATED PIPING.
11. LIMIT OF DEMOLITION. CUT AND PLUG EXISTING VENT PIPING
ABOVE CEILING AT APPROXIMATE LOCATION INDICATED.
PIPING SHALL BE CONNECTED TO VENT PIPING DURING NEW
WORK.
12. REMOVE AND DISCARD EXISTING URINAL, CARRIER, AND ALL
ASSOCIATED PIPING.
13. LIMIT OF DEMOLITION. CUT AND PLUG EXISTING VENT PIPING
ABOVE CEILING AT APPROXIMATE LOCATION INDICATED.
PIPING SHALL BE FOR FUTURE USE.
14. LIMIT OF DEMOLITION. CUT EXISTING OD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW OD PIPING DURING NEW
WORK.
15. LIMIT OF DEMOLITION. CUT EXISTING SD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SD PIPING DURING NEW
WORK.
16. REMOVE AND DISCARD EXISTING AREA DRAIN, TRAP, AND ALL
ASSOCIATED PIPING.
MATCH LINE A
M .G
FEC
FEC
FEC
FEC
FEC
FEC
DN
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
5 5
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
(E) 4" OD
(E) 4" SD
(E
3" V
(E) 4" OD
(E) 4" SD
(E) 4" OD(E) 4" OD
(E) 2" V (E) 2" V
(E
3" V
(D
6" S
D
(D
3" V
(E
6" O
D (E
6"
O D
(E
6" O
D
(E) 2" V(E) 2" V
(E
2" V
(E
2" V
(E) 2" V
(E
2" V
(E) 1 1/2" V (E) 1 1/2" V
(E
3" V
(D) 2" V
(D
2" V
(D) 1 1/2" V
(E
2" V
(E
6" O
D
(D
1/
2" V
(D
2" V
(D
2" V
(D
2" V
(D
2" V
(D
1/
2" S
S (D
1/ 2"
S S
(D) 1 1/2" SS
(D
2" V
(D
2" V
(D) 1 1/2" V
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
EXAM
TREATMENT
DIETITIAN
CONSULT
CORR
PHARM
CONSULT
PHARM
CONSULT
SW CONSULT
SW CONSULT
PHARM
CONSULT
NURSE
CLEAN SUPPLY
CORR
EXAM
EXAM
CORR
SOILED UTIL
CORR
LOUNGE
PHARM
CONSULT
EXAM
CORR
CORR
M TLT
WAITING
RECEPTION
EXAM
EXAM
NURSE
EXAM
EXAM
RN EXAM
RN EXAM
PR OFFICE
CONFERENCE /
CLASSROOM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
CORR
PR OFFICE
PR OFFICE
CORR
EXT BALCONY
EXAM
EXAM
EXAM
ST TLT
EXAM
CORR
EXAM
PT TLT
ISOL EXAM
EXAM
2253EXAM
TREATMENT
DIETITION
CONSULT
CORR
CORR
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-103A
SECOND FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B - ALT. #1
SCALE: 1/8" = 1'-0"
SECOND FLOOR GRAVITY PIPING
DEMOLITION PLAN - AREA B - ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
B. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
C. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN FLOORS
AND CEILINGS WHICH ARE DISCOVERED DURING DEMOLITION
BACK TO THE ORIGINAL BASE MATERIAL OR BETTER
COMPLYING WITH WATER TIGHT AND/OR FIRE RETARDANT
CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION ON THE FLOOR AND CEILING
REPAIR.
1. LIMITS OF DEMOLITION.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. REMOVE AND DISCARD EXISTING WATER CLOSET AND ALL
ASSOCIATED PIPING.
4. REMOVE AND DISCARD EXISTING WALL HUNG LAVATORY,
FIXTURE SUPPORT, TAILPIECE, TRAP. AND ALL ASSOCIATED
PIPING.
5. REMOVE AND DISCARD EXISTING SINK, TAILPIECE, TRAP. AND
ALL ASSOCIATED PIPING.
8. REMOVE AND DISCARD EXISTING MOP BASIN, FAUCET, AND
ALL ASSOCIATED PIPING.
9. REMOVE AND DISCARD EXISTING BI-LEVEL ELECTRIC WATER
COOLER, AND ALL ASSOCIATED PIPING.
10. REMOVE AND DISCARD EXISTING FLOOR DRAIN, TRAP, AND
ALL ASSOCIATED PIPING.
11. LIMIT OF DEMOLITION. CUT AND PLUG EXISTING VENT PIPING
ABOVE CEILING AT APPROXIMATE LOCATION INDICATED.
PIPING SHALL BE CONNECTED TO VENT PIPING DURING NEW
WORK.
12. REMOVE AND DISCARD EXISTING URINAL, CARRIER, AND ALL
ASSOCIATED PIPING.
13. LIMIT OF DEMOLITION. CUT AND PLUG EXISTING VENT PIPING
ABOVE CEILING AT APPROXIMATE LOCATION INDICATED.
PIPING SHALL BE FOR FUTURE USE.
14. LIMIT OF DEMOLITION. CUT EXISTING OD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW OD PIPING DURING NEW
WORK.
15. LIMIT OF DEMOLITION. CUT EXISTING SD PIPING ABOVE
CEILING AT APPROXIMATE LOCATION INDICATED. PIPING
SHALL BE CONNECTED TO NEW SD PIPING DURING NEW
WORK.
16. REMOVE AND DISCARD EXISTING AREA DRAIN, TRAP, AND ALL
MATCH LINE A
M .G
FEC
FEC
FEC
FEC
FEC
FEC
DN
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
3 4
4 5
7 9 9
(D) 1/2" OX
(D) 1/2" MA
(D) 3/4" MV
(D) 1/2" OX
(D) 1/2" MA
(D) 3/4" MV
(D) 1/2" OX
(D) 1/2" MA
(D) 3/4" MV
(D) 1/2" OX
(D) 1/2" MA
(D) 3/4" MV
(D
1/ 2"
O X
(D
1/ 2"
M A
(D
3/ 4"
M V
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
EXAM
TREATMENT
DIETITIAN
CONSULT
CORR
PHARM
CONSULT
PHARM
CONSULT
SW CONSULT
SW CONSULT
PHARM
CONSULT
NURSE
CLEAN SUPPLY
CORR
EXAM
EXAM
CORR
SOILED UTIL
CORR
LOUNGE
PHARM
CONSULT
EXAM
CORR
CORR
M TLT
WAITING
RECEPTION
EXAM
EXAM
NURSE
EXAM
EXAM
RN EXAM
RN EXAM
PR OFFICE
CONFERENCE /
CLASSROOM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
CORR
PR OFFICE
PR OFFICE
CORR
EXT BALCONY
EXAM
EXAM
EXAM
2233ST TLT
EXAM
CORR
EXAM
PT TLT
ISOL EXAM
EXAM
EXAM
TREATMENT
DIETITION
CONSULT
CORR
CORR
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-104
SECOND FLOOR PRESSURE PIPING
DEMOLITION PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
B. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
C. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN FLOORS
AND CEILINGS WHICH ARE DISCOVERED DURING DEMOLITION
BACK TO THE ORIGINAL BASE MATERIAL OR BETTER
COMPLYING WITH WATER TIGHT AND/OR FIRE RETARDANT
CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION ON THE FLOOR AND CEILING
REPAIR.
D. DOMESTIC HOT AND COLD WATER PIPING FEED FIXTURES
FROM BELOW. REFER TO PLUMBING DRAING 80-PD102.
SCALE: 1/8" = 1'-0"
SECOND FLOOR PRESSURE PIPING
DEMOLITION PLAN - AREA B
1. EXISTING PLUMBING PIPING ABOVE CEILING TO REMAIN.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. REMOVE AND DISCARD EXISTING WATER CLOSET AND ALL
ASSOCIATED PIPING.
4. REMOVE AND DISCARD EXISTING WALL HUNG LAVATORY,
FIXTURE SUPPORT AND ALL ASSOCIATED PIPING.
5. REMOVE AND DISCARD EXISTING SINK AND ALL ASSOCIATED
PIPING.
6. REMOVE AND DISCARD EXISTING DOUBLE COMPARTMENT
SINK AND ALL ASSOCIATED PIPING.
7. REMOVE AND DISCARD EXISTING CLINICAL SINK, FLUSH
VALVE, FAUCET, AND ALL ASSOCIATED PIPING.
8. REMOVE AND DISCARD EXISTING MOP BASIN, FAUCET, AND
ALL ASSOCIATED PIPING.
9. REMOVE AND DISCARD EXISTING BI-LEVEL ELECTRIC WATER
COOLER, AND ALL ASSOCIATED PIPING.
10. REMOVE AND DISCARD EXISTING URINAL, FIXTURE SUPPORT,
FLUSH VALVE, AND ALL ASSOCIATED PIPING.
11. LIMIT OF DEMOLITION. CUT AND PLUG EXISTING MEDICAL AIR,
OXYGEN, AND MEDICAL VACUUM PIPING AT VALVE BOX.
12. REMOVE AND DISCARD EXISTING HOSE BIB AND ALL
MATCH LINE A
M .G
FEC
FEC
FEC
FEC
FEC
FEC
DN
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
3 4
4 5
(E) 1/2" OX
(E) 1/2" MA
(E) 3/4" MV
(E) 1/2" OX
(E) 1/2" MA
(E) 3/4" MV
(E) 1/2" OX
(E) 1/2" MA
(E) 3/4" MV
(E) 1/2" OX
(E) 1/2" MA
(E) 3/4" MV
(D
1/ 2"
O X
(D
1/ 2"
M A
(D
3/ 4"
M V
COMP OFFICE
W TLT
WAITING
M TLT
VEST
EXAM
CORR
EXAM
EXAM
EXAM
ALC
EXAM
NURSE
RECEPTION
CORR
EXAM
EXAM
EXAM
RN EXAM
RN EXAM
CORR
EXAM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
EQUIP STOR
CORR
CONFERENCE /
CLASSROOM
ST TLT
EXAM
EXAM
PT TLT
ISOL EXAM
EXAM
HAC
CORR
EXAM
TREATMENT
DIETITIAN
CONSULT
CORR
PHARM
CONSULT
PHARM
CONSULT
SW CONSULT
SW CONSULT
PHARM
CONSULT
NURSE
CLEAN SUPPLY
CORR
EXAM
EXAM
CORR
SOILED UTIL
CORR
LOUNGE
PHARM
CONSULT
EXAM
CORR
CORR
M TLT
WAITING
RECEPTION
EXAM
EXAM
NURSE
EXAM
EXAM
RN EXAM
RN EXAM
PR OFFICE
2236CONFERENCE /
CLASSROOM
PR OFFICE
PR OFFICE
PR OFFICE
PR OFFICE
CORR
PR OFFICE
PR OFFICE
CORR
EXT BALCONY
EXAM
EXAM
EXAM
2233ST TLT
EXAM
CORR
EXAM
PT TLT
ISOL EXAM
EXAM
EXAM
TREATMENT
DIETITION
CONSULT
CORR
CORR
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\
D o c u m e n ts
\8
T u c s o n E x p a n d a n d R e n o C lin ic s
D E
D U
C T
P
M a ri o n
.V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PD-104A
SECOND FLOOR PRESSURE PIPING
DEMOLITION PLAN - AREA B - ALT. #1
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
DEMO KEY NOTES#
GENERAL NOTES
A. DEMOLITION SHALL INCLUDE, PIPING, FITTINGS, PIPE
SUPPORTS,AND HANGERS OF PIPING BEING REMOVED.
B. ABANDONED OR UNUSED PIPING, FITTINGS, SUPPORTS, AND
HANGERS ABOVE CEILING SHALL BE REMOVED.
C. CONTRACTOR SHALL RESTORE ALL PENETRATIONS, HOLES,
VOIDS, HOLLOWS, DEPRESSIONS, DIPS, DENTS, INDENTS,
CAVITIES, CONCAVITIES, PITS, TROUGHS, DIMPLES, CLEFTS,
NICKS, NOTCHES, GROOVES, IMPRESSIONS, IMPRINTS,
MARKS, RECESSES, BAYS, INLETS, AND ANY COVES IN FLOORS
AND CEILINGS WHICH ARE DISCOVERED DURING DEMOLITION
BACK TO THE ORIGINAL BASE MATERIAL OR BETTER
COMPLYING WITH WATER TIGHT AND/OR FIRE RETARDANT
CONDITIONS. REFER TO ARCHITECTURAL DRAWINGS FOR
ADDITIONAL INFORMATION ON THE FLOOR AND CEILING
REPAIR.
D. DOMESTIC HOT AND COLD WATER PIPING FEED FIXTURES
FROM BELOW. REFER TO PLUMBING DRAING 80-PD102.
SCALE: 1/8" = 1'-0"
SECOND FLOOR PRESSURE PIPING
DEMOLITION PIPING PLAN - AREA B -
ALT. #1
1. EXISTING PLUMBING PIPING ABOVE CEILING TO REMAIN.
2. REMOVE AND DISCARD EXISTING PLUMBING PIPING BACK TO
LIMITS OF DEMOLITION.
3. REMOVE AND DISCARD EXISTING WATER CLOSET AND ALL
ASSOCIATED PIPING.
4. REMOVE AND DISCARD EXISTING WALL HUNG LAVATORY,
FIXTURE SUPPORT AND ALL ASSOCIATED PIPING.
5. REMOVE AND DISCARD EXISTING SINK AND ALL ASSOCIATED
PIPING.
8. REMOVE AND DISCARD EXISTING MOP BASIN, FAUCET, AND
ALL ASSOCIATED PIPING.
9. REMOVE AND DISCARD EXISTING BI-LEVEL ELECTRIC WATER
COOLER, AND ALL ASSOCIATED PIPING.
10. REMOVE AND DISCARD EXISTING URINAL, FIXTURE SUPPORT,
FLUSH VALVE, AND ALL ASSOCIATED PIPING.
11. REMOVE AND DISCARD EXISTING MEDICAL GAS AND VACUUM
PIPING, FITTINGS, AND HANGERS BACK TO LIMITS OF
DEMOLITION. CAP PIPING AT LIMITS OF DEMOLITION.
12. REMOVE AND DISCARD EXISTING HOSE BIB AND ALL
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
6" S
S
2" SS
4" SS
4" SS
4" SS
4" SS
2" SS
6" S
S 6"
S S
2" SS 8"
S
D
4" SD
6" S
D
6" SD
4" S
D
4" SD
10-42" BFF -48" BFF
10,376 SQFT
324 GPM
-24" BFF
3" SD
3" SD
3" SD
6" S
D 4"
S D
9.69.08.28.07.57.37.17.0
M
L.8
L
K.8
K
J.8
J.5
I
H.8
H.7
H.6
M.8
H.6A
3" S
D 8"
S D
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-101
FOUNDATION PIPING PLAN - AREA A
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
C. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
SCALE: 1/8" = 1'-0"
FOUNDATION PIPING PLAN - AREA A
1. 2"SS-UP.
2. 4"SS-UP.
3. 4"SS-UP TO CLEANOUT.
4. 4"SS-UP TO OUTSIDE CLEANOUT.
5. 3"SD-UP TO CANOPY STORM WATER.
6. 4"SD-UP.
7. 4"SD-UP TO CLEANOUT.
8. 4"SD-UP TO OUTSIDE CLEANOUT.
9. 6"SD-UP.
10. REFER TO CIVIL DRAWINGS FOR CONTINUATION OF PIPING.
11. TWO-WAY CLEANOUT TEE
12. SEE PIPE AND FOOTER DETAIL ON SHEET 80-P-001.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
9.69.08.28.07.57.37.17.0
I
H.8
H.7
H.6
H.4
H
G.5
G
F.5
F.2
F
E.5
E.2
E
H.6A
3" S
D 3"
S D
4 4
4" S
S
24" BFF
(E
6" S
D
(E) 2" SS(E) 2" SS
(E) 4" SS
(E) 4" SS
(E) 8" SD
(E) 2" SS
(E) 2 1/2" SS
(E) 2" SS
(E
2" S
S
(E
2" S
S (E
2"
S S
(E) 2 1/2" SS
(E
2" S
S
(E) 2 1/2" SS
(E) 2" SS
(E) 8" SD
(E) 4" SS
(E
4" S
S
(E) 4" SS
(E) 4" SS
(E
4" S
S
(E) 4" SS
(E
3" S
S
(E
4" S
S
(E) 4" SS
(E
6" S
D
(E
3" S
S
(E) 4" SS
(E
3" S
S (E
3"
S S
(E
1/
2" S
S (E
2"
S S
(E
2" S
S
(E) 2" SS
(E) 2" SS
(E) 2" SS
(E) 4" SS
(E) 2" SS
(E
4" S
S
(E) 2" SS
(E) 2" SS
(E) 4" SS
(E) 2" SS
(E) 2" SS
(E) 4" SS
(E) 2" SS
(E) 2" SS
(E) 4" SS
(E) 4" SS(E) 4" SS
(E) 4" SS
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r i o n .V a n
T ru m p
II
I.
rv t
EXPAND - RENOVATE CLINICS
B80
TUCSON, AZ
FEBRUARY 15, 2022 WAW GTK
678-328
80-PL-102
FOUNDATION PIPING PLAN - AREA B
1/8" = 1' - 0" 0 8' 16'4'
GRAPHIC SCALE(S)
KEY PLAN
GENERAL NOTES
# KEY NOTES
A. COORDINATE PIPE ROUTING WITH DUCT ROUTING,
EQUIPMENT LOCATIONS, ELECTRICAL INSTALLATIONS, AND
BUILDING STRUCTURAL MEMBERS. OFFSET PIPING WHERE
REQUIRED TO AVOID CONFLICTS. AVOID PENETRATING ANY
MAIN STRUCTURAL BEAM. NOTIFY COR AND ARCHITECT OF
ANY CONFLICTS.
B. PROVIDE CLEANOUT(S) AS REQUIRED BY INTERNATIONAL
PLUMBING CODE, LOCAL CODE, AND/OR WHERE HORIZONTAL
SANITARY SEWER PIPING CHANGES DIRECTION OVER 45
DEGREES.
C. NEW 2" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF TWO PERCENT, ONE-QUARTER INCH PER FOOT.
NEW 3" AND 4" SANITARY SEWER PIPING SHALL BE SLOPED A
MINIMUM OF ONE PERCENT, ONE-EIGHTH INCH PER FOOT.
SCALE: 1/8" = 1'-0"
FOUNDATION PIPING PLAN - AREA B
1. 4"SS-UP.
2. 3"SD-UP.
3. 3"SD-UP TO CLEANOUT.
4. CONNECT NEW SANITARY SEWER PIPING TO EXISTING
SANITARY SEWER PIPING BELOW FLOOR AT THE
APPROXIMATE LOCATION INDICATED.
AREA
A
BLDG
AREA
B
PLAN
NORTH
TRUE
NORTH
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
MATCH LINE AMATCH LINE A
MATCH LINE BMATCH LINE B
4" OD
4" SD
4" O
D
6" SD
4" OD
4" S
D
6" O
D
CO
CO
YCO YCO
2" SS
2" S
S
4" S
S
2" SS
2" S
S 2"
S S
2" S
S
4" S
S
4" SS
2" S
S
CO
CO
CO
CO
4 4
4,595 SQFT
144 GPM
9.69.08.28.07.57.37.17.0
M
L.8
L
K.8
K
J.8
J.5
I
H.8
H.7
H.6
M.8
H.6A
4,706 SQFT
147 GPM
6" O
D
6" O
D
4" O
D
6" O
D
4" O
D
4" O
D
4" OD
4" SD
4" SD
CO
4" SS4" SS
CO
2" S
S
2" SS
CO
CO
2" S
S
CO
4" S
S
2" S
S
CO
2" S
S 2"
S S
2" S
S
4" SD
CO
4"
S S
4" S
S
(E
3" S
D (E
3"
O D
(E
3" O
D
(E) 3" SD
(E) 3" SD
(E
3" O
D
8 8
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
WCO
CLEAN SUPPLY
PATIENT
CIRCULATION
EXAM /
CONSULT
EXAM /
CONSULT
EXAM /
CONSULT
EXAM /
CONSULT
WOMEN'S
HEALTH
WOMEN'S
HEALTH TOILET
1325A
STAFF TOILET
EXAM /
CONSULT
EXAM /
CONSULT
CLEAN SUPPLY
UTILITY
ELECTRICAL
TELERETINAL
VOLUNTEERS
MECHANICAL
ELECTRICAL
ALCOVE
1301A
VESTIBULE
STAIR
PATIENT
CIRCULATION
CHECK-IN
ALCOVE
ELEVATOR
80-P3
ELEVATOR
80-P4
ELEVATOR
LOBBY
FAMILY TOILET
FAMILY TOILET
FAMILY TOILET
FAMILY TOILET
CONSULT
CONSULT
PACT TEAMLET
AREA A2
C O
R R
ID
O
R
PACT TEAMLET
AREA A1
C O
R R
ID
O
R
EXAM /
CONSULT
EXAM /
CONSULT
EXAM /
CONSULT
ELECTRICAL
PATIENT
TOILET
SHARED
MEDICAL
APPOINTMENT
STAFF BREAK
ROOM
PACT
WORKROOM
BREAKOUT
WORKROOM
PACT
WORKROOM
STAFF TOILET
PATIENT
TOILET
DATA ROOM
C O
R R
ID
O
R
YCO
YCO YCO
STRUCTURAL ENGINEER
INNOVATIVE ENGINEERING
3380 TRICKUM ROAD
SUITE 500
WOODSTOCK, GA 30188
770.517.5507
CIVIL ENGINEER
PSOMAS
333 E. WETMORE ROAD
SUITE 450
TUCSON, AZ 85705-5256
MEP ENGINEER
CLARK NEXSEN
440 MARTIN LUTHER KING JR BLVD
SUITE 101
MACON, GA 31201
478.743.8415
Drawing Number
Project Number
Date
OF
Project Title
Building Number
Location
Checked Drawn
APPROVED: CHIEF, FACILITIES MANAGEMENT
Drawing Title
Revisions Date o n e -e ig h th in ch o n e f o o t o n e -q u a rt e r in ch o n e f o o t th re e
-e ig h th s in ch o n e f o o t o n e -h a lf in ch o n e f o o t th re e -q u a rt e rs in ch o n e f o o t o n e in ch o n e f o o t o n e a n d o n e
-h a lf in ch e s o n e f o o t th re e in ch e s o n e f o o t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
B
A
C
D
E
FF
E
D
C
A
B
VA FORM 08-6231
Dwg.
ARCHITECT/ENGINEERS:
APPROVED: DIRECTOR
APPROVED: ASSOCIATE DIRECTOR
APPROVED: ASSISTANT DIRECTOR APPROVED: CHIEF OF STAFF
APPROVED: ASSOCIATE DIRECTOR PATIENT SERVICES
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CONSULTANTS:
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENTS
C
U s e rs \M a ri o n .V a n
T ru m p
II
I\ D o c u m e n ts
\8
T u c s o n E x p a n d a n d
R e n o C lin ic s P
M a r…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .